Loading...
HomeMy WebLinkAboutSUB201900158 Review Comments Road Plan and Comps. 2020-04-20COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage plan review Project title: Spring Hill Village Road Plan Project file number: SUB201900158 Plan preparer: Collins Engineering [scott@collins-engineering.com] Owner or rep.: Spring Hill Development, LLC Stanley Martin Homes[odonnellgp@stanleymartin.com] Date Received: 07 Oct 2019 Rev. 1 Received: 09 March 2020 Date of comments: 27 Nov 2019 Rev. 1 Comments: 20 April 2020 Scott, We have reviewed the above referenced plans and have the following comments: Engineering (Emily Cox) 1. Professional seal should be signed and dated. Rev. 1: Comment addressed. 2. Provide detail for driveway entrances in the alley with the roll-top curbing: Figure B-22 http://www.virginiadot.org/business/resources/appendb.pdf Rev. 1: Comment addressed. 3. Provide transitioning detail for roll top curbing in front of inlets. Rev. 1: Comment addressed. 4. Topography should be at least visually field verified within the last year. Cover sheet says Aug 2018. Rev. 1: Comment addressed. 5. Ensure all sheets provide a North arrow (one example, Sheet 8 is missing). Rev. 1: It appears Sheet 4 is still missing one. Please double check all sheets. 6. Provide horizontal curve information (start points, end points) on plan view. Radii were shown. Rev. 1: Comment addressed. 7. Ensure all necessary pavement markings are shown. Rev. 1: Comment addressed. 8. Street trees should be placed as far away from storm sewer as possible and should not be touching. Trees in front of lots 69-70 are too close. There may be others. Rev. 1: Tree in front of lot 60 is still too close to a structure. Also, please review the tree at the southern end of Berwyn Lane, it appears to be in a storm easement and close to a pipe. 9. Show existing managed slopes on all applicable sheets, not just existing conditions. Rev. 1: Comment addressed. 10. Double check all contour labels. One in the open space should be 550 and is labeled 540. Rev. 1: Comment addressed. 11. Show the SWM facility easement (and any other easements). Rev. 1: Comment addressed. 12. Ensure ADA requirements are met. All necessary crossings do not appear to be shown. Rev. 1: Comment addressed. 13. Provide signed and sealed retaining wall plans, especially for the alley, where the walls are very close to adjacent property. Please note that retaining walls will need building permits. Rev. 1: Comment not addressed. 14. The minimum drainage easement width is 20ft. Some loft are shown on this plan. Rev. 1: Engineering Review Comments Page 2 of 3 Comment addressed. This will be further evaluated with WPO or site plan, since this does not apply to the roads. 15. Will the 5ft pathway throughout the site have an easement/deed? Provide a type and thickness on the detail for the asphalt. (Sheet 10). Rev. 1: Comment addressed. 16. Sight distance lines cannot go through parking spaces. Also, ensure the correct required sight distances are shown for all intersections. Rev. 1: A small portion of one parking space on Berwyn lane appears to conflict with the sight distance line from Loyola Way. 17. Sidewalk detail should specify concrete that is 3000 psi at 28 days or stronger. Rev. 1: Comment addressed. 18. YD4A-YD4 has a velocity over the 15 ft/s maximum allowed by the County. Rev. 1: Comment addressed. 19. Ensure all proffers and conditions associated with the ZMA are addressed. These are outlined in planning comments from Chris Perez. Rev. 1: Comment addressed. These are reviewed by planning. 20. Rev. 1: WPO plan (WPO201900042) must be amended to match this plan and must be approved before road plan can be approved. 21. Rev. 1: Please provide signs or traffic calming measures on Berwyn Lane. 22. Rev. 1: There are sanitary lines in the middle of private roads. Ensure that manholes are not located within vehicular wheel paths and that tops are flush (or slightly lower) than the top of the asphalt. Planning (Daniel Butch) 1. Based on a current corridor study of Avon St Extended, the draft plan identifies a 10 foot asphalt shared -use path on Avon St Extended. The Development Concept Plan identifies a 8 foot concrete sidewalk. Recommendation is for a 10 foot asphalt shared -use path on Avon St Extended. Requested Changes: 1. Extend all sidewalks/shared-use paths on Avon St Extended and Scottsville Rd to property line. 2. Sidewalk on Scottsville Rd on both sides of entrance to be 8 foot concrete sidewalk. Rev. 1: No objection. Planning (Chris Perez, Rev. 1: Tori Kanellopoulos) 1. See attached comment letter dated 11/8/19. Rev. 1: See attached comment letter dated 3/30/2020. VDOT (Adam Moore) 1. See attached comment letter dated 11/26/19. Rev. 1: See attached comment letter dated 4/10/2020. Fire Rescue (Shawn Maddox) 1. No objection. Rev. 1: No objection. ACSA (Jeremy Lynn) 1. Currently under review per email dated 11/19/19. Rev. 1: No objections. GIS (Andrew Slack, Rev. 1: Brian Becker) 1. The applicant should contact this office with a list of three (3) proposed road names to replace "Warkwick Court". There is an existing road named "Warwick Court" and the similarities Engineering Review Comments Page 3 of 3 between these road names could cause problems for emergency response. Rev. 1: No objection. ARB (Margaret Maliszewski) 1. Landscaping must be consistent with ARB approved landscaping. A final ARB site plan submittal is required. Rev. 1: Landscaping must be consistent with ARB approved landscaping. A final ARB site plan is under review. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. If you have any questions or concerns, please contact me either by email (ecox2@albemarle.org) or by phone at 434-296-5832 ext. 3565. Sincerely, Emily Cox, P.E. Civil Engineer II County of Albemarle Department of Community Development Memorandum To: Emily Cox — CDD Engineering From: Tori Kanellopoulos - Senior Planner Division: Planning Services Date: March 30, 2020 Subject: SUB201900158 — Spring Hill — Road Plan The following are Planning comments for Road Plan submittal SUB201900158: Planning (Tori Kanellopoulos): 1. Advisory comment. Planning review of this Road Plan is for comments specific to Road Plan requirements only. Planning approval of the Road Plan does not constitute subdivision plat or site plan approval; Planning has not reviewed this Road Plan for other requirements such as setbacks, minimum lot size, open space, etc. 2. Advisory comment. The final plat will need to meet the requirements of 14-235 and will need a maintenance agreement meeting the requirements of 14-317. 3. ZMA201300017 Application Plan. Board of Supervisors approval of a special exception for road design/layout is required prior to road plan approval. The road plan will need to match the special exception and meet any conditions with the special exception. The applicant submitted the special exception request on March 9, 2020, and review is in progress. 4. ZMA201300017 Application Plan. Show the required landscaping/fence buffer, per the ZMA application plan, with the adjacent properties. 5. ZMA201300017, Proffer #4, SR 742 (Avon St Ext). The applicant is responsible to design, bond, and construct the improvements shown on the County -approved engineering drawings titled Development Concept Plan, Sheet 4, dated 10-21-13 and last revised on 8-29-14, as prepared by Alan Franklin PE, for both SR 20 (Scottsville Road) and SR 742 (Avon St Ext). The following proffer requirements are still not met or shown on the Road Plan- a. Show the proposed landscaping (street trees) in the planting strips along SR 742. b. The southern portion of the multi -use path adjacent to Dauphin Drive does not have the required planting strip. c. Show the proposed multi -use path going all the way to the property line with TMP 90-27B. d. Indicate if the required ROW has been dedicated to VDOT. 6. ZMA201300017, Proffer #4, SR 20 (Scottsville Road). The applicant is responsible to design, bond, and construct the improvements shown on the County -approved engineering drawings titled Development Concept Plan, Sheet 4, dated 10-21-13 and last revised on 8-29-14, as prepared by Alan Franklin PE, for both SR 20 (Scottsville Road) and SR 742 (Avon St Ext). The following proffer requirements are still not met or shown on the Road Plan: a. Show the proposed landscaping (street trees) in the planting strips along SR 20. b. The northern portion of the sidewalk adjacent to Dauphin Drive does not have the required planting strip. c. Show the extension of the 8" SAN SL to TMP 91-16A1 and along frontage to TMP 90-27. Send a PDF copy of off -site SAN SL plans if separate document. 7. 18-32.7.9 Landscaping and utilities. Some trees appear to conflict with utilities and be closer than the 5' as stated on the Road Plan. See Lot 34 as an example. 8. 18-32.7.9.5 Street trees. Include the street tree information/requirement for Sheridan Street on Sheet 29. It may also be that Warwick Court is a previous street name and therefore the Sheridan Street requirement is included, and just the label needs to be changed. 9. 18-32.7 Required easements. Approval of application SUB201800082, easement plat for required offsite easements, is needed prior to road plan approval. SUB201900079, also for required offsite easements, has been approved. The DB and PG for the recorded easements need to be on the road plan. 10.18-32.7 Required easements. Is there an approved easement for the improvements shown on adjacent parcel TMP 90-35V? Please contact Tori Kanellopoulos in the Planning Division at vkanellopoulos(a)-albemarle.orc or 434-296-5832 ext. 3270 for further information. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street (804) 786-2701 Commissioner Richmond, Virginia 23219 Fax: (804) 786-2940 April 10, 2020 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Emily Cox, P.E. Re: Spring Hill Village — Final Road Plans SUB-2019-00158 Review #2 Dear Ms. Cox: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 4 October 2019, revised 18 February 2020, and offer the following comment: 1. Due to the special exception request#2, this change will require an update to the turn lane warrant analysis on the road plans. If further information is desired, please contact Adam Moore at 434-422-9782. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING