Loading...
HomeMy WebLinkAboutWPO201600082-Full Inspection ReportV NOTICE TO COMPLY Hand delivered Project: WP0201600082 5th Street Commercial Development Operator/Contractor: DESIGN BUILDERS, LLC FTV INVESTMENTS LLC Issued Date: 4/16/2020 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 434 296-5832 Under section § 17-900 of the Albemarle County Code, this is your NOTICE TO COMPLY with the requirements of the Land Disturbance Permit (or Agreement in Lieu of a Plan) for the referenced project and to immediately take corrective measures to address erosion and sediment control deficiencies on this property. This Notice to Comply is being issued because of the following deficiencies: Deficiency: Large areas of denuded soil present Corrective Action: Seed and straw mulch as required per VESCP minimum standards Deficiency: Inlet protection missing on a number of active storm inlets Corrective Action: Install and maintain proper inlet protection as per the state program minimum standards Deficiency: Missing or inadequate controls in place Corrective Action: Install proper perimeter controls to protect downstream properties and waterways Deficiency: Areas of mortar and concrete wash on the ground. Corrective Action: Provide a containment area for waste disposal Deficiency: No containment observed at time of inspection, Corrective Action: Provide a concrete waste water containment area Deficiency: Areas of mortar and concrete wash on the ground. No containment for cleaning of contractor equipment, visible signs of wash directly on the ground. Corrective Action: See item 54 Deficiency: No wash facility present, nor any containment for directed vehicle wash waste. Corrective Action: Have a vehicle wash facility and necessary trapping device for use with vehicle wash Deficiency: No containment present at time of site visit. Visible waste on the ground. Corrective Action: Deficiency: Stabilize as needed Corrective Action: Seed and straw mulch as required by the VESCH manual minimum standards Deficiency: Trap observed to be at capacity for proper treatment Corrective Action: Clean out sediment to regain full capacity and stabilize conveyance and denuded soil around the trap Deficiency: Improperly used and installed controls Corrective Action: Install proper controls as per VESCH minimum standards Deficiency: Could not confirm box was locked Corrective Action: Relocate and maintain document storage as required. Inspection frequency must be maintained as required by program Deficiency: See item 25 Corrective Action: See item 25 Deficiency: On post that was laying on the ground Corrective Action: Maintain postings in a visible location Deficiency: See item #2 Corrective Action: See item #2 Unless subsequently amended in writing by this office, it is expected all of these corrective measures will be completed by. Re -inspection of this notice to verify corrective measures will incur a $150 for land disturbing under VESCP and single-family dwelling units (§ 17-207) or a $250 fee for land disturbing under VSMP (§ 17- 208). Failure to take effective corrective measures will result in a Stop Work Order upon re -inspection. County Inspector Name: Geoff Elsie County Inspector Phone Number: (434) 296-5832 County Inspector Signature: Receipt Signature: 2�y OF Ay�F� r r�hcr�ti� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP/VESCP PERMIT SITE INSPECTION REPORT Project Name: 5th Street Commercial Development Project/WPO Number: WP0201600082 Project Address: DEQ Permit Number (if applicable): VAR10K228 Project Operator: DESIGN BUILDERS, LLC Operator Telephone #: Project Contact: FTV INVESTMENTS LLC Contact Telephone #: Contact E-Mail: randy@raltsonpc.com Qualified Personnel (QP): Inspector: Geoff Elsie Weather (Wet/Dry/Rain): Sunny Disturbed Acreage: Inspection Date & Time: 4/16/2020 10:00:00 AM Single -Family: Stage of Construction: Grading Re -Inspection: NocoveragesAvail COVERAGE & POSTING REQUIREMENTS Compliant? Reviewed during re -inspection? Yes Comments/Description 1 Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A) Yes (9VAC25-870-310)(Alb. Co. Code §17-300, 17-302) 2 A copy of the notice of coverage letter is posted conspicuously near the Yes On post that was laying on the ground main entrance of the construction activity? (CGP Part II.C) Notice of the location of the SWPPP is posted near the site's entrance, if Yes See item #2 3 applicable, and information for public access is provided? (9VAC25-870- 54.G)(CGP Part II D.2 & 3) SWPPP AVAILABILITY AND CONTENTS Compliant? Reviewed during re -inspection? No Comments/Description 4 The SWPPP is on -site or made available during the inspection? (CGP Part II D.1 & 2)(9VAC25-870-54.G) 5 The SWPPP contains a signed copy of the registration statement? (CGP Part II A.1.a) 6 The SWPPP includes, upon receipt, a copy of the notice of coverage letter and the CGP? (CGP Part II A.1.b & c) The SWPPP includes a narrative description of the nature of the 7 construction activity, including the function of the project? (CGP Part II A.1.d) The SWPPP includes a legible site plan identifying all appropriate 8 measures and that includes the locations of support activities and the onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7)) Page 1 of 4 9 The SWPPP contains the name, phone number and qualifications of "Qualified Personnel" conducting inspections? (CGP Part II A.6) 10 The SWPPP contains an approved erosion and sediment control plan? (9VAC25-870-54.B)(CGP Part II.A.2) The SWPPP contains an approved stormwater management plan or an 11 existing construction site has a stormwater management plan that ensures compliance with the water quality and quantity requirements? (9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ II.0 ❑ 12 The SWPPP contains an adequate pollution prevention plan? (9VAC25- 870-54.D)(CGP Part II.A.4) The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of 13 concern, exceptional waters and the additional controls measures applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b)) 14 Delegation of Authority is provided and signed in accordance with Part III K? (CGP Part II A.7) 15 The SWPPP is signed and dated in accordance with Part III K? (CGP Part 11 A.8) SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Compliant? Reviewed during inspection? No Comments/Description Is the SWPPP being amended whenever there is a change in the design, 16 construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870- 54.G) Has the SWPPP been amended if inspections or investigations by the 17 operator's qualified personnel, or by local, state or federal officials find that existing control measures are ineffective in minimizing pollutants in discharges? (CGP Part II B(2))(9VAC25-870-54.G) 18 Contractor(s) that will implement and maintain each control measure are identified? (CGP Part II B(3))(9VAC25-870-54.G) Have there been updates to the SWPPP when any modifications to its implementation have occurred, including a record of dates when major 19 grading activities occur, construction activities temporarily or permanently cease on a portion of the site or stabilization measures are initiated? (CGP Part II B.4(a))(9VAC25-870-54.G) 20 Is there documentation in the SWPPP of replaced or modified controls? (CGP Part 11 B.4(b))(9VAC25-870-54.G) 21 Is the SWPPP updated to indicate areas that have reached final stabilization? (CGP Part II B.4(c))(9VAC25-870-54.G) Is the SWPPP updated to indicate properties that are no longer under the 22 legal control of the operator and the dates on which the operator no longer had legal control over each property? (CGP Part II B.4(d))(9VAC25-870- 54.G) Does the SWPPP identify the date of any prohibited discharges, the 23 volume released, actions taken to minimize the impact of the release and measures taken to prevent the recurrence of any prohibited discharge? (CGP Part 11 B.4(e-f)) (9VAC25-870-54.G) 24 mendments, modifications, or updates to the SWPPP are signed in accordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G) INSPECTIONS AND CORRECTIVE ACTIONS Compliant? Reviewed during inspection? Yes Comments/Description Inspections required by the SWPPP are conducted at the required Could not confirm box was locked 25 frequency, including a modified frequency for impaired water(s), approved No TMDL(s), and exceptional waters when applicable? (CGP Part II F (2)) (CGP Part II A.5.b.3) 26 Inspection reports are completed and signed in accordance with CGP No See item 25 Part 11 F (3-4)? (CGP Part 11 F (3-4)) Page 2 of 4 27 Corrective actions are taken consistent with the requirements of the N/A CGP? (CGP Part II G(1-2)) ESC AND SWM PLAN IMPLEMENTATION Compliant? Reviewed during inspection? Yes Comments/Description 28 Have stream buffers and steep slopes been protected as shown on the yes plan? Sequencing of the project is implemented in accordance with the yes 29 approved erosion and sediment control plan and stormwater management plans? (9VAC25-870-54.B and C) Have all denuded areas requiring temporary or permanent stabilization Large areas of denuded soil present been stabilized, and have stabilization requirements for impaired waters, 30 approved TMDL(s), pollutants of concern and exceptional waters, when No applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25- 880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8)) (CGP II E(1-2)) Are soil stockpiles adequately stabilized with seeding and/or protected No Stabilize as needed 31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II A.2(c)) (9VAC25-870-54.B) A permanent vegetative cover has been established that is uniform, N/A 32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have sediment trapping facilities been constructed as the first step in land No Improperly used and installed controls 33 disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have earthen structures been stabilized immediately after installation? Yes 34 (9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.6) Are sediment traps and basins installed in accordance with MS-6 and the No Trap observed to be at capacity for proper treatment 35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Are finished cut and fill slopes adequately stabilized to prevent or correct yes 36 excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1- 2)) (9VAC25-870-54.B) Is concentrated runoff down cut or fill slopes contained in an adequate yes 37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is adequate drainage or other protection provided for water seeps? N/A 38 (9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.B) Do all operational storm sewer inlets have adequate inlet protection? No Inlet protection missing on a number of active storm 39 (9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- inlets 54.13) Are stormwater conveyance channels adequately stabilized with channel N/A 40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is in -stream construction conducted using measures to minimize channel N/A 41 damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are temporary stream crossings of non -erodible material installed where N/A 42 applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) 43 Is necessary restabilization of in -stream construction complete? (9VAC N/A 25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B) Are utility trench operations conducted and stabilized in accordance with yes 44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are soil and mud kept off paved or public roads to minimize the transport yes 45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B) 46 Have all temporary control structures that are no longer needed been N/A removed and disturbed soil resulting from their removal permanently Page 3 of 4 stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are properties and waterways downstream from development adequately Missing or inadequate controls in place. See photo 47 protected from erosion, sediment and damage in accordance with the No item 33 standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840- 40.19(a-n)) 48 Permanent control measures included in the SWPPP are in place? Yes (9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a)) POLLUTION PREVENTION PLAN IMPLEMENTATION Compliant? Reviewed during inspection? Yes Comments/Description Practices are in place to prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, Yes 49 and cleaning up spills, leaks, and other releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part III G? (CGP Part II A.4.e(1))(9VAC25-870-56) Practices are in place to prevent the discharge of spilled and leaked fuels Yes 50 and chemicals from vehicle fueling and maintenance activities? (CGP Part 11 A.4.e(2))(9VAC25-870-56) Practices are in place to prevent the discharge of soaps, solvents, No containment present at time of site visit. Visible 51 detergents, and wash water from construction materials, including the No waste on the ground. clean-up of stucco, paint, form release oils, and curing compounds? (CGP Part II A.4.e(3))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from vehicle No No wash facility present, nor any containment for 52 and equipment washing, wheel wash water, and other types of washing? directed vehicle wash waste. (CGP Part 11 A.4.e(4))(9VAC25-870-56) Concrete wash water is directed into a leak -proof container or leak -proof No No containment observed at time of inspection, 53 settling basin? (CGP Part 11 A.4.e(5))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from Areas of mortar and concrete wash on the ground. No 54 storage, handling, and disposal of construction products, materials, and No containment for cleaning of contractor equipment, wastes? (CGP Part II A.4.e(6))(9VAC25-870-56) visible signs of wash directly on the ground. Practices are in place to prevent the discharge of fuels, oils, and other Yes 55 petroleum products, hazardous or toxic wastes, and sanitary wastes? (CGP Part II A.4.e(7)(9VAC25-870-56) Practices are in place to minimize any other discharge from the potential NIA 56 pollutant -generating activities not addressed above, when applicable? (CGP Part II A.4.e(8))(9VAC25-870-56) Inspector Signature: Date: Page 4 of 4 Construction General Permit Site Inspection Report Request for Correction Action Check Regulatory Occur. Observation Recommended Corrective List # Citation/Legal Action Requirement* 30 (9VAC 25-840-40.1) Large areas of denuded soil Seed and straw mulch as (9VAC25-870-54.B) present required per VESCP minimum (9VAC25-880-60) (CGP standards Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8)) (CGP II E(1-2)) 39 (9VAC 25-840-40.10) Inlet protection missing on a Install and maintain proper (CGP Part II A.2(c)) number of active storm inlets inlet protection as per the (CGP II E(1-2)) state program minimum (9VAC25-870-54. B) standards 47 (9VAC 25-840-40.19(a- Missing or inadequate Install proper perimeter n)) controls in place controls to protect downstream properties and waterways 54 (CGP Part II A.4.e(6)) Areas of mortar and concrete Provide a containment area (9VAC25-870-56) wash on the ground. for waste disposal 53 (CGP Part II A.4.e(5)) No containment observed at Provide a concrete waste (9VAC25-870-56) time of inspection, water containment area 54 (CGP Part II A.4.e(6)) Areas of mortar and concrete See item 54 (9VAC25-870-56) wash on the ground. No containment for cleaning of contractor equipment, visible signs of wash directly on the ground. 52 (CGP Part II A.4.e(4)) No wash facility present, nor Have a vehicle wash facility (9VAC25-870-56) any containment for directed and necessary trapping vehicle wash waste. device for use with vehicle wash 51 (CGP Part 11 A.4.e(3)) No containment present at (9VAC25-870-56) time of site visit. Visible waste on the ground. 31 (9VAC 25-840-40.2) Stabilize as needed Seed and straw mulch as (CGP Part II A.2(c)) required by the VESCH (9VAC25-870-54.B) manual minimum standards 35 (9VAC 25-840-40.6) Trap observed to be at Clean out sediment to regain (CGP Part II A.2.c (9)) capacity for proper treatment full capacity and stabilize (CGP Part II A.2(c)) conveyance and denuded (CGP 11 E(1-2)) soil around the trap (9VAC25-870-54. B) 33 (9VAC 25-840-40.4) Improperly used and installed Install proper controls as per (CGP Part II A.2(c)) controls VESCH minimum standards (CGP II E(1-2)) (9VAC25-870-54. B) 25 (CGP Part II F (2)) (CGP Could not confirm box was Relocate and maintain Part II A.5.b.3) locked document storage as required. Inspection frequency must be maintained as required by program 26 (CGP Part II F (3-4)) See item 25 See item 25 2 (CGP Part II.C) On post that was laying on Maintain postings in a visible the ground location 3 (9VAC25-870-54.G) See item #2 See item #2 (CGP Part II D.2 & 3) Recommended 4/27/2020 Corrective Action Deadline: Targeted Re- 4/28/2020 Inspection Date: Comments: *Refers to applicable regulation found in the most recent publication of the State Water Control Law(Va. Code § 62.144.2 et seq.), Virginia Eros on and Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from Construction Activities(9VAC25-880). Construction General Permit Site Inspection Photo Log Photos for Item 30 Image_637226468843643940.jpg w: X 1 � Photo Description: Large denuded area that is in need of stabilizing Photos for Item 31 Image_637226470159681910.jpg 1.56MB j 0 Photo Description: Stockpile in need of stabilizing Photos for Item 33 Image_637226478482313030.jpg 1.63MB Photo Description: Straw bales not properly used or installed. Photos for Item 35 Image_637226473518089240.jpg 1.74MB m% } s Photo Description: Trap is at capacity for sediment storage. Needs to be maintained and seed needs to be installed to control Erosion Photos for Item 39 Image_637226471150962760.jpg 703.96KB Photo Description: Missing inlet protection Photos for Item 53 lmage_637226471763805210.jpg 1.82MB z Photo Description: Concrete wash directly onto the ground Photos for Item 54 Image_637226468397982020.jpg 860.68KB Photo Description: Mortar discharge on ground above unprotected drop inlet Image_637226475900572430.jpg 2.27MB Photo Description: Trash in flood plain. No dumpsters on site for construction use. COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 434 296-5832 Inspection Date: 4/16/2020 County Inspector