HomeMy WebLinkAboutSDP202000034 Plan - Submittal (First) Initial Site Plan 2020-04-06LEGEND
EXISTING
NEW
DESCRIPTION
BOUNDARIES
BENCHMARK
SITE PROPERTY LINE
ADJACENT PROPERTY LINE
BUILDING SETBACK
PARKING SETBACK
SITE TEXT
10
10
PARKING COUNT
TOPOGRAPHY
INDEX CONTOUR
INTERVAL CONTOUR
_150
SPOT ELEVATION
1
TOP OF CURB ELEVATION
Th
1Mr
TOP OF WALL ELEVATION
1 5 B `Jrl r,1
BOTTOM OF WALL ELEVATION
_ -
STREAM
STREAM BUFFER
100 YEAR FLOODPLAIN
BUILDING
BUILDING
RETAINING WALL
STAIRS
EDGE OF PAVEMENT
ROAD CENTERLINE
FRONT OF CURB
BACK OF CURB
o
CG-12 TRUNCATED DOME
SIDEWALK
BIKE PARKING
HANDICAP ACCESSIBLE AISLE
HANDICAP PARKING
MATERIAL
°
CONCRETE
F - -
RIPRAP
ASPHALT
EC-2 MATTING
EC-3 MATTING
WETLAND
TREELINE
X
X
FENCE
UTILITY
UTILITY POLE
m
GUY WIRE
oHu
OHu
OVERHEAD UTILITY
UGu
ucu
UNDERGROUND UTILITY
STORM
O
O
STORM MANHOLE
DROP INLET
STORM SEWER
�RD
ROOF DRAIN
SANITARY
O
O
SANITARY MANHOLE
SANITARY SEWER MAIN
S
S
SANITARY SEWER LATERAL
W
W
WATER LINE
®
O
WATER METER
0
WATER METER VAULT
FIRE HYDRANT
A
A
FIRE DEPARTMENT CONNECTION
GAS
GAS
GAs
GAS LINE
EASEMENTS
CONSTRUCTION
GRADING
ACCESS
SIGHT DISTANCE
UTILITY
STORMWATER FACILITY MAINTENANCE
STORMWATER ACCESS
DRAINAGE
SANITARY
WATERLINE
GASLINE
NOTE:
1. THE SIZE
OF THE SYMBOLS MAY
VARY FROM WHAT IS SHOWN.
OWNER/DEVELOPER
Post Office Land Trust; Charles WM Hurt & Shirley L Fisher Trustees
P.O. Box 8147
Charlottesville VA, 22906
PLAN PREPARATION
Shimp Engineering, P.C.
912 East High Street
Charlottesville, VA 22902
(434) 227-5140
ZONING
Planned Development Mixed Commercial
ZMA201700005 approved on January 15, 2020
MAGISTERIAL DISTRICT
Rio
SOURCE OF TITLE
DB 2904 PG 065
BUILD -TO LINES
Per approved ZMA201700005, residential build -to lines are provided as follows:
FRONT MINIMUM: 0' from edge of sidewalk
FRONT MAXIMUM: 20' from edge of sidewalk
SIDE: None
REAR: None
BUILDING HEIGHT
Per approved ZMA201700005:
Block II: 2-4 stories
Block III: 2-5 stories
Block VII: 2-4 stories
SOURCE OF BOUNDARY AND TOPOGRAPHY
Boundary & topographic survey provided by:
Meridian Planning Group, LLC, April 1, 2020.
Four (4) foot contours provided by:
Albemarle County GIS
BENCHMARK
Datum for topography is NAVD 88
FLOODZONE
According to FEMA Flood Insurance Rate Map, effective date February 4, 2005 (Community Panel 51003C0140D), this property
is not located within a Zone AE 100-year floodplain.
RESERVOIR WATERSHED
This site is within the Powell Creek Watershed.
This site is not within a watershed of a public water supply.
WATER & SANITARY SERVICES
Site is served by ACSA public water and sewer.
GENERAL CONSTRUCTION NOTES
1. Prior to any construction within any existing right-of-way, including connection to any existing road, a permit shall be obtained
from the Virginia Department of Transit (VDOT). This plan as drawn may not accurately reflect the requirements of the
permit.Where any discrepancies occur the requirements of the permit shall govern.
2. All materials and construction methods shall conform to the current specifications and standards of VDOT unless otherwise
noted.
3. Erosion and siltation control measures shall be provided in accordance with the approved erosion control plan and shall be
installed prior to any clearing, grading or other construction.
4. All slopes and disturbed areas are to be fertilized, seeded and mulched.
5. The maximum allowable slope is 2:1 (horizontal:vertical). Where reasonably obtainable, lesser slopes of 3:1 or better are to be
acheived.
6. Paved, rip -rap or stabilization amt lined ditch may be required when in the opinion of the County Engineer or designee it is
deemed necessary in order to stabilize a drainage channel.
7. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices.
8. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe - Class III.
9. All excavation for underground pipe installation must comply with OSHA Standards for the Construction Industry (29 CFR Part
1926).
GENERAL WATER & SEWER NOTES
1. Work shall be subject to inspection by Albemarle County Service Authority inspectors. The Contractor will be responsible for notifying the
proper service authority officials at the start of the work.
2. The location of existing utilities across the line of the proposed work are not necessarily shown on the plans and where shown, are only
approximately correct. The contractors shall on his own initiative locate all underground lines and structures as necessary.
3. All materials and construction shall comply with the current edition of the general water and sewer construction specifications as adopted by
the Albemarle County Service Authority.
4. Datum for all elevations shown in National Geodetic Survey.
5. The contractor shall be responsible for notifying "MISS UTILITY" (1-800-552-7001).
6. All water and sewer pipes shall have a minimum of 3.5 feet of cover measured from the top of pipe, over the centerline of pipe. This includes
all fire hydrant lines, service laterals and water lines, etc.
7. All water and sewer appurtenances are to be located outside of roadside ditches.
8. Valves on deadend lines shall be rodded to provided adequate restraint for the valve during a future extension of the line.
9. Trees are not permitted in the ACSA easement.
10. The contractor shall be responsible to comply with the no -lead regulation regarding brass fittings effective January 4, 2014 (Senate Bill 3874
which amends the Safe Drinking Water Act).
11. All public water and sewer facilities shall be dedicated to the Albemarle County Service Authority.
12. Backflow prevention is required for all connections to the water main.
STORMWATER MANAGEMENT NOTES
Per the approved ZMA201700005, regional stormwater facilities are provided. Regional stormwater basin in TMP 32B-A to
serve Block III (TMP 32-41 K1) and regional basin in Block I (TMP 32-41 D3) to serve Blocks II and VII (TMP 32-41J and
TMP 32-41 P).
ITE Trip Generation
AM
PM
Daily
Use Description
ITE
Qty
In
Out
Total
In
Out
Total
Total
Townhomes (Mid -Rise)
221
101
8
24
32
24
17
41
549
I
HTC AREA C
EXISTING USE
Vacant Land
PROPOSED USE
Single Family Dwelling
LAND USE SCHEDULE
Block II (TMP 32-41J)
EXISTING
Area
%
Building
0 SF
0%
Pavement
8,626 SF
5.0%
Sidewalk
1,121 SF
0.7%
Open Space
161,444 SF
94.3%
Total=
171,191 SF
(3.93 ac.)
PROPOSED
Area
%
Building
54,814 SF
32.0%
Pavement
42,197 SF
24.6%
Sidewalk
9,071 SF
5.3%
Open space
65,109 SF
38.1%
Total=
171,191 SF
(3.93 ac.)
Block III (TMP 32-41K1)
EXISTING
Area
Building 0 SF 0%
Pavement 3,380 SF 3.4%
Sidewalk 0 SF 0%
Open Space
94,630 SF
96.6%
Total=
PROPOSED
98,010 SF
Area
(2.25 ac.)
%
Building
Pavement
Sidewalk
9,900 SF
10,149 SF
1,408 SF
10.1 %
10.4%
1.4%
Open space
76,553 SF
78.1 %
Total=
98,010 SF
(2.25 ac.)
Block VII (TMP 32-41 P)
EXISTING Area %
Building
0 SF
0%
Pavement
3,723 SF
4.2%
Sidewalk
135 SF
0.2%
Open Space
84,133 SF
95.6%
Total=
87,991 SF
(2.02 ac.)
PROPOSED
Area
%
Building 31,862 SF 36.2%
Pavement 22,641 SF 25.7%
Sidewalk 7,677 SF 8.7%
Open space 25,811 SF 29.4%
Total= 87,991 SF (2.02 ac.)
PARKING SCHEDULE
Multi -family units: Two or more bedrooms, 2 spaces per unit, 101 units total
= 202 parking spaces required
89 units with 2-car garage
+ 12 units with 1-car garage, 1 additional parking space behind unit
= 202 parking spaces provided
Guest parking provided behind 2-car garages
LIGHTING
Lighting shall comply with Section 4.17 of the Albemarle County Zoning Ordinance.
LANDSCAPE
Landscape shall comply with Section 4.32.7.9 of the Albemarle County Zoning Ordinance.
RECREATION
Recreational area shall comply with conditions of approved ZMA20170005. Block II and Block VII shall provide amenity area
no less than 7% of the total block area.
Block ll: 0.28 AC or 11,984 SF required; 14,376 SF provided.
Block VII: 0.14 AC or 6,159 SF required; 7,816 SF provided.
SIGNS
All signs and pavement shall conform with the latest edition of the MUTCD Guidelines.
A sign permit must be issued in accordance with the Albemarle County Sign Regulations prior to placement of any signs on -site.
Contractor shall provide handicap signs as shown on plan.
GENERAL NOTES
1. The information and data shown or indicated with respect to the existing underground utilities at or contiguous to the site are
based on information and data furnished to the owner and engineer by the owners of such underground facilities or others.
The owner or engineer shall not be responsible for the accuracy or completeness of such information or data. The contractor
shall have full responsibility for confirming the accuracy of the data, for locating all underground utilities, for coordination of the
work with owners of such underground utilities during construction, for the safety and protection thereof and repairing any
damage thereto resulting from the work. All of these conditions shall be met at no additional cost to the owner. The contractor
shall contact "Miss Utilities" of Virginia at 1-800-552-7001 prior to the start of work.
2. When working adjacent to existing structures, poles, etc., the contractor shall use whatever methods that are necessary to
protect structures from damage. Replacement of damaged structures shall be at the contractor's expense.
3. The contractor shall be responsible for protecting all existing site structures from damage and coordinating work so that the
owner can make necessary arrangements to modify/protect existing structures from damages.
4. The contractor shall be responsible for notifying all utility owners, adjacent land owners whose property may be impacted and
the Virginia Department of Transportation prior to completing any off -site work.
5. Contractor shall notify and coordinate all work involving existing utilities with utility owners, at least 72 hours prior to the start
of construction.
6. Contractor shall immediately report any discrepancies between existing conditions and contract documents to the owner and
engineer.
7. Contractor shall submit for the approval of the owner submittals of all specified materials listed in the plans, to include shop
drawings, manufacturer's specifications and laboratory reports. the owner's approval of submittals will be general and will not
relieve the the contractor from the responsibility of adherence to the contract and for any error that may exist.
8. All bare areas shall be scarified, limed, fertilized, seeded and mulched.
9. All trees, saplings, brush, etc. shall be removed from within the right of way and the drainage easements.
10. Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated.
11. Retaining walls require separate building permits.
12. All water service lines, sanitary laterals, and sprinkler lines must be visually inspected by the Albemarle County Building
Department from the main to the structure.
NITIAL SITE DEVELOPMENT PLAN
TOWNHOMES
SDP NUMBER IMPENDING
TAX MAP 32, PARCEL 41 J, 41 K1 & 41 P
ALBEMARLE COUNTY, VIRGINIA
VICINITY MAPSCALE: T"=Soo
BERKMAR DRIVE
BLOCK VII
SITE
rtrw�„, r+.ic
BLOCK III
.. BLOCK II
Bonefish Grill 19
Sakura 9
mncn yv,cri,c,
SuMnor Sandwiches V
Partera Hread 10
Hollymead Town Center 7 ,ram
,�l Slafbul*t:
Domme's Pizza 19
Pel alarl P
Target 9
Hoky Memorial Gardens
a 9
Goggle
Alrporl (Road Aulo
Cenler Tire Pray
9
�4
Walgree
WNW lime,
Z4 Hest&tJf2nf
ROUTE 29
SEMINOLE TRAIL
The UPS Stare Q
Wells Fargo Bank'
BPIQ
80J,1JgeS i�amrjus
C h I r,Ae n `ri H l ;curl r;
IF
19 RiverSrde Narlh
TimberWnad Grill 9
19
Dairy Queen Grill & ChM
SHEET INDEX
C1 COVER
C2 ZMA201700005 APPROVED PROFFERS
C3 EXISTING CONDITIONS
C4 SITE PLAN: BLOCK II
C5 SITE PLAN: BLOCK III
C6 SITE PLAN: BLOCK VII
J
IMAGE PROVIDED BY GOOGLE MAPS
HIMP
ENGINEERIN 32
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
00
0� NLTH OF
O
v JUS HIMP a
c. o.45183
O
'S'SIONAL ��Cs
INITIAL SITE DEVELOPMENT PLAN
HTC AREA C
TOWNHOMES
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2020.04.06
REVISION:
FILE NO.
COVER
20.018
C1
shall be as required by VDOT design standards and detailed plans submitted by the Owner and
2. The Owners of Area C, as shown on the Application Plan (the "Owner") shall cause completion of the following
approved by VDOT.
Original Proffers
road improvements that shall be roads constructed to VDOT standards and either be accepted by VDOT or be
Amendment _X_
bonded for VDOT's acceptance as follows:
3. All road improvements listed in proffer 2 above shall be substantially completed prior to the
issuance of the first Certificate of Occupancy in Area C; notwithstanding the foregoing, the road proffers
A. Construction of Timberwood Boulevard, as depicted on the Application Plan and further described as
described in proffer 2 above shall be satisfied if the Owner has submitted plans for all such road improvements
PROFFER STATEMENT
follows: i) from the intersection at US Route 29 to a new terminus within Hollymead Town Center that is
for review by VDOT, and although such improvements are not fully completed by the issuance of a Certificate
shown at the extension of the VDOT future road improvement project of Airport Road, this will provide
to
of Occupancy for Area C, sufficient bond has been supplied to satisfy all costs to complete such improvements
ZMA Number and Name: ZMA2017-00005 Hollymead Town Center Area C Blocks II and VII
the connection to Airport Road from Route 29 as previously proffered as part of ZMA-94-08. The
in accordance with plans approved by VDOT. Substantially complete for the purposes these proffers shall
Tax Map and Parcel Number(s): 03200-00-00-041P0, 03200-00-00-041J0
constructed improvements shall include two Eastbound lanes in conjunction with the improvements
designed for TM 32 Parcels 41D1 and 41A to the first dual lane roundabout at access road B and
mean approved sub -base gravel, curb and gutter, intermediate surface and necessary storm water management
Westbound lanes of dual left lanes; one thru lane and one continuous right turn lane -from the roundabout
improvements and satisfactory completion of road improvements required for public safety, and signalization;
Owner(s) of Record: Post Office Land Trust
at access road B to the intersection with Route 29, from the roundabout at access road B a two lane
but shall not include final activated signals which are subject to testing and synchronization according to
section shall be constructed to the VDOT extension, with additional turn lanes at intersections located in
VDOT inspection. All proffers to make road improvements contained in proffer 2 of these proffers are
Date of Proffer Signature: I4L4 d r7— �j , Z02 O
Area C pursuant to road plans approved by the Virginia Department of Transportation ("VDOT") and the
conditioned upon VDOT's approval of an entrance permit at the Timberwood Boulevard intersection with
County as part of the Area C site plan.
Route 29 as shown on the Application Plan. The Owner shall submit to VDOT plans for such road
Rezone 2.02 acres (TMP 32-41P) from Planned Development Mixed Commercial to Planned Development Mixed
improvements within 30 days of the rezoning and shall diligently pursue such approvals from VDOT.
Commercial
B. Construction of dual left turn lanes at the intersection of Route 29 and Timberwood Boulevard, from
Rezone 3.93 acres (TMP 32-41J) from Planned Development Mixed Commercial to Planned Development Mixed
northbound Route 29 into Timberwood Boulevard. The turn lane and taper lengths will be
4. Upon request of the County, the Owner shall contribute $10,000.00 to the County or VDOT for the purposes of
Commercial
determined with final road plans to be reviewed and approved by VDOT.
funding a regional transportation study for the Route 29 Corridor. The $10,000.00 contribution shall be made
C. Signalization at Timberwood Boulevard and Route 29 shall include reconstruction at the Forest Lakes
within 30 days after requested by the County after the first final site plan or subdivision plat is approved in
Area C and, if not expended for such purposes within three years from the date the funds were contributed such
Post Office Land Trust is the owner (the "Owner") of Tax Map and Parcels 03200-00-00-041PO and 03200-00-00-041JO
Subdivision entrance location, as scheduled in coordination with VDOT. All turn movements shall be
funds shall be refunded to the Owner.
(collectively, the "Property") which is the subject of rezoning application ZMA No. ZMA2017-00005, a project known as
signaled at the intersection of Route 29 and Timberwood Boulevard, as approved by VDOT. The
"Hollymead Town Center Area C Blocks II and VII" (the "Project").
existing intersection exiting Forest Lakes shall be reconstructed to maintain the dual left lanes, the
5. The Owner shall contribute $200,000.00 (the "total contribution") to the County for the purpose of funding
Pursuant to Section 33.3 of the Albemarle County Zoning Ordinance, the Owner hereby voluntarily proffers the
continuous right turn lane and add a through lane according to the final design in the previous
capital improvements related to the Hollymead Town Center. The contribution shall be paid as follows:
conditions listed below which shall be applied to the Property if it is rezoned to the zoning district identified above. These
paragraph.
$100,000.00 shall be contributed to the County within 30 days after the first final site plan or subdivision plat
conditions are proffered as a part of the requested rezoning and the Owner acknowledges that the conditions are
containing dwelling units is approved in Area C; the remainder of the contribution shall be paid on a pro rata
reasonable. Each signatory below signing on behalf of the Owner covenants and warrants that it is an authorized
D. The Owner proffers to dedicate land and construct a third through lane on Route 29 (consisting of lane
basis at the time a certificate of occupancy is issued for each dwelling unit; the pro rata contribution shall be
signatory of the Owner for this proffer statement. This proffer statement amends the proffers applicable to the Project that
width, shoulder and drainage improvements) southbound from the entrance road, (Timberwood
based upon the number of dwelling units approved as part of the first final site plan or subdivision plat. If five
were accepted in conjunction with ZMA2001-00020, Hollymead Town Center Area C.
Boulevard) at the Property's Northern boundary. The Owner also shall dedicate land or cause to be
years after the date of approval of the first final site plan or subdivision plat the total contribution has not been
dedicated and construct: i) a continuous through lane 500-feet to the Southern boundary of Area C, ii)
fully paid, the Owner shall contribute the unpaid balance within 30 days upon the request of the County. If the
These conditions are proffered as part of the requested zoning and it is agreed that: 1) the rezoning itself gives rise to the
a taper lane consisting of a 200 foot taper beginning at the Southern boundary and Route 29 (in the
fund is not exhausted within 10 years from the date the last contribution is made, such unexpended funds shall
need for the conditions; and 2) such conditions have a reasonable relation to the rezoning request:
event area B is not rezoned and their proffers accepted), and iii) a continuous right turn lane starring at
be refunded to the Owner.
the right -in at the Northern boundary of TM 32 Parcel 41A to the right -in at the Southern entrance of
1. Development shall be in general accord with the Application Plan entitled Rezoning Application Plans for
Area C.
6. Upon the request of the County, for any parcel used for non-residential purposes in the portion that is currently
Hollymead Town Center Regional Service Area C, (Sheets A-1, A-2, only), prepared by Rivanna Engineering &
zoned Light Industry that will be rezoned to PDMC the Owner shall petition for and consent to a Community
Surveying, PLC, revised, last revised July 7, 2003 with plan revisions to Sheet A-2 prepared by Shimp
E. Construction of one additional continuous right turn Northbound lane starting 1090 feet south of
Development Authority ("CDA") established pursuant to Section 15.2-5152, et seq. of the Code of Virginia
Engineering, P.C. dated December 18, 2019 (collectively, the "Application Plan"). The standards of development
Timberwood Boulevard at the location of the beginning of the turn and taper of Worth Crossing and
("Code") to be created for the purpose of financing, funding, planning, establishing, constructing,
and central features and major elements within the Property essential to the design of the development shall be in
Route 29, and terminating at Timberwood Boulevard.
reconstructing, enlarging, extending or maintaining Route 29 and roads and other improvements associated
general accord with the Block Exhibit, the Code of Development's Narrative, and the Code of Development's
therewith, which shall include, but may not be limited to improvements to Route 29 from the South Fork of the
tables and appendices set forth in the attached Application Booklet, entitled "Revised Application Booklet for
F. Access Road C, between Area A and its intersection with Timberwood will be built or bonded before
Rivanna River to Airport Road, the extension of Ridge Road as depicted on the Master Plan, to the South and
Code of Development ZMA201700005: A Revision to ZMA 201300004 Originally Revised from ZMA 01-20-
the issuance of the first certificate of occupancy within Area B. If bonded, the road will be constructed
across the Rivanna River to connect to Berkmar Drive.
2001 (Area C) `At Hollymead Town Center"' dated June 19, 2017 and last revised December 18, 2019. The
for acceptance by VDOT within one year of the first certificate of occupancy.
Owners have presented, as part of their rezoning application, a number of conceptual plans and illustrations for
various purposes, but principally to provide justification for the rezoning actions they are seeking. Unless
The road improvements listed in proffer 2A, 2B, 2C, 2D, 2E and 2F above shall be constructed, in
specifically referenced in these proffers, all plans and illustrations submitted as part of the Applicant's rezoning
accordance with road plans submitted by the Owner and approved by VDOT. All of the foregoing
application, other than the Application Plan as defined above, shall be deemed illustrative only, and such plans
improvements shall be i) constructed to VDOT design standards pursuant to detailed plans agreed to
and illustrations shall not be deemed proffers. The Owners reserve the right to reconfigure the internal block
between the Applicant and VDOT, and ii) accepted by VDOT for public use or bonded for VDOT's
improvements, consisting of buildings, parking and drive aisles and drive -through window features and as shown
acceptance as a condition for issuance of any certificate of occupancy for Area C improvements
on the Application Plan in order to: i) comply with conditions imposed by Special Use Permits, and ii) assure
(except as otherwise provided in proffer 217). The width, length, location, (inside median or outside
compliance with ARB requirements and iii) and provide all necessary storm water management and BMP s as
existing pavement), type of section (e.g., urban vs. rural), and geometries of all lane improvements
necessary.
1
2
3
OWNER:
Post Office Land Trust /
'J �7 ✓
By: Dr. Charles Hurt
Title: Trustee, Post Office Land Trust
OWNER:
Post Office Land Trust
By: Shirley isher'
Title: Trustee, Post Office Land Trust
4
The undersigned Owner hereby proffers that the use and development of the Property shall be in conformance with the
proffers and conditions herein above. This document shall supersede all other agreements, proffers or conditions that may
be found to be in conflict. The Owner agrees that all proffers shall be binding to the property, which means the proffers
shall be transferred to all future property successors of the land.
WITNESS the following signatures:
OWNER:
Post Office Land Trust
I
By: Dr. Charles Hurt
Title: Trustee, Post Office Land Trust
OWNER:
Post Office Land Trust
A, zzw, L Z ��&
By: irley F' her
Title: Trustee, Post Office Land Trust
COMMONWEALTH OF VIRGINIA
e1W/COUNTY OFyWQAMCA, , to wit:
The foregoing instrument was acknowledged before me this day of 2020 by Post Office Land
Trust.
My Commission expires: MQ,t� 31 . ZD ZI C-4-1
Notary Public
GAIL BREEDEN WATKINS
NOTARY PUBLIC
REG. #101082
COMMONWEALTH OF VIRGINIA
MY COMMISGION EXPIRES MAY 31, 2021
HIM
ENGINEERING
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434,227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
NLTH O,,
O L
o J�
v JUSHIMP
Nac. o.45183
w
SSIONAL IC,
INITIAL SITE DEVELOPMENT PLAN
HTC AREA C
TOWNHOMES
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2020.04.06
REVISION:
FILE NO.
20.018
ZMA201700005 APPROVED
PROFFERS
C2
v -
_-
"_,
/ _ -w -w -w -w -w
-w -w -w -w -w 1-w -w -w -w -w -w
_
-w -w -w w -w -w -w -w w -w
// I ()r.K\N(lnn RnAD
/
/
/
/
/
/
/
/
/
/
/
/
/
,
/
/
/
/
/
/
/
/
/
I
/
/
/
/
/
-------------------------------------------
'
\-
----------
-
'
-----
------------
_
--------
- - - - __------ _------- _ _ - _ - - - - - - - - - - - - - -
------- sir ------------------ --i - - - - �?E-
- - - -
TMP 32 4E MEAD UUG \
' N0� I
NEW M ARKZoNED . MERGI P \I
' cDM
USE 12 93 AG
/ � I
\
B 0 UNDAR Y CURVE TABLE
Curve
Length
Radius
Delta
Tangent
Chord
Chord Bearing
C1
163.32'
177.50'
52'43'01"
87.95'
157.62'
N 83°25'07" E
C2
111.96'
100.00'
64°09'03"
62.67'
106.21'
S 33'02'21" E
C3
18.17'
91.50'
11 °22'35"
9.11'
18.14'
S 18*38'56" W
C4
53.53'
180.00'
17*02'16"
26.96'
53.33'
S 32°51'21" W
C5
32.85'
180.00'
10*27'21
16.47'
32.80'
S 46*36'10" W
C6
72.62'
833.50'
4'59'31
36.33'
72.60'
N 31'05'51" E
C7
41.97'
84.50'
28°27'31"
21.43'
41.54'
N 42°49'51" E
C8
84.22'
245.00'
19°41'47"
42.53'
83,81'
S 34*17'44" W
C9
56.71'
100.00'
32°29'33"
29.14'
55.95'
N 57°43'26" W
C10
137.46'
300.00'
26*15'10"
69.96'
136.26'
N 60°50'08" W
C11
4.52'
969.50'
0*16'01"
2.26'
4.52'
N 42'09'26" E
�--w�
�w
�w \�w
�w
\w
�w
�w
\w
�w
\ �w
\w
Dg 3�Po ei
/ --'%
of
1
`v vI II V `v -------------------
---'-so_,
--1 i
I I 1 1 1 0 SDMH \ \
1 i BERKMAR RIVE
I
OTAIE ROUTE 1405 v
(VARIABLE WIDTivI RAN) `v I
/- ------ I DB 3265 PGv 6� v
� \ 1
vv
C1
' W 20 EASY \
F
3265
/ I
355P�556\\ y \\ \\ \\ POSES
PpSMG
G a
\ \
\ \
`v -600 `v
'--
Y v 1MP YMEAE, C�
ZONEID PO �U5
V / AGCESS EG 68
3265 P v v v vv v �I vv
VL
-
7 \ ` --- - - �- - ---- 20'SANITARI -------
��--- -S� R-EASEMENT v --
ti ---- --- DB 3265 PG /
\-`--------ti----=--- I _T_ \
vv v vv / �ENPS�
A MEA156Dg
PGEvv 5 ?5�-'- -_---- --- ,-�---'----
65ND p83G`b'g4 - zs_-------49 ' I v
vv
-
' d'
/ pG
-Y---�� ` - pg3515 G556 ---- -
pg35�5P �V vv
I I
ER
-
2 EM6 2
i'- I-----------------
PSEM I \\\ \ I I x--------
�
V v _� vv 05c5 1D 29 / vv III
0 9 i
\V � � ZUG�•�rtiPE // // vv vv I I II
CS
�- s41s2'aow ------
(PRIVATE RIGHT -OE -WAY) SH22$0'w ---- _� --- -4
SS SE EN ♦ / A `v i I //
EPSEMEN 2 120' 0A61 Jg�405 --- 20 D 2g1 I 40' ACB 2g16 22 ------ -
5, P�CEspg 2g�6,2 Mr 1 pg \ \ D \
------- ---
SE ----'
C \ v
�,410 /
\ TMP ��E _
---- --__-------
----- v III
N�I��EE------__ --- -- �I
�
_ --I- ---'----- /� � vI � ----- ZON�;F��T91U-
' I 1 92
---- - -
I
---------- ----
III --------------------- 50 0 50 100 150
----- --- __-- Scaler 1"=50'
HIM
ENGINEERINGa
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
V, NLTH 0A
O �
v JUS HIMP >
c, o.45183
w
SIONAL ', Cz
INITIAL SITE DEVELOPMENT PLAN
HTC AREA C
TOWNHOMES
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2020.04.06
REVISION:
FILE NO.
20.018
EXISTING CONDITIONS
C3
i
KM�R D���IE
PG 6P
Dg 3265
F,HE A�
A \s
Oct
— — — — — —
< 4
a
a .
° \ �S
Vol
J �
\�
8' PED SIRLAN WAL Y \ \ ` \ o4.
ao
8
a
41
DM i i
1Z—
� l
/ \t5E
L-
DR A\� AGE
MEP 49
�
I �
DR
AWN AGE
SEMEN
EA 5 p G 5560g
Dg 3516 p G 494
/
HIMP
ENGINEERINGa
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
e-�p,LTH OA
O
v JUS HIMP >
Io. g445183
w
sSIONAL
INITIAL SITE DEVELOPMENT PLAN
HTC AREA C
TOWNHOMES
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2020.04.06
REVISION:
NA SDMN FILE NO.
MEND DER EA ASEgEN�
N� �g,� EASE ZG g16,2 GcESs E � � 20.018
SS � PSEME 22 � ZG Dg g6� 8 405 p 2 � 4G A Dg 2g16 22 \ \
g, PccE 08 2916 MEND I SITE PLAN: BLOCK II
cEss � PSE I
0'
3 _ 425
g
08 267 I 4�06 30 0 30 60 90
r ���� Scaler 1 "=30'C4_
KM�R D���IE
PG 6P
Dg 3265
F,HE A�
A \s
Oct
— — — — — —
< 4
a
a .
° \ �S
Vol
J �
\�
8' PED SIRLAN WAL Y \ \ ` \ o4.
ao
8
a
41
DM i i
1Z—
� l
/ \t5E
L-
DR A\� AGE
MEP 49
�
I �
DR
AWN AGE
SEMEN
EA 5 p G 5560g
Dg 3516 p G 494
/
HIMP
ENGINEERINGa
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
e-�p,LTH OA
O
v JUS HIMP >
Io. g445183
w
sSIONAL
INITIAL SITE DEVELOPMENT PLAN
HTC AREA C
TOWNHOMES
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2020.04.06
REVISION:
NA SDMN FILE NO.
MEND DER EA ASEgEN�
N� �g,� EASE ZG g16,2 GcESs E � � 20.018
SS � PSEME 22 � ZG Dg g6� 8 405 p 2 � 4G A Dg 2g16 22 \ \
g, PccE 08 2916 MEND I SITE PLAN: BLOCK II
cEss � PSE I
0'
3 _ 425
g
08 267 I 4�06 30 0 30 60 90
r ���� Scaler 1 "=30'C4_
I 1 I
1
1
1 I
I \ I
1
1 I I I I I
i
� I /
i
/
/
/. ............... .......... ...................
EXISTING WATERLINE
--7L / —W —W _W —N
N —W —W—WI--W%% W —W —W —W —W
—W W —W — N' —VJ it W —W
—W TW —;W —W —� —W —T
—W —W —W —W —W —W —W —W I s
—
W—W —W I I� II /� LOCKWOOD ROAD
I
68 PUBLIC R/W
/
i
—
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
I
I
I
I
I
I
1
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
YV __ W
---- w
w
___ w
___ w
O CO Co
CD r-- FT�
Fq
CA NJ_� O�
Cl) O O
0n — O
2
O
O C O
O �
U
G 6g
P
32°3 Ro ��0Pg°� 06
AHEPD /_
" *' - �_ V�
HIM
ENGINEERINGa
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
ALTH O/,
o
v JUS*o445183
HIMP >
�
w
sSIONAL
INITIAL SITE DEVELOPMENT PLAN
HTC AREA C
1001
TOWNHOMES
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2020.04.06
REVISION:
FILE NO.
SITE PLAN: BLOCK III
20.018
0 1 _ WIp1H
_ T _ N 2
cn �J' — N V P1E P ' a
Q <' X9 pRl p° 30 0 30 60 90
°SDI-3 FHA
Ln o �\ Scaler 1 "=30' 4000,
D
/ I
D
BERKMAR DR VE
STATE ROUTE 1403
Cn (VARIABLE WIDTH R/W)
DB 326'PG 68
s°H \
C11 GPS 10,
4IIN° / SIDEWALK
— d ° d ° d ° ° ° d e °
� ° ° ° ° a °
- _ 20' °
- - - - - - - ---- ----- -- --7-7e��- -- --- r---_ ------ ------------- -- -- -- 18 / d °
4 � '
41.2 �C'N / P� �� — — 6
_ / _ _ _ , _
I ( LOT 1 07 LOT 3 —LOT 4 LO-T 5 LOT 6 _ =� LOT 7, SLOT 8 LOT LOT-1-O—
LOT 11 LOT -1-2`
F I 1 RECREATION AREA: —
�b 2178 SF
d —
Ia( L+ I I Y W T I lW---W-,i
—I—P� __d-f—�--— — -- -- ---- /TS+V DI-3B I Mom/ I i 28 DI-3B cn / c� � �-o ° °4�t� e (n in d�/FHA
�—W— WW W W—W U' W— W—WSW W—W—Ws)—W�ESV—W VV -W -s"'wL W—WSW—W W/--cW—W W—W— —W W W— �W—W W—W—W— WP�IVATE R AD A: 0 WI TH I I I I I \ '{
---------- — I
\ / °
cn I d
\ cn —
Cn
— — — — — ��— -- ! -- ---I—
RECREATI AREA: I
149 S\
W15 °
° 2 v— e LOT- 22 OT 1 ALOT y20 A L`OT LOT h — RECREATION AREA /
\ 18 Cn
4148 SF LOT 17 LOT 16 6. &-- L9-15/ � T �4 LOT 13 °
V r NHIM
S I-3B \ ��/\\ \ \ �� \ V A\ \— — - /� / \�� ° m
\ \ \ \ \ - \\ \ — — — 1 8 ° a LAND PLANNING - PROJECT MANAGEMENT
-D --
--�� --- IL-------J
02 \ \ \ \ \ \ 8 — ---- 7- ` d 912 E. HIGH ST. 434.227.5140
( ° \ d \ ° ° \a\ \ — PEWALKWAY 0-
-DI-7 / /° ° ° ° CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
d ° \ e \ ° e
ICI^`1\[xo 9 I d ° ° /" d ° d °
8
°d d ° ° �� 14 \
° \ d
LLJ__—__------- _
05
/
A 3 \ �- ------------ , N T O
L H
\ d 7� O `
--610— ° v JLTS HIMP >
G-(s° 8 \ LOT 23 �OT 24 �T 25� L0 -2 —L9 28— LOT 29 L C. o.45183
G -OT 26 _ — — — — 3 31 LOT 32 LOT 33
e�
70
° ° SIONAL
°
Q C-
\z � 12
��` I V I I O I�
�� _ T
2 \ �n
\/ (1 ° Ln
° d d \ ° d ° ° e ° N ° d INITIAL SITE DEVELOPMENT PLAN
35 P °
HTC AREA C
\ do
_ - _ �� - N TOWNHOMES
\ \ e" wL \ — �— — — — FHA \ N/\ —W—W— S \W —WSW W —W—W W� W— —W—W— WW— —W—= WSW W—WW—W— d
� \ � _ — d_ � N ALBEMARLE COUNTY, VIRGINIA
5 PG 5 ( \ �g HOPE SUBMISSION:
�g 35 t° 4 \ , NEW INLET _\ \ S44°�8'49"W 209.18' — _ —
5� 6 P NECTS TO EXISTING SANITARY SEWER \ \' \ ` \ 1 \ \ — _ _ — _ _ _ 2020.04.06
REVISION:
kxx
zzx
— — � � \ � \ � FILE N0.
z i ��
�80� ,� _ � � — — 20.018
R SITE PLAN: BLOCK VII
20 0 20 40 60
Scaler 1 "=20' C6