Loading...
HomeMy WebLinkAboutSDP201600054 Review Comments Major Amendment, Final Site Plan 2016-09-23Short Review Comments Report for: SDP201600054 ]— Happy Boxes - Major SubApplication Type: ImajorAmendment Date Completed: 11-09-2016 Reviewer: Johnathan Newberry Division: CDD Planning Review Status: Requested Changes Reviews Comments: Date Completed: 11-03-2016 Reviewer: Matthew Wentland Review Status: Reviews Comments: Date Completed Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Requested Changes Division: CDD Engineering 1. A VSMP plan will need to be submitted and approved before the amendment can be approved. 2. Include the storm sewer profiles, drainage summary table, and calculations with the plan. 3. Provide an easement around the SWM facility and an access easement to the facility. 4. Slopes steeper than 3:1 must be permanently stabilized with landscaping vegetation hardier than grass, which will not require mowing. Please show on the plans and specify the vegetation to be used. [Design Standards Manual] 5. Provide a pavement design detail on the plans. 6. Provide a detail for the retaining wall. 10-04-2016 Jay Schlothauer Division: CDD Inspections No Objection Based on plans dated September 26, 2016. Vo comments or conditions. 10-12-2016 Derek Bedarf No Objection 11-10-2016 Robbie Gilmer Requested Changes Division: CDD E911 Division: Fire Rescue Based on plans 09/26/2016 Comment #1- Fire flow test required before final approval. Comment #2- Show FDC location on site plan. Location shall be on Address side of the structure within 100 feet of a fire hydrant. Comment #3- Please add note, Knox Box required. Please contact Albemarle County Fire Rescue for location. Date Completed: 11-07-2016 Reviewer: Margaret Maliszewski Division: CDD ARB Review Status: Requested Changes Reviews Comments: The ARB offers the following comments on the preliminary proposal: At its meeting on November 7, 2016, the ARB provided the following comments on the preliminary proposal: 1. Provide street -level views of the full building from both directions on the EC. 2. Revise the loading entrance to coordinate more fully with the main entrance and corner window. 3. Consider revisions to the locations where the brick color changes to coordinate more fully with the Page: 1 of 4 County of Albemarle Printed On: April 15, 2020 Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: corner windows. 4. Consider changes to the proportions of the window trim for a more consistent appearance in the corner windows. 5. Adjust the plan to provide planting area and trees along the east and west elevations to relieve blankness. 6. Consider an alternate material and/or color the for metal siding on the side elevations. 7. Provide for review a streetscape elevation including the proposed building and nearby buildings to clarify compatibility of height, scale and volume. Consider the use of alternative materials to help reduce the scale of the blank walls. 8. Add the standard window glass note to the architectural drawings. Visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. Provide a sample of the glass for review. 9. Indicate if mechanical equipment is proposed outside of the building. If it is, show locations and sizes on the plans. Show how the equipment will be screened. 10. Add the standard mechanical equipment note to the architectural plans. Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 11. Replace the European Hornbeam with a large shade tree species. 12. Intersperse ornamental trees along the corridor. 13. Revise the planting plan to more fully integrate the winterberry holly into the landscape. 14. Provide 2'/2" caliper trees along the travelway, 40' on center, with sufficient planting area clear of utilities and easements. 15. Add a 2'/2" caliper large shade tree north of the three parking spaces on the western property line. 16. Add trees along the east and west walls faced with metal siding, with sufficient planting area clear of utilities and easements. 17. Add shrubs along the EC and along the western property line to help integrate the development. 18. Add the standard plant health note to the plan. All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 19. Consider alternate treatment for the entrance at the northeast corner of the building to integrate it more fully into the overall design. 20. Revise the plan to identify retaining wall materials and colors. 21. Add landscaping to mitigate the appearance of the drainage channel on the east side of the property. 11-02-2016 Adam Moore Division: VDOT Requested Changes 11-15-2016 Alexander Morrison Division: ACSA Requested Changes I have reviewed the above referenced major site plan amendment and have the following comments: • A water and sewer construction plan submittal is required. The applicant shall submit 3 copies of the plan along with water and sewer data sheets to the ACSA, Attn: Michael Vieira, PE, to begin the review. • Correctly label the existing sewer as 8". • Label the existing water main size. • Propose a water main connection at the existing water infrastructure on the north western corner of the property. • The proposed sewer shall be public up to proposed manhole 5. • The proposed public sewer shall be 8". • Add water and sewer profiles. Let me know if you have any questions. Alexander J. Morrison, P.E. Civil Engineer Page: 2 of 4 County of Albemarle Printed On: April 15, 2020 Date Completed: Reviewer: Review Status: Reviews Comments: ................................................................................... Date Completed: Reviewer: Review Status: Reviews Comments: 03-08-2017 Johnathan Newberry Division: CDD Planning No Objection ..................................................................................................................................................................................................................................................................... 03-08-2017 Johnathan Newberry Division: CDD Planning Requested Changes 1. The request to waive the dumpster pad requirement has been granted without conditions. Please add a note to Sheet C1.0 that states "A waiver of the dumpster pad requirement (Section 4.12.19) has been granted without conditions under Section 4.12.2(c)." 2. On Sheet 1-1.0, the Landscape Legend shows 11 piedmont azaleas (symbol "RC"), but the plan appears to only show 9 plantings. Please revise. 3. On Sheet SL1.0, I assume that "Lumenfacade" luminaire (symbol "I") will be oriented down towards the ground, but the plan doesn't explicitly indicate its direction and many examples of this fixture show it facing upward. Please confirm the direction of this fixture with a note on this sheet. Date Completed: 12-20-2016 Reviewer: Matthew Wentland Division: CDD Engineering Review Status: Reviews Comments: Requested Changes 1. A VSMP plan will need to be submitted and approved before the amendment can be approved. Response noted. 2. Include the storm sewer profiles, drainage summary table, and calculations with the plan. Comment partially addressed. Please provide the drainage calculations for the storm sewer. 3. Provide an easement around the SWM facility and an access easement to the facility. Comment not addressed. The easement does not appear to be shown on sheet C6.0 and the easement on the storm sewer leading to the facility is not labelled. 4. Slopes steeper than 3:1 must be permanently stabilized with landscaping vegetation hardier than grass, which will not require mowing. Please show on the plans and specify the vegetation to be used. [Design Standards Manual] Comment addressed. 5. Provide a pavement design detail on the plans. Comment addressed. 6. Provide a detail for the retaining wall. General wall details will be fine for the plans (i.e. general stack block wall details), engineered plans will not be necessary on the plans (only when submitting for the building permit for Date Completed: 01-03-2017 Reviewer: Jay Schlothauer Division: CDD Inspections Review Status: No Objection Reviews Comments: Based on plans revised December 5, 2016. Vo comments or conditions. Date Completed: 12-20-2016 Reviewer: Derek Bedarf Division: CDD E911 Review Status: No Objection Reviews Comments: Date Completed: 01-04-2017 Reviewer: Margaret Maliszewski Division: CDD ARB Review Status: Requested Changes Reviews Comments: Date Completed See ARB-2016-124 for ARB comments to date. The ARB is scheduled to review this proposal again Dn January 17, 2017. Updated comments will be available after that meeting. 12-27-2016 Page: 3 of 4 County of Albemarle Printed On: April 15, 2020 Reviewer: Amanda Burbage Review Status: No Objection Reviews Comments: ................................................................................................................................................................................. Date Completed: 01-04-2017 Reviewer: Robbie Gilmer Review Status: Requested Changes Reviews Comments: Division: CDD Zoning Division: Fire Rescue Based on plans dated 12/5/16. 1. Show FDC location on site plan. Location shall be on Address side of the structure within 100 feet of a fire hydrant. Date Completed: 01-06-2017 Reviewer: Adam Moore Division: VDOT Review Status: No Objection Reviews Comments: ........................................................................................................................................................................................................................................................................................................................................................... Date Completed: Reviewer: Alexander Morrison Division: ACSA Review Status: Pending Reviews Comments: Date Completed: ......................................................................................................................................... 03-16-2017 .......... Reviewer: Robbie Gilmer Division: Fire Rescue Review Status: No Objection Reviews Comments: ................................................................................................................................................................................................................................................................................................... Date Completed: 03-21-2017 -..................... ............................... . Reviewer: Johnathan Newberry Division: CDD Planning Review Status: No Objection Reviews Comments: Page: 4 of 4 County of Albemarle Printed On: April 15, 2020