HomeMy WebLinkAboutWPO202000016 Review Comments WPO VSMP 2020-04-16COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP Permit Plan Review
Project: Stonefield, Block D-1 — VSMP Plan
Plan preparer: John Beirne, P.E., WW Associates / 968 Olympia Drive, Suite 1
Charlottesville, VA 22911 [ jbeime@wwassociates.net ]
Owner or rep.: OCT Stonefield Property Owner, LLC, 230 Royal Palm Way, Suite 200
Palm Beach, FL, 33480 [ odesai(&oconnorcp.com ]
Plan received date: 8 Mar 2020
Date of comments: 16 Apr 2020
Reviewer: John Anderson
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any
VSMP permit by issuing a project approval or denial. This project is denied for reasons listed below. The
VSMP application content requirements can be found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain
(1) a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary.
1. Sec. 4, 5: Update these sections with revised ESC and SWM plan sheets, once comments are addressed.
2. Sec. 6.A. / Exhibit: While ESC /SWM plans are at Sec. 4, 5, please include PPP Exhibit (sheet C-3 can
serve as a basis). On Exhibit, please show:
i. Rain gauge location
ii. Concrete washout location
iii. Solid waste dumpster location
iv. Solvent /chemical storage location
v. Paved construction entrance (PCE), with spray wash
vi. PCE spray wash collection trapping measure
vii. On -site fuel storage location, if any
viii. Portable sanitary facility location
3. Sec. 9., Signed Certification: Individual who prepared SWPPP document must sign as condition of VSMP
/WPO plan approval. Also, Albemarle cannot register project with DEQ until SWPPP Sec. 9 is complete.
4. Include 2019 Notice of Termination form. Link:
http://www.albemarle.ore/unload/imaees/forms center/departments/Community Development/forms/Erieineeririe and
_WPO_Forms/CGP_Notice _of Termination _2019_FINAL 201904.pdf
5. Revise SWPPP booklet title to include ref. to VSMP /WP02020-00016.
B. Pollution Prevention Plan (PPP) — See above.
The PPP content requirements can be found in County Code section 17-404.
C. Stormwater Management Plan (SWMP) —Also, please see SDP202000024 Engineering review comments d.
15-Apr 2020. Note: Item 4, below, is copied verbatim from SDP202000024 (4/15/20) Engineering final site plan
review comments. Given this, overlap between ESC and SWM plan -related (and even site plan) comments is
possible.
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This
plan is disapproved for reasons listed below. The stormwater management plan content requirements can be
Engineering Review Comments
Page 2 of 7
found in County Code section 17-403.
1. Easement Plat (C=1 Note 3): Plat at deed bk.-pg. 4489-22 includes label reading: `* Easement is defined
with this plat but will be created and dedicated with a separate instrument.' Furnish deed bk.-pg. ref. to
recorded instrument that creates and dedicates north underground detention (at Costco) to public use
(Albemarle County, Grantee).
2. Easement Plat (C_1 Note 4): Certificate of Plat at deed bk.-pg. 4135-217 is insufficient for WPO202000016
plan approval (WPO2011-00055 Amendment). Certificate of Plat, sheet 1 of 8, plat Note 8, may offer clue.
This note reads: `A Master Declaration will be prepared and recorded in conjunction with this plat. Please
see this Declaration for common shared rights and easements of all owners of these parcels.' Since
document at bk.-pg. 4135-215 is only a Certificate of Plat, please revise C=1 second Note 3 to include text
reference to a Certificate of Plat, rather than a Maintenance Agreement. Also:
a. Revise second note 3 to read Note 4.
b. Provide bk.-pg. ref. to SWM Facility Maintenance Agreement for District Ave. biofilter.
c. Provide bk.-pg. ref. to SWM Facility Easement for District Ave. biofilter*.
(* This SWM facility easement may be included with Master Declaration referenced in Plat, sheet
1, Note 8, but Certificate of Plat only states that a Master Declaration will be prepared, and does
not provide bk.-pg. ref. to recorded Master Declaration, or to a SWM (biofilter) easement.)
3. C=1: Beneath plan title text reading Amendment to WPO2011-00055, please provide new text reading
VSMP IWPO202000016.
4. below
SDP202000024 Engineering final site plan review comments, 15-Apr 2020
For Final Site Plan Approval: (FSP) Partially addressed /see below.
WPO202000016 review is pending.
Submit VSMP Amendment Plan to WPO2011-00055. Although WPO2011-00055 is approved, site layout
has changed. WW Associates prepared WPO2011-00055 /SDP2011-00047, so plan sheets and design data
are likely readily available. At a minimum, please include the following with WPO Plan Amendment:
a. (LOD) Limits of Disturbance. Ref. SDP C-15, DA Parking Area: Project Area =3.01 Ac. (FSP)
Comment persists. As follow-up, revise WPO C-3 to include label /leader line indicating 2.66 Ac.
disturbance.
b. Since claiming this is a grandfathered project, ref. /address conditions required for Grandfathering
to guide review and approval, including 9VAC25-870-48.A. L(iv): `...has not been subsequently
modified or amended in a manner resulting in an increase in the amount of phosphorus leaving
each point of discharge, and such that there is no increase in the volume or rate of runoff.' This
means if apartment development runoff exceeds parking lot runoff, then on -site preliminary and
modest detention may be required prior to discharge to overall Albemarle Place detention system
installed beneath Costco parking lot. Design should provide and review will consider: points of
discharge, amount /rates of storm release from D1, especially whether apartment development
increases overall site imperviousness even slightly, which it appears may be the case. Please ref.
9VAC25-870-48, as well as SDP2011-00047, sheets C-15, -16 (Storm Sewer Design comps), etc.
(FSP) Comment revised to request that WPO202000016 confirm any increase in rate of runoff or
amount of phosphorus leaving SWM detention facility beneath Costco parking lot (easement
shown on bk.-pg. 4135-223).
c. Revised storm sewer design computations. Also, see item 7., below. (FSP) Partially addressed.
As follow-up: see item 24, below.
[Item 24: `Storm profile 46 thru 46.8 shows 18" HDPE downstream of 24" DIA pipe. Increase
receiving pipe diameter.' Note: Include storm profiles (not at present included) with WP02011-
00055 Amendment /WPO202000016 since post -developed As -built drawing (relocated filterra)
also needs to include storm lines built with apartment project. Also, SWM Plan item 5, below.]
d. ESC Plan: show tree protection (TP) for trees that are to remain. (FSP) Addressed /shown on
WPO202000016 C-3.
e. SDP2011-00047, C-18 includes typ. ESC measure details required during parking lot construction.
Provide ESC measures appropriate for parking lot demolition, and apartment construction. These
Engineering Review Comments
Page 3 of 7
may consist of IP, RWD, TS, SAF, etc. but prior -approved WPO does not consider current
development, only past development. ESC plan is required with W002011-00055 Amendment.
(FSP) Addressed. WP0202000016 is under review
f. SWPPP: Use county template; please also include: (FSP) Addressed -see WP0202000016 for
follow-up comments.
i. 2019 VPDES Permit Registration Statement
ii. 2019 CGP Termination Form
iii. 2019 CGP (26-pg.)
Links:
a. http://www.albemarle.or,a/upload/images/forms_center/departments/CommunityDevelo
pment/forms/En ing eering_and_WPO_Forms/CGP_Re,gistration_Statement_2019_FINA
L 201904.pdf
b. http://www.albemarle.or,g/upload/ima,ges/forms_center/departments/CommunityDevelo
pment/forms/En ing eering_and_WPO_Forms/CGP_Notice_of Termination _2019_FINA
L 201904.pdf
c. http://www.albemarle.or,a/upload/ima,ges/forms_center/departments/CommunityDevelo
pment/forms/En ing eering_and_WPO_Forms/CGP_2019.pdf
g. VSMP /WPO Plan Amendment Fee: $200
h. Approved Easement Plat for SWM Facilities (for final Amendment approval), including relocated
Filterra unit/s and any additional on -site SWM: detention, for example, if required to qualify for
Grandfathering. A separate Easement Plat Application with fee, as well as separate independent
review of plat, is required. Please ref. county website, Planning documents. Tori Kanellopoulos
may be a helpful resource guide. (FSP) Comment persists. Compare plat at bk.-pg. 4135-221
with SDP202000024 C=8 relocated filterra (Bond St.). A SWM facility easement is required for
this relocated filterra. Also: WP0202000016 review comments /comments pending.
NEW 9.50' SIDEWALK
MAINTENANCE EASEMENT
RESERVED FOR DEDICATION
UPON DEMAND OF THE COUNTY \ : z 31 �1 PARCEL 1 SESIDUE ! l�
(TYPICAL) V, P 1
I ry 1,288,127 SF U` ;
r6 E �N�1 1� Q� � 29.571 AC
(f
co :4
Li fi �' W LLl—Lt 66 EASEMENTU NEW SIGTRE SE W
PW'.c Jf FOR DEDICATION PC W
vl PARCEL 1 RESIDUE 3 W 9F I ll��o UPON DEMAND OF
s p THE COUNT!
1,288,127 SF m �(- z
i 29.571 AC 6 W I Iz
�� Ii a of !ll JI Qml I�
rn '�,,f I. U
I C iI 1 p I i
NEW SIGHT DISTANCE
EASEMENT RESERVED I'IIJ G„ O w I.a J
FOR DEDICATION Q O Q I I z
UPON DEMAND OF I 0 i
THE COUNTY x e NEW 23'
EGRCC> �5 COW n I INGEASEMENT I
(P,A ) �, Cas cas e 3 L Ds ; <9
Cog 2g, C51 j "d ND STREET (PRIVATE) 45
�YG NBW �4 C50 `.a 1L j - — —L94
I2ESS 1 - L2
1SN/EGRESS <� 11 Lz2 I
�L ! ��
!N 10' PUBLIC DRAINAGE In
EASEMENT RESERVED
FOR DEDICATION UPON
i. Additional information from WP02011-00055, including tables, civil details, ESC legend, SWM
Plan data (Filterra unit/s [relocation /size]; VA SWMH, 1999, Vol. II, Appendix 5D Worksheets
[revise, as needed; ref. SDP2011-00047, C-23]), including ref. to approved WPOs, to prepare a
comprehensive standalone Amendment to WP02011-00055. (FSP) Comment persists. For
example: WP0202000016, C7, Stormwater Narrative relies on biofilter `installed as part of the
Stonefield Blvd Road Plan (WP0201100036).' WP02011-00036 (C-22) shows a biofilter at
present-day Int. of District and Houston. Please provide an As -built drawing comparing as -built
condition of this biofilter against design (WP0201100036, C-22). Note: WP0201100036, C-22,
calculations provide that load removed by biofilter (C-22) = 5.26 x 0.65=3.42lbs. If later WPO or
Engineering Review Comments
Page 4 of 7
WPO Amendment revised biofilter design to provide WP0202000016 C=7 pollutant removal of
9.69 lb, reference WPO# on SDP202000024 and WP0202000016. Also, please revise
WP0202000016 C=7 text /calculations (Narrative), consistent with as -built condition of Houston -
District biofilter, and approved SDP /WPOs, including biofilter landscaping (as -built v. design).
WP0201100036 plan /GIS /Pictometry2 images —biofilter location circled:
Plan, C-1 ^7
�' � 14tiVNil6'�r�tii�8 =
'' U nu Nllltlun11111H11 h1111N0 nllAHAIA" , I'.
C-22
IF THIS DRAWING IS A REDUCTION
M
GRAPHIC SCALE MUST BE USED
BIO-FILTERPLAN SCALE. I" - 20'
20' 0 20'
— — .- - EX \
EC-1 5'K20'`
_ __DSCAPE RAP B ro
/I RIP - -$TONE POOL
`y MH71WI --r\
iSROUZED` _
LANDSCAPE
STONE
WEIR WALL CO
46 P10—FIL ER
�y 48
-22 Fk-------- Go GG GD
-- 4SV---------
_
STORMWATERMAINT
EASEMENANNT CE - �/ 6" PERFORATED REFER TO LANDSCAE-PIA1L-
BIO-FILTER PVC UNOERORAIN ON DWG NO. C-24 FOR
SECTION BIOLFILTER PLANTING DETAILS
_- - - - -- -- - 7
Engineering Review Comments
Page 5 of 7
GIS
i
5. Include Albemarle county guidance document found at:
http://www.albemarle.org/upload/images/forms center/departments/Community Development/forms/En ing eerin
g_and _WPO_Forms/WPO VSMP Construction_ Record_ Drawings Policy 23Ma, 2�pdf titled Construction
Record Drawings (As -built) for VSMP on the VSMP /WPO plan.
6. Easement deeds and District Ave. biofilter SWM Facility Maintenance Agreement must be recorded prior
to VSMP /WP02020-00016 approval.
D. Erosion and Sediment Control Plan (ESCP)
Engineering Review Comments
Page 6 of 7
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESOP. This plan
is disapproved for reasons listed, below. The erosion control plan content requirements can be found in
County Code section 17-402.
1. C=2: Provide reference to 2.66 Ac. area of disturbance. Also, item 4.a., above.
2. C=3: Remove /replace this plan sheet. Provide a Phase 1 ESC plan based upon existing conditions, that
includes demolition. Ex. condition is paved lot. Ref. 3/19/18 Pictometry2 imagery, below. At a minimum,
provide:
a. Existing land cover (pavement).
b. Existing grade: generally flat, since paved.
c. Inlet protection during demolition of existing pavement.
d. Sequence of demolition should a portion of Ex. pavement serve as a stockpile /storage area.
e. Paved construction entrance symbol, PCE, on plan (detail shown on C=6). Construction vehicles
may not exit onto Inglewood via a stone construction entrance. Show /label spray wash.
f. PCE spray wash collection /small trapping measure. Also, see PPP Exhibit.
g. ESC measures appropriate to Ex. paved /impervious condition.
h. If safety fence is proposed for paved areas, include detail that specifies embedment of SAF posts.
i. If PCE is gated into the site, show and label gate.
j. * It is vital for incident -free compliance to work from Ex. conditions, to match ESC perimeter
controls to existing conditions /demolition, and to consider staged vertical construction of the
apartment complex.
3/19/18 satellite imagery
3. C=4: Remove contractor laydown /storage that overlaps improvements at entrance on Houston. An interim -
phase ESC plan may be required to advance site work /vertical construction. Main entrance to apartments
on Houston could serve as laydown /storage while portion of site is developed. At some point, it appears
an offsite laydown /storage area may be required. This off -site area must be identified /reported to CDD
prior to project receiving a grading permit, or sequence demonstration made that an off -site area is not
required even as construction of a building that occupies nearly the entire site advances. Note: The
Standard (Main Street, Charlottesville) required long-term closure of a travel lane of Main St.
4. Additional comments possible.
Engineering Review Comments
Page 7 of 7
The VSMP permit application and all plans may be resubmitted for approval when all comments have been
satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed
application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this
review.
Process:
After approval, plans will have to be bonded. The bonding process is begun by submitting a bond estimate request
form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and
check parcel and easement information based on the approved plans. The County's Management Analyst will
prepare bond agreement forms, which will have to be completed by the owner and submitted along with cash,
certificates or sureties for the amounts specified. The agreements will have to be approved and signed by the County
Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also have to be completed and recorded. The
County's Management Analyst or other staff will prepare the forms and check for ownership and signature
information. The completed forms will have to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will enter project information in a DEQ database for state
application processing. DEQ will review the application information based on local VSMP authority approval. At
this time, the DEQ portion of the application fees will have to be paid directly to the state. For fastest processing,
this is done electronically with the emails provided on the application. DEQ should notify applicants with
instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This
should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants must complete the request for a pre -construction conference form, and pay the remainder of the
application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid.
This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the
County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and
grading permit will be issued by the County so that work may begin.
County forms can be found on the county website forms center under engineering;
hLtp://www.albemarle.org/deptfonns.asp?department--cdengmTo
WP0202000016_Stonefield block D1 041620