Loading...
HomeMy WebLinkAboutWPO201500044 Bond Release 2020-04-06COUNTY OF ALBEMARi.F Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECT NAME: _ F�M #—b"D'' PLAN/PERMIT NO.: ZD/S- DATE: / zD Ali This project has been satisfactorily completed and the erosion control performance bond may be released at this time if all re -inspection and annual maintenance fees invoiced have been paid. -z�� Erosion Control Inspector DEQ Termination Date _ or<&� Communitv Development Department All fees invoiced on the above project have been collect Director of Community Development C "^Enginee Date Cc: Ana Kilmer Revised:07/03/2028 • COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 MITIGATION PERFORMANCE BOND RELEASE PROJECT NAME:_! WA -al FF'r'I /7` —(90 0 PLAN/PERMIT No.: _ZO/;_ —04?yy DATE: 6 ZOLa This project has been satisfactorily completed and the stormwater/mitigation performance bond may be released at this time if all re -inspection and annual maintenance fees 'nvoiced have been paid. C Erosion Control Inspector Date As -built plan was approved by Engineering Division: DEQ Termination Date �'" or N/ Community Development Department orsm All fees invoiced on the above project have been collected �j Q Director of Community Development / unty Engineer 'y /t /V,) Date Cc: Ana Kilmer Revised:07/03/2018 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone 434) 296-5832 Fax (434) 972-4126 STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE PROJECT NAME: IA WOnM 1y;--M PLAN/PERMIT No.: DATE: of &. Z zd This project has been satisfactorily completed and the stormwater management performance bond may be released at this time if all re -inspection and annual maintenance fees invoiced have been paid. Date As -built plan was approved by Engineering Division: DEQ Termination Date " or IY/ Engineering Reviewer Community Development Department All fees invoiced on the above project have been co or6/10 Director of Cominunity Development/ untyEng'rnf Date Cc: Ana Kilmer Revised: 07/03/2018