HomeMy WebLinkAboutWPO201900042-Full Inspection ReportCOUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
434 296-5832
WRITTEN WARNING
Hand delivered
Project: WP0201900042
Spring Hill Village - VSMP
Operator/Contractor: Goodman Excavation
SPRING HILL LAND DEVELOPMENT LLC
Issued Date:
This is your Written Warning in accordance with § 17-900 of the Water Protection Ordinance of
Albemarle County and Section 62.1-44.15:37 of the Virginia Stormwater Management Act.
This Written Warning is being issued because of the following deficiencies:
Deficiency: Offsite water is not contained, diversion not installed to SB 1
Corrective Action: Direct offsite water away from site. Was there a plan ever presented to the County
and were easements ever obtained?
Deficiency: Stabilizing needed
Corrective Action: Seed and mulch as needed
Deficiency: Seed needs to mature more
Corrective Action:
Deficiency: Missing diversion
Corrective Action: Install diversion as shown on approved plan to capture and direct SW as designed
Deficiency: Diversions not stabilized with vegetation
Corrective Action: Stablize to prevent erosion as per the minimum standards
Deficiency: No stabilizing of the areas
Corrective Action: Stabilize denuded areas as required per the minimum standards set by the program
Deficiency: Failure at one along Rt.20
Corrective Action: Repair and maintain or install additional controls to prevent loss
Deficiency: Need stabilizing
Corrective Action:
Deficiency: Failures of current controls leading to sediment laden runoff leaving the project
Corrective Action: Repair or replace with additional controls.
Unless subsequently amended in writing by this office, it is expected all corrective
measures will be completed by
Failure to comply by the required date may subject the owner to penalties and remedies as listed
under § 17-900 et -al of the Water Protection Ordinance of the Albemarle County Code.
Should you have a legitimate reason you cannot complete your required corrections by the
above given date, you must immediately contact your erosion control inspector. Unless you
have contacted the inspector and agreed to alternative arrangements, all compliance work is
expected to be completed by the above date.
County Inspector Name: Geoff Elsie
County Inspector Phone Number: (434) 296-5832
County Inspector Signature:
Receipt Signature:
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP/VESCP PERMIT SITE INSPECTION REPORT
Project Name:
Spring Hill Village - VSMP
Project/WPO Number:
WP0201900042
Project Address:
DEQ Permit Number (if
applicable):
VARlON324
Project Operator:
Goodman Excavation
Operator Telephone #:
(540) 872-5105
Project Contact:
LLC SPRING HILL LAND DEVELOPMENT
Contact Telephone #:
Contact E-Mail:
kesslerja@stanleymartin.com
Qualified Personnel (QP):
Inspector:
Geoff Elsie
Weather (Wet/Dry/Rain):
Rain
Disturbed Acreage:
15.32
Inspection Date & Time:
4/13/2020 11:00:00 AM
Single -Family:
Stage of Construction: Grading
Re -Inspection: NocoveragesAvail
COVERAGE & POSTING REQUIREMENTS
Compliant?
Reviewed during re -inspection? Yes
Comments/Description
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
Yes
1
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
Yes
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
Yes
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Compliant?
Reviewed during re -inspection? Yes
Comments/Description
4
The SWPPP is on -site or made available during the inspection? (CGP
Yes
Part II D.1 & 2)(9VAC25-870-54.G)
The SWPPP contains a signed copy of the registration statement?
Yes
5
(CGP Part II A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
Yes
letter and the CGP? (CGP Part II A.1.b & c)
The SWPPP includes a narrative description of the nature of the
Yes
7
construction activity, including the function of the project? (CGP Part II
A.1 A)
The SWPPP includes a legible site plan identifying all appropriate
Yes
8
measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
Page 1 of 4
9
The SWPPP contains the name, phone number and qualifications of
Yes
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
10
The SWPPP contains an approved erosion and sediment control plan?
Yes
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11
existing construction site has a stormwater management plan that
Yes
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ II.0 ❑
12
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
Yes
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
Yes
13
concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
14
Delegation of Authority is provided and signed in accordance with Part III
Yes
K? (CGP Part 11 A.7)
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
Yes
11 A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
Compliant?
Reviewed during inspection? No
Comments/Description
Is the SWPPP being amended whenever there is a change in the design,
16
construction, operation, or maintenance that has a significant effect on the
discharge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870-
54.G)
Has the SWPPP been amended if inspections or investigations by the
17
operator's qualified personnel, or by local, state or federal officials find that
existing control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
18
Contractor(s) that will implement and maintain each control measure are
identified? (CGP Part 11 B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19
grading activities occur, construction activities temporarily or permanently
cease on a portion of the site or stabilization measures are initiated? (CGP
Part 11 B.4(a))(9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part 11 B.4(b))(9VAC25-870-54.G)
21
Is the SWPPP updated to indicate areas that have reached final
stabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22
legal control of the operator and the dates on which the operator no longer
had legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
54.G)
Does the SWPPP identify the date of any prohibited discharges, the
23
volume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part 11 B.4(e-f)) (9VAC25-870-54.G)
24
mendments, modifications, or updates to the SWPPP are signed in
accordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS
Compliant?
Reviewed during inspection? No
Comments/Description
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26
Inspection reports are completed and signed in accordance with CGP
Part 11 F (3-4)? (CGP Part 11 F (3-4))
Page 2 of 4
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? Yes
Comments/Description
28
Have stream buffers and steep slopes been protected as shown on the
N/A
plan?
Sequencing of the project is implemented in accordance with the
Offsite water is not contained, diversion not installed
29
approved erosion and sediment control plan and stormwater management
NO
o SB1
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
Stabilizing needed
been stabilized, and have stabilization requirements for impaired waters,
30
approved TMDL(s), pollutants of concern and exceptional waters, when
No
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25-
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
Yes
Seed needs to mature more
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
N/A
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
No
Missing diversion
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part 11 A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
No
Diversions not stabilized with vegetation
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.6)
Are sediment traps and basins installed in accordance with MS-6 and the
yes
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
No
No stabilizing of the areas
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
N/A
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
yes
38
(9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
No
Failure at one along Rt.20
39
(9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are stormwater conveyance channels adequately stabilized with channel
No
Need stabilizing
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
N/A
41
damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are temporary stream crossings of non -erodible material installed where
N/A
42
applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
43
Is necessary restabilization of in -stream construction complete? (9VAC
N/A
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
Are utility trench operations conducted and stabilized in accordance with
N/A
44
MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are soil and mud kept off paved or public roads to minimize the transport
yes
45
of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
46
Have all temporary control structures that are no longer needed been
N/A
removed and disturbed soil resulting from their removal permanently
Page 3 of 4
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are properties and waterways downstream from development adequately
Failures of current controls leading to sediment laden
47
protected from erosion, sediment and damage in accordance with the
No
runoff leaving the project
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
40.19(a-n))
48
Permanent control measures included in the SWPPP are in place?
N/A
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? No
Comments/Description
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part II
A.4.e(2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51
detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part II A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54
storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56
pollutant -generating activities not addressed above, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Inspector Signature:
Date:
Page 4 of 4
Construction General Permit Site Inspection Report
Request for Correction Action
Check
Regulatory
Occur.
Observation
Recommended Corrective
List #
Citation/Legal
Action
Requirement*
29
(9VAC25-870-54.B and
Offsite water is not contained,
Direct offsite water away from
C)
diversion not installed to SB1
site. Was there a plan ever
presented to the County and
were easements ever
obtained?
30
(9VAC 25-840-40.1)
Stabilizing needed
Seed and mulch as needed
(9VAC25-870-54. B)
(9VAC25-880-60) (CGP
Part I F.1(a)) (CGP Part
II A.5.b(1)) (CGP Part 11
A.2.c (8)) (CGP 11 E(1-2))
31
(9VAC 25-840-40.2)
Seed needs to mature more
(CGP Part 11 A.2(c))
(9VAC25-870-54. B)
33
(9VAC 25-840-40.4)
Missing diversion
Install diversion as shown on
(CGP Part 11 A.2(c))
approved plan to capture and
(CGP 11 E(1-2))
direct SW as designed
(9VAC25-870-54. B)
34
(9VAC 25-840-40.5)
Diversions not stabilized with
Stablize to prevent erosion as
(CGP Part II A.2(c))
vegetation
per the minimum standards
(CGP 11 E(1-2))
(9VAC25-870-54. B)
36
(9VAC 25-840-40.7)
No stabilizing of the areas
Stabilize denuded areas as
(CGP Part II A.2(c))
required per the minimum
(CGP 11 E(1-2))
standards set by the program
(9VAC25-870-54. B)
39
(9VAC 25-840-40.10)
Failure at one along Rt.20
Repair and maintain or install
(CGP Part 11 A.2(c))
additional controls to prevent
(CGP II E(1-2))
loss
(9VAC25-870-54. B)
40
(9VAC 25-840-40.11)
Need stabilizing
(CGP Part II A.2(c))
(CGP II E(1-2))
(9VAC25-870-54. B)
47
(9VAC 25-840-40.19(a-
Failures of current controls
Repair or replace with
n))
leading to sediment laden
additional controls.
runoff leaving the project
Recommended 4/20/2020
Corrective Action
Deadline:
Targeted Re- 4/20/2020
Inspection Date:
Comments:
*Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1- 4.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stormvater Management Program (VSMP) Regulations(9VAC25-870), or the General Permit for
Discharges of Stormvater from Constructi on Activities (9VAC25-880).
Construction General Permit Site Inspection Photo Log
Photos for Item 29
Image_637223909908348200.jpg 1005.14KB
Photo Description: Offsite runoff damaged diversion and entering site
Photos for Item 36
Image_637223909021980720.jpg 1.04MB
Photo Description: Non stabilized areas
Photos for Item 39
Image_637223907896693080.jpg 1.25MB
Photo Description:
Photos for Item 47
Image_637223907121586050.jpg 1.13MB
Photo Description: Sediment leaving site
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
434 296-5832
Inspection Date: 4/13/2020
County Inspector