Loading...
HomeMy WebLinkAboutWPO201900039 Plan - VSMP 2020-04-08VICINITYMAP VICINITY MAP SCALE: 1" = 2000' SITE INFORMATION PARCEL ID #: 06900-00-00-02000 ACREAGE: 123.84 AC ZONING: AG ADDRESS: 8585 DICK WOODS ROAD AFTON, VA 22920 OWNER: AUGUSTA PROFESSIONAL PARK LLC ATT: MICHAEL MCGINNIS PO BOX 300 LYN D H U RST VA, 22952 LAT/LONG: 38.020000,-78.860510 HILLCREST VINEYARD TASTING 0 & VENUE VS 8585 DICK WOODS ROAD AFTON, VA 22952 VIRGINIA CERTIFIED RESPONSIBLE LAND DISTURBER NAME -PRINTED PHONE # ADDRESS COMPANY SIGNATURE DATE MP SHEET INDEX Sheet List Tab e Sheet Number Sheet 7tl e C-0.01 TITLE SHEET C-1.01 GENERAL NOTES C-2.01 EXISTING CONDITIONS C-2.02 STEEP SLOPES & SODS MAP C-2.a SOILS LEGEND C-3.00 OVERALL PLAN OF DEVELOPMENT C-3.01-A ESC/PPP PHASE 1 - A C-3.01-B ESC/PPP PHASE 1 - B C-3.01-C ESC/PPP PHASE 1 - C C-3.02-A ESC/PPP PHASE 2 - A C-302-B ESC/PPP PHASE 2 - B C-3.02-C ESC/PPP PHASE 2 - C C-3.0J ESC/PPP NOTES C-4.01 SITE LAYOUT C-6.01 EXISTING DRAINAGE C-6.02 PROPOSED DRAINAGE C-6.03 STORMWATER MANAGEMENT PLAN C-6.04 ENLARGED SWIM PLAN & NOTES C-6.05 STREAM BUFFER MITIGATION PLAN C-9.01 DETAILS C-9.02 DETAILS C-9.03 DETAILS C-9.04 DETAILS C-9.05 DETAILS APPROVED by the Albemarle County Community Development Department Date 04/08/2020 File WP02019-00039 SETH R DERICK Lie. No. 041454 W 0� Nov. 21, 2019 �W 1�1 61SI DNA L o� C/) Q 0 Q � M � W W C/)LO Z O Q 0 o �z LLl Q I- L,LL CLO')Q J _ Co J � y Q No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 P4_ CONSTRUCTION ISSUE TITLE SHEET Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C-0 - 0 1 STANDARD PROJECT LINETYPES EXISTING LEGEND PROPOSED LEGEND --14J9--- EXISTING CONTOUR (MINOR) EXISTING CONTOUR (MAJOR) STORM INLET STORM STRUCTURE 1439 EXISTING CONTOUR (MINOR) 1440 44o EXISTING CONTOUR (MAJOR) CURB INLET S ❑■ DROP INLET STORM DRAIN STORM DRAIN ET ELECTRICAL TRANSFORMER ET ELECTRICAL TRANSFORMER TV CABLE PEDESTAL TV CABLE PEDESTAL ❑T TELEPHONE/COMMUNICATION PEDESTAL ❑T TELEPHONE/COMM!_l i T T TELEPHONE LINE T T TELEPHONE LINE ❑E ELECTRICAL ❑E ELECTRICAL SS SS SS SANITARY SEWER LINE SS SS SS SANITARY SEWER LINE coo SANITARY SEWER CLEANOUT • SANITARY SEWER CLEANOUT SS SANITARY SEWER MANHOLE SS SANITARY SEWER MANHOLE GV GAS VALVE GV GAS VALVE GT GAS TAP GT GAS TAP GAS GAS LINE GAS GAS LINE X X GATE/FENCE 1� GATE/FENCE POST - - - - PROPERTY LINE - - - - PROPERTY LINE - - - - INTERIOR LOT LINE - - - - INTERIOR LOT LINE O FOUND IRON PIN - - - - - - SETBACK O P.K. NAIL N GATE VALVE FIRE HYDRANT FIRE HYDRANT ExW WATER LINE w WATER LINE WO WATER METER WATER METER WATER VALVE WATER VALVE UTILITY POLE UTILITY POLE LIGHT POLE LIGHT POLE EXISTING INLET LABEL INLET LABEL — — — — CATCHMENT AREA — — — — CATCHMENT AREA X CATCHMENT OUTLET X CATCHMENT OUTLET CURB AND GUTTER 30" CURB AND GUTTER (STD CC-6) EDGE OF PAVEMENT REVERSE CURB AND GUTTER (STD CG6R) 6" CURB (STD CG-2) �j ' DUMPSTER HEAVY DUTY ASPHALT LIGHT DUTY ASPHALT as CONCRETE CALCULATED GREEN SPACE (LANDSCAPE SHEET) WALL DRAINAGE ACCESSIBLE PARKING -••-••-••- LIMITS OF DISTURBANCE va 8J.com THIS PLAN DOES NOT GUARANTEE THE EXISTENCE OR NON-EXISTENCE OF UTILITIES WITHIN THE WORK LIMITS. CALL MISS UTILITY AT 811 OR 18005527001 BEFORE DIGGING. EACH "PERSON" AS DEFINED IN THE UNDERGROUND UTILITY DAMAGE PREVENTION ACT MUST PROVIDE THEIR OWN NOTICE OF EXCAVATION. SUBCONTRACTORS MAY NOT WORK UNDER ANOTHER COMPANY'S TICKET UNLESS THEY ARE UNDER THE DIRECT SUPERVISION OF THE COMPANY THAT PROVIDED THE NOTICE OF EXCAVATION. ALLOW REQUIRED TIME FOR MARKING - BEGIN EXCAVATION ONLY AFTER CHECKING THE POSITIVE RESPONSE SYSTEM, EXCAVATION MAY BEGIN WHEN: ALL NOTIFIED UTILITIES HAVE EITHER MARKED THEIR LINES OR REPORTED THAT THEY HAVE NO FACILITIES IN THE AREA OF EXCAVATION OR THE MARKING PERIOD HAS EXPIRED (AFTER 7:00 AM ON THE THIRD WORKING DAY AFTER NOTICE TO THE CENTER.) OR MISS UTILITY INFORMS YOU THAT NO MEMBER OPERATORS NEED TO BE NOTIFIED OF THE EXCAVATION. YOU WILL STILL GET A TICKET NUMBER! RESPECT THE MARKS - PROTECT AND PRESERVE THE MARKINGS FROM THE TIME EXCAVATION BEGINS UNTIL THE WORK IS COMPLETED. CALL MISS UTILITY TO UPDATE THE TICKET IF WORK WILL CONTINUE PAST 15 DAYS OR IF THE MARKS BECOME ILLEGIBLE DUE TO TIME, WEATHER, CONSTRUCTION OR ANY OTHER CAUSE, EXCAVATE CAREFULLY - IF THE EXCAVATION IS WITHIN 2 FEET OF A MARKED UTILITY LINE, EXPOSE THE UTILITY LINE BY HAND DIGGING AND KEEP ALL MECHANIZED EQUIPMENT AT LEAST 2 FEET AWAY FROM THE EXTREMITIES OF THE UTILITY. ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES 1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE PERMIT SHALL GOVERN. 2. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT UNLESS OTHERWISE NOTED. 3. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER 4. CONSTRUCTION. 5. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED. 6. THE MAXIMUM ALLOWABLE SLOPE IS 2: 1 (HORIZONTAL: VERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED, 7. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 8. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES. 9. UNLESS OTHERWISE NOTED ALL CONCRETE PIPE SHALL BE REINFORCED CONCRETE PIPE -CLASS III. 10. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). lI"I0CL\�1[01100N I ►I11101611W_1NNW&Ii 1. WORK IN THIS PROJECT SHALL CONFORM TO THE LATEST EDITIONS OF THE VIRGINIA DEPARTMENT OF TRANSPORTATIONS (VDOT) ROAD AND BRIDGE SPECIFICATIONS, THE VDOT ROAD AND BRIDGE STANDARDS, THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS, THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK, THE VIRGINIA STORMWATER MANAGEMENT REGULATIONS AND ALBEMARLE COUNTY DESIGN AND CONSTRUCTION STANDARDS. IN THE EVENT OF CONFLICT BETWEEN ANY OF THESE STANDARDS, SPECIFICATIONS OR PLANS, THE MOST STRINGENT SHALL GOVERN. ALL UTILITIES SHALL BE CONSTRUCTED AND TESTED TO CONFORM TO COMMONWEALTH OF VIRGINIA/STATE BOARD OF HEALTH WATERWORKS AND/OR SEWERAGE REGULATIONS AND ALBEMARLE COUNTY DESIGN AND CONSTRUCTION STANDARDS, 2. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY RELOCATED WHEN AND AS NECESSARY AND SHALL BE CHECKED AFTER EVERY RAINFALL. SEEDED AREAS SHALL BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RESEEDED AND MULCHED AS NECESSARY TO OBTAIN A DENSE STAND OF GRASS. 3. ALL DRAIN INLETS SHALL BE PROTECTED FROM SILTATION. INEFFECTIVE PROTECTION DEVICES SHALL BE IMMEDIATELY REPLACED AND THE INLET CLEANED, FLUSHING IS NOT AN ACCEPTABLE METHOD OF CLEANING. 4. WHEN THE CRUSHED STONE CONSTRUCTION ENTRANCE HAS BEEN COVERED WITH SOIL OR HAS BEEN PUSHED INTO THE SOIL BY CONSTRUCTION TRAFFIC, IT SHALL BE REPLACED WITH A DEPTH OF STONE EQUAL TO THAT OF ORIGINAL APPLICATION. 5. THE LOCATION OF EXISTING UTILITIES AS SHOWN IS APPROXIMATE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL PUBLIC OR PRIVATE UTILITIES THAT LIE IN OR ADJACENT TO THE CONSTRUCTION SITE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING, AT HIS EXPENSE, ALL EXISTING UTILITIES DAMAGED DURING CONSTRUCTION. FORTY-EIGHT (48) HOURS PRIOR TO ANY EXCAVATION CALL MISS UTILITY 1 (800) 552 7001, 6, ALL UNDERGROUND FACILITIES LOCATED WITHIN RIGHTS -OF -WAY SHALL BE INSTALLED PRIOR TO THE PLACEMENT OF ANY PART OF THE PAVEMENT STRUCTURE. 7, INSTALLATION OF CONCRETE STORM PIPE SHALL COMPLY WITH VDOT STANDARD DRAWING PB1. 8, PLASTIC PIPE INSTALLATION SHALL CONFORM TO MANUFACTURES SPECIFICATIONS, 9, ALL MATERIALS USED FOR FILL OR BACK -FILL SHALL BE FREE OF WOOD, ROOTS, ROCKS, BOULDERS OR ANY OTHER NONCOMPACTABLE SOIL TYPE MATERIAL. UNSATISFACTORY MATERIALS ALSO INCLUDE MAN-MADE FILLS AND REFUSE DEBRIS DERIVED FROM ANY SOURCE. 10, SATISFACTORY MATERIAL FOR USE AS FILL FOR PUBLIC STREETS INCLUDE MATERIAL CLASSIFIED IN ASTM D-2487 AS GW, GP, GM, GC, SW, SP, SM, SC, MIL, AND CL GROUPS. THE MOISTURE CONTENT SHALL BE CONTROLLED WITHIN PLUS OR MINUS 2 PERCENTAGE POINTS OF OPTIMUM TO FACILITATE COMPACTION. GENERALLY, UNSATISFACTORY MATERIALS INCLUDE MATERIALS CLASSIFIED IN ASTM D-2487 AS PT, CH, MH, OL, OH, AND ANY SOIL TOO WET TO FACILITATE COMPACTION. CH AND MH SOILS MAY BE USED SUBJECT TO APPROVAL OF THE COUNTY ENGINEER, SOILS SHALL HAVE A MINIMUM DRY DENSITY OF 921_B/CUBIC FOOT PER ASTM D-698 AND SHALL HAVE A PLASTICITY INDEX LESS THAN 12, 11. COMPACTION OF FILL MATERIAL UNDER BUILDING SLABS SHALL BE BASED UPON RECOMMENDATIONS OF SOILS ENGINEER AFTER COMPLETION OF STANDARD PROCTOR TEST AND SHALL MEET BEARING REQUIREMENTS OF ARCHITECT FOR BUILDINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TESTING. 12, MATERIALS USED TO CONSTRUCT EMBANKMENTS FOR ANY PURPOSE, BACK -FILL AROUND DRAINAGE STRUCTURES OR IN UTILITY TRENCHES OR ANY OTHER DEPRESSION REQUIRING FILL OR BACK -FILL SHALL BE COMPACTED TO 95% OF MAXIMUM DENSITY AS DETERMINED BY THE STANDARD PROCTOR TEST AS SET OUT IN ASTM STANDARD D-698, THE CONTRACTOR SHALL, PRIOR TO ANY OPERATIONS INVOLVING FILLING OR BACKFILDNG, SUBMIT THE RESULT OF THE PROCTOR TEST TO THE COUNTY'S ON -SITE INSPECTOR TOGETHER WITH A CERTIFICATION THAT THE SOIL TESTED IN REPRESENTATIVE OF THE MATERIALS TO BE USED ON THE PROJECT, TESTS SHALL BE CONDUCTED BY A CERTIFIED MATERIALS TESTING LABORATORY AND THE CERTIFICATIONS MADE BY A LICENSED PROFESSIONAL ENGINEER REPRESENTING THE LABORATORY, 13, CERTIFICATIONS FOR MATERIALS INCLUDING, BUT NOT LIMITED TO STONE, CONCRETE, PIPES, PRECAST UNITS, HANDRAILS, STABILIZATION MATS, TRAFFIC SIGNAL ITEMS, MUST BE PROVIDED TO THE CITY'S ON -SITE INSPECTOR AND APPROVED BY THE INSPECTOR PRIOR TO INSTALLATION. SEE INSPECTOR FOR MATERIALS CERTIFICATION CHECKLIST. 14, EMBANKMENT FILL AND TRENCH BACK -FILL SHALL BE PLACED IN LIFTS AT A MAXIMUM UNCOMPACTED DEPTH OF 8-INCHES AND 6-INCHES, RESPECTIVELY. DENSITY TESTS SHALL BE CONDUCTED AT THE FOLLOWING MINIMUM FREQUENCIES: 14.1. EMBANKMENT FOR ROADS, STREETS, DAMS, ETC.: ONE TEST PER LIFT PER 10,000 SQUARE FEET OF LIFT. 14.2, BACK -FILL AROUND STRUCTURES AND IN TRENCHES: ONE TEST PER LIFT PER 500 LINEAL FEET OF TRENCH. 15, COMPACTION TESTS FOR STREET PAVEMENT STRUCTURE SHALL BE MADE IN CUT AND FILL AREAS AT THE FOLLOWING MINIMUM FREQUENCIES: 15.1. SUB -GRADE: ONE TEST PER LANE PER 500 LINEAL FEET, 15.2, STONE BASE: ONE TEST PER LANE PER 6"COMPACTED LIFT PER 500 LINEAL FEET. 15.3, HOT ASPHALTIC CONCRETE: ONE TEST PER LANE PER LIFT PER 500 LINEAL FEET. 16, ALL EXCAVATIONS, INCLUDING TRENCHES, SHALL BE KEPT DRY TO PROTECT THEIR INTEGRITY, 17, TEST RESULTS SHALL BE SUBMITTED TO THE COUNTY ENGINEER. FAILURE TO CONDUCT DENSITY TESTS AND SUBMIT TEST RESULTS SHALL BE CAUSE FOR NONACCEPTANCE OF THE FACILITY. TESTS SHALL BE CONDUCTED AT THE SOLE COST OF THE DEVELOPER OR HIS AGENT, 18, COMBINATION UNDER -DRAINS TYPE CD-1 SHALL BE INSTALLED AT THE LOWER END OF THE CUT SECTIONS. UNDER -DRAINS TYPE CD-2 SHALL BE INSTALLED AT THE LOW POINT OF ALL VERTICAL CURVES. 19, STANDARD UD-1 AND UD-3 UNDER -DRAINS SHALL BE INSTALLED WHERE INDICATED ON PLANS ON FURTHER WHERE DETERMINED NECESSARY IN THE FIELD BY THE COUNTY INSPECTORS. 20. INSPECTORS HAVE FULL AUTHORITY TO REJECT FILL OR BACKFILL MATERIALS, REQUIRE UNDERCUTTING OR SUB GRADE STABILIZATION, REQUIRE PROVISIONS FOR SUB DRAINAGE, OR REQUIRE OTHER MEASURES WHICH AFFECT THE NTEGRITY OF ROAD AND UTILITY CONSTRUCTION. FAILURE TO COMPLY WITH NSPECTORS'DIRECTIVES SHALL BE CAUSE FOR NON -ACCEPTANCE OF THE FACILITY. 21, TRAFFIC CONTROL ON PUBLIC STREETS SHALL BE IN CONFORMANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND AS FURTHER DIRECTED BY VDOT INSPECTORS. COUNTY INSPECTORS MUST BE NOTIFIED 24-HOURS IN ADVANCE OF ANY PLANNED WORK OR ACTIVITY IN RIGHT-OF-WAY THAT REQUIRES FLAGGING, LANE CLOSURE OR STREET CLOSURE, ALL SIGNAGE AND OTHER CONTROL DEVICES SHALL BE IN PLACE BEFORE SUCH ACTIVITIES CAN COMMENCE. 22. ANY DISCREPANCIES FOUND BETWEEN THE DRAWINGS AND SPECIFICATIONS AND SITE CONDITIONS OR ANY INCONSISTENCIES OR AMBIGUITIES IN DRAWINGS OR SPECIFICATIONS SHALL BE IMMEDIATELY REPORTED TO THE ENGINEER, IN WRITING, WHO SHALL PROMPTLY ADDRESS SUCH INCONSISTENCIES OR AMBIGUITIES. WORK DONE BY THE CONTRACTOR AFTER HIS DISCOVERY OF SUCH DISCREPANCIES, INCONSISTENCIES OR AMBIGUITIES SHALL BE DONE AT THE CONTRACTOR'S RISK, 23. A PRECONSTRUCTION CONFERENCE SHALL BE HELD PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL ARRANGE THE MEETING WITH THE COUNTY ENGINEER, AT THIS TIME, THE CONTRACTOR SHALL PROVIDE A SCHEDULE AND TRAFFIC CONTROL PLAN FOR WORK WITHIN THE RIGHT-OF-WAY. 24. IF TRAFFIC SIGNAL PLANS HAVE BEEN REVISED OR CHANGED SINCE APPROVAL, THE DEVELOPER MUST PROVIDE AS -BUILT DRAWINGS REFLECTING CHANGES TO THE VDOT. PROVISION OF AS -BUILT DRAWINGS IS A CONDITION OF BOND RELEASE. G SETH R DERICK Lie. No. 041454 W 0� Nov. 21, 201,7 �W 1�,SI DNA L �~ CJ Q 0) o W W � �� Z O Q 0) 0 o �z Q �00L,LL CC) LO J °° J � No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE GENERAL NOTES Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C-1.01 _�// I I / / / -_� _� _ _ _ __- _-_-_ _ \VAAVAI\� 1 Illlll�j A V `�'1// '� � —1-- V/r// - / /////// //////// j��` __ %/ j l I I-.'/ j//�'�:-_VAAVA \\ VAAVAAVA\ VAA��- _ - �-' </ / / �' / i-----_--� ��'���_ ___-�`-----------� ----- ��`:� h /i' ---- v _ _------ - / / - ��� --'--------------- - v v A \ \ v �—��` // j�����---5 ��oss�os—Lo \ v ✓ A V — / �- s — cos dos �s' -Cos V Ill \ \VA A \ \ \VAA \ V \ VA V AVAVA \ VA \ V 1 1 I I I I I I / / � �` ---- , / v� v v � � •i / / -- Vv vv �`� VAA v / ----> °s ---i i/ // / / � � � v����v vvvv�w�--____—� i� —_vvvvv v� � v \ V V � v V� \ \ / / � V A V V` v v \A VA A✓ �'os�-`o --_/ // / //__i,° _ � vvvA ���� �°>ow v � �� � _ --%' �'�ov �� �� v vv v A \\�\\ //i//,%_- I _ I I _ _- IIIII - 1 - \ - \- \ LOS _/ sue/ i � � \ v / I IIII I, I I l / l / / / l I I \ \ / / / / / / / / / /✓/ / <os� os -��0os --- --- _ gem_ -_----__- I MATCH NE -- I 706v vvv �'/ /////lr�'�'� ---_ A - moo' - vvVAAVAVAA/,''------------ /r --- - ---- - /4II �' moo_ v v v _ -- ---- ---- � `� �-----__ -- ----- � / / /,�/ / / / / / �e- - / / //// � � _-- v v I 1 / ////�� A A - - - - - �� r � - ==-�i / I I \ -9-40- \�V\VAVA - \ 940_/ I \ VVAV A\\\vvvvvvv�v`��vvvvvvvv�vvvVvvVA`' __-------_-_ - v ` _-� / / sap- - --_ - \ I I vA vvvv v�vvvvvvvAvvvvv \\V v --__ _ � 1 \ 1 1 1 1 1 I I I I I I I I-- -�/ MATCH LINE IIIIII I I 1 A _ ----- __ _ / / 6„ CPP NV OUT � 842. \ I/ / /�---_ �' \ � � � �� � // // \ EXISTING / / / — -- ---- v //V/ / // �I I I ----e ---- // _--_- ----'� POND _ --- - I I I I III \ l l \ \ V A \ \ V vv vv �i� I I I I V ) Pv � V A V v- ��_--- - _-°' � // ) A A111j1 POND l l / /� I I � V A V � �' I I I �-� �� �� ' � / / / / I I �� -----------'' -------- \\ �'__ --- - _ \ V v v v- - - - - - - - I \ \ V \ V v\ v----- - - - - -' fV vv / ------�° v V A A Vv / vEYN,8��P/4 �- A------------ - I 1 V A A \ \ / /-------' � / � �'' // /' 1 �v vv A � � � \\ 1 \ I �-' _� _- �/ ///C�s / 5 / // / / I �- / // I I v^• v � � ���� � ' � ___l v v \ \ �- / vvv - /'-- \ _ -_- SURVEY NOTES: 1. TOPOGRAPHY NOTED WITHIN LIMITS OF SURVEY (LOS) LINES AS PROVIDED FROM TOM SHUMATE SURVEYOR, INC. WAYNESBORO, VA; THOMAS E. SHUMATE JR., LS 2042 ON MAY 29, 2019. 2. TOPOGRAPHY NOTED OUTSIDE LOS LINES AS PROVIDED BY ALBEMARLE COUNTY GIS DATA. 3. STEEP SLOPE OVERLAY AS PROVIDED BY ALBEMARLE COUNTY GIS DATA SCALE: 1n = 150'-0' I� O � SETH R DERICK Lie. No. 041454 W 0� Nov. 2-1, 201,7 �W ZONAL Q 0 Q W W �Lo Z � O Q a) _z�0 oN Q LL C2) �z J Co J � No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE EXISTING CONDITIONS Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C-2.01 • 75 6 150 301 I , I I — _\ \ \ v // / / , DI I__---- I `- i // -'' STEEP 06900--00-05000 �� v v v vI v v I \ V A \ // /' / / // --v-\ \ \\ /' - �� ' /' /'/- SLOPES _ BEL_ VISTA LLC _\--_---� `- \� \ A\ V A V A I V/ /'/ _ - V A \ \ V< / A A A /� / /,//'��� i- COUNTY --i'-- _-- - � � V A\\\Vvv V A A V I \ / /' A I \/ / ' i' / -_--- -�--- -v AA A ,A \ V I I GIS - ���-_ \ \ \ \ \, v v v v vv )� I / // / ��I 11 i 6900-00-00-050C1 /// ___------ �V vvvvv vvvvvvv� vvv w Iv Iv v v v v v/ /III 1 1 I v LEISHER, MITCHELL - ---------- w v vv vv v v v v v v v� V_- V A \ \ ) / / / I II I / \ I - \ / \ ----_ ---- ---- --- -- -emsv, v v \ \\ \ \ \ v\v� v- -v \ I I / V - J - - - / i _ _ _ - \ _ - - _ cos - ns_ cos -dos _ o� s V V A J l l I l \ —. - / - --- — - AvA to A \ - -� ) / V A I I I \ / = -/ �� STEEP -- -� V A- - -- - - .s__ _- --===cam=y A ----A V.. A_c�\ \V A \ \ \ A /, - / / / \I I I V A \ \ - - i SLOPES __ - / Z, - - V A Los _ - - _ _ - � --� � ` AAvv,�� V \ \ V A _ __ i i / I I v _-- —��� — / // �— ��os--L�_�ins� Los 'o,—�� �`--- -_� _--- �A�, �,- V A. \ ,� VA \ A \\ / i // i FROM \-_--------- _ / _-Los-�� ^I������ — �� -- _ -Z---- —��� V� A A A-w` v A \ V A A / \' i A �os� i/oe / _ _--�-- --� -- �..� —-�����_� —� --_ -- �yvA \V A V \\ / / // / — - — — i // --- - --- — —i _ - \ \ / \ — v - �/ -v v- — - - _ _ _ v v A V A / / - -' - > - i // / - -- - i i ->, - vv v \ I A / ^ GIS v 1 ( -�- \ 5 _ - /i/ ///�/�� �� -�z _:��­_:::- --� - ', I/ Z '/ � � ,- �, �� y_ = _-- -� ��v� v v . ,o / i ,o� — --A \---- v --- -- A \ \ V A A I 5E / __ — - ___ _ - \\ 'h / " __- -- -- -1 _ _ —--�- —_ 1� -::: _�_ — — —/// KC / _ \ \ \— \,\ \\, \\ \\- —\ — 08_— �— � _ \-�—,, -.\� \V, g , \\\ \\ \ \ \ \I '� \ \ I I J � � __ I \ Ids __ — \ \ \, / / I -- �7 / I I / , .- , �� ::::: \ \\ \ \ \ <— -�7 -�- � — -:--! — — — — \ �\\\ ,�,�- 1, — ---�— — — - \ o /1_� -- ��- - :�- -- - J \ / / VA A - - _ _ — / 110 ors -.... ---� � -VI I � �V AVA \VA —�� -- — - \—— — -- \ �,:� A _v� A VA �A A V —\ -__� �- ,�, V A V I / / V\ �A V A —\ VA \----,�o V- _ AAA�VAVA\VA \ I _1 II I vv v _ I I °s _ -v y vv v/ / I I VI >vvv v'vvv 1 � ` v � ------ v v ,)II III v v� v� v 07000 00 0 014B5 I — / v vvv v / �v I /,/ )V A vv -vv II Avvvv� v \\ - I \ \ - os\ \ \ \ \ \ \ 1 \ ,I// / / "_. - \ // \\ \\\ \ I I I —I— l , ��\ \\ - \� -/ l / I J ,/ / / __ I _ - \\ l \ \ \ DEVR ES, PETER I 69000000019A9 \ \ \ \ \ \ \ \ / / I "// / '%-- - - \ r I \ I I \ / TALLARD, GILBERT_ �J , 05 1 I\\ \\ \ \ \ - \\\ \ \ /// �\ �/ /l /// /// - - - �, / 11 I \ \ \ v vv -- / / / - � / / /// I. \ \ ��v - \ I I I v v vv v vvv / // _ -v '� // v v I/ � � II / / _ �� / N ,, vv v vv ,\ y _ \V AAVv� ---� '\ _---; / /// / / - v // / /// ;,e� 1 I II I o A 'v I I I I r i �� I 1 III v °,- - - \ \ V - - / / 1 -_ -- i /// / / / /i -- y \- v - -' / i / / -„�"- � �- i j / \ \ I I I I I I I I I I v �/ —Y o I I J / �I I 1 / I A v v�-- �� \ V v - — —/ ( �� / // - - // % / / �- �v -- — — - , - � / ) I l v �� / VA` v V - - _ _ / -- i� - - _�/ A I I I i \ i / / l / 1 I 1 A VAAAy \ \ VA - \ \ V - - -/ / - // / / /// - w VA \ � - i i --, ii_ - y ,°5 / / / � > V A I / LIMITS OF S VEY I / A V- - �L/ / / - vA _ - 1 l l I I I I l I l l \ \ / i �I \ ' -°'�/ / l I I \\ .\ \ \\\\\ \\- \ \ I ) / i i/i = i/// ///l / \\\\\\\`- \iiii'i/'� --_-ice i / i 1 1 1 I l , I l h - _ TOPOGRAPHY BEYOND LINE IS / I \ - - - _ \' \ \ \ \\ \ \ l / / / - - i % % _ - / / l / / \\\ � - -- �_i / , � _ _ -_- _ _ / \ I I I / / - - FROM COUNTY GIS \- -- / /i - - / - \-=-- _' j I 1 l l l l __ -- ` _-- -- -= I I \ \ \°\ \ \\ \ I 1 / / // /i// % i % _ ///// //" / //i =�\\\\-'%'i /ii"'i%\\--- ----- � i' / \ \\ i = , - - I / I / I - ----_ / / i =-_ _ —_ _ \ \ \, , \ \ I I I I I I I �' iiiii -_ _ ' %'i/ / \ \ %__i >/i %- - --- , I` / - I I I I I I / I / l l l \ \k /� --_ - / oy` -. -_- -- \I \ \ \1 \ s 1 1 1 1 111 i/ / ,%i ' \ -\�' \i/i//\ „ _==,°w--- / \ // / // \ -- gaze- -- _ ---- -Q \�\\ \ \ 1 IIII I IIII / - ; _= == =___ - --�% � / \\/� _ _ --�Vy / / / / \ - _ - -- - - \\ 1 I _- — -- - - / // / / / / \ _-- \ \\\\ \ \ I // / _\_ _\ _ \ \ \ i //ii / i. - / /l,/ �// / - ��-- - iiiiiiii- / - - - - - _ / I 1 I - - _-_\ \\ \\ \ - _ - \ - - - --� \� AA�vA - ,os / �ii s/� -,---- - _ / - / I I / I _ _ _ _ _ - _ - / // /, / I / I \V /' STEEP SLOPES � - ` � -, vvv -, _ _ - - v / STEEP SLOPES =\ dos -c cos dos -<' cos � s os / / A - lo�/ / / / / / \A_ I I \ \ /' FROM COUNTY GI - \ ; � v� v - -�� -v-- A ' e' / / FROM COUNTY os-� - - _ - / I-- - - �- ��'� \ �'/ / -V A��---������-�_ �//'/ GIS dos cos - _ --192 �- \ \-\ \-- - - - - - \5 _ --- -- -- _-- - -- \ - I V / / V-_-_�-����-y��- _--�' //-------- A_ V A \ -- -. / 1060 -\- ---�- I�-�-�- 0 --_y / os/1� __ -- --- �'\\ V ASV - \ \\\ \- \\�-�\ MATCH LINE - - -- ----,' s/1 a ___ - -- 1 v _ -- - v v v v v >s° v -- D _ I ° v- - v v - i /� \ � V A - - - - - - - - os STEEP v - - v v v \ 11 040 - - \ '�-, - - /� v A v A\ \ I - - - 5 \� � - - ib6q — - - - i °s — - SLOPES v � � \ � A V A / ,, _ - J � - �� \- - \ - - - - - _ - �-, LIMITS LIMITS OF SURVEY FROM / \ \ — - / � \ \ j \\ I o - -__ / COUNTY / \\---- / / /( �� - - - - - - - - TOPOGRAPHY BEYOND LINE IS FROMF GIS / - - - I / / ' / �',�J - --- Iwo_ --yy- ��°sue COUNTY GIS 111I 11 \ - --- I / /I \ / I i ro_ - - --- - \ �_ ---- I I / I I \ - / // I I I---'------� I I I I\ I I IV v V `v`- - '�__� v � - _--— -- — —_ V A w-< — ---- - -\�-__� ��,�_�-__- nSos I -L -- -- ___ ` \\ 11 II\ III III II II II I \ \ o 8:9--\ -- -- - �s v D - / - I I - - - - - , — — - v-_ - �- - / // sao / __ _ - - -- I -- v-_ �/ °o - _-yam dos V �� / '/'/ / i -� I I I I /1 I --- -- -- '� I/ " z _. — — —1 —) / J t, 11 — — -- _Zl Q �� �- ___ --' / // / ' \ \ -- - _ -_-- - - ____,� , — —/ _ STEEP ' , � I / v / // / / / / / // I - - - - - - - / / / i / ,'--------- - A \ / - - SLOPES _ _ - - - - - -- -- _- // / / / _ '`v \ / / -- FROM _ y / / / // / / // / / ( - v \ V -- - -- - ------ / / � -- v \Q / COUNTY � / / / ___-/ / / // / / / - - v A \V � A A\ v--- -- --y- _ /' / I , -- �V vv / /� GIS -- ��/ / / ' /- / / -- / /-_// / / // \ -_ �V V v ---- / - ---- _ / \ I \ -- , / / / _ \\ \ VA- v vv -v -- -- _ / i- / SLOPES v - v -- _--- / / / I 1 1 //--- y - \ \ \\\ J - / I V- / / V / V A \ \ - - v v - - _ - - _- --- / / FROM A - / / I v A - -V A V v ---- \----- �\ VA - - - v- - - A - - v v- / / / / l v /l/ , A \ \ \ \ \ v v - - �b vvvv - Cbl9NTY _ seo V A v _---- -_/ / / / / / / / / / / ( v / / / / A \ \ \ \ v v \ V - vV 11 --� / GIS - ---- /// \ \� I �I I V A \\ v-�_-- /7 / / / / / / - v // / ///A\ \ V AV A\ \� \ -- - � / / / \ 1 \ - / / 06900 0 04700 - / / � \ \ � __ ---- v / / / / / / - _E: -I I _ - / '/ / T / / // vv v- I — — / / / -- --' �/// - / / - - II --- '/// / / A W DAVID --/ / / I -\- - --- �aa- ____� v ---- , r v s6a- / // 06900 00 00 02000 v / / // / /' / / / v - -_ __ --- / vv / / / / / /, / - - / / v _ I _ V __ — ---- " --- — /' \ I I I -\ vv , --- _/ --- __ /'// AU GUSTA � // \� / /, ' / /' , / / I — --_ --- -�/ / // ��\—-------- --- -- ----- / / / PROFESSIONAL / / - - / / - _ I, �/ EESSIO / // PARK - - - - - - _ v � _ / - v _ ,_------_ gao- - I I I v / / / - ---_ / - � - // / /_::-_-__� � \\ — — — / \ \ \ //^— / / / I\ --J , � fl \ \ �-� "� _ —JJ / / `----- - v — _ __ �,,- _'1 V / /- - - - ' - _ - - v - � / - v v / _ -� / / I - �' 1 v/ // / �-_-//_ I I \- ---- - --- / -\ \ I \ \\\ -'"/ - i / / -, \ _- It \ -/ / //---_//- I I - - \ 1 / / i - -- ---- _ --_ - / / \ \ i �� i -920-i / / \ / / //� I i -� ///- _ i - - - - / o ' V A 1 I I -_-- ------ '/ / �\ _ __ -- 3 v_-' -I V A I I111 I \��-- I I I I I I CD e - / / A I I I I --'-- v \ �/ �J I I I 1 V I I v 1 - _ ---- / r---- \ v \ v / II A / / STEEP A l A I I ti- A V A l l -- / I \ I I I I I _ � /---- erg- - SLOPES / i I A I A - - 1 ( - I 1 \ V A V \ - --_--- -__- - / ----' -- - --- --- I \ - - \ III\ / / \ \ - - / \\ \ \ 66v v �- - v- / I V I I �/// __ FROM // '/ V I I \ \v A v 1 I i I I / I 1 1 1\ V A A V I� I/ vvv\ VA\y - v A - -----------__ -v -� // A 1\ �\ v� ,__ / /// ao GIS / /,' 11 11 / - v - I I �1 �/ / 1\ \ V A \\\ \ A I / /VA \ Vv --, v ` - - - --/ // AVA\\\\V l l I I ,/ / VAA I ---v v 1 1 / / / \ \ \ \ \\ �_ ,-- I I - --- \- \ - - - v v FROM OUNTY GIS l�\v a = - A / - � V A I A - - v \ \ \ - - S EEP SLOPES I V A \ \ - o v \\ _ II v v -_ / / /VA11 III \" �, v v v- - _ A\ ��v_� _ _- / �' / I I I v v ------------ / / / I I A v v v v \ vvvv V v' \ ___- l v 1 I / O III I \ vvvv 1 \ V A ---- v v v v _ ��,_- \ / \ 11 1 \- v v--- -'�' / I = / 1 / V A - /' / 11 1 1 1 1 v v v v v / m / _ _ _ I \ v\\\\ _ v - _ o vv -%/ , -- ��os 4 --- / //� 06900AU USTA 020B1 V I v v v \_ _-- ----- / v / / / A \ -' // // / 111 11 1 I v v v \ -J /' / II I I\ r-- \\ \ \ \--9so---_---- �v - - / / I, I --9ze-- _ _------ / / /' / III I I v v v v I I, �_ - _ _`v v _\----- _ // / / // ���v MA CH LINE �� , ii' /' S7 /- _ ' / PRO ESSIONAL - // - ---�/ - //// / / I I I Il \ / / v v v / ( \----- / - _ / /i/o / - A / // ----- l v v v v / / - /' o/ / / l v v \ V A V A -- ------ /i / / - A�� '%/�j �i'i/�/ N // i jam//ice ' V PARK / _ i - - --- -/ ' / l V't A \ / \V A // /\\ \\\---------- --/ // / ` L - / j 11 i_ / \ / // :\ /%% - / %y/\ \\ L ' -- - - / // / ' / III 1 ( / -- \ \ / / v " v _ - _ �/ / / / - - - --- / 1 v v / - iio /i C / 1\ \ o 1i / /_ i y' � �/ - v / 6 CPP - i / r//i /�� v \ \ - / / v - - ------ - / V N 851. 1 / / ';,� �' i �ii / i ! /''/i/�///// /,, `- \I \ \ V I --_ --- ' /� / 1 / /`v - I r- / -- - TNV UT 842.E //�__ %%� /i ,; //i / - - � / / / 1 \ / v I -- / - / //_- y�ii / _ % / ///// // LIMITSOFS EY -- - -- / i l - _ _ i i — J / i i /i / i i i— / ---- — — _ J / - \ - - - ----- / _ ��_iii'%`a // / f/// / / l /� TOPO PHYBEYONDLINEIS \ - - -\ -- _--- / /-- - --- -- - -/ l \ \ / i \ _ _ A I _-/ / /�/ %��iiiI ��l /// /// l l l FIR COUNTY V -- -_ -- / / - - --- i----- / A \ V A I �7- - ---- - / _ /l - - - __ / /--_-_-__- ---- \ \ I I � - ---� / /-= y� ��� /v /Ili / ill �/I I I I I I � V �� vI I v- -- -- - v- _ - -+�/ / / /'_� -- ----� -I I AAVA A \\ I I o y EXISTING / //� I I \ vvv --------- 1 1 -- -tee----- // / /-=---_- ---- � ) ) vAvvvv vv I I V - POND v v -� - - - -- y_-- ------ _/ ---- i // I - - / /// / �, \ \ V A \ --_- $a� I I I I I \ - -- , /� \ \ \ -- I - - -- - - ---- / \ 1 v � - ,, � // I � � III �, �_ v v \\ v I I I - - - _ _ I / / - v----- / V A \ I \V A \ - A _---_--' , I/ /// \\ \) / / I /I v\ \, v O, ----- I I \ - ---- - _ -IIII (\ /r ---- ----- // 1 A \ \� I V A \__i' I I \v \ EXISTING FARM ---_d/�/J/ V ,AVlll OND / � \ \ \ i -1 -- -- - - J 1 I -- ---- - / - A ROAD CENTER LINE__-- ) ' - - - - / / / --- ----- v�- --- --- __-- ��°_ ��. / / 91 / / \ �� -- -- `- / / / l 1 I- --- - / III ---_ - _--- ov`- -- i //i / /// /VV A �,� — ---- I I I - - - --- -- I \ \ - 06900 00 00 020B0 - _ 8e$- /_ _ - i ////// �\ \ I I \ - � / / / / / / ---- --- -\ / \ --- - _ - - - - -- v�----- PROFESSIONAL _ -� _r / / / �� 1 v �/ -- I I - -� v // // // / / / / v _ _ - ---- - v v -_--- ° -/ I v PARK `v = �y / I I 1 `� / v I ' / r / r I Jill - ----- 6 __ -�� a /� '_�, - - /Ill - I ---- \\ �'a / / \------- LIFO \ _- -- - -_ \-- - - �/, /i �/ - ////II -\�o / / \ L \ \ // / // / / --__-- - V - _- - - -- A� / -� I - - A A� / / --_ - I V - -1 ---- tee.- _ � I I I / i' / �-_ \---------- / I I \ \ \ \ -- ---- _ _ _y\— _ / -' // \ \ \ - , I h i 11 ,- s I /\_/1 / 1 1 ---- \ \ \\ \ 1� // / / / / / / // / - - - __ I I \ _--- --- - V v / / I A \ / / / / / / \ vv vv - ------ - I A � A -- --- -_v A \\ V v// V`IA w / // I \ / / / l l / / / ! �- - I I - I / V A / / - os - -- ����_.vV AAAV \ \ 1 / / I I - - - __ ,� - v - vv � I- I v - / I v I v v �� - -� s���--_; � v � A A_ / / �I� I � , / yv I I ____-- I - / / / / / / A v v � v - -- --- -- v i v v I i v / / v � v �v v ___- = � v v v vvv v _�18"/ bP / III /' , - / / I, / / / / / / / V A - I \v -/ ��" - `°s�� - \ \ V AV A /OIN � /r� "//�a� // / /II I I II \\\ \ ./ /// /- -/// / I I / / / / / - - ---�ao ------ I � V - - - / V �- \ I -- ---� \\ a� VAS_/ii/// / // l / /- / / / / / / v I I V V-- - -- ---- ---- - --->------- I \ \\V ������/i//� / / _� 1 v / // / I / / / / A- _ _� \ \ ' ---- v �� l I - - i', o "I, \\,I VvV �i �i /'i / ' / / / / / / A\ \ \v \ - \ ' ' // / / II \I I I/ //// I , - I A \ \ ---- I ii i /� / / / —/ I 1 / / / �/ //11 -� - - /� / //- _� I / / I \ \ v� V A ��� �_ ' v v _ %�,� �� - - / l\ l l / / r / A \ - / - / \ \ � 1 V I - \ I I / --- / A' \A -�_-__ - s l j l / / / / /1 / V A / �< ' \ V A / - A \\ V I - ,- "— - - _\ \ - � - � _ - - - A\ I \ \ V / - - - - - /--/ �nnj - - - - � � I LIMI OF SURVEY /\ / / I I V A - _ - - - i' i' - A \ \ V A / / A V - - I \ V A / �' - - _ - ) / ea°/) \ i ��-_ - -' / `n / TO OGRAPHY BEYOND LINE I / / / A i - - A A \ _ I \ \ V A ,v - ---- / ---- �, i / / ---- --_--- %///lull/1/I__ i' / �< �� OMCOUNTYGIS �/ / 1 l V A- / -� � � - - ' \ V A _ - - - - \ / / os /- / / \ \ \ \ \ \\\ I \ - 11\ V i - i/ A cos ---- �J1I111111�---' \ /� l6l / / A V A - --- / / i--- / / 1 -�-----_-- i I //y% / / \ I/ /l l 1 -- � / V A V A A 1 -- -v V A / / / ---- - i - / / i� °s� - _ // A- -- o /C / v _ -- / / - � - / / / A /( - =LSO/ V v /' v A A VII\\ /� -/--- v / / / / / / o A i // / / /� / v v - A v \ \ I A \ \ \ V 'v v- \ V A \ V/ / /' / ''�i' ' / / / // vv \ �/ I V A \ 1 \ - - - / // (ems 1 0 / / r- / / / / I -� - - --� I I V v V A A VA \ \ \ \\ / - -- \ / / / / / _ V A / / / - _ \ v - I V v / / / _ / / / % \ �\ V 11 A ( - ' Ste. ' / / / / / / / /I I - - A36�, V A VAA\\\ I /- - \ \ / - / / / / \ MISTING ARM o / / / - / \ \ \ - V A V A �- / // /// / - ---' // ! /����- A A \ 1 1 V A \ V A I / /iROAD ENTE�LINE / l / / / �/ / - - -�� v /, ' V V AAA \ \ \ \ VAV A -- - I A A \ V A-- _ / _ i / / \ STEEPS OPES /i A 1�� V AV A\ \ V A A \ \ / - o / // / / / / / /� / / \- _-- --7 6-C i i� I - // A \ \ v Av v---/�--- Av 1 \-- / / �__ I V\ v v v v v v v _ / _ /' // /l // -/r ,/ // // - --v , II - 06900 00 00 47C0 --- OUN GIS / / / I \ m \ - - - / ' - 19 -' / - - _ ' FROM C - - 1 v _-- / ' - I/ ' / / _I j / o A A 1 \I \IIII 1 \ / 1// / / / / v ///� /- / v v // - I - -/� //' MCALLISTER, DA NY --/ I - '// / -_/ )) I / 1 1 1 j 1 - -� / / / / / V� v v � I I I - /' / / / ) \ A v V 'VA\V -' / I -� '� /// �,\ I / �// , / / A - - y - o / / \ / // / vv i� / ' \ V A - - / / / 1 /' o / / / / / / I / - / / / / y / I / , ' v v V /' � 1 - / � / \ \ v / / / / / --- / / / / A \ \ / ,' 1 A- -- A \ V �, \ - -- ---- '�/ /� z/ N!-�x�� �\� \� I i' �'/ // / 11 / � / / 'Il I �v v ,-// / 1 V - - /'� / / // \\ I \V 1 /- / / / / / / A os / // / / / // --�- / / v I I v / A - -� I II \\�\ I ---- - --- / / / / / i� / I A os / / / /� l // ' - - o / // / / 1 v I / v - i' \ V -- / ---� / I VA \ / / / V /r I / i // 0 1� / -1 / \ \ / - _ - -- -_aA.e I I / / - - _\ v - \ o A v i/� . / / / / -/ v -� I vv / / / / / v -- v / _ //// / l / / r / I \ \ I I I - I I / / A -_ \ v / / --- V - - 1 XISTING FARM / // / / I \ V � / ----- -- I - - / - - \ \ ' / / -\ _ \ ` - _\ `� _ROAD ENTRANCJa' / I _ / / V v� / /' // (/ _� y ��\ \---_-� \ - - _ Cam' / / -/ / /�///// / I I I L// , / /- / \ \ V I I I I / v�--� - --__ / % / / / l / _ �- - 1V / / _ / / // I / / V \ -- - V -- / ( -� - - \ / / / / / // / / A V A V 1 r---_ A -- - / / - / / \ V < r v- I = _ OD _ o / y / / I y / \ V A V A V \ I ---- \ \ I - - _ / - - / / \ \ V v � <' �---2\ V v 1 I \ v / /// / // / / / I I / // \ \ \V A V A�\ \ \ �_ - � - 1 I --_- --- --- // / � )1 / / / / --- _ -- / v v v - v 1 I / /) I v��� ' -- v v v /� / / v / 1vvvvv\ - - \ - __ /v - / _ / / / v v v v v � � v v v - / v / I �� ( / / v v v - / - / __/ i /------- \ \ \ \ \ cos \ 1 / \ \ - — - --- ,/ -- , — / I J \ \ \ \ \ / _- I / \ \ \ \ l / A A- ---� I / / / A \ / / v� / / / / / -, \�_ — -\ / /V / v v _ v \ - �� / / / \ � I \ / — --- — — - ""I \ 1 36 E__ / / \ I/ / / \, - — / — — ------ B14G_ — z z ___ ,Z,� __ \\ \1 - - I �,__ — � �J I I \ � / �_ __ --- � ,_ __�,, Z) / / — — --- / / / I / \ " / ( / �_ __ / - / � J 6 \\, \ C � �\ ,_- --- I_ —- / / /- I V /I I n I I < / - -- / 1� / / / / / V v / II / \ v �/ V v\ - - - \ V A I 1 A -�� - - / /_/ / / / / // I I `/ \ / \ A \ vv \ ---- - - __ / / " __/ ___ -- _—I / - /: // SURVEY NOTES: 1. TOPOGRAPHY NOTED WITHIN LIMITS OF SURVEY (LOS) LINES AS PROVIDED FROM TOM SHUMATE SURVEYOR, INC. WAYNESBORO, VA; THOMAS E. SHUMATE JR., LS 2042 ON MAY 29, 2019. 2. TOPOGRAPHY NOTED OUTSIDE LOS LINES AS PROVIDED BY ALBEMARLE COUNTY GIS DATA, WITH LIMITED INTERPOLATION PROVIDED TO BRIDGE SURVEY SOURCES, WHERE NECESSARY. 3. STEEP SLOPE OVERLAY AS PROVIDED BY ALBEMARLE COUNTY GIS DATA 4. SOILS MAPPING FROM USDA NRCS WEB SOIL SURVEY. -- I / / / / I I I 1 I v / / v - __- -- - / \ \\ \V A \V A I i \ I I I / I A ` / // /i // // I I I I I V AV l / / / 1 \ N --- _-�� • 1� - 150,_On / / I I \ / SCALE: - \ \ I `. I I I , II / I 1 \ \ \\ � / / /, / / I I I \ / 150 75 6 150 300 6!dSETH ____"'� DERICK � Lie1;6. No. 041454 C 0,,� Nov. 21, 2019 , ' 1�,SI CNA L �~ Q Z "/ , Q � 0) Q CO Z W W C/)LO Z Z) O Q 0) _Z I0N �W�� ��VQ) �z U),,,6N(-) W Q Q� (3 OL,LL U z � Q J � Co J r�n ftftZ .;� v No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE STEEP SLOPES & SOILS MAP Project number Date Drawn by Checked by 19004C June 21, 2019 ETS SOR C2.02 Albemarle County, Virginia Map Unit: 4E—Ashe loam, 25 to 45 percent slopes Description Category: GENSOIL Ashe: 75 percent The Ashe component makes up 75 percent of the map unit. Slopes are 25 to 45 percent. This component is on mountain slopes, mountains. The parent material consists of residuum weathered from granite and gneiss. Depth to a root restrictive layer, bedrock, lithic, is 20 to 40 inches. The natural drainage class is somewhat excessively drained. Water movement in the most restrictive layer is very low. Available water to a depth of 60 inches (or restricted depth) is low. Shrink —swell potential is low. This soil is not flooded. A is not ponded. There is no zone of water saturation within a depth of 72 inches. Organic matter content in the surface horizon is about 3 percent. Nonirrigated land capability classification is 7e. This soil does not meet hydric criteria. Map Unit: 513-36voir loam, 2 to 7 percent slopes Description Category: GENSOIL Belvoir: 80 percent The Belvoir component makes up 80 percent of the map unit. Slopes are 2 to 7 percent. This component is on swales, piedmonts. The parent material consists of residuum weathered from granite and gneiss. Depth to a root restrictive la er fra an is 16 to 30 inches. The natural draina e class is somewhat oorl drained. Water layer, 9p � g p Y movement in the most restrictive la er is moderate) low. Available water to a depth of 60 inches or restricted Y Y p ( depth) is very low. Shrink —swell potential is moderate. This soil is not flooded. It is not ponded. A seasonal zone of water saturation is at 18 inches during January, February, March, April. Organic matter content in the surface horizon is about 1 percent. Nonirrigated land capability classification is 3w. This soil does not meet hydric criteria. Description Category: GENSOIL Worsham: 3 percent Generated brief soil descriptions are created for major soil components. The Worsham soil is a minor component Map Unit: 7B—Braddock loam, 2 to 7 percent slopes Description Category: GENSOIL Braddock: 80 percent The Braddock component makes up 80 percent of the map unit. Slopes are 2 to 7 percent. This component is on fans, mountains. The parent material consists of alluvium and colluvium derived from acid crystalline rocks. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is well drained. Water movement in the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is high. Shrink —swell potential is moderate. This soil is not flooded. It is not ponded. There is no zone of water saturation within a depth of 72 inches. Organic matter content in the surface horizon is about 2 percent. Nonirrigated land capability classification is 2e. This soil does not meet hydric criteria. Map Unit: 145—Chester loam, 2 to 7 percent slopes Description Category: GENSOIL Chester: 80 percent The Chester component makes up 80 percent of the map unit. Slopes are 2 to 7 percent. This component is on hillslopes, piedmonts. The parent material consists of residuum weathered from granite and gneiss. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is well drained. Water movement in the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is moderate. Shrink —swell potential is low. This soil is not flooded. It is not ponded. There is no zone of water saturation within a depth of 72 inches. Organic matter content in the surface horizon is about 2 percent. Nonirrigated land capability classification is 2e. This soil does not meet hydric criteria. Map Unit: 14C—Chester loam, 7 to 15 percent slopes Description Category: GENSOIL Chester: 80 percent The Chester component makes up 80 percent of the map unit. Slopes are 7 to 15 percent. This component is on hillslopes, iedmonts. The parent material consists of residuum weathered from granite and gneiss. Depth to a p P P 9 g p root restrictive layer is greater than 60 inches. The natural drainage class is well drained. Water movement in the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is moderate. Shrink —swell potential is low. This soil is not flooded. It is not ponded. There is no zone of water saturation within a depth of 72 inches. Organic matter content in the surface horizon is about 2 percent. Nonirrigated land capability classification is 3e. This soil does not meet hydric criteria. Map Unit: 14D—Chester loam, 15 to 25 percent slopes Description Category: GENSOIL Chester: 80 percent The Chester component makes up 80 percent of the map unit. Slopes are 15 to 25 percent. This component is on hillslopes, piedmonts. The parent material consists of residuum weathered from granite and gneiss. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is well drained. Water movement in the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is moderate. Shrink —swell potential is low. This soil is not flooded. It is not ponded. There is no zone of water saturation within a depth of 72 inches. Organic matter content in the surface horizon is about 2 percent. Nonirrigated land capability classification is 4e. This soil does not meet hydric criteria. Map Unit: 15C—Chester very stony loam, 7 to 15 percent slopes Description Category: GENSOIL Chester: 75 percent The Chester component makes up 75 percent of the map unit. Slopes are 7 to 15 percent. This component is on hillslopes, piedmonts. The parent material consists of residuum weathered from granite and gneiss. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is well drained. Water movement in the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is moderate. Shrink —swell potential is low. This soil is not flooded. It is not ponded. There is no zone of water saturation within a depth of 72 inches. Organic matter content in the surface horizon is about 2 percent. Nonirrigated land capability classification is 6s. This soil does not meet hydric criteria. Map Unit: 15D—Chester very stony loam, 15 to 25 percent slopes Description Category: GENSOIL Chester: 75 percent The Chester component makes up 75 percent of the map unit. Slopes are 15 to 25 percent. This component is on hillslopes, piedmonts. The parent material consists of residuum weathered from granite and gneiss. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is well drained. Water movement in the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is moderate. Shrink —swell potential is low. This soil is not flooded. It is not ponded. There is no zone of water saturation within a depth of 72 inches. Organic matter content in the surface horizon is about 2 percent. Nonirrigated land capability classification is 6s. This soil does not meet hydric criteria. Map Unit: 15E—Chester very stony loam, 25 to 45 percent slopes Description Category: GENSOIL Chester: 75 percent The Chester component makes up 75 percent of the map unit. Slopes are 25 to 45 percent. This component is on hillslopes, piedmonts. The parent material consists of residuum weathered from granite and gneiss. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is well drained. Water movement in the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is moderate. Shrink —swell potential is low. This soil is not flooded. It is not ponded. There is no zone of water saturation within a depth of 72 inches. Organic matter content in the surface horizon is about 2 percent. Nonirrigated land capability classification is 7s. This soil does not meet hydric criteria. Map Unit: 16—Chewacla silt loam Description Category: GENSOIL Chewacla: 85 percent The Chewacla component makes up 85 percent of the map unit. Slopes are 0 to 2 percent. This component is on flood plains, river valleys. The parent material consists of residuum weathered from granite and gneiss. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is somewhat poorly drained. Water movement in the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is high. Shrink —swell potential is low. This soil is occasionally flooded. It is not ponded. A seasonal zone of water saturation is at 12 inches during January, February, March, April, November, December. Organic matter content in the surface horizon is about 3 percent. Nonirrigated land capability classification is 3w. This soil does not meet hydric criteria. Description Category: GENSOIL Wehadkee: 3 percent Generated brief soil descriptions are created for major soil components. The Wehadkee soil is a minor component. Map Unit: 36B-4Icyesville loam, 2 to 7 percent slopes Description Category: GENSOIL Hayesville: 80 percent The Hayesville component makes up 80 percent of the map unit. Slopes are 2 to 7 percent. This component is on hillslopes, piedmonts. The parent material consists of residuum weathered from granite and gneiss. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is well drained. Water movement in the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is high. Shrink —swell potential is low. This soil is not flooded. It is not ponded. There is no zone of water saturation within a depth of 72 inches. Organic matter content in the surface horizon is about 2 percent. Nonirrigated land capability classification is 2e. This soil does not meet hydric criteria. Map Unit: 36C-4;cyesville loam, 7 to 15 percent slopes Description Category: GENSOIL Hayesville: 80 percent The Hayesville component makes up 80 percent of the map unit. Slopes are 7 to 15 percent. This component is on hillslopes, piedmonts. The parent material consists of residuum weathered from granite and gneiss. Depth to a root restrictive g layer is greater than 60 inches. The natural drainage class is well drained. Water movement in Y g the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is high. Shrink —swell potential is low. This soil is not flooded. It is not ponded. There is no zone of water saturation within a depth of 72 inches. Organic matter content in the surface horizon is about 2 percent. Nonirrigated land capability classification is 4e. This soil does not meet hydric criteria. Map Unit: 36D-4;ayesville loam, 15 to 25 percent slopes Description Category: GENSOIL Hayesville: 80 percent The Hayesville component makes up 80 percent of the map unit. Slopes are 15 to 25 percent. This component is on hillslopes, piedmonts. The parent material consists of residuum weathered from granite and gneiss. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is well drained. Water movement in the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is high. Shrink —swell potential is low. This soil is not flooded. It is not ponded. There is no zone of water saturation within a depth of 72 inches. Organic matter content in the surface horizon is about 2 percent. Nonirrigated land capability classification is 6e. This soil does not meet hydric criteria. Map Unit: 37C3--tIcyesville clay loam, 7 to 15 percent slopes, severely eroded Description Category: GENSOIL Hayesville: 80 percent Map Unit: 38D­Hcyesville very stony loam, 15 to 25 percent slopes Description Category: GENSOIL Hayesville: 75 percent The Hayesville component makes up 75 percent of the map unit. Slopes are 15 to 25 percent. This component is on hillslopes, piedmonts. The parent material consists of residuum weathered from granite and gneiss. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is well drained. Water movement in the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is high. Shrink —swell potential is low. This soil is not flooded. It is not ponded. There is no zone of water saturation within a depth of 72 inches. Organic matter content in the surface horizon is about 2 percent. Nonirrigated land capability classification is 7s. This soil does not meet hydric criteria. Map Unit: 5613-Meadowville loam, 2 to 7 percent slopes Description Category: GENSOIL Meadowville: 75 percent The Meadowville component makes up 75 percent of the map unit. Slopes are 2 to 7 percent. This component is on interfluves, Piedmont uplands. The parent material consists of colluvium derived from igneous rock. Depth to a root restrictive la er is reater than 60 inches. The natural drainag e class is well drained. Water movement in Y g the most restrictive layer is moderate) high. Available water to a depth of 60 inches or restricted depth) is Y Y g p ( p) high. Shrink —swell potential is moderate. This soil is not flooded. It is not ponded. A seasonal zone of water saturation is at 48 inches during January, February, March, April, May, December. Organic matter content in the surface horizon is about 3 percent. Nonirrigated land capability classification is 2e. This soil does not meet hydric criteria. Description Category: GENSOIL Worsham: 3 percent Generated brief soil descriptions are created for major soil components. The Worsham soil is a minor component. Map Unit: 56C—Meadowville loam, 7 to 15 percent slopes Description Category: GENSOIL Meadowville: 80 percent The Meadowville component makes up 80 percent of the map unit. Slopes are 7 to 15 percent. This component is on interfluves, Piedmont uplands. The parent material consists of colluvium derived from igneous rock. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is well drained. Water movement in the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is high. Shrink —swell potential is moderate. This soil is not flooded. It is not ponded. A seasonal zone of water saturation is at 48 inches during January, February, March, April, May, December. Organic matter content in the surface horizon is about 3 percent. Nonirrigated land capability classification is 3e. This soil does not meet hydric criteria. Map Unit: 66E—Parker very stony loam, 25 to 45 percent slopes Description Category: GENSOIL Parker: 75 percent The Parker component makes up 75 percent of the map unit. Slopes are 25 to 45 percent. This component is on interfluves, Blue Ridge uplands. The parent material consists of residuum weathered from granite and gneiss. Depth to a root restrictive layer, bedrock, lithic, is 48 to 80 inches. The natural drainage class is somewhat excessive) drained. Water movement in the most restrictive Y la er is Y high, 9 Available water to a depth of 60 p inches (or restricted depth) is low. Shrink —swell potential is low. This soil is not flooded. It is not ponded. There is no zone of water saturation within a depth of 72 inches. Organic matter content in the surface horizon is about 2 percent. Nonirrigated land capability classification is 7s. This soil does not meet hydric criteria. Map Unit: 8113—Thurmont loam, 2 to 7 percent slopes Description Category: GENSOIL Thurmont: 80 percent The Thurmont component makes a 80 percent of the ma unit. Slopes are 2 to 7 percent, This component is on P P p p p p p interfluves Piedmont a lands. The arent material consists of colluvium derived from granite, ranodiorite and p p 9 g granite gneiss. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is well drained. Water movement in the most restrictive la er is moderate) high, Available water to a depth of 60 Y Y g p inches (or restricted depth) is moderate. Shrink —swell potential is low. This soil is not flooded. It is not ponded. A seasonal zone of water saturation is at 60 inches during January, February, March, April. Organic matter content in the surface horizon is about 1 percent. Nonirrigated land capability classification is 2e. This soil does not meet hydric criteria. Map Unit: 81C—Thurmont loam, 7 to 15 percent slopes Description Category: GENSOIL Thurmont: 80 percent The Thurmont component makes up 80 percent of the map unit. Slopes are 7 to 15 percent. This component is on interfluves, Piedmont uplands. The parent material consists of colluvium derived from granite, granodiorite, and granite gneiss. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is well drained. Water movement in the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is moderate. Shrink —swell potential is low. This soil is not flooded. It is not ponded. A seasonal zone of water saturation is at 60 inches during January, February, March, April. Organic matter content in the surface horizon is about 1 percent. Nonirrigated land capability classification is 3e. This soil does not meet hydric criteria. Map Unit: 96B—Worsham loam, 2 to 7 percent slopes SETH R DERICK Lie. No. 041454 W 0� Nov. 21, 201,7 �W SI DNA L CJ Q 0) o W W C/)Lo Z O Q 0) 0 �O Q Q �00L,LL LQ J _ o0 J � The Hayesville component makes up 80 percent of the map unit. Slopes are 7 to 15 percent. This component is on hillslopes, piedmonts. The parent material consists of residuum weathered from granite and gneiss. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is well drained. Water movement in the most restrictive layer is moderately high. Available water to a depth of 60 inches (or restricted depth) is high. Shrink —swell potential is low. This soil is not flooded. It is not ponded. There is no zone of water saturation within a depth of 72 inches. Organic matter content in the surface horizon is about 2 percent. Nonirrigated land capability classification is 4e. This soil does not meet hydric criteria, Description Category: GENSOIL Worsham: 75 percent The Worsham component makes up 75 percent of the map unit. Slopes are 2 to 7 percent. This component is on Piedmont uplands, drainageways. The parent material consists of colluvium derived from igneous rock. Depth to a root restrictive layer is greater than 60 inches. The natural drainage class is poorly drained. Water movement in the most restrictive layer is low. Available water to a depth of 60 inches (or restricted depth) is moderate. Shrink —swell potential is moderate. This soil is not flooded. It is not ponded. A seasonal zone of water saturation is at 6 inches during January, February, March, April, November, December. Organic matter content in the surface horizon is about 2 percent. Nonirrigated land capability classification is 4w. This soil meets hydric criteria. Map Unit: W—Water No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 11/06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE SOILS LEDGEND Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C2.03 nF)gnn-nn-nn-nc)nnl / /v / vv-- / -�-_-� / - - 1 <3__ - - j � - v 11 A V / / / // /' /' �'' -v__ Iv - v 11 vV \ v\ 'V 7 / l / / v v A V / v ___-- - /' ,-- /--v_-- -- -v v v \ V I I / �v / v v A, /' vv v v A \ v I I / / \� 11� I----------- ___'\ -�\� \� \� �/ � v�vT, � `^ /� i' iI i_____ --- ---v -� / / / v V A \ \ A \ I I __ - � j 6 /�v ,� / -- STEEP - 06900-00-00-05000 1, v vv vv v vv vI vv v I - '--, I ' SLOPES BELLE VISTA LLC � �- ` v v / /z //, s- FROM - /- _- __ - - -: \ \ \ \\ \ / /� / /��� COUNTY _--- - __�----- v v V A V G\ I / / - GIs - j�� - v v A V A \ \ / --__-----------\--\ \- \ \ \ \ \ \ \ \ \ \ � -- -------- - v v v v v v v -- ___ -\- \ \ \ \ \ �\ \ - - - \ - - _ - - _ Los Los - Los dos \ -cos \ \ \ \ \ \ \ \ \ - \ >-- - - - - v -- - - -- - - - - _ s _ _ _ _ _- _-\\ \ \ \\ \ \ STEEP �.. _ /- -\ SF_ cos_ c: - _�����•� ��.;<\\���\ \� \ \\ \ \ \ \ LOS \ \ \ SLOPES _ _ _ / - _ - _ _ _- // // os=L��,Oss�os�--FO L0 -v � � -v v��v v 1 A A ��V v VA \ v A\ \ V / / os v - FROM \_-- _-- -- -- - - \\ \\ \ \ \ \ \ v / ��� ; /os'/ _ - - - � LIMITS OF vv�� v v v v v-\ vv v v V / C UI�TY - �oS� , / /, j / / w All �� vv v vv D BAN �,vv A �A '^A \ V A A v VA A / - _ - GIS 105 � _ // // _ - SF \ \\ \ \ \ \ s - / / / SF - \\ E _\\\ � � \� � \ \ \ L /� / _ \ \ \� \ \\-_� - - / \ \ \\\\ \\\\\ Loses _ - ,mom/ ' i A\AAA --�\ Vvv -� _ -_- AAA�-� \. ,.A A A / --_- _- �// / / // _ �, v \ VA --vv vv-�: w --vvvv �'.^ °s = =- __ --_ - ////% /'��'��___��_ �AAA VA --_1 � v -::� -- - - , �v� wVA VA V� \ J, 1-1 __ ____v vv vvA v - - �v�-wvv vv �`�\ v °s __ _IF � � _-- /// �, ��__ \`� AVA�VAA\-- sF T�--....... -- _.VA �A\VAAVA\V A V A A yAf/- - a - / />w v A A \ SEDIMENT BASIN DRAINAGE AREA AVAVA \` A A V v o / - _ - - / Rs \ \ °�. ;%%-,� \\\\ \ J / / 1 I \ >Lv I /$\\ �o - \ \ .II111 I\ \ \\; 07000 00 00 014B5 \ '. LIMITS OF DISTURBANCE ^ ;� \ \ \ / ` \ I \ \ \ - \ \ \ j \ / - - \\ \ I // \ \ \ \\ \\ DEVRIES, PETER \ \ _;_ _� ; -\ m 1 I t / _ - _ 1 \ \ \\ v / , 5/�` vvv v _ VAVA� V / ,Z _- - - 1 1 1 �) 1 A 1 1111 \1 L) I I lvv v v' \IF �v VAAVAVvv � /o/ '� /' / / _� / / /// // // 1 / IIII I I A \ \ \ V v vv �- v A v v v - - // -��//� /// //,��1/ ) I I A V A \\ v v v / 5 J / I I I - AV A A - __/ ,' I / / /` v / / / // / . J v v A / / o / I A \ oes� I A v / / / / v , v v / / � ,, / '%+°' i/ / - / // // A \ V A " v v 5 o °»' \\ LIMITS OF SURVEY / '//I 1- sF�"ei l� / _e \\\\\\�\�\, ��\\\ \\sT°R.- sr II,ILE �zo•' -=-'i,/////////' 11 ' \\, \. -,- -, -/'� i'_' --- -- \ soil 11 OPOGRAPHY BEYOND LINE IS - / 5 I _ \\ \\ \ \ - \ ✓ - _ _ // // l ' / / '\ \\\ _ _ /�i'i'///i % - - _ - - / FROM COUNTY GIS °>, _ _ - _ - ' iivcEin.eo . / / __ 1 1 \\\\\\\ \\ I I I IIII/ /s a g. % // i/ / \\ \ % ----'i�/��__---_-= - - - SEDIMENT BASIN DRAINAGE AREA - - \ \ \ \ I !III / ;�"/ /' ' ' '1. T TEE " / \ \ // /' ' - - -- -_ - R _T RS - - - ` - - - �___%__ / \\ III „% _ __ / /�/// /� - �` \ --- _ \\ / \ I II I/I _ - -- ---- - -- -- ____ ,�, %.a°`--\\ \�...,\\Jl /l/jl I/I �' U '" - -- --_- �\-_�---- -i�i ��i'-_-- \\\ \ -- �] /, - _ _ - o _ / DV J _ _ _ ___ - __= i'�� , \\ \\ i _ _ TEMPORARY SEDIMENT - _� s \\ '\ - - / _ =_ - - - _ _ - - 5 - TRAP DRAINAGE AREA - / - = _ _ - _-'° \ __ _ - - --- - v� -sF \, \ - - / �// -- --- - _ ice' v - , '� v' : - �'" _ _ --v , _ / I \ \\ // STEEP SLOPES �\ aF \ \s \-�\ \�\\�\\\ \� ./r STEEP SLOPES --= os-Cosmos-<ios os�ios - /j°j/// sF FROM COUNTY - - _ I \ \ / O80 FROM COUNTY GIS - VA v vvv wv -- - / �� Os L-5 - /' - "17 vvv �, vv - vv _ v -- -�/ / GIS _--- v _� VA �� v v�� - A -. / _-7072 - vvv -- -v_ / ------ v- - v� �� // oco , � v�1 v� v --- //' `°s/ ----- - - /V \\ L\ - / / - - --- / v v MATCH LINE - - - 1 - __ / 05 --- \ v \ - / \ \ / \ 1040 I sF - oo Z-\..\\\\.... j /°s STEES \ ; �\ 1 \I - v v ��-- - - / °s v LOP vv A \ -' ���v�Z' �� os FROM / -•���- --- /` LIMITS OF SURVEY COUNTY / A �v /I I ( ' = -- _ 02 - - os TOPOGRAPHY BEYOND LINE IS FROM GIS - _ / / \- _ _ - DISTURBANCE R5 --\ °s/ COUNTY GIS /-_ i ' �J LIMITS OF I v - O,� __,, a \ \ \ \ _ / / ; -- - TEMPORARY SEDIMENT os I I / 1 1 \ \ / __ \__ TRAP DRAINAGE AREA / I I \ \ _ }- --' - F_ -- v v __J � I v = os- / --- , ----� I I I V v - - k-.. -I 0 °D_ AVAVA vv,--� �-II� _ IV I 1 \ \ \ - -- - -- vv I _ J, 7 v v \ _v vvv s'- -1-02 / I I �_--- _ -'1 A \ v y-vvvvvv��0���----- - v / I I---- - -- 1 V V A\ vv _ - - - / �/' s�o / - -- / _v_ v/, / -�jll/ / / / _- ------ - A --- STEEP --_ '-,�/ // I/ // / / I i �Ov -_ / /-i _ - \ ./ /� SLOPES vV vv/// /// / / / / / \ v v y v - /' // ' __.v \ \ / FROM / v v ' / / i / / / \ \ \\ - - - - / / - - 1cL4d COUNTY \\ �/ / / --- - - / / / \\ - - --- --- / I. J / o� v vv v / I i - T __ / / v-_ /// / -- -- / ///i / l l / / \-- _-- vv --_ - - r I STEEP i _ -- / / / --__� / / / / < vv- ---_-� / / J SLOPES --- o\\I--_-_ vv / / II \ v --- _- - / // / l l I I 1 J / _C ' \\--_-_--__- / ////// FROM --- \, \ \ / 4l1 1l \\-----_--7 / / / / / / / I \ - TY _ ,v �-- __ - -------/// //// // /I/ / GIS _@ I -- % - /' Q v- - I A\\\ \\ v-� 1 // / / ,/ //,/ / / / / / vv ___ ------ _ / / / / / I - -I I I \ \ _ / / / 06900 00 00 04700 / \\\ - \\ - // / // / / / __ '' I / /''/ j_ - I 1- /j/ z// D \\ / / / I ) -\ --_ _ / v - __ - __ ATWELL AVID vv �aa--�AvG-_ - -- - // / / v Sao sse �/ �� 06900000002000 1v /i ////�/ /// / / I -- / / / / / - - -_--__ \---.__-- // � I I / � --_/ �� /' /// AU GU STA / / ` \� // //� /// ' I / - -\\ \, ///////�\ \-- / / , / - --_- /// PROFESSIONAL i / / /// / / i - \ / / // //---- __�_- - - _ - v y TEMPORARY SEDIMENT `� - - _ - ' � _ / / / / / , I I v A A _ � // - - - \ \ \\\ /; TRAP DRAINAGE AREA -_-- PARK __--ij/ , _ I \ \ \ J/ l //�/� �-- --_- v v v - - / / v V _ -- - -��� I v �42 v' - / i - \ \ _ / -- - -__-_ _v � v v /-- / / v _- / / I -\ // - _ --- ----v v \- vv-� vv ___ / - v v v \� - / / / - J \ \- - \ - - - \ ��� / � / , i / \ \ \ � TEMPORARY SEDIMENT / \ -- \ - \ -) / / /-- / \ \ \ - v = - - / v - TRAP DRAINAGE A / / / - - v ---� -- v//_ --- / / / vA A - - _�� - v- _ _ -- ,, - -�� R / / \ - vv v -v / / I � \ V --___ I� QII � v v -_ „ --�4s_ j c �- v , v v <__- EROSION AND SEDIMENT CONTROL SEQUENCING - _/ / N / v I 0 �' V I vv v v v vv _ R ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE O SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. / / /v I I' ' " --- �vLIMITS OF / STEEP v A v v v v- --- / , • SITE LIES WITH IN HAYSEVILLE LOAM AND CHESTER LOAM COMPLEX. SOILS ON / I / I II 1 ----_ ]l SLOPES / \ 1\ \ \\ I / SITE ARE VERY STONY AND STEEP IN SOME AREAS. DISTURBED AREAS WITH -- -- _��'/ I / sF DISTURBANCE FROM / / I/ 1 v v v v v _ _ I �1 v °° --. �'' COUNTY / / - / v �v I `� v v v I STEEP SLOPES SHALL BE MINIMIZED. --�--_ __-- vv __ 1/ / I I y �V I _ - ` I :�` GIs /� � vv v 1 / vv `v vv vv I I v • A COPY OF EROSION & SEDIMENT CONTROL PLANS AND PERMIT MUST BE KEPT ------- y / ,I I I V A V\ 4os , i' ---- / , I I l vv v v� V 1 I v ON SITE AT ALL TIMES. -- - V A V�os / AV I I I V v v vv FROM courSVTY GIs I I ! v \ v �_ TEMPORARY RY SEDIMENT i / / I I I A `v v • ALL PUMPING OF SEDIMENT LADEN WATER FROM EXCAVATIONS SHALL BE I H vv I11 - TRAP�C-3.01-8 FOR // // v v �v v vv -_' THROUGH A SEDIMENT FILTER BAG OVER A STABILIZED SURFACE. /� v / v _- ENLARGE'7 AIL / / 06900-00-00-020HI I V A \ - • CONCRETE WASH WATER SHALL BE HANDLED IN ACCORDANCE WITH LOCAL 11 --- / \ _ _ / v v - A tea, vcam -- / / AU GU STA / / I - �� _ _ _ _ ORDINANCES. IN NO CASE SHALL IT BE ALLOWED TO ENTER ANY SURFACE OR v ----- / / / ;MATCH LINE I ',IS/ /- ___/ e PROFESSIONAL � / / ;/ -` \ '-�- - / \ � '/ / / ��/o / v ' i GROUND WATER SYSTEMS. \ / v v / / / o�, / / , j' <1 V PARK / I-- - - • v / °o� / / / a - - SPECIAL CARE SHALL BE MADE TO AVOID SEDIMENT TRANSFER TO / v vv // / / 6" CPP ��/ -� - '"� / '� �� a/i// �y v LTC / - " I ��// , /- \ \ \ DOWNSTREAM PROPERTIES. ADHERING TO THE SEQUENCE BELOW IS _ / / /�%/ �`��////� '� , - ' CRITICAL TO THIS REGARD. / -- _ - /INV IN - 851. p RS IF� // - y \ \ \ ry / vv-------- PNV OUT 842.E ' / / /, ' ////// /. I v / ` ' ` � // / ///// / / LIMITS OF SURVEY \ \ \ \ \ \ \ - - - • \ / _,/ / T// ///j/ e� //// , / o I / NO TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE v - �-� i/// /0 //// l l l -TOPOGRAPHY BEYOND LINE Is v v v v _-- -` // REMOVED WITHOUT THE PRIOR APPROVAL OF THE COUNTY EROSION AND / / / / _ /' // // % // / / / / / / FROM COUNTY GIS \ /- %= / I I SEDIMENT ADMINISTRATOR OR DESIGNATED REPRESENTATIVE. _ // % ' EXISTING / �/ I I v -, \ / / i POND /I I I \ \ ' V -v ,",9----- //// / I I I I I vv_ --- sI 1 � / I v v o/_- � �_ v __ - I / 1. CONTRACTOR IS TO SCHEDULE PRE -CONSTRUCTION MEETING WITH COUNTY $s6 I I 1 1 I I vv LIMITS OF DISTURBANCE I l `,' 1/ �V V vvvv �' --- '1 1 --v vvv vvv------'' _ --- I I I AND ENGINEER OF RECORD. � I I I �� U v v I 1 I I \ \; l i,111 i\ \ ` \°/ - -- I I I� J 1 2. NOTIFY ALBEMARLE COUNTY AT LEAST 3 DAYS PRIOR TO LAND DISTURBING --' I j -- - I) 1 \�1111 /' V v v v -I --- / / I V v v - / \ POND ' V A V � I __ / ACTIVITIES. i v Q -- - � / / I / ��\�� vA� - ----- vv vv // / / I / / \ _ I -\ \__- / 3. THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF ALL EROSION AND 069000000020B0 �v --- $�---_ __ -- /� //// I I I I v v v v v AUGUSTA --- - -I // I I I I v v05 - I SEDIMENT CONTROL MEASURES. v-----�__w-- - '- /(/ I I illl I V A\ _� I 1 v v11 - - - - \ °5 \\ / I \ _ - - - _ I \ - _ \ \ \ / /' 4. INSTALL CONSTRUCTION ENTRANCE, PERIMETER CONTROLS; SILT FENCING, PROFESSIONAL v vTv �1�LIMITS OF DISTURBANCE � v %moo `v / / -- 0" PARK ` - °°�- v _- ", l v / -- 1 --- `v vv v / CHECK DAMS, DIVERSION, INLET PROTECTION, CONSTRUCTION ROAD _ \ _ \\ / �, / \ _ LLC _ � \ _ Q \ I L \ / 8ae / / r \ \ \ \`__ \o\ \\ / �� \\\\ 1 \ X. / // \ // / . v ��_ _ - vv--, Rs j/ / v / A A v STABILIZATION AND SEDIMENT BASIN/TRAP ' 1 l \ \ \ \\ \\\ \ / --- \ `\ \\ \\ // /' / // 5. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR ae / / l I 1 I I I j v V vv /' = �w-z' - � �'v � ' m v v' "" I""A ' ;°sue I / ''/ / I -� I v v v // / // PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF -------- - --os vvvvvv vvv A / i V / / / v - / / / I 1 i f \ \ \ __ j j _`_� o \ \\ ` \ \ \ \\ � �� / el llll l I / // // y, ,_ _- / / / SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE - \\\\ _\ \ ------- I v / / s - _v. A v _ I / ---- I A / / / / I I I \ \ '/ /' �,os = -� \ \ 18"/ hP / / / \ \ _ ,-- SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE I v v //, --v ��_1, vv� v SIN / /////%� I I v / / / -- -' - --- - -� - \ \ \ \t \ / //� 1 __ / ,- / / ROAD SURFACE SHALL BE CLEANED THOROUGHLY WITH DRY METHODS NO r v �/% ' v- -'�.-\\ \ \ V A�WT i /l "�// 1 I _ I I V A � _ -/ / ) ------- /I 1 I 1 v _� __ _ - -- � 1 v v: �'\ /���/� ///o� /� / / / /II v \v v v v // � /`' // WASHING) AT THE END OF EACH DAY. / / \ / -v I - v / I v 6. CLEAR AND GRUB SITE / / v-- __�/ --_ ��m-I � --,�% // <</ / � - _ / // �/ / v v v� �' // 7. REMOVE AND STOCKPILE TOP SOIL FOR REUSE AT CLOSE OF PROJECT. ---_ �1 I ____/ a '% / / / /I \ \ \ --- _' _ 8. COMMENCE ROUGH GRADING, CUT AND FILL. PLACE FILL IN LIFTS NO GREATER /' _ / / - - - ` � r �- _ � I LIMITS OF SURVEY / � / / / I \ - -� - - - � � � - o / '--- _ ' �' // / �- /' / / /_/\ /I� --' �� /Os / TO OGRAPHYBEYONDLINEI� I / /��< / A --- / _- THAN 8 , COMPACT TO95/o MAX PROCTOR DENSITY. DO NOT PLACE FILL IF IN j / / -- _ - /I III/ql x _ - / \l ROM COUNTY GIS I _ / / / I \ \ , - - _ _ SITU SOIL OR FILL MATERIAL IS SATURATED OR FROZEN. / , / p5 _ i - - - _ �- _ ' -� / / \ II III --' /' / °1 / / ' ( I / / / I \ \ l I( - -/ / % , / ' I/ // / / \ \ ---_-- I/ l �i / A ,�5� /_, -_-_ //ll vvv, - / / \ I I / // / "\ v - __-� 9. INSTALL STORM DRAIN SYSTEM AND INLET PROTECTION AS EACH INLET IS _ - i / / �' ------ // /'� / -_'� // / /// �- v \\ �1V A I _ // / C' / �5 / / / / I -_ / I v v v ---- - , -- v /___ - _/ / / / / / / v vv INSTALLED. 11 /'/ / "I / / / / / _ - 10.INSTALL SITE UTILITIES. - / / / / / / vv vv �I vv vv 1 /-� % �/ / / /� / / - / n v ' / /�/ � / , v v s v 1\ \ \ V t / - i/ 05�� /' / / / / / /I _��- _ ' 11.BRING BUILDING PAD TO GRADE AND INSTALL BUILDINGS FOUNDATIONS. < A \ - - - ' 1 \1 �// / / / / _- \ \\ /' �' -1 12. ENSURE DRAINAGE TO SEDIMENT TRAP AND BASIN THROUGH ALL PHASES OF / _ _ / / STEEPS OPES l 0 \ \ \ V / l / / / - I \ \ / / -- s1 \ \ \ \ \ /� /LIMITS OF DISTURBANCE / / / - GRADING AND CONSTRUCTION. - 1 / / / / / / / FROM COUN GIS �' / 1 \ V A A \ V A / / / I r / / - v v / / / i / / /`/ \ \ \ 111 I - - .--- � / / / / / / / / / v v _' I , _ _ _ _ j / / I / /' /� \ \ \ I _ _ - _ _ �/` /' / / / - \ I I 13. BRING PARKING AREA TO GRADE AND STABILIZE. ` // / / , ��� / �I I -/ ) I 1 I I I � I I \ � // / / / / / 1 / / / / / -- \ \\ \ / I 14.FOLLOWING STABILIZATION OF REMAINDER OF SITE, WHERE FEASIBLE, / / / 0 //�j qV l -' - i ' / � I - --- o / / / / / I / / l l / i v v �' �/ -_.�'/ �' // /' /� /may �< w�/i I ��' /'/ /��//// / ___ �� / l / / v A I / / �/ �v - vv v // �/� I CONTRACTOR SHALL DEWATER SEDIMENT TRAP THROUGH SEDIMENT FILTER 11 �I ,i / ' / �� / �-" / / ,� /' -_ - /' �/ / / / I / /I/ \\ f\ \\ \\/ /' \ - BAG, REMOVE AND STABILIZE SEDIMENT, AND DECOMMISSION SEDIMENT �, / // / /�// / �i // I \ °s' / / j �// / / / //vvv / / �v / I I / / I I � v v v �,___-7 / / v /` / / - . / / -� / //vv v / / / ----v\ vv BASIN. DEWATERING AND DECOMMISSION SHALL BE MADE DURING A DRY /' / / / / / / \ o / /// / -/ / / / / / / / - � / \ / �\ PERIOD WITH NO RAIN PREDICTED. FILL OPERATIONS IN DIRECT PROXIMITY / / / / --- -_v v - - - - -- v I of /-/// / / /% / /// / I / // v v � / �--- - -- - OF SEDIMENT TRAP SHALL BE MADE LAST. ,� C�'- / / / / / / / I i A - �v V -_ � - /// / / /� / / vv I / A / / / _- \ _�__ �� ��� - - - - / / / / / I - _ _ ` 15. UPON TEMPORARY CESSATION OF AN EARTH DISTURBING ACTIVITY OR ANY \ -� ° 0� -/J// / // / / // I / // \ \ \ \ \ \�1 I r-- \ STAGE OR PHASE OF AN ACTIVITY WHERE A CESSATION OF EARTH \ - _ / I \ �� \ \ 1 I \ �� �/ /' X / / / / I / // \ \ \ \ \ \, \ \ _ -- � // \I DISTURBANCE WILL EXCEED 4 DAYS THE SITE SHALL BE IMMEDIATELY \ -\ \ \ \ \ \ \ 1 \ \ \ ___--­_'� / / / / / I 1 \ 1 \ \ / L I � / / / 1 v A I v v \ /� V A I SEEDED, MULCHED OR OTHERWISE PROTECTED FROM EROSION AND /- v v v v S ov vv vv I vv \v v - //`o� I �v I / / � � vv v y v vvv vV v---/'� //v A ---- SEDIMENTATION PENDING FUTURE EARTH DISTURBING ACTIVITIES. '� - // A v \ \ V A A \ / / /__ _-' I / v A 1 -/I v '-� '� v V A / \ \ \ / T / \ \ \ \ \ \ " 1 ` 16.IMMEDIATELY AFTER EARTH DISTURBING ACTIVITIES CEASE, THE / / /' \ \ \\ \ 8�_ // / / / / \ _\` /' / // / \\ // I \\ \� \� / �\ \ ---- CONTRACTOR SHALL STABILIZE THE DISTURBED AREAS. IF WEATHER DOES /> > / ,_� // // // / / / / v y G / // / v / �_ v v ��- ----- - _ NOT PERMIT VEGETATION, MULCH MUST BE APPLIED (VESCH - 3.35). SCALE: 1" = 150'-O� /' // / / // // //// / / l v / v � I vv // ) // �v � v 17.INSTALL CURBS AND ASPHALT PAVING, AND SIDEWALKS. / /_/ _/ / / / // / / I II 'p v vv I vv / / / v \ 18.IN AREAS TO BE TOPSOILED AND PLANTED SCARIFY SUBSOIL 6 TO 12 INCHES / /' /' // / / I I I I � I v / / / \ ---- PRIOR TO PLACEMENT OF TOPSOIL. ALL AREAS TO BE VEGETATED SHALL 15075 0 \ 15000vv //// // I I v vv v // /vv1 v vv-_� HAVE 4 INCHES MINIMUM TOPSOIL. TOPSOIL SHALL NOT BE PLACED WHEN v v � 1)�/ / / / / I �, v v / / 1 I , v. v� v FROZEN OR EXCESSIVELY WET. PROPOSED EROSION AND SEDIMENT CONTROL LEGEND SAE SAFETY FENCE (3,01) e CE CONSTRUCTION ENTRANCE (3.02) CRS CONSTRUCTION ROAD STABILIZATION (3.03) -R SF SILT FENCE (3.05)�-X---� IP STORM DRAIN INLET PROTECTION (3.07) CIP CULVERT INLET PROTECTION (3.08) DV TEMPORARY DIVERSION DIKE (3.09) N 6)RIGHT OF WAY DIVERSION (3.11) �)� ST SEDIMENT TRAP (3,13) ST TO TOP SOILING (3,30) TO TS TEMPORARY SEEDING (3.31) TS PS PERMANENT SEEDING (3.32) PS MU MULCHING (3.35) MU DC DUST CONTROL (3.39) DC SB SEDIMENT BASIN (3.14) CD ROCK CHECK DAM (3.20) - - LIMITS OF DISTURBANCE SEDIMENT BASIN DRAINAGE AREA 16w►Zw_iyb]16vmGLl:olff_]G711I_1 'H p O - j f G SER DERICK - Lie. No. 041454 C 0 ,1�> Nov. 2-1, 2019 �W �� (:;~ SIGNAL Q Z C ) Q � 0) Q CO Z W W v) Lo z Z) Q) Q 0) _zQ)oN �W�°� � � V Q) �z U) "'6N u W Q Q�00Lr,LL CD z - CL2) Q J P Co � v) Z .;� No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE OVERALL ESC PLAN - PHASE 1 Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C-3-00 ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE UU � O \ O� � � L; COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. �X 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND WA \ H F D / / SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. / - - 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. / - 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION `--__----_-------- -- AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. _ - 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND - DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. - / - - - SILT FENCE J-HOOKS _ _ / LOS 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. _ - WHERE SILT FENCE _ 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. - - i / i RUNS DOWN SLOPE \ \ \ \ SF ��' _\ ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. ---- / 50 FT SPACING TYP. \ - �_ S - 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. - - - \ \ LOS LO_ 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, -- SEDIMENT BASIN O / LOS - ---- LO'S LOS L0LO \ \ \\ \ \ \ \ STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. - - - - DRAINAGE AREA ' S'- - .18AC 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. -- \ ✓ _ 4L0 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. L o \ \ \ \ \\ \ O 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7.00AM TO 9.00PM. SILT FENCE J-HOOKS - - L0S 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY WHERE SILT FENCE RUNS S _ - HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE O SLIDES, DOWN SLOPE / L0 - �/ SINKING, OR COLLAPSE. 50 FT SPACING TYP. j SF /10 \V� A \ V /0�0 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT-- - _ / - \ \ \ \ / FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, L0 / f- ----- �/ / / / / \ \ \ \ \ \ \ \ \ \\ SILT FENCE JFENCE ,,_--- \ \ \ \ WHERE SILT FENCE RUNS BUILDING OR OTHER PORTION OF THE PROPERTY. LOS o - - - -1070- / / / _ \ \ \\ \ \ \ \ \ _ _ ' �., DOWN SLOPE 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF - S - O � // _ /-''�� �`, � \ \ � 50 FT SPACING TYP. SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE - _ ---- ---------- _____-%/ SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. �� - �- _ O 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE / O� S 1 - -- _ - �; :_ \ O \ \ SF \ \ APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND CRS ` - 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO \ / - o \ / SEDIMENT BASIN DRAINAGE AREA _ APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 01 �/ / \ ~ \ Jo�S O \ \ 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL \ �1CP MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50 OF THE WET STORAGE VOLUME IS FILLED WITH /o r� \ SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION /\\� / \ !� / \ \ / / ✓ J / ) �. DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. i -o \ \ O \ o / I I -' �O o O �, A� / `LIMITS OF SF O 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN \ \� / O /�-' / \ o \ \ 1 I \ / J y / ' DISTURBANCE MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. --- / ---- -- - SF SILT FENCE J-HOOKS \ VA �� SF \ \ WHERE SILT FENCE RUNS No�� o�\ / / / 1070 v \ \ DOWN SLOPE 'I X 50 FT SPACING TYP. ,-'�� VA - \\\O - \.� \ 95\ y DV / SOIL \ O \ STOCKPILE \ - - - -- \ \ CRS \ �\ \ AREA SF r 6------- 20! / -- I SF �� / A PORT-A-JOHN/�' sa ;' - 1075' LOCATION C1� r SILT FENCE J-HOOKS O S O I / / 1070 % --- t- 7 \ 1065 I S �- / EMERGENCY SPILLWAY WHERE SILT FENCE RUNS V- r FUEL STORAGE AST WITH CONTAINMENT BERM. �� v ®' / ' // // INVERT: 1078.3 _ _ / �� o DOWN SLOPES / SEE SPILL PREVENTION NOTE, THIS SHEET. I I I I oo D /j / / SF/ DENSELY VEGETATEDo° 50 FT SPACING TYP.- / PAINT STUCCO SOLVENT STORAGE - - 17101I \ - - RAIN GAUGE I I I I 4s" CMP RISER W/ ANTI -FLOATATION BASE / I I I I / AND ANTI -VORTEX TRASH RACK AND CLEAN OUT LOCATION, - - --- - `� v \ o / O / - , / RIM: 1077.20' --- - SEALED/SHELTERED \i\ \\1 \\ IfI DEWATERING ORIFICE: 1075.25' ----- / 10 55 / - �, I � CRS SF INV OUT: 1072.00' / NON -HAZARDOUS WASTES T DUMPSTER / \ [1] ANTI -SEEP COLLAR 5.5'x5.5' @ 30' � I J i J �~ \ I \ SEDIMENT BASIN DRAINAGE AREA \ I / / �,�' / RIP -RAP VELOCITY ATTENUATION PAD i DV ,, D_50:9" / EROSION AND SEDIMENT CONTROL SEQUENCING TEMPORARY SEDIMENT - DD \ \ j, ' • SITE LIES WITH IN HAYSEVILLE LOAM AND CHESTER LOAM COMPLEX. SOILS ON TRAP DRAINAGE AREA SITE ARE VERY STONY AND STEEP IN SOME AREAS. DISTURBED AREAS WITH STEEP SLOPES SHALL BE MINIMIZED A COPY OF EROSION & SEDIMENT CONTROL PLANS AND PERMIT MUST BE KEPT \VA SF ON SITE AT ALL TIMES. \ i ALL PUMPING OF SEDIMENT LADEN WATER FROM EXCAVATIONS SHALL BE THROUGH A SEDIMENT FILTER BAG OVER A STABILIZED SURFACE. 1105 - ��;� \ • CONCRETE WASH WATER SHALL BE HANDLED IN ACCORDANCE WITH LOCAL ORDINANCES. IN NO CASE SHALL IT BE ALLOWED TO ENTER ANY SURFACE OR O SF- DV �'� �j A GROUND WATER SYSTEMS. \ CPSO v SPECIAL CARE SHALL BE MADE TO AVOID SEDIMENT TRANSFER TO DOWNSTREAM PROPERTIES. ADHERING TO THE SEQUENCE BELOW IS >>00 CRITICAL TO THIS REGARD. SF • NO TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHOUT THE PRIOR APPROVAL OF THE COUNTY EROSION AND SEDIMENT ADMINISTRATOR OR DESIGNATED REPRESENTATIVE. SILT FENCE J-HOOKS WHERE SILT FENCE RUNS f DOWN SLOPE 50 FT SPACING TYP. P Ln���� v`xy v v yv v jam/ 'o r F sow MATCH LINE OSF DD \\ \ \ \\ \\ \\\ \�� - - LIMITS OF ��� \ \ TEMPORARY SEDIMENT �� \= _ - S O\ - TRAP DRAINAGE AREA DISTURBANCESF vd� 1. CONTRACTOR IS TO SCHEDULE PRE -CONSTRUCTION MEETING WITH COUNTY AND ENGINEER OF RECORD. 2. NOTIFY ALBEMARLE COUNTY AT LEAST 3 DAYS PRIOR TO LAND DISTURBING ACTIVITIES. 3. THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES. 4. INSTALL CONSTRUCTION ENTRANCE, PERIMETER CONTROLS; SILT FENCING, CHECK DAMS DIVERSION INLET PROTECTION CONSTRUCTION ROAD STABILIZATION, AND SEDIMENT BASIN/TRAP. 5. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY WITH DRY METHODS (NO WASHING) AT THE END OF EACH DAY. 6. CLEAR AND GRUB SITE 7. REMOVE AND STOCKPILE TOP SOIL FOR REUSE AT CLOSE OF PROJECT. 8. COMMENCE ROUGH GRADING, CUT AND FILL. PLACE FILL IN LIFTS NO GREATER THAN 8", COMPACT TO 95% MAX PROCTOR DENSITY. DO NOT PLACE FILL IF IN SITU SOIL OR FILL MATERIAL IS SATURATED OR FROZEN. 9. INSTALL STORM DRAIN SYSTEM AND INLET PROTECTION AS EACH INLET IS INSTALLED. 10.INSTALL SITE UTILITIES11. BRING BUILDING PAD TO GRADE AND INSTALL BUILDINGS FOUNDATIONS. SOS r \ f - SPILL PREVENTION NOTE: ' DD IF ONSITE FUEL STORAGE IS PROVIDED, ABOVE -GROUND STORAGE TANK ' -tnO _� (AST) SHALL BE LOCATED IN A SECONDARY CONTAINMENT SYSTEM ' \ CONSISTING OF A 100 SF BASE FOOTPRINT (SUGGESTED 10' x 10') WITH SILT FENCE \`� \- --- PERIMETER BERMS MEASURING AT LEAST 12" HIGH AND 10-MIL (MIN) J-HOOKS POLYETHYLENE LINER. DIMENSIONS PROVIDED ABOVE ARE ONLY SUITABLE WHERE SILT ; -\` \� \\\\� �\ \O`= FOR STORAGE OF AST UP TO 250-GAL. EQUAL MAY BE SUBSTITUTED, SO FENCE RUNS LONG AS CONTAINMENT SYSTEM LIP HAS A MIN OF 7" FREEBOARD ABOVE DOWN SLOPE \ / �� __� �\ \\ j S 110 /o OF AST STORAGE VOLUME. CONTAINMENT SYSTEM SHALL BE PUMPED \ O Temporary Sediment Basin Sizing Drainage Area 182,089 sf 4.18 ac Required Volume 560 cu yd Wet Storage 280.1 cu yd 7562.0 cu ft Proposed Wet Storage 7565.0 cu ft Sediment Storage 137.9 cu yd Dry Storage 280.1 cu yd 7562.0 cu ft Proposed Dry Storage 7568 cu ft Riser Diameter 48 in Height 7.08 ft Barrel Diameter 18 in Length 60 ft Upstream Invert 1072 Slope 2 Downstream Invert 1070.8 Anti -Flotation Block Sizing d 7.08 ft Dia 4 ft A 12.57 sq.ft gama_water 64.321b/cu.ft F buoy_rsr 5722.5 1b gama_conc 1501b/cu.ft Height 1.5 ft Width 8 ft Length 8 ft F buoy_conc 6174.721b Sum F buoy 11897.26 lb F do 144001b Safety Factorl 1.21 12. ENSURE DRAINAGE TO SEDIMENT TRAP AND BASIN THROUGH ALL PHASES OF DC DUST CONTROL (3.39) DC GRADING AND CONSTRUCTION. 13.BRING PARKING AREA TO GRADE AND STABILIZE. 14.FOLLOWING STABILIZATION OF REMAINDER OF SITE, WHERE FEASIBLE, SB SEDIMENT BASIN (3.14) CONTRACTOR SHALL DEWATER SEDIMENT TRAP THROUGH SEDIMENT FILTER BAG, REMOVE AND STABILIZE SEDIMENT, AND DECOMMISSION SEDIMENT CD ROCK CHECK DAM (3.20) BASIN. DEWATERING AND DECOMMISSION SHALL BE MADE DURING A DRY LIMITS OF DISTURBANCE PERIOD WITH NO RAIN PREDICTED. FILL OPERATIONS IN DIRECT PROXIMITY - OF SEDIMENT TRAP SHALL BE MADE LAST. SEDIMENT BASIN DRAINAGE AREA 15.UPON TEMPORARY CESSATION OF AN EARTH DISTURBING ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY WHERE A CESSATION OF EARTH DISTURBANCE WILL EXCEED 4 DAYS THE SITE SHALL BE IMMEDIATELY 1 3.24 AC DISTURBED AREA SEEDED, MULCHED OR OTHERWISE PROTECTED FROM EROSION AND �\ \\ f \ DRY AFTER EVERY MEASURABLE RAINFALL EVENT. SEDIMENTATION PENDING FUTURE EARTH DISTURBING ACTIVITIES. 50 FT SPACING 16.IMMEDIATELY AFTER EARTH DISTURBING ACTIVITIES CEASE, THE TYP. - CONTRACTOR SHALL STABILIZE THE DISTURBED AREAS. IF WEATHER DOES DD� os IF FUEL AND OIL STORAGE UTILIZE A SINGULAR AST IN EXCESS OF 660 GAL, - NOT PERMIT VEGETATION, MULCH MUST BE APPLIED (VESCH - 3.35). SF \ ` OR PROVIDE AN AGGREGATED STORAGE IN EXCESS OF 1,320 GAL, A FULL SCALE 1 - 50 -0 \17.INSTALL CURBS AND ASPHALT PAVING, AND SIDEWALKS. SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN SHALL BE IN 18.IN AREAS TO BE TOPSOILED AND PLANTED SCARIFY SUBSOIL 6 TO 12 INCHES O� \ PLACE AND APPROVED BY A REGISTERED ENGINEER, IN ACCORDANCE WITH STATE AND FEDERAL REGULATIONS. 50 PRIOR TO PLACEMENT OF TOPSOIL. ALL AREAS TO BE VEGETATED SHALL 25 O 5O 1OO HAVE 4 INCHES MINIMUM TOPSOIL. TOPSOIL SHALL NOT BE PLACED WHEN FROZEN OR EXCESSIVELY WET. Sediment Basin Component ELEVATION Basin Bottom 1072 Sediment Cleanout Elevation 1074 Wet Storage 1075.25 9" Orifice Elevation 1075.25 Dry Storage 1077.2 Riser Crest 1077.2 2yr water elevation 1077.58 Emergency Spillway 1078.3 25yr water elevation 1078.41 Dam Crest 1079.8 SETH R DERICK No. 041454 W Nov. 2-1, 2019 �W SI DNA L vJ Q o Q LLl W o C/) LO �000) zp ON � oN o �z C/)�N�O Q �00L,LL C� z CL2) Q J Co J ^ r� v ) No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE ESC/PPP PHASE 1 -A Project number Date Drawn by Checked by 19004C June 21, 2019 ETS SOR C-3 - 01 -A p I I I I I I I I I 0� vvv 1040 D20 1000 UQ d�l 0 ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE \' COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. r MATCH LINE \ \ \ _� / 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND ___________ ____ ;{ _ \ SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND �._._.._. _._._._ .-.-. - - - --.�_._._:� _ ------------•- T-- -,------- --� SEDIMENT CONTROL REGULATIONS. I O 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. SF 4. \\ \ \ \ \ \\� \\� \` / 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. DD \� \\ \\ ���`= - / 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR \ \ _ --� / REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. OS 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION vAND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND \� TEMPORARY SEDIMENT \ DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. �� �� LIMITS OF �� DISTURBANCE �' \ \\' TRAP DRAINAGE AREA \ =� \ \ / 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. \ S 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. SF �_� �� ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. - 0- \ \ -- cn_ 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. i OS 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY r - - DD \ ���\\� \�� �= jj �O`� HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE O SLIDES, t \��\�� \ SINKING, OR COLLAPSE. - � - --- _- i --- \ i -_ �\ � � `, 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT ` _ 1 FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, SILT FENCE ��\ -�� �� ��// BUILDING OR OTHER PORTION OF THE PROPERTY. J-HOOKS _ \\ \\\\� �iS 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF WHERE SILT _ r -, - - �\ �\ �i SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF FENCE RUNS .y ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE DOWN SLOPE \ \\ OS SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 50 FT SPACING 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE TYP. / \` - \ f S \ APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF DID A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND SF �\ i ° PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO \ \ / APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL CRS \ MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 100 EROSION AND SEDIMENT CONTROL SEQUENCING • SITE LIES WITH IN HAYSEVILLE LOAM AND CHESTER LOAM COMPLEX. SOILS ON \ SITE ARE VERY STONY AND STEEP IN SOME AREAS. DISTURBED AREAS WITH STEEP SLOPES SHALL BE MINIMIZED. • A COPY OF EROSION & SEDIMENT CONTROL PLANS AND PERMIT MUST BE KEPT ON SITE AT ALL TIMES. 50 FT SPACING TYP. ALL PUMPING OF SEDIMENT LADEN WATER FROM EXCAVATIONS SHALL BE THROUGH A SEDIMENT FILTER BAG OVER A STABILIZED SURFACE. CONCRETE WASH WATER SHALL BE HANDLED IN ACCORDANCE WITH LOCAL ORDINANCES. IN NO CASE SHALL IT BE ALLOWED TO ENTER ANY SURFACE OR GROUND WATER SYSTEMS. TEMPORARY SEDIMENT i\ ' / / • SPECIAL CARE SHALL BE MADE TO AVOID SEDIMENT TRANSFER TO TRAP DRAINAGE AREA DOWNSTREAM PROPERTIES. ADHERING TO THE SEQUENCE BELOW IS i \ ' _ CRITICAL TO THIS REGARD. NO TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE TEMPORARY SEDIMENT - / REMOVED WITHOUT THE PRIOR APPROVAL OF THE COUNTY EROSION AND TRAP DRAINAGE AREA SEDIMENT ADMINISTRATOR OR DESIGNATED REPRESENTATIVE. 1. CONTRACTOR IS TO SCHEDULE PRE -CONSTRUCTION MEETING WITH COUNTY AND ENGINEER OF RECORD. \ \ � � \ � � � \ � � � - - / / 2. NOTIFY ALBEMARLE COUNTY AT LEAST 3 DAYS PRIOR TO LAND DISTURBING ACTIVITIES. 3. THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES. - 4. INSTALL CONSTRUCTION ENTRANCE, PERIMETER CONTROLS; SILT FENCING, I ' CHECK DAMS, DIVERSION, INLET PROTECTION, CONSTRUCTION ROAD - STABILIZATION, AND SEDIMENT BASIN/TRAP. DD0� / 5. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY WITH DRY METHODS (NO CPS WASHING) AT THE END OF EACH DAY. / _ / - 6. CLEAR AND GRUB SITE 7. REMOVE AND STOCKPILE TOP SOIL FOR REUSE AT CLOSE OF PROJECT. LIMITS OF / / 8. COMMENCE ROUGH GRADING, CUT AND FILL. PLACE FILL IN LIFTS NO GREATER I DISTURBANCE -__ / THAN 8", COMPACT TO 95% MAX PROCTOR DENSITY. DO NOT PLACE FILL IF IN I I I - �0_Q-- SITU SOIL OR FILL MATERIAL IS SATURATED OR FROZEN. R D I I I 9. INSTALL STORM DRAIN SYSTEM AND INLET PROTECTION AS EACH INLET IS SEDIMENT TRAP INSTALLED. I I SE 2.25 AC DRAINAGE AREA 10.I1NISTALL SITE UTILITIES. 151 CY STORAGE WET 11.BRING BUILDING PAD TO GRADE AND INSTALL BUILDINGS FOUNDATIONS. I 1 I WET AREA = 25'x5O' 12. ENSURE DRAINAGE TO SEDIMENT TRAP AND BASIN THROUGH ALL PHASES OF WET STORAGE ELEV.= 892.0 GRADING AND CONSTRUCTION. WET DEPTH = 3.9' (888.1) 13.BRING PARKING AREA TO GRADE AND STABILIZE. -- \ 151 CY STORAGE DRY 0 gg 14.FOLLOWING STABILIZATION OF REMAINDER OF SITE, WHERE FEASIBLE, DRY STORAGE ELEV. = 894.7 CONTRACTOR SHALL DEWATER SEDIMENT TRAP THROUGH SEDIMENT FILTER SILT FENCE J-HOOKS N 0S i EMBANKMENT ELEV. = 895.7 BAG, REMOVE AND STABILIZE SEDIMENT, AND DECOMMISSION SEDIMENT \ S___------ � --- = EMBANKMENT WIDTH = 3.0' \ \ ,- - __- _=� BASIN. DEWATERING AND DECOMMISSION SHALL BE MADE DURING A DRY WHERE SILT FENCE RUN 890 =-- 40S LENGTH OF SPILLWAY = 13.5' PERIOD WITH NO RAIN PREDICTED. FILL OPERATIONS IN DIRECT PROXIMITY DOWN SLOPE \ A '� " � \-- _-- � � 1 OF SEDIMENT TRAP SHALL BE MADE LAST. g90 _ 50 FT SPACING TYP.� 15.UPON TEMPORARY CESSATION OF AN EARTH DISTURBING ACTIVITY OR ANY j i STAGE OR PHASE OF AN ACTIVITY WHERE A CESSATION OF EARTH 00 1P�_�- // �� �0 i DISTURBANCE WILL EXCEED 4 DAYS THE SITE SHALL BE IMMEDIATELY LETION OF \ \ SF S SEEDED MULCHED OR OTHERWISE PROTECTED FROM EROSION AND SILT FENCE J-HOOKS WHERE SILT FENCE RUNS DOWN SLOPE PROJECT, REPLACE \ \/�/� \ SEDIMENTATION PENDING FUTURE EARTH DISTURBING ACTIVITIES. CHECK DAMS WITH EC-3 / MATTING EXTENDING 12" �� ��' ���� ��� _ A 16.IMMEDIATELY AFTER EARTH DISTURBING ACTIVITIES CEASE, THE x/ - / CONTRACTOR SHALL STABILIZE THE DISTURBED AREAS. IF WEATHER DOES CHANNEL; TOTAMIN. ABOVEOL LEONGOTH \ S�� V / , NOT PERMIT VEGETATION, MULCH MUST BE APPLIED (VESCH - 3.35). 150' UPSTREAM OF \ / \ / 17.I1NISTALL CURBS AND ASPHALT PAVING, AND SIDEWALKS. 18.IN AREAS TO BE TOPSOILED AND PLANTED SCARIFY SUBSOIL 6 TO 12 INCHES CULVERT \ -- MATCH LINE S / �OS��\ PRIOR TO PLACEMENT OF TOPSOIL. ALL AREAS TO BE VEGETATED SHALL _._ ._,_,_,_,_,_,_,1 _ 1................................. ' ' '"'" "' "'"'"' '"'" 1 -- / \ \ HAVE 4 INCHES MINIMUM TOPSOIL. TOPSOIL SHALL NOT BE PLACED WHEN FROZEN OR EXCESSIVELY WET. SCALE " CD S� /; ���/ X �g55 ��� A� JD / �, 100 PROPOSED EROSION AND SEDIMENT CONTROL LEGEND SAE SAFETY FENCE (3.01) CE CONSTRUCTION ENTRANCE (3.02) CRS CONSTRUCTION ROAD STABILIZATION (3.03) SE SIFT FENCE (3.05) X IP STORM DRAIN INLET PROTECTION (3.07) CIP CULVERT INLET PROTECTION (3.08) DV TEMPORARY DIVERSION DIKE (3,09) � RWD RIGHT OF WAY DIVERSION (3,11) � ST SEDIMENT TRAP (3.13) ST TO TOP SOILING (3.30) TO TS TEMPORARY SEEDING (3.31) TS PS PERMANENT SEEDING (3.32) PS MU MULCHING (3.35) MU DC DUST CONTROL (3.39) DC SB SEDIMENT BASIN (3.14) CD ROCK CHECK DAM (3.20) - - LIMITS OF DISTURBANCE SEDIMENT BASIN DRAINAGE AREA 13.24 AC DISTURBED AREA SETH R DERICK Lie. No. 041454 W Nov. 2-1, 2019 �W SI DNA L No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE ESC/PPP PHASE 1 - B Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C-3.01-B CHECK DAMS WITH EC-3 \ MATTING EXTENDING 12" I \ MIN. ABOVE BOTTOM OF CHANNEL! TOTAL LENGTH 00) 150' UPSTREAM OF _ CULVERT �� MATCH LINE D A \� �� -- �� C / 36" CPP 86 INV IN 851.3 / CIP /II CRS IMV OUT - 842.1 / / SF ROAD TO FOLLOW EXISTING ROADBED & GRADE TO EXTENT PRACTICAL _ oc� / EXISTING / // POND // / i �� E,CO / LIMITS OF DISTURBANCE 00\D� l llll Il I \ \ s �GO �- -----LIMITS OF DISTURBANCE \ ' 24' DRIVEWAY TO HAVE MAXIM \ \ / UM SLOPE OF 16% \C Ln ROAD TO FOLLOW EXISTING 50 ° ��\� \\ I � \ \ ROADBED &GRADE TO EXTENT PRACTICAL CRS \� \ �40� CONTRACTOR TO GROUT EXISTING LO 40S �A �v �83e �7\AV��\� \\\A V\ O V 18" CPP SOLID TO PREVENT WATER o SEEPAGE AND COLLAPSE. <o / INV 0J - 8155 / / /-/O' TV/ 69 _ - - ---- -- o /R U �AIL - - - o lb oC�) \ \ \ \ \ CRS I/ �O LIMITS OF DISTURBANCE �� \ \ \ \ / 00 o� / \ \ 1 WATER / o \ \ -/_ 0 CR\ PROTECPON/ CR\_EK / ------- CO / \RS ° ED� ORD B,\BC/E\ _WA - / _ / B U \DD D/ \ STONE CONST ION ENTRANCE / I A- / / a4�'- / V CONTRALI�T R TO INSTALL PAVED CZ) CO �TI�UCTION ENTRANCE WITH \ WASH RACK UPON INSTRUCTION BY \ o ALBEMARLE COUNTY � \� CONCRETE I�� \ WASHOUT � \ �5 \\ LOCATION, \ i � C E � SCALE-E� 1� = 50'-0� \ cos � LO_ - � _ / ° / / / I � 50 25 0 50 A 100 S�L�c� �� ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE O SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. EROSION AND SEDIMENT CONTROL SEQUENCING • SITE LIES WITH IN HAYSEVILLE LOAM AND CHESTER LOAM COMPLEX. SOILS ON SITE ARE VERY STONY AND STEEP IN SOME AREAS. DISTURBED AREAS WITH STEEP SLOPES SHALL BE MINIMIZED. • A COPY OF EROSION & SEDIMENT CONTROL PLANS AND PERMIT MUST BE KEPT ON SITE AT ALL TIMES. • ALL PUMPING OF SEDIMENT LADEN WATER FROM EXCAVATIONS SHALL BE THROUGH A SEDIMENT FILTER BAG OVER A STABILIZED SURFACE. • CONCRETE WASH WATER SHALL BE HANDLED IN ACCORDANCE WITH LOCAL ORDINANCES. IN NO CASE SHALL IT BE ALLOWED TO ENTER ANY SURFACE OR GROUND WATER SYSTEMS. • SPECIAL CARE SHALL BE MADE TO AVOID SEDIMENT TRANSFER TO DOWNSTREAM PROPERTIES. ADHERING TO THE SEQUENCE BELOW IS CRITICAL TO THIS REGARD. • NO TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHOUT THE PRIOR APPROVAL OF THE COUNTY EROSION AND SEDIMENT ADMINISTRATOR OR DESIGNATED REPRESENTATIVE. 1. CONTRACTOR IS TO SCHEDULE PRE -CONSTRUCTION MEETING WITH COUNTY AND ENGINEER OF RECORD. 2. NOTIFY ALBEMARLE COUNTY AT LEAST 3 DAYS PRIOR TO LAND DISTURBING ACTIVITIES. 3. THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES. 4. INSTALL CONSTRUCTION ENTRANCE, PERIMETER CONTROLS- SILT FENCING, CHECK DAMS, DIVERSION, INLET PROTECTION, CONSTRUCTION ROAD STABILIZATION, AND SEDIMENT BASIN/TRAP. 5. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY WITH DRY METHODS (NO WASHING) AT THE END OF EACH DAY. 6. CLEAR AND GRUB SITE 7. REMOVE AND STOCKPILE TOP SOIL FOR REUSE AT CLOSE OF PROJECT. 8. COMMENCE ROUGH GRADING, CUT AND FILL. PLACE FILL IN LIFTS NO GREATER THAN 8", COMPACT TO 95% MAX PROCTOR DENSITY. DO NOT PLACE FILL IF IN SITU SOIL OR FILL MATERIAL IS SATURATED OR FROZEN. 9. INSTALL STORM DRAIN SYSTEM AND INLET PROTECTION AS EACH INLET IS INSTALLED. 10.INSTALL SITE UTILITIES. 11.BRING BUILDING PAD TO GRADE AND INSTALL BUILDINGS FOUNDATIONS. 12. ENSURE DRAINAGE TO SEDIMENT TRAP AND BASIN THROUGH ALL PHASES OF GRADING AND CONSTRUCTION. 13.BRING PARKING AREA TO GRADE AND STABILIZE. 14.FOLLOWING STABILIZATION OF REMAINDER OF SITE, WHERE FEASIBLE, CONTRACTOR SHALL DEWATER SEDIMENT TRAP THROUGH SEDIMENT FILTER BAG, REMOVE AND STABILIZE SEDIMENT, AND DECOMMISSION SEDIMENT BASIN. DEWATERING AND DECOMMISSION SHALL BE MADE DURING A DRY PERIOD WITH NO RAIN PREDICTED. FILL OPERATIONS IN DIRECT PROXIMITY OF SEDIMENT TRAP SHALL BE MADE LAST. 15.UPON TEMPORARY CESSATION OF AN EARTH DISTURBING ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY WHERE A CESSATION OF EARTH DISTURBANCE WILL EXCEED 4 DAYS THE SITE SHALL BE IMMEDIATELY SEEDED, MULCHED OR OTHERWISE PROTECTED FROM EROSION AND SEDIMENTATION PENDING FUTURE EARTH DISTURBING ACTIVITIES. 16.IMMEDIATELY AFTER EARTH DISTURBING ACTIVITIES CEASE, THE CONTRACTOR SHALL STABILIZE THE DISTURBED AREAS. IF WEATHER DOES NOT PERMIT VEGETATION, MULCH MUST BE APPLIED (VESCH - 3.35). 17.INSTALL CURBS AND ASPHALT PAVING, AND SIDEWALKS. 18. IN AREAS TO BE TOPSOILED AND PLANTED SCARIFY SUBSOIL 6 TO 12 INCHES PRIOR TO PLACEMENT OF TOPSOIL. ALL AREAS TO BE VEGETATED SHALL HAVE 4 INCHES MINIMUM TOPSOIL. TOPSOIL SHALL NOT BE PLACED WHEN FROZEN OR EXCESSIVELY WET. PROPOSED EROSION AND SEDIMENT CONTROL LEGEND SAE SAFETY FENCE (3.01) CE CONSTRUCTION ENTRANCE (3.02) CRS CONSTRUCTION ROAD STABILIZATION (3.03) SE SILT FENCE (3.05)�-X­l IP STORM DRAIN \LET PROTECTION (3.07) CIP CULVERT INLET PROTECTION (3.08) DV TEMPORARY DIVERSION DIKE (3.09) �� RWD RIGHT OF WAY DIVERSION (3.11)� ST SEDIMENT TRAP (3.13) ST TO TOP SOILING (3.30) TO TS TEMPORARY SEEDING (3.31) TS PS PERMANENT SEEDING (3.32) PS MU MULCHING (3.35) MU DC DUST CONTROL (3.39) DC SB SEDIMENT BASIN (3.14) CD ROCK CHECK DAM (3.20) LIMITS OF DISTURBANCE SEDIMENT BASIN DRAINAGE AREA ►ZWMATMs 9IIN]:�:]0010 101A :�s-1, SETH R DERICK Lie. No. 041454 W Nov. 21, 201,7 �W SI DNA L Q 0) o W W � �� Z�oo0) _z�oN o �z � � N u W o� �00L,LL C� z Q.. CL2) Q J Co J r�^ `'� , No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE ESC/PPP PHASE 1 - C Project number Date Drawn by Checked by 19004C June 21, 2019 ETS SOR C-3 - 01 -C ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. i 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. / 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. \ 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW \ AND APPROVAL BY THE PLAN APPROVING AUTHORITY. - -- \ SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY.- 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND SILT FENCE J-HOOKS EOS DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. \ - _ 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. WHERE SILT FENCE - - - - 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY -- \ / /' j' � RUNS DOWN SLOPE EC-2 MATTING ON 3:1 SLOPES - NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. - - \ 50 FT SPACING TYP 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. \ \ \ / . \ - - = EQS \ 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, \ \ \ LOS WOOD, RUBBISH, AND OTHER DEBRIS. - - \ \ LOS �- LOB. SEDIMENT BASIN \ \ LQS � L\ LOS 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. \ _ / 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. - DRAINAGE AREA \ \ S TO _ IS m SF\ / 4.18AC i \ \ \ 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. / \ ✓ - LQ �0\ \\ \ \ \ \ B M \ / 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY �Q\ M U - P S HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE O SLIDES, SILT FENCE J-HOOKS - ------- _ SINKING, OR COLLAPSE. WHERE SILT FENCE RUSE RUNS L�}S 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES OS ' 0 6 --- - DOWN SLOPE L --yam - - WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER �/ _ /\ / \ / \ 50 FT SPACING TYP. I � LL PORTION OF THE PROPERTY. �- -_ � _ �i A ; � � \ L � C �I B M - � � 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF E \ \ / \I \ . SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF � - -'' - ' LPL SILT FENCE J-HOOKS 10 7 - - - \ ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE �-OS o� \ WHERE SILT FENCE RUNS ----- _ \ SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. DOWN SLOPE / _ � � 0 6.9 - 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE Oct \ 50 FT SPACING TYP. APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A �= / 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% \ \ \ `� \ \ / PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY / EC-2 MATTING ON 3:1 SLOPES - \ COUNTYTHE EROSION _ _ - a _ r - � 19. MA NTENANCE: ALLLMEASOUR SCONTROL TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES //� B M --- _ �pgp _ _ P \ ` I L 7 L IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50 /o OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED LLL // / _ _ I \ �� L L L L \ AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING ST \ L�� 1085 \ 1080 ED `. \ MEASURES SEDIMENTARE NO LONGERHALF THEIR ENEEDED, SUBJECT TO APPROVAL IGHT MUST BE CLEANED AND LBgD Y T IMMED COUNITY E OSION CONTROL INSPECTOR. \ L\ \ / \ SEDIMENT BASIN DRAINAGE 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN O \ \_1� 1090\ 1 76� - i � n 077 MU,PS T - '--- � � CIP � - \ \ COo^ LIMITS OF \ _ V - - - BM --- y \ V DISTURBANCE \\ LIMITS OF DISTURBANCE \\ pg5 / L l L V - - \ \ \ 1 / FFE 1083 SILT FENCE J-HOOKS \ \ \\\ - L\L_ ' \ \\ �p - 1100 \ 1095 V \ 4� 'o \ \ \ \ \ WHERE SILT FENCE RUNS \\ A\ - 1090 �o 1070 \ v \ DOWN SLOPE � � � � � V � -LL 7 1085 �/ \ � 50 FT SPACING TYP. / ", I �d - - - - H� EC-2 MATTING ON 3:1 SLOPES -L '� y' �� V� V \ �� � � _ L � � �\ �\ EC-2 MATTING IN TRANSPORT SWALE TO I \ / V 1105 \ \ �." - ZL V DER p g L SPREADER LS2 / O - � 1 0°,��� '\8 .5 L LLi \I_ TRANSPORT SWALE TO LS2 A PORT-A-J\ J 6 L L LE \ \ \ ,, BOTTOM WIDTH: 16.5' OHN \ O BM e LOCATION \ �. PIL� , �� �� \ i �_�� ASIDE SLOPES: 3:1,3:1 - - � TOTAL DEPTH: 2. 0' SILT FENCE J-HOOKS 7 1100 ! /. / / / EMERGENCY SPILLWAY 1070 / I S - EC-2 MATTING ON 3:1 SLOPES I / / \ / SCOPE: 1 .2% WHERE SILT FENCE RUNS _ S I FUEL STORAGE AST WITH CONTAINMENT BERM. \ / I / `� ,-�`� MU PS // // INVERT: 1078.3 EC-2 MATTING ON 3:1 SLOPES \ / o DOWN SLOPE - ^� y\ I I I I I \\ - ' / DENSELY VEGETATED - \ \ o`O \ MANNINGS N: .027 - - SEE SPILL PREVENTION NOTE, THIS SHEET. I / � -� % \ \ -- � \ 50 FT SPACING TYP. - I - PAINT STUCCO SOLVENT STORAGE - -- 777oi \ _ 1095 I _ 10YR24HR FLOW: 1.93 CFS _ -- \ AND CLEAN OUT LOCATION, - �- as J \ /i /_ 48" CMP RISER W/ANTI-FLOATATION BASE RAIN GAUGE TO , TS / /j , AND ANTI -VORTEX TRASH RACK _ WATER DEPTH: 0.28 ET �, r 1105 0 � _ RIM: 1077.20' -- / / SEALED/SHELTERED ` \ I \ \I �� ����° �� SE i / //DEWATERING ORIFICE: 1075.25' �y \ �055 VELDGTY: 2.46 TTS / NON -HAZARDOUS WASTES � / / iINv ouT:1o72.00' DUMPSTER BARREL: 18" HDPE 60 LF @ 2% /v [1] ANTI -SEEP COLLAR 5.5'x5.5' @ 30' ///_/ /%5 EROSION AND SEDIMENT CONTROL SEQUENCING 0� \ \ - 1100 I \ SEDIMENT BASINm RAINAGE AREA J I �I I I L RIP -RAP VELOCITY ATTENUATION PAD \\ \ i ' \ J Y / / / • SITE LIES WITH IN HAYSEVILLE LOAM AND CHESTER LOAM COMPLEX. SOILS ON �� - - - i 1 �1100 TO TS F 1 2 D50:9" //� - - --- -I / SITE ARE VERY STONY AND STEEP IN SOME AREAS. DISTURBED AREAS WITH - TEMPORARY SEDIMENT - \ i-__ - \ O A \ \ TRAP DRAINAGE AREA g STEEP SLOPES SHALL BE MINIMIZED. \ MU - < , . PS " ' '�\ • A COPY OF EROSION & SEDIMENT CONTROL PLANS AND PERMIT MUST BE KEPT � ON SITE AT ALL TIMES. 0-� �° \�`� H \\\ ALL PUMPING OF SEDIMENT LADEN WATER FROM EXCAVATIONS SHALL BE THROUGH A SEDIMENT FILTER BAG OVER A STABILIZED SURFACE. EC-2 MATTING ON 3:1 SLOPE, \, CONCRETE WASH WATER SHALL BE HANDLED IN ACCORDANCE WITH LOCAL ORDINANCES. IN NO CASE SHALL IT BE ALLOWED TO ENTER ANY SURFACE OR \\\ \ \ \ \ \ 1099- /I / GROUND WATER SYSTEMS. O \\ \ \ \�0 \ \\\ \\ SPECIAL CARE SHALL BE MADE TO AVOID SEDIMENT TRANSFER TO \ BM DOWNSTREAM PROPERTIES. ADHERING TO THE SEQUENCE BELOW IS CRITICAL TO THIS REGARD. SF \ \ 110� . NO TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE �/A VA \ \\ \ \VA\Vy \ V 7y �r REMOVED WITHOUT THE PRIOR APPROVAL OF THE COUNTY EROSION AND \ \ \ SEDIMENT ADMINISTRATOR OR DESIGNATED REPRESENTATIVE. SILT FENCE J-HOOKS 1. CONTRACTOR IS TO SCHEDULE PRE -CONSTRUCTION MEETING WITH COUNTY M WHERE SILT FENCE RUNS \ VA V \ \ \ \ y \ \\ yAA y y jam.V LQ � � , A \ \\ v V V S AND ENGINEER OF RECORD. DOWN SLOPE , \ \ \\ \ \ \ \ \ \ \ \\ 2. NOTIFY ALBEMARLE COUNTY AT LEAST 3 DAYS PRIOR TO LAND DISTURBING M 50 FT SPACING TYP. ; \ \ \ \ \ \ \ \ \ \ \\ \\ \ �/ / �Oc' ACTIVITIES. \ 3. THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF ALL EROSION AND OS SEDIMENT CONTROL MEASURES. 4. INSTALL CONSTRUCTION ENTRANCE, PERIMETER CONTROLS- SILT FENCING, �A 7o \ \ so CHECK DAMS, DIVERSION, INLET PROTECTION, CONSTRUCTION ROAD STABILIZATION, AND SEDIMENT BASIN/TRAP. r \ \ \ \\ \\\ \ MATCH LINE ��_\ \ \ 5. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR \ ______ \ \ PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF 7' . -.� fit_,_, ,_,_\`-\ ..........�,_, _, \\ \\ SOS \ \\ , SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE \ \\ \ \\ \ \\\\� \\\ \`� \ \ / �Oc� / SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE \ \ \ \\\ \ \\ \ \\ \\\\\ / ROAD SURFACE SHALL BE CLEANED THOROUGHLY WITH DRY METHODS (NO \ \ \ \\ / WASHING) AT THE END OF EACH DAY. 6. CLEAR AND GRUB SITE 7. REMOVE AND STOCKPILE TOP SOIL FOR REUSE AT CLOSE OF PROJECT. 8. COMMENCE ROUGH GRADING, CUT AND FILL. PLACE FILL IN LIFTS NO GREATER _ THAN 8", COMPACT TO 95% MAX PROCTOR DENSITY. DO NOT PLACE FILL IF IN / 04 SITU SOIL OR FILL MATERIAL IS SATURATED OR FROZEN. LIMITS OF �r\ �\ \ TEMPORARY SEDIMENT -\\� \\ \ OS 9. INSTALL STORM DRAIN SYSTEM AND INLET PROTECTION AS EACH INLET IS TRAP DRAINAGE AREA \� _ / INSTALLED. DISTURBANCE 10. INSTALL SITE UTILITIES. 11.BRING BUILDING PAD TO GRADE AND INSTALL BUILDINGS FOUNDATIONS. 12. ENSURE DRAINAGE TO SEDIMENT TRAP AND BASIN THROUGH ALL PHASES OF GRADING AND CONSTRUCTION. 1030 \ \ , \\\\\\\\ \\\\\ �O ��� 1 \\ 3. BRING PARKING AREA TO GRADE AND STABILIZE. cn_ \ \\\\\ \\ \\\\\ �� / 14.FOLLOWING STABILIZATION OF REMAINDER OF SITE, WHERE FEASIBLE, CONTRACTOR SHALL DEWATER SEDIMENT TRAP THROUGH SEDIMENT FILTER \ _ O BAG, REMOVE AND STABILIZE SEDIMENT, AND DECOMMISSION SEDIMENT BASIN. DEWATERING AND DECOMMISSION SHALL BE MADE DURING A DRY SPILL PREVENTION NOTE: PERIOD WITH NO RAIN PREDICTED. FILL OPERATIONS IN DIRECT PROXIMITY O \ VAVAVA\ V� 1020' -- \i� OF SEDIMENT TRAP SHALL BE MADE LAST. -- n _ \ IF ONSITE FUEL STORAGE IS PROVIDED, ABOVE -GROUND STORAGE TANK S 15. UPON TEMPORARY CESSATION OF AN EARTH DISTURBING ACTIVITY OR ANY v4 _ i � O (AST) SHALL BE LOCATED IN A SECONDARY CONTAINMENT SYSTEM STAGE OR PHASE OF AN ACTIVITY WHERE A CESSATION OF EARTH SAT SAFETY FENCE (3.01) CE CONSTRUCTION ENTRANCE (3.02) CRS CONSTRUCTION ROAD STABILIZATION (3.03) SE SILT FENCE (3.05) X IP STORM DRAIN INLET PROTECTION (3.07) CIP CULVERT INLET PROTECTION (3.08) DV TEMPORARY DIVERSION DIKE (3,09) E) RWD RIGHT OF WAY DIVERSION (3.11) (��� ST SEDIMENT TRAP (3.13) ST TO TOP SOILING (3.30) TO TS TEMPORARY SEEDING (3.31) TS PS PERMANENT SEEDING (3.32) PS MU MULCHING (3.35) MU DC DUST CONTROL (3.39) DC CONSISTING OF A 100 SF BASE FOOTPRINT (SUGGESTED 10' x 10') WITH DISTURBANCE WILL EXCEED 4 DAYS THE SITE SHALL BE IMMEDIATELY PERIMETER BERMS MEASURING AT LEAST 12" HIGH AND 10-MIL (MIN) C) _ POLYETHYLENE LINER. DIMENSIONS PROVIDED ABOVE ARE ONLY SUITABLE SEEDED, MULCHED OR OTHERWISE PROTECTED FROM EROSION AND 13,24 AC DISTURBED AREA SEDIMENTATION PENDING FUTURE EARTH DISTURBING ACTIVITIES. FOR STORAGE OF AST UP TO 250-GAL. EQUAL MAY BE SUBSTITUTED, SO 16.IMMEDIATELY AFTER EARTH DISTURBING ACTIVITIES CEASE, THE LONG AS CONTAINMENT SYSTEM LIP HAS A MIN OF 7" FREEBOARD ABOVE 1p1p `.\\ \ \\ CONTRACTOR SHALL STABILIZE THE DISTURBED AREAS. IF WEATHER DOES \ \ \ ---- - - - - 110% OF AST STORAGE VOLUME. CONTAINMENT SYSTEM SHALL BE PUMPED NOT PERMIT VEGETATION, MULCH MUST BE APPLIED (VESCH - 3.35). DRY AFTER EVERY MEASURABLE RAINFALL EVENT. 17.INSTALL CURBS AND ASPHALT PAVING, AND SIDEWALKS. 18.IN AREAS TO BE TOPSOILED AND PLANTED SCARIFY SUBSOIL 6 TO 12 INCHES J \ IF FUEL AND OIL STORAGE UTILIZE A SINGULAR AST IN EXCESS OF 660 GAL, PRIOR TO PLACEMENT OF TOPSOIL. ALL AREAS TO BE VEGETATED SHALL SCALE 1n = 5O'-On / OR PROVIDE AN AGGREGATED STORAGE IN EXCESS OF 1,320 GAL, A FULL _ _ / HAVE 4 INCHES MINIMUM TOPSOIL. TOPSOIL SHALL NOT BE PLACED WHEN \ ` SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN SHALL BE IN FROZEN OR EXCESSIVELY WET. SO PLACE AND APPROVED BY A REGISTERED ENGINEER, IN ACCORDANCE WITH \ 25 ' O 5�2- -f0� STATE AND FEDERAL REGULATIONS. r-, - P OW j�G SETERICK `Lie. No. 041454 W Nov. 2-1, 2019 �W SI ONAL 0) o M � O p o`er, Q) O N O O U O 0 Q LL � � QCC) No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE ESC/PPP PHASE 2 -A Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C-3.02-A h k p 0 ID In Ilp PROJECT, REPLACE CHECK DAMS WITH EC-3 MATTING EXTENDING 12" MIN. ABOVE BOTTOM OF CHANNEL; TOTAL LENGTH 150' UPSTREAM OF CULVERT W/ \�� / MATCH LINE / SEVA S \ \ \ \\ SSS 4p TEMPORARY SEDIMENT LIMITS OF DISTURBANCE O� TRAP DRAINAGE AREA �� c� �7 - SF �--- --- O DID 1020 SILT FENCE k \\\ = �/ - 1-0-2 0 \ J-HOOKS - -`-- WHERE SILT FENCE RUNS DOWN SLOPE S 50 FT SPACING�O TYP. D D F J CRS i 980 - I\ADD \� ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE O SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. --------- - - - 960 - i / / EROSION AND SEDIMENT CONTROL SEQUENCING E J-HOOKS ' DID • SITE LIES WITH IN HAYSEVILLE LOAM AND CHESTER LOAM COMPLEX. SOILS ON :NCE RUNS / / SITE ARE VERY STONY AND STEEP IN SOME AREAS. DISTURBED AREAS WITH IWN SLOPE / STEEP SLOPES SHALL BE MINIMIZED. 4CING TYP. - / / • A COPY OF EROSION & SEDIMENT CONTROL PLANS AND PERMIT MUST BE KEPT ON SITE AT ALL TIMES. \ 950 I / / • ALL PUMPING OF SEDIMENT LADEN WATER FROM EXCAVATIONS SHALL BE THROUGH A SEDIMENT FILTER BAG OVER A STABILIZED SURFACE. �!I / • CONCRETE WASH WATER SHALL BE HANDLED IN ACCORDANCE WITH LOCAL ORARYSEDIMENT \; / / ' ORDINANCES. IN NO CASE SHALL IT BE ALLOWED TO ENTER ANY SURFACE OR P DRAINAGE AREA �' GROUND WATER SYSTEMS. i • SPECIAL CARE SHALL BE MADE TO AVOID SEDIMENT TRANSFER TO DOWNSTREAM PROPERTIES. ADHERING TO THE SEQUENCE BELOW IS CRITICAL TO THIS REGARD. � / % 940 TEMPORARY SEDIMENT TRAP DRAINAGE AREA � 0- • NO TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE _ REMOVED WITHOUT THE PRIOR APPROVAL OF THE COUNTY EROSION AND j SEDIMENT ADMINISTRATOR OR DESIGNATED REPRESENTATIVE. � O � � - - / / 1. CONTRACTOR IS TO SCHEDULE PRE -CONSTRUCTION MEETING WITH COUNTY SE � � / / AND ENGINEER OF RECORD. \ 930 / 2. NOTIFY ALBEMARLE COUNTY AT LEAST 3 DAYS PRIOR TO LAND DISTURBING ACTIVITIES. 3. THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES. - I 4. INSTALL CONSTRUCTION ENTRANCE, PERIMETER CONTROLS \; SILT FENCING, 0 ' DD� / CHECK DAMS, DIVERSION, INLET PROTECTION, CONSTRUCTION ROAD I / � STABILIZATION, AND SEDIMENT BASIN/TRAP. 5. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR ' 920 _ PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE 1 CPS SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE - - � , ROAD SURFACE SHALL BE CLEANED THOROUGHLY WITH DRY METHODS NO I WASHING AT THE END OF EACH DAY. 6. CLEAR AND GRUB SITE ' LIMITS OF 7. REMOVE AND STOCKPILE TOP SOIL FOR REUSE AT CLOSE OF PROJECT. � ___ _ _ _ / � R D 10 DISTURBANCE �O� 8. COMMENCE ROUGH GRADING, CUT AND FILL. PLACE FILL IN LIFTS NO GREATER THAN 8", COMPACT TO 95% MAX PROCTOR DENSITY. DO NOT PLACE FILL IF IN SEDIMENT TRAP SITU SOIL OR FILL MATERIAL IS SATURATED OR FROZEN. DDT 2.25 AC DRAINAGE AREA 9. INSTALL STORM DRAIN SYSTEM AND INLET PROTECTION AS EACH INLET IS \ DD wI 151 CY STORAGE WET INSTALLED. \� WET AREA = 25'x50' INSTALLED. SITE UTILITIES. WET STORAGE ELEV= 892.0 11. BRING BUILDING PAD TO GRADE AND INSTALL BUILDINGS FOUNDATIONS. goo ___ WET DEPTH = 3.9' (888.1) 12. ENSURE DRAINAGE TO SEDIMENT TRAP AND BASIN THROUGH ALL PHASES OF �-- 151 CY STORAGE DRY ca�jO GRADING AND CONSTRUCTION. DRY STORAGE ELEV. - 894.7 - 13. BRING PARKING AREA TO GRADE AND STABILIZE. 40S i EMBANKMENT ELEV. = 895.7 14.FOLLOWING STABILIZATION OF REMAINDER OF SITE, WHERE FEASIBLE, S__---- - �y ' EMBANKMENT WIDTH = 3.0 CONTRACTOR SHALL DEWATER SEDIMENT TRAP THROUGH SEDIMENT FILTER BM _ - 40S LENGTH OF SPILLWAY = 13.5' BAG, REMOVE AND STABILIZE SEDIMENT, AND DECOMMISSION SEDIMENT _-- - - BASIN. DEWATERING AND DECOMMISSION SHALL BE MADE DURING A DRY - PERIOD WITH NO RAIN PREDICTED. FILL OPERATIONS IN DIRECT PROXIMITY 990 \ - \ OF SEDIMENT TRAP SHALL BE MADE LAST. �O i 15. UPON TEMPORARY CESSATION OF AN EARTH DISTURBING ACTIVITY OR ANY SF ��� S , STAGE OR PHASE OF AN ACTIVITY WHERE A CESSATION OF EARTH DISTURBANCE WILL EXCEED 4 DAYS THE SITE SHALL BE IMMEDIATELY SEEDED, MULCHED OR OTHERWISE PROTECTED FROM EROSION AND � \\_ �� �� -_ - SEDIMENTATION PENDING FUTURE EARTH DISTURBING ACTIVITIES. 'gooA OS / 16.IMMEDIATELY AFTER EARTH DISTURBING ACTIVITIES CEASE, THE \ CONTRACTOR SHALL STABILIZE THE DISTURBED AREAS. IF WEATHER DOES NOT PERMIT VEGETATION, MULCH MUST BE APPLIED (VESCH - 3.35). .. _ ----- - MATCH LINE / / S17.INSTALL CURBS AND ASPHALT PAVING, AND SIDEWALKS. '-'-'-'-'-'-'-'-'-........ / \ 18.IN AREAS TO BE TOPSOILED AND PLANTED SCARIFY SUBSOIL 6 TO 12 INCHES S PRIOR TO PLACEMENT OF TOPSOIL. ALL AREAS TO BE VEGETATED SHALL SCALE -�'� �/ HAVE 4 INCHES MINIMUM TOPSOIL. TOPSOIL SHALL NOT BE PLACED WHEN FROZEN OR EXCESSIVELY WET. PROPOSED EROSION AND SEDIMENT CONTROL LEGEND SAE SAFETY FENCE (3.01) CE CONSTRUCTION ENTRANCE (3.02) CRS CONSTRUCTION ROAD STABILIZATION (3.03) -� SF SILT FENCE (3.05) x P STORM DRAIN INLET PROTECTION (3.07) CIP CULVERT INLET PROTECTION (3.08) DV TEMPORARY DIVERSION DIKE (3.09)� RWD RIGHT OF WAY DIVERSION (3.11)� ST SEDIMENT TRAP (3.13) ST TO TOP SOILING (3.30) TO TS TEMPORARY SEEDING (3.31) TS PS PERMANENT SEEDING (3.32) PS MU MULCHING (3.35) MU DC DUST CONTROL (3.39) DC SB SEDIMENT BASIN (3.14) CD ROCK CHECK DAM (3.20) - - LIMITS OF DISTURBANCE SEDIMENT BASIN DRAINAGE AREA 13.24 AC DISTURBED AREA SETH R DERICK Lie. No. 041454 W Nov. 2-1, 2-019 �W SI DNA L 0) o M � O p o`er, Q) O N O O U O 0 Q � � � QCC) No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE ESC/PPP PHASE 2-B Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C-3.02-B / CHECK DAMS WITH EC-3 / / MATTING EXTENDING 12"-- / MIN. ABOVE BOTTOM OF BM CHANNEL; TOTAL LENGTH 6 S 890 150' UPSTREAM OF CULVERT - MATCH LINE . _ A r 0 /- �55_ // 36" CPP 865 ��� % �\ �z-�� INV IN 851.3 CRS _ Cl) J j ROAD TO FOLLOW EXISTING ROADBED & GRADE TO EXTENT PRACTICAL EXISTING 1 O POND _ I l II I 11 ' - LIMITS OF DISTURBANCE 0�' -- / \ \ I POND \ - - ��I o__ /LIMITS OF DISTURBANCE IIljI/II/l I1I 1 II I / \ 24' DRIVEWAY TO HAVE MAXIM / \ / ° - -- UM SLOPE OF 16% 850 FAO A A ROAD TO FOLLOW EXISTING _ ROADBED &GRADE - - / �� // �V TO EXTENT PRACTICAL �85 L� os < os � �� � � � \�\ \ � CONTRACTOR TO GROUT EXISTING � �\ \\�� � \ \ 18 CPP SOLID TO PREVENT WATER o SF \ \ \ \\\ \ SEEPAGE AND COLLAPSE. I c, /INV O�- 815 5 / /� T I V 1/ C D / / 4/1 / - kh 00 30 y i 840 °cam �g45 SE \ 1 \ CRS LIMITS OF DISTURBANCE I \ \ \ \ ! \; \ \ ` I -D DR\ WATER / o \ I - CR_EEKCO A � / \/1/ATCR S DD / / / / i / - _ oCl) / BU RDDR/ �SF� � RUCK STONE CONST ION ENTRANCE-.,' I / CONTRALT R TO INSTALL PAVED CO STI UCTION ENTRANCE WITH WASH RACK UPON INSTRUCTION BY G ALBEMARLE COUNTY CONCRETE I_ _--- WASHOUT \ LOCATION, \ LOS LOS Lnc� CEPCE SCALE-r = 50'-0' 50 25 0 50 100 ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE O SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. EROSION AND SEDIMENT CONTROL SEQUENCING • SITE LIES WITH IN HAYSEVILLE LOAM AND CHESTER LOAM COMPLEX. SOILS ON SITE ARE VERY STONY AND STEEP IN SOME AREAS. DISTURBED AREAS WITH STEEP SLOPES SHALL BE MINIMIZED. • A COPY OF EROSION & SEDIMENT CONTROL PLANS AND PERMIT MUST BE KEPT ON SITE AT ALL TIMES. • ALL PUMPING OF SEDIMENT LADEN WATER FROM EXCAVATIONS SHALL BE THROUGH A SEDIMENT FILTER BAG OVER A STABILIZED SURFACE. • CONCRETE WASH WATER SHALL BE HANDLED IN ACCORDANCE WITH LOCAL ORDINANCES. IN NO CASE SHALL IT BE ALLOWED TO ENTER ANY SURFACE OR GROUND WATER SYSTEMS. • SPECIAL CARE SHALL BE MADE TO AVOID SEDIMENT TRANSFER TO DOWNSTREAM PROPERTIES. ADHERING TO THE SEQUENCE BELOW IS CRITICAL TO THIS REGARD. • NO TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHOUT THE PRIOR APPROVAL OF THE COUNTY EROSION AND SEDIMENT ADMINISTRATOR OR DESIGNATED REPRESENTATIVE. 1. CONTRACTOR IS TO SCHEDULE PRE -CONSTRUCTION MEETING WITH COUNTY AND ENGINEER OF RECORD. 2. NOTIFY ALBEMARLE COUNTY AT LEAST 3 DAYS PRIOR TO LAND DISTURBING ACTIVITIES. 3. THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES. 4. INSTALL CONSTRUCTION ENTRANCE, PERIMETER CONTROLS; SILT FENCING, CHECK DAMS, DIVERSION, INLET PROTECTION, CONSTRUCTION ROAD STABILIZATION, AND SEDIMENT BASIN/TRAP. 5. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY WITH DRY METHODS (NO WASHING) AT THE END OF EACH DAY. 6. CLEAR AND GRUB SITE 7. REMOVE AND STOCKPILE TOP SOIL FOR REUSE AT CLOSE OF PROJECT. 8. COMMENCE ROUGH GRADING, CUT AND FILL. PLACE FILL IN LIFTS NO GREATER THAN 8", COMPACT TO 95% MAX PROCTOR DENSITY. DO NOT PLACE FILL IF IN SITU SOIL OR FILL MATERIAL IS SATURATED OR FROZEN. 9. INSTALL STORM DRAIN SYSTEM AND INLET PROTECTION AS EACH INLET IS INSTALLED. 10.INSTALL SITE UTILITIES. 11. BRING BUILDING PAD TO GRADE AND INSTALL BUILDINGS FOUNDATIONS. 12. ENSURE DRAINAGE TO SEDIMENT TRAP AND BASIN THROUGH ALL PHASES OF GRADING AND CONSTRUCTION. 13. BRING PARKING AREA TO GRADE AND STABILIZE. 14.FOLLOWING STABILIZATION OF REMAINDER OF SITE, WHERE FEASIBLE, CONTRACTOR SHALL DEWATER SEDIMENT TRAP THROUGH SEDIMENT FILTER BAG, REMOVE AND STABILIZE SEDIMENT, AND DECOMMISSION SEDIMENT BASIN. DEWATERING AND DECOMMISSION SHALL BE MADE DURING A DRY PERIOD WITH NO RAIN PREDICTED. FILL OPERATIONS IN DIRECT PROXIMITY OF SEDIMENT TRAP SHALL BE MADE LAST. 15. UPON TEMPORARY CESSATION OF AN EARTH DISTURBING ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY WHERE A CESSATION OF EARTH DISTURBANCE WILL EXCEED 4 DAYS THE SITE SHALL BE IMMEDIATELY SEEDED, MULCHED OR OTHERWISE PROTECTED FROM EROSION AND SEDIMENTATION PENDING FUTURE EARTH DISTURBING ACTIVITIES. 16.IMMEDIATELY AFTER EARTH DISTURBING ACTIVITIES CEASE, THE CONTRACTOR SHALL STABILIZE THE DISTURBED AREAS. IF WEATHER DOES NOT PERMIT VEGETATION, MULCH MUST BE APPLIED (VESCH - 3.35). 17.INSTALL CURBS AND ASPHALT PAVING, AND SIDEWALKS. 18.IN AREAS TO BE TOPSOILED AND PLANTED SCARIFY SUBSOIL 6 TO 12 INCHES PRIOR TO PLACEMENT OF TOPSOIL. ALL AREAS TO BE VEGETATED SHALL HAVE 4 INCHES MINIMUM TOPSOIL. TOPSOIL SHALL NOT BE PLACED WHEN FROZEN OR EXCESSIVELY WET. PROPOSED EROSION AND SEDIMENT CONTROL LEGEND SAE SAFETY FENCE (3.01) CE CONSTRUCTION ENTRANCE (3.02) CRS CONSTRUCTION ROAD STABILIZATION (3.03) SE SILT FENCE (3.05)�-X---� IP STORM DRAIN INLET PROTECTION (3.07) CIP CULVERT INLET PROTECTION (3.08) DV TEMPORARY DIVERSION DIKE (3.09)� RWD RIGHT OF WAY DIVERSION (3.11)� ST SEDIMENT TRAP (3.13) ST TO TOP SOILING (3.30) TO TS TEMPORARY SEEDING (3.31) TS PS PERMANENT SEEDING (3.32) PS MU MULCHING (3.35) MU DC DUST CONTROL (3.39) DC SB SEDIMENT BASIN (3.14) CD ROCK CHECK DAM (3.20) LIMITS OF DISTURBANCE SEDIMENT BASIN DRAINAGE AREA ff I tM9116*1 M III no] 091W_\III I "ll SETH R DERICK Lie. No. 041454 W Nov. 2-1, 201,7 �W SI ONA L Q 0) o W W � �� Z�o40) _z�oN o �z C/)�N�O Q �00L,LL CL2)Q J Co J � No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE ESC/PPP PHASE 2-C Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C-3.02-C EROSION AND SEDIMENT CONTROL NARRATIVE 1, PROJECT DESCRIPTION: THIS PROJECT WILL CONSIST OF A TASTING ROOM FOR THE VINEYARD, AN EVENT VENUE, AND ASSOCIATED PARKING. THE EXISTING FARM POND WILL BE MODIFIED FOR STORMWATER QUANTITY MANAGEMENT. THE DISTURBED AREA FOR THIS PROJECT WILL BE 13.24 AC, 2. EXISTING SITE CONDITIONS: THIS SITE IS LOCATED AT 8585 DICK WOODS ROAD AND PROJECT AREA CONSISTS OF AN EXISTING FARM ACCESS ROAD, CLEARED SITE, AND AN EXISTING FARM POND. THE PROJECT MINIMIZES IMPACTS TO STEEP SLOPES. NO FLOOD PLAINS ARE ON SITE, 3. ADJACENT AREAS: THIS PARCEL AND ALL ADJOINING PARCELS ARE RURAL AGRICULTURAL OR R20 RESIDENTIAL. THE AGO, PARCEL TO THE WEST IS CURRENTLY ALSO USED AS A VINEYARD. 4. OFF -SITE AREAS: THE SITE SHOULD NOT REQUIRE FILL OR WASTE TO BE IMPORTED/EXPORTED FROM OFF SITE, ANY OFF -SITE LAND -DISTURBING ACTIVITY ASSOCIATED WITH THE PROJECT MUST BE PERMITTED THROUGH THE APPROPRIATE JURISDICTION. 5. SOILS: REFER TO C2.02 & C2.03 FOR SOILS INFORMATION. 6. CRITICAL AREAS: THERE ARE NO SPRINGS, WETLANDS, OR FLOOD PLAINS IN THE PROJECTS LIMITS. DISTURBANCE OF STEEP SLOES (C2.02) ON SITE WILL MINIMIZED. ALL CUT AND FILL SLOPES IN THE PROJECT AREA SHALL BE 3H: 1 V OR LESS. UTILIZE EC2 BLANKET MATTING ON ALL 3: 1 SLOPES, 7. EROSION AND SEDIMENT CONTROL MEASURES: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THIRD EDITION, 1992, AS WELL AS ANY ADDITIONAL MEASURES REQUIRED BY APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS. STRUCTURAL PRACTICES 3.02 - CONSTRUCTION ENTRANCE - A STABILIZED STONE PAD WITH FILTER FABRIC UNDERLINER LOCATED AT POINTS OF VEHICULAR INGRESS AND EGRESS ON A CONSTRUCTION SITE. 3.03 CONSTRUCTION ROAD STABILIZATION THE TEMPORARY STABILIZATION OF ACCESS ROADS, SUBDIVISION ROADS, PARKING AREA, AND OTHER ON -SITE VEHICULAR TRANSPORTATION ROUTES WITH STONE IMMEDIATELY AFTER GRADING. 3.05 SILT FENCE BARRIER A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SYNTHETIC FILTER FABRIC STRETCHED ACROSS AND ATTACHED TO SUPPORTING POSTS AND ENTRENCHED, 3.07 STORM DRAIN INLET PROTECTION A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP INLET OR CURB INLET. 3.08 CULVERT INLET PROTECTION A SEDIMENT FILTER LOCATED AT THE INLET TO STORM CULVERTS. 3.11 TEMPORARY RIGHT OF WAY DIVERSION A RIDGE OF COMPACTED SOIL OR LOOSE ROCK OR GRAVEL CONSTRUCTED ACROSS DISTURBED RIGHTSOE-WAY AND SIMILAR SLOPING AREAS, 3.12 TEMPORARY SEDIMENT TRAP A TEMPORARY BARRIER OR DAM WITH A CONTROLLED STORMWATER RELEASE STRUCTURE FORMED BY CONSTRUCTING AN EMBANKMENT OF COMPACTED SOIL ACROSS A DRAINAGEWAY. 3.14 - TEMPORARY SEDIMENT BASIN - A TEMPORARY PONDING AREA FORMED BY CONSTRUCTING AND EARTHEN EMBANKMENT WITH A RISER TO DETAIN SEDIMENT LADEN RUNOFF FROM DISTURBED AREAS LONG ENOUGH FOR THE MAJORITY OF SEDIMENT TO SETTLE OUT. 3.15 - TEMPORARY SLOPE DRAIN - A FLEXIBLE PIPE EXTENDING FROM THE TOP PAST THE TOE OF A CUT OR FILL SLOPE TO CONVEY WATER DOWN THE FACE OF THE SLOPE WITHOUT CAUSING EROSION. 3.20 - ROCK CHECK DAMS - SMALL TEMPORARY STONE DAMS CONSTRUCTED ACROSS A SWALE OR DRAINAGE DITCH. 3.26 - DEWATERING STRUCTURE - A TEMPORARY SETTLING AND FILTER DEVICE FOR WATER WHICH IS DISCHARGED FROM DEWATERING ACTIVITIES. 3.30 - TOPSOIL (STOCKPILE) - METHODS OF PRESERVING AND USING THE SURFACE LAYER OF UNDISTURBED SOIL, OFTEN ENRICHED IN ORGANIC MATTER, IN ORDER TO OBTAIN A MORE DESIRABLE PLANTING AND GROWTH MEDIUM. 3.31 TEMPORARY SEEDING THE ESTABLISHMENT OF A TEMPORARY VEGETATIVE COVER ON DISTURBED AREAS BY SEEDING WITH APPROPRIATE RABIDLY GROWING ANNUAL PLANTS. 3.32 PERMANENT SEEDING THE ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER ON DISTURBED AREAS BY PLANTING SEED, 3.35 MULCHING APPLICATION OF PLANT RESIDUES OTHER SUITABLE MATERIALS TO THE SOIL SURFACE. 3.39 DUST CONTROL REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMOLITION, AND CONSTRUCTION ACTIVITIES, 8. PERMANENT STABILIZATION: ALL DISTURBED AREAS SHALL BE STABILIZED WITH PERMANENT SEEDING WITHIN SEVEN WORKING DAYS OF FINAL GRADING, WEATHER AND SOIL CONDITIONS PERMITTING, AS SPECIFIED IN THE PROJECT SPECIFIC STANDARDS AND SPECIFICATIONS FOR VIRGINIA. 9. STORMWATER RUNOFF CONSIDERATIONS: POST -DEVELOPMENT STORMWATER WILL FLOW OFF THE BUILDING AND OFF THE PARKING/DRIVE AREA AS SHEET FLOW. THE RUNOFF WILL BE ALLOWED TO FOLLOW NATURAL DRAINAGE PATTERNS TO THE STORMWATER MANAGEMENT POND, THE POND RISER WILL BE ENGINEERED TO RELEASE STORMWATER ACCORDING TO 9VAC2587066. ANY LOCATION WHERE A SWALE GRADIENT IS STEEPER THAN 1 % WILL BE ARMORED WITH RIP -RAP OR EC-2 MATTING. 9.1, THE PROJECT MEETS STORM WATER QUALITY REQUIREMENTS THROUGH 26.00 AC DEDICATED FOREST AND OPEN SPACE EASEMENTS, 9.1, THE PROJECT MEETS CHANNEL PROTECTION REQUIREMENT 9-VAC25-870-66 B.3.a. DOWNSTREAM CHANNEL PROTECTION IS MET THROUGH ENERGY BALANCE (SEE ATTACHED STORMWATER CALCULATIONS). 9.2. DESIGN MEETS FLOOD PROTECTION REQUIREMENT 9VAC25-870-66 C.1, THE PROJECT RELEASES POST -DEVELOPMENT PEAK FLOW RATE FOR THE 10-YEAR 24-HOUR STORM EVENT THAT IS LESS THAN OR EQUAL TO PRE -DEVELOPMENT FLOW RATE. 10. MAINTENANCE: THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF EROSION AND SEDIMENT CONTROLS, TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. MAINTENANCE AND REPAIR SHALL BE CONDUCTED IN ACCORDANCE WITH THE APPROVED PROJECT SPECIFIC STANDARDS AND SPECIFICATIONS. CONDUCT INSPECTIONS OF TEMPORARY ESC CONTROLS AND SWIM BMPS AT LEAST ONCE EVERY FOUR BUSINESS DAYS, AND WITHIN 48 HOURS FOLLOWING A MEASURABLE STORM EVENT. REPAIR OF ALL INEFFECTIVE TEMPORARY ESC MEASURES SHALL OCCUR WITHIN 24 HOURS OF IDENTIFICATION, OR AS SOON AS CONDITIONS ALLOW IF COMPLIANCE WITH THIS TIME FRAME WOULD RESULT IN GREATER ENVIRONMENTAL IMPACTS. TEMPORARY BMPS WILL BE REMOVED UPON ACHIEVING VEGETATIVE STABILIZATION, DISTURBED AREAS NOT ATTAINING AN ACCEPTABLE VEGETATIVE COVER SHALL BE RE -SEEDED AS NEEDED UNTIL STABILIZATION IS ACHIEVED. TEMPORARY ESC BMPS SHOULD BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY BMPS ARE NO LONGER NEEDED, TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL RESULTING FROM REMOVAL OF BMPS OR VEGETATION SHALL BE PERMANENTLY STABILIZED. GENERAL EROSION AND SEDIMENT CONTROL NOTES: ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS 9VAC25840 EROSION AND SEDIMENT CONTROL REGULATIONS. ES-2: THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING, ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. ES-5: PRIOR TO COMMENCING LAND -DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. ES6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. ES-7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. ES8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. ES9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY, IAmN Al N►l�1111cll_"19r101DWI Al1N l ALL LAND -DISTURBING ACTIVITIES UNDERTAKEN ON PRIVATE AND PUBLIC LANDS IN THE COMMONWEALTH OF VIRGINIA MUST MEET THE 19 "MINIMUM STANDARDS" FOR ESC IN SECTION 4VAC503040 OF THE VIRGINIA ESC REGULATIONS. THE APPLICANT WHO SUBMITS THE ESC PLAN TO THE PROGRAM AUTHORITY FOR APPROVAL IS RESPONSIBLE FOR ENSURING COMPLIANCE WITH THE MINIMUM STANDARDS THAT APPLY TO HIS/HER ACTIVITIES. MS-1 SOIL STABILIZATION. PERMANENT OR TEMPORARY STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN 7 DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN 7 DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. MS-2 SOIL STOCKPILE STABILIZATION. DURING CONSTRUCTION, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES, TEMPORARY PROTECTION AND PERMANENT STABILIZATION SHALL BE APPLIED TO ALL SOIL STOCKPILES ON THE SITE AND BORROW AREAS OR SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. MS-3 PERMANENT STABILIZATION, PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE, AND WILL INHIBIT EROSION. VS-4 SEDIMENT BASINS & TRAPS. SEDIMENT BASINS, SEDIMENT TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS, AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP N ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. MS-5 STABILIZATION OF EARTHEN STRUCTURES. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKE'S AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. MS-6 SEDIMENT TRAPS & SEDIMENT BASINS. SEDIMENT TRAPS AND BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN AS FOLLOWS: A. SEDIMENT TRAPS: 1. ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. 2. MINIMUM STORAGE CAPACITY OF 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA, B. SEDIMENT BASINS: 1. CONTROL DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES, 2. MINIMUM STORAGE CAPACITY OF 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. 3, THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A TWENTY-FIVE YEAR STORM OF 24-HOUR DURATION, VS-7 CUT AND FILL SLOPES DESIGN & CONSTRUCTION. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION, SLOPES FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED, MS-8 CONCENTRATED RUNOFF DOWN SLOPES, CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME, OR SLOPE DRAIN STRUCTURE, MS-9 SLOPE MAINTENANCE. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED, MS-10 STORM SEWER INLET PROTECTION, ALL STORM SEWER INLETS MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE STORMWATER CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED/ TREATED TO REMOVE SEDIMENT, MS11 STORMWATER CONVEYANCE PROTECTION. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL, MS12 WORK IN LIVE WATERCOURSE. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. MS-13 CROSSING LIVE WATERCOURSE. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. MS-14 REGULATION OF WATERCOURSE CROSSING. ALL APPLICABLE FEDERAL STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET, MS-15 STABILIZING OF WATERCOURSE, THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. MS-16 UNDERGROUND UTILITY LINE INSTALLATION. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. E. COMPLY WITH APPLICABLE SAFETY REGULATIONS. MS17 VEHICULAR SEDIMENT TRACKING, WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS: A. PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. B. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. C. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. MS18 REMOVAL OF TEMPORARY MEASURES, ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION MS-19 STORMWATER MANAGEMENT. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA, STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS: A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER: 1. THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR 1.1. NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS, 1.2. ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A 10-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS 1.3. PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A 10-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM. C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL: 1. IMPROVE THE CHANNELS TO A CONDITION WHERE A 10-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL, THE BED, OR THE BANKS; OR 2, IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE 10-YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES; 3, DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A 10-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR 4, PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE VESCP AUTHORITY TO PREVENT DOWNSTREAM EROSION, D. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS. E. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT CONDITION OF THE SUBJECT PROJECT. E. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN APPROVAL FROM THE VESCP OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. G. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATORS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL. H. ALL ON -SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE, INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY. J. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS, K. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE, L. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO: 1. DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; 2. DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND 3. REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS; UNLESS SUCH LAND -DISTURBING ACTIVITIES ARE IN ACCORDANCE WITH 9VAC25-870-48 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATION OR ARE EXEMPT, COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC2587066 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATION SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF THIS SUBDIVISION 19. SETH R DERICK Lie. No. 041454 W 0� Nov. 21, 201,7 �W 1�,SI DNA L �~ CJ Q 0) 0 LLl W o C/) Lo Z O Q 0) 0 �Wo°� o �z C/) 0O �00Q Lr,U� LQ J _ Co J � No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE ESC/PPP NOTES Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C-3-03 NPWQ Off UV e Engineering a Design Studio / 128 W Bruce St., Harrisonburg, VA 22801 / 540.228.0202 1 www.monteverdedesigns.com 231' TO PROPERTY SINE 9.0 6 R5' / R40' 18 I � / 'H / 10 RS R5 24 1 6 1 R5' R5 R 1 0R5' R5' I 6 i° SETH R DERICK / 10 0 10 10 5' Lie. No. 041454 R1 I � WW 24.0' R 1 8 / �� 2- Nov. 1, z01,7 � 0' I R 17 / 14 R5' (TYP) 6. 0' R 1 2' i R 100' S' TYP) 24' R5' (TYP R5' ANAL / R5' (TYP) 8.0' ` RS 0 R52' R5 R5' 6. / R5 9' 9 R12' R76' 4 1 9, 9 9 9 / ' R52' j 8 0' LIMITS OF DISTURBANCE 24.0 LIMITS OF DISTURBANCE R 1 0' � 379.5 TO PROPERTY LINER1 0 R5 24.0' 8 0' R R65' / R65' / R 1 0' 1 R 15' R35' R 1 0' 5 / 24.0 R5' R5' 7 24.0' 5 R48' R10' 7 R15 6' 694' 0 PROPERTY LINE / R 1 0' R5' R 1 5' R RS R5' (TYP) 7 Y ) 6 \ / 7 R5' (TYP) R5' ( Y ) 7 8 — — R5' (TYP) 5' ( Y ) / R30' ` 6' / 7 R1 / R C] 11 11' 7 ' Q / O / \ CJ Q R35' 0) 24' M / `_ J LVUJO v, e oN tea; A � �2SNvo UJ o �- 715.5' TO PROPERTY LINE O L / C Q Lr) OPEN SPACE J 1= °° Z C/) L� I I / / CONSTRUCTION ISSUE SITE LAYOUT TREE LINE Project number 19004C Date June 21, 2019 ETS Drawn by SCALE: 1n = 50'-On Checked by SOR 50 25 ................................ 50 100 C-4.01 \ � \ 0 No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 1 J __-v v v / /' _ � �/' 11 -_--_------v vv v \ v A \ I I I I /— I I / / STEEP - 06900000005000 vv vv vvvvvvvI vv v I I I I I-'' /'-vv SLOPES BELLE VISTA LLC ,y___`- �_ v v vv vv j Iv /,' /�v - 11 - FROM - _ - ' \ \- ���\ \ \\ I / \ / � COUNTY = -� \ \ \ \ \ \ \ \ 1 \ / / \ - GIS - - - -- ���-- vv v A V A\ V'A \ V I I I I--_ �/ / - _--- ---- vvv vv v v \ \ \ \ \ \ V I 1 1v -- / A/�-- v v V A A\\ V A\ V V c -- _`vvvv V A \ V A\\ A V A `v vv-'-vv`- _ \ \ \ \ / / \ - _ - - _ / LOS LOS _ LOS �[OS _ �0 \ �Q5 �p \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ __� -- \\ \--- _ - GOS _ _ _ _ �= \���\�\\�\\ \ \ \ \ \ \ \ /_� _ / i _ \. vv LoS �'Los�-�os_� :�- =�_ A�\V�A�\�\� '�-\\ \ �" \ \ V V AV / �� -_- \\\\\�\\\`\\\\\\ \ ���` ��\ \ \� \ \ \\ \ / - ' Lose i /�"zz ---� v v�� v�-V vvvv- ���� -� - i'-\ - VA �A� A���� A; A� t, A "I V A \ l ---i, ,- �i/� j//// �/ -/ _ �vv�°'sue\VAwv --,,vvvvv --'i i-v"� ���\\���v: V \ \ V� \\ V V A V / ----/i%/i//'/// i � —, ��vA v vv_ o,--- :_3z -----� ovvvvvv��� �������V A V vVA �A \\\\v\\\'\ A //// --i - // / / / --- v AAA VA - _vVAA�v� v ---' ���vvvv v` VA VAAvA \ �� \ \ \A A \ V A �/ /� - - - / /�/ / ---\ v \\VAAVAAAv \ Vvvv v _� A -:� \ �vI'` V \ � VA \ \\ VA\ ,, -'\ / A V A \ V A - v A VA V A / I/ - _ V A vvA v v v -_vv -- v--vim y,.. y v V AA \ V A V v v'::::� v l- / \ / / v A V A \ v v - v v A' y v. A \' \ A v� -\ v- v`v I / I / I I ( /� -v,vvv vvvvvVvv 1 v -= ,�� - ,o,o-v - vAA VA�yy yvvy�vv v v v v ` �" i y11 v / I v v v v v- vv o I v v I l A vvvv � 07000-00-00-014B5 -� vv -. - 7 v �\ v v - 1 I 1 I\ vvvvv v� _ A v_ vv i� v o�vv v v v �___;;� EX NORTH I v�I /// /, /' v v v t //II vv v vvvvvvvv�v� DEVRIES, PETER vvv v 06900-00-00-019A9 v a� v yT��� ` v vv-' °v/ I �/ // i/,/ 1 v 111 11 v v v `vvo / //�//' l 1I i A \ TALLARD, GILBERT _ `I 1 My -"�- v v v - DRAINAGE /e '%v - // /,/// . I I vvI v v v _ v ' - - / EXISTING DRAINAGE v XISTING POND WATERSHED / 1 o III I'' v v ,��,; - -- REA 2.5 AC / / �,_ ;' ///�//U /,� %- - I A \/ v� , vv _ i -- - - /// - DRAINAGE DIVIDE I I / I I i / / / I ` \. � \\ \ \\ _-' (- // - /// / / / ,:-_ \` - \ \ D AINA E E \ T' / / '.vvv v v v - - / - - / / -,v v v AREA Al 1.026 AC v v v /-__ I I v - v vv - / -- / /� -= -- / ////' - - > v v v � \ \ v LIMITS OF SURVEY I / a / \ \ \ \ � \ / / _ / i \\\\ \ - \ \ - `� _ _, TOPOGRAPHY BEYOND LINE IS , y�l \\ \ � ; _ - ,-r /i / ' \\" FLOW PATH LENGTH 309 FT \ v - i V _ - _ / i A v v l / / - i � - /// / // A \Vv \ \ \ / / - - FROM COUNTY GIS _ �, _ - - // // /// �� - � , _ _ / A \ - / v A A / _-___- - ��� - - - / ��� V� II; //�:�/% %%%� -- -�' / I vvv1`�,oss - // v v \\\ -v I ---- - - ��` __ — I vvvv I III = %%,_,_�_ _ %;',�;'%/ FLOWRATE. 2.557 CFS YR 2 vv `v 1 III / \ _ ,o,o 11 v Ix / / - / 05 - _- - - EXISTING POND v v \ V 1 i // / / _ -1. - —_ / / �� v I --- - o -- -_ - - - _ - - \\ \ = v/ /- _�ze----' - _ - v A V 11111 I I /////�� / / - //�, V A - I / oss \ `v v // ---_ --=__ WATERSHED vvIIIIIIIIIIII I/l//i/i�(� - - EXSOUTH %%�� I� v I V ' __-- II / // / - - - - - _I' /IIIII --_- A-G v v - I - - - - - - -- - _ - DRAINAGE DIVIDE // ill/l 11///// ///�/ - - _ \ _ % �%� � ' . \ I I- I //////////�//r = DRAINAGE _ =i__ -_ i��ii__ s� .\ \ \i - = I 1 _ „ / /, / / / %,_ v� vv _ v v o -_ � ` - //, ,, // // , AREA 86 � - v � v I 1100 _ -'%/// %// ///// _ - --_ - - v/vvvv - �- �) A \ _ _ - -„os- \ - - _ __-i/// // -- _ _ :___���-/ems/ `v vv - \\\ \ / /j / 1 V A / STEEP SLOPES v v vvvA� ` ' � � v / /" // / STEEP SLOPES - - - -- -� Los �a Los 0s/ 0i i� / / v I \\\ \ i v VvA V AVA v _ vv» / " / /// _ - os s s �/ v - - --- - V A \ v / / 08o FROM COUNTY GIS v v v _ >> -- vv � �, v v v �' j ////� FROM COUNTY �os� _ _- /' / v v �l A v v v- '\ "� �, = / "//,/ s --_- - - 1� �v vvv �7"' v - / v '_ v v ' v v v - / GIS -_0 / / 1W �; 7 / / 1060 V '_ vv AV�� ��w�_ / vos -_ - ./ V Av v /. '/ vv vv �� ��Cc -' A/ - v \ `\ `v A vv '/ MATCH LINE v_=� ' 1eo v / - �4 - _; /--------- / vv v v \ v >> EXISTING POND 04o y���v y y - v v v v -� v v \ 1 R\ \v vv v �g - SLOPES \ \ v I --_-' WATERSHED DIVIDE "�vv`v� v _ STEEP /. v � vv `\1 �_-_"' v v vv v /� \\ \ I �_\ Z \\ \ - - J os FROM / / \ / / > \ � ( I 1020 �v y � �� v _ = = os/ LIMITS OF SURVEYCOUNTY LINE IS FROM COUNTY / / / / / �'\ v - , - - � I/ / / / / �\ = TOPOGRAPHY BEY / / \ \-\-��_- as/ COUNTY GIS GIS / / / I \\ - - _ - I // / /� / / a. / = s/ / I / - --- I I / / / I I \\ V vv / --- r �w--_ �� °1 / // I A __---�- - - -� I I I I V I I v v vvv- '/ l000 I- -\ .vv -os / I I I -' --- I I I I\ I I A A A v v --_w v -s/ - 1a2�— // I I 1 - -- --_ 1V A A\ 1 11 I A v-_ �Oso v ____­I-wvwvv�- s_ // / I I- _ - -� V A A I i I I 1 1\ ------ _ _vvv - / I_ ---- - -- I I I I I v _ _ %" -- v - v_ 1A v / - - ------ \ \ / STEEP v _ / - / � _ v _ v v �Ov vvv -' _ ' - \ \/ /_- SLOPES ` / / / - - ' / v --_ A Av --- \ \ -/ / _ \ y \\ \\ //I - \\ / / -/ / //y / \- _ \ \ - \ \ \ \ / - - / FROM / / / / / - \ \ \\ \\ \ --- �� -- 100� COUNTY // // - / / \ --- \ \ \ vv / i I -- v �I- / / GIS - v_- -� J // / - A - / - / / / v v v / / / -_ _---/ / STEEP v �, , , / // / , // __�- ! ///// / / / /\\ _ _ / / / \ v v - _ _ - - _ _ - / - J SLOPES _ vv I �` v _ _ - - _ / / 1 v---------- ---/ / / /,/ /' / FROM V vv / "4Ik• \ " v---_--� / �/ / / I v -- -\ \V - -- --- - / / / / C619NTY v A A �7 v V A v'_�___ _ -- /� / / / / vv A A --- �� -- ---- / / / ' ; - 980 V 1 --- --� // / / / / / -- - / L / / GIS v - -v / l v _ v // a , �/ I 1 I AV A vv ----- / - / ` v ----- __ - --- / / � / /; � vI 1 / ' 06900-00-00-04700 /'� -vv - - - - - - v - / / / � \ --- �/ _ �� `/ I I --_- -// ////z D v / / / v _ - _ _, _ ____ 1 ATWELL, AVID - _ - / - -ss&- /' // - \ \ /// /// / / / / / - - - -sae - / // 06900-00-00-02000 vv 1 /i// //� / - v v/ - / \ - -- - - - - - / i \ _ - - __ - I -_/ --- - //// AUGUSTA /, // / \ ` \> / / '/ / /' I / / ////� _ ` - / - -/// PROFESSIONAL / / // // / I / / V / y / / v_ _ vv__-- - - /y PARK �/ / _ � / / ///// / I --- v v // //// ----- r // \ ` - I - v v v / \ v / - -�_ �v2 - / / / �-- - / -go--- -- i I I - ,- -_/ /-_vim vv - --- I I V v - -- / v v - /` _ /� V I \ - ---- �// - \ - /� / / EX SOUTH /' // / /` � - - 'EXISTING POND WATERSHED\ \� , ///�/ � ) �I 11 I I I I -- - - - \ v��---�,//'/ // / v 1 ��v v DRAINAGE // / �v DRAINAGE DIVIDE / - 11 i� �i----_vI �I I II I I I II I I \ --- \ \-- �___l / / /I \ \ I I I 1 / - / \ / �v� / A v / / I �I \ A ��=� //// / I Cl v v 1 1 -� AREA 86.75 AC . v v / s / I/ (� - /-- I I I I I I I I, v v )aa- -- v_/ ///" I �- V A A I I I - ' ` \ �____- I I -- I vvv / / V 11 II I , � --- -- \ v A -A / �- II I�� _ I I 1 v /-- - / / 1 \ I I /.Q 1 v v v - / I I/ I I I/ 1 I �V I v v v -/ A I I I ------ ----_ - - i' V 1 V A v v / / I I I I I/ I I I --- - \\ ' J / / /\ I I I I I I i � // / - / STEEP /J/ i \ \ \ \ \ \� / / `\ \ III \ \ I I ti-' \ \ \\ \ 1 \ I\ \\\ \ `\ v v vim-' / I / 1 I I I i ---' / I- �' V \ A vv vvv / l � I I \ - v vv v� v \ \ SLOPES /` / ( - \ \ \ \ ----- \ / ' I / I I I I I I \\ - / --- FROM / /,i \ \\ \ \\ \\ I-- -'' \ \ \ \ \ \ _ -- v v v-' /------- ----- / \ V 1 _ / I AVA V 1 / A \ � v v y \ \ v vv --- 1 1 1 � - / ----- C�TY / /,' I 1 v v v v / A\\ V v A\ v s�o--- ---- v v v / I (\ \ �v v 1v ------ -_-� --- /` GIS / / V AV 1 vvv v11 v v V / / \ \ VA V \\\\\\ AI I I // /VAA\A \v vv v V A V A v - / / v v k_ - - v / -------- v - / / l I 1 V A \ \v w'��_ �coy� �� ---- / /` / / �V A A 1 I ( \v v v AV A `� - _/ // I \\ \\\\\I 111 I I I / // VVAA ' vvvvv\\\ V AV A \ ----- v-v ---- STEEP SLOPES V A \ `�vvv'°v�� �s�/ /� , / I \ v v v _------- / / / VA111 II I ( \VAvv vv v A\VA A\ vvv v v v _ - FROM COUNTY GIS \ \ \ ,\ \ \ -- \ 1 I - - - / / ) I I I I I I I - \ \ \ \ \ \ \ \ v vv ----- / I I( I I vvv v - v - _ \ v,'� vAVA A � -ii" Ago / / / V A V A - / / / I I v v \ v V A \ \ - vv v vvvv__ - I 1\ ��� vv - - ./` / / 06900 00 00 020B1 v I v IV ------------------ / / I I I� II vvv v / / I I\ r v v v v v v A\ - / � / / // AUGUSTA / / / A \ -- "/ / / //I IIII I I � I I I v� v v v v vv v � -seo-_------/ v v v v -- / ,1a1 / s ./� --/ / '-------- / / / I I I v v v v V A v v v v --- - / '// v MATCH LINE /' // ��os /� �2e - /-v/ / // / ') I I I ( vv v v v v � v v v �/ / \ V A \'\\ - // - / rb'��vVA� / / / �iii� /�/ /'/ / os/�/�-/ \ PROFESSIONAL -/i / I -v- // / // / 1 11 Al \ / / V A\V A \ VA EP / / / vim- %'_ / /s" ,/,� v PARK - - , -- , - - ; / / / J I v v v v v /v v vv / / �� �� / / // // / / �� - -- / // VA v v v v \v - - v EXISTING POND WATERSHED / /,v � / / �� / ////� v / / / v / v v v v v i/ 85 _ /" a / //-/ ,� LLC I \ / / I I I 1 / v - - ,/ / --- // vv vv v DRAINAGE DIVIDE o' - /i�� �,ia - -- -- - / v vv v ------ / / / - - - / v v V IN \ , \ IN OUT 842� j - - � / / / I - ___/ / i \ \ - h_ , , ---- - - - / - �� / //// ///// / TOPOGRAPHI LIMITS OF Y BEYOND LINE IS, A v v v v v _ // -- - ---- �- / / \VAAVA / vv ��V A - - / - - / /0 /// v v v / - / / /v A - - - / / / - / ��/ /,� - FROM COUNTY GIS v v v v v / - - - \ \ ( ( v v \ -- I I - - /// I III v vvvv v_vv vv__-_--- //// - - - - �- - / --- / / / / ' / I I I I 1 v _ A // / / - - - -- f --- --- - \VAA \ \ V `v �v ` I I [ - ,- - y _ - EXISTING / // �I I I 1 v -- - -- _ 1 e----- / / / / _ _-- -- ---- � I ) vVv v v v -__aao---- � , , / '///////1 I v v�_-v- 1 1 I , vv_ v�--- -- ( I / / --- v-------- - / A 0 A \\ /`v v- a80' �� I v v- --_ -- - � v� POND I /l/ �jdl ) A A v `�- - - - I I -v --_ - -y I I / / / ----__ --'/ / A A A \ vv - I v - - - 0 1 � I II / // I //ILA/ v v vy I I 1 I vv vv _ - -'_ I I I( // / v-_ - / / A A V A - A A -- --- - I I 1/ A A\ v - --I vv v v -- '/ )/ I I I v `v , A 1 1 I --/ / i v v v / /� V A,Iq' POND. // / / I �� V A Vy I vv - -- - ,_ - / / / / I -1----------'- / I 1 1 / _ - - - -/ I / / / \ \ \ \ y I I \\ - / / / / / / I\\\ \__-- - I 1 I 1 / l 06900 �00 y0�y� 020B0 - -- ---- --- / / / / ./ / I III III v vvv/ v,------- vvv v - / / / / / / v- --- ---- v / v v A -11 sea-- / -- / - / v I / / / / r / /vv v ` ---'ps�/ \--- - /\ i 1 / I I \ \ - I \ - / / / / / / / --_-------- \ \ \\ -- PROFESSIONAL v _ vvv __ / , / // 1 I I -- --_ / / / / /v - v v v \\ \ \ ----------/\ --- \\\\\\ _ _ //// X/// / IIII \\\O/ // -\ I \\ \�\ \ / -/ // /I // // / / / / _ --_ \\ I \ \ \ \ -ar4o _ \ \ \ - � \ \\\\\ _ /////, k \<\ -- I - \ \ - - / I / / / — - - - - \ \ PARK ------- - -- - - - / �\ / - \ I \ - / / \ \ \ v v v - v v /i /,i / v `/ I L--- A- // / /// v V A v A V A ----- -- - V'O �_ -i /////� / vvvv Ili � / A A \ - / / / / / / / --_A A \ LLC v v v ----- _ _ , I-- _ v vv, v /, <�/ / v��� ,/ IIII I/ i; v j� - / A �_ ` v \ / / / / / / / / v_-----�,V V A \ - -- I I 1A A \ \ ----- - ��_ vvv '�' �« - / / ��v, s / 1 I v - V A V - -- / / / / / / / / /^v_v - A A I I V A \ ----- --- s _- v A` - /I v - / \ - -- - --vvvvv v� � - POINT OE ANAUs 9�`S �• I I I v v - / // / / / /' / ---- - -- I I I I v \ vv _ / s �� "� __ v \\ V r, I / t \ / (�''' / v I I I --' --/ / / / l / / / / �v v I \ I ' I I I \\ \ v----- - /-� -2:!" �� _ v A A VA -� ( \�i --/ /'Iilll�l( � 'I I I I I 1 1 \ - --- / / / '/ / / / ,' /' v\ vv I _ / ----- - - - - I f\ v vv / /' - --� �o�v _ v v v A `� /i I j I� I // I - \ I _ I \V /' / / // I' l // // / / w A Al I \ V ///� - - vs vAV A A r/)/��Pli�/ /l / / - / - / / I _- --/ - -- v �- v vv IN // 22 4'/ I I I v / v ' --- --/ `v �\ \ \ \L A �'/ -8 /// / / / I /- /� v A -/ / ----/ // / // // v _ 11 I / I v v \-�i//�/ / / / / / 0 /�, 1/5 i-� , , \ I \ \ / // - / / I / / / / / \ i \ - - I \ � \ \ T-/ //� / / I 1 / / - \ - - - I \ - - - \ -- / - - \ -/ -/ I / / / A v �/ / / I \ / / / / v �I - - - - - / I v v A --� /� / / / / / / / - \ - / v -- \ V ---- -/ / // A \ v - / / -/ - - - - - - // l / I / I / - _-------- s \ \ -,- ',A / / / -- — I / / / / / / A \ �v vv / i / - / I, I 1 / ) I --- _ / - I I v --- / - -. ----- - o / //� A l I / / / /� / A \ _ _ -/ / 1, I \ V 1 r / 1 V A 1 I / - - I / /v----/� ' - - -- / / / /1 \ _ _ A ---- v // / o A \ \ / - A - A v / - / / i - /-- �- _ - - 'A I LIMIT OF SURVEY (/ / / v /// A y - / - - \\ \V \ // - - \ / / / ' /- -- l / - / a / ) -- Tv A -- _- / / A \ \ V / A \ - - - - / y _ _ ( �s - - I � / TOPOGRAPHY BEYOND LINE IS / / / C / / I \ \ - / � - I \ \ \ \ � ( \ _ _ \ \ \ - --- j POINT OE ANALYSIS - \ - ----- ' -- -- -- //// / / ---- - _ -/ I/' -- _- / � OMC N / / I l \ \- _ �-� / _ \ \ \ \ \-_ -� \ \ - IS / -- --- �// - / I / \\ o��o-- - _ - �� / COUNTY //// I \ \ - - -�� �� - ---- A AV A AV �1\II Avvvvvv-- --- R G \ ` ----- - -- �_ _-- / / // V /`�� ( ( --_- -_-' "� ��)- - l // / / 1 I //� /,/ // I v `V ' -11 - - --_� A A\ \V A AV A I I \ \ v_v /�V v v/-_ - - - / - -- / / / ( �v A 1 V A V 1 - --- - / /// / 05 / / /� / / 1 v v _ - ��- i v v A V I \ \ v // vv vv /'-_ _ / - /-- / / / / / \ �I \ \ \\ \ I I I 1 /'-- - /// / / / / / l I / / A \ -� - --� \ \ \\\ \ \ \ / \/ \ \ _ --' \ 11 ( / / / - I \ V I v / / / / / / - s V A / /- / /�- / / / / L __� / V A \ \ V A vv v / / / ' A \ V A v /�____ / / �,// ''K __ A \\ V11\ VA\\VAA I //�___ _/ / / / / / /�/ /I v _ - / \ A \ V I -_ - / \! - / / -1 vv / , � A A \ \ \ \v v ./ v v �/ / --- ' / �` � STEEPS O S \ Ins\ \ \ V A V A /_--- o / / / / / / I/ / / / / \ _v vv v/� -- -- I vv / // vv/-____ A /v_r --- ' / / FROM COLIN GI /) , v v v v v ___ r - - I / / 06900-DO-00-047C0 v v ,11 i -- // // /�/ I /" �l! A\\\\ \ 1 11 111 V A \ _ - / //'/ // / / �_/ l / / v v -- -/ vvv/ /� ---' / , I i - / � I 1 I I I I I v v -- ��� / / / / / / / _ - I // //' MCALLISTER, DANNY vv vv - / /&P�'�� I I // /// / // I / ---- / / / v / A / / / / vvv A / - --1 1 _ / - \ / / �� // / - - _ / / / / -_ x - / / \ V AV �'- / / � -�� I / / / // - o / / \ / \ - 1 1 \_ -_ / \\ / / / / / // / / - - / / / ( v ` � / /' _� / / / / ) A \ V A --v - 1 I l I / 1 \ \ \ \ / / / / / I A / / / / - - / /-vv / / / / \ / - v ___- aae / /11 I 1 vA - -� V A \ / / / / / /5 / / I A \ os / / / / // //' --_ / A I I ` v -' -' \ V /�'--� v-_/ / I VA A \ \ / ( - -11 \_ A I / (�/v v// /' % _/ / /' / / / / / / r-/ � / i 'v V 1 1 / \vv v' -' - I I v / A v _ -) /� V A v // // // / //--_ V 1 /-�// /- / / //// I / I // V / �- - -�\ / // \ v� v / / / / �� v - -y -__ ��� -'�) /// /// / // /// / / I I / / A - v / V A / / �i - v - �-�- �' (- // / - / //// / I I I / � A \ IV I I v� � --_ �V / ) / / / / I // / A A - / / / - -� -- v / / v / l - ��r - --- � --L /,// / o / / / // / / / I I / / \ \ V A V `� r--v__ � - - / / / / / I A \ v > - <�-_ 'r v v —L _� , D _ /0, �/ / / / / I I y I // v v v v v vv -- --- v\ v 1_v ---- - / / vl1/ / i / / / l/ v vv -- v v V I \ // / / I I / / A v\ - v \-- A \ \v A 1 A I -�_� / / // / I / A \\ \ - --V A I / / / I / / I / \ v v \ \ \ \ \ \ \ \ \ S, — / I l / \ 1 \ \\ `\\ \ // \ \ \ - / / \\ // /- _Jl I / /`I \ \ -- -- A V A \ v v V v A /4o, v I ( / / / / A� \ 1 A /\ V A v_ ---- , // v / /- �/ / I // / / V vv vv / --- I / / r /-- ------ /l \> \\ \ \\ \\ 1\ ---/ / // , v���!�\ / / / % \ \\ \\ \ \1 \ \v\ \----- -- / —/ _—/ // /__ ,, -- // / I -- / -- -- - \ \ V I ago- / / / / / / / / / V v vv--_------_g2' --/- //- -/ / / / / /A v -- --- /' --1 � > / / -_ / / / / / / � \ / ( \ v v ---- / / /- -/ / A --- - � / / - - / / / / / /I A / I v v Lv // -- __ /- -- / / / - / / / / / // / I / v A \ \\ -/ V � - - - - --- ----' --/ / /' // --- -/ / A \ - __ -� �- --- -� / /-/ / / / / , / I I vvh \ \ v \ A \ v \ ---- / - / v- _--- I - - _�/ / / // / / I I I I ) \ I I �/ / // v --- ------ - II ___/ / -� / /' / /V vv I y i v vv // // I I I I 1 v� / / / v y ----- -_-� / / / / / / \ - - d / / / � A, \\ 11 /I- // '// // -- / I I I A A\ IV / / V'\ - / / — — — SCALE: 1' = 150'-On I'H 0' � SETH R DERICK �- ` Lic. No. 041454 W �.� Nov. 2-1, 2019 �W lt,SI CNA L �~ Q Z C) Q � M) o `_ J z W W o C /)L Z Z) O 0 0) _Z I0N �W�°� � � V o �z C/)0SNc-o W Q I— Q� (D 0L,ILL CD z CLO') Q J P Co ft-J r�n Z .;� No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE EXISTING DRAINAGE PLAN Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C-6-01 /,AIM v 1/ I I I �/ / // - \\V A \ V\ VA\ \ i - �%' - -- `� - V A V , A \ -- / li I111 1 v / I I v I I I I I I / // / 111_ / // / _''---v v v vvvv vv vvvvv - — ////w�� /--_____ __ ___ ------ - TREE LINE vvv vI v v I I I ---- ///I I I / l _�// // -- vAA \ \ \ \ \ vAA��--- - _- _/ // / / ,' ---- - ------------__ v A v \ V \ / l / A I I I I I V\l(/ / 1 I_-_/// VAAAA\\\VA VAvA v�� _--- ---- 1� / //� ---- --�P A\ V A A A A ' / ///1111l - \ I v v V vvV\\\\ v \ _ _- / ///i/- ' �vvvvvvv vv vv vvvv > - - -�------- PROPOSED POND WATERSHED v v A v v v v / / / - - / / I A A\\ \\\\ ---' ///// / - �^ VAA��\VA\VAVA�-�---- `---- _-��i/j /� ��-` � � ���os�to�A A\\ V\ \\\\\ \` �� \ /� - - / A VAA / /- \V V A A _ / ���� v s V A /__ DRAINAGE E /,////I - - \ \ - // / \ \\ \ \ \ - / - _ / _ _( I i \ \ \\\ _ - _ / / / / / - \\ \ \\\\\ \ � - - - _ _ - �' FLOW PATH LENGTH 344 FT °s, - _ \ \ -- \ __ -- - \ \\\ \ �\ \ \ \ / / / // ' ' I I \ �\ \ -- \ // / / / / / \ \\\ \\\\\\\ - DA-6 /: - ���, Loses-0° ;--- -_— -�\ \ \\\\ \\_I)s�11 \ d _ - _ - - _ v _ / v v vv v v _ _PROPOSED POND _ °s /os/ / _ _ 4 ,LIMITS OF ' � vv vv vv v , yv : �v / 0 420 AC ' r _ ---/ / / / v � _aIIIIIIIIv WATERSHED- ��s- i v / / / / / - _- -- / _ v ` v v"� vv DRAINAGE DIVIDE - / ;'' /vv i_:- - v v v v / / - - / v - / A v v l PROPOSED POND WATERSHED -2--' oss _ _ _ - - / v - Y � 0.304 AC _ - ,v � 0.994 AC ; � _ - __ , , � -w v v v v v v i /// / / / / / - / / L - fiao FLOW PATH LENGTH 366 FT - . - \ - \ \ \ / / - ;,o, _ i f _ FLOW PATH � � - \\ \\ \\ `\ "\ // //v_� v A/ TREE LINE I ,v�, �- l v LEN TH 528 FT v v 1 v v v v v v - v__ / I/ / // vv �\ I v v I -- I� LIMITS OF DISTURBANCE vv v, _ - - - - v v (� v vv v v ` v v / v I y v 'v v v1 v v v _v / // / -��\V\ / V I /'`y v V A - ��e - _� v V (�I A�I� VVAA \ ��\\ \ V �� \ A v VA \ \ 1 / I �-- o \\ \ \ ' _ E 1083 / - _ - i / I I I I ) \ \ \ \ 1 / / — — \ \I - I - / � �' '.\11. \ \ —,gym �,w / / _ \ / — — — // / / / I I I '/' / y / v v v - / ,,oro��v v /// // I/ 11 XISTING POND WATERSHED \ / / A 1 // / -\ V I I V / A �// - / I 1 l / / � / I I j -- v o_ - �l / - - /� �%�6� ,'0/// //1/ �q �6 A / A - ---- �/ i �7 ,- �_/ o R N G DIVIDEw / / // / --� I 1 �- I /� I ,y�l // „os - vv �v --- = ^% �% -% / i A \ D \A A E � \ / \ - / // // /�\ VA \ I // ,�/I IVAI� �_ ; l _ -vvvv DA - A2 0.742 AC I A v v v v \ V --v v / v vv � v \ I o . I - /`` \ / / // vvv\vL - - FLOW PATH LENGTH 214 FT � vv v vv A v v v v -- _ I 1 ��� vI v 1 /v __ 5�\ `-_ - _ = - DA - v ��' '; OST DEVELOPMENT 10YR-24HR vv vv vv vvv _vvv ° _ \ 1 I t y I1 // - -- � �� afl ��; -- 80259 C ,vvv P + vy vv 1 _ „oo _ _ - - -i �, /. _ -,ow- - - )// / 1--- / _ A I I v v � �— � I / / I � � - " FLOW PATH vv - % FL R 011 FS 46 CFS = .557 I v/ ��= W 2 5 " / I I /// ///, - i ----- el FLOW PATH LENGTH 227 FT o - /' - _ - LENGTH �= E , ��`' --- — ----- v vI / - - __-__ _ - �. - -- -- -- _ - __ j/ / / // — -- -- --� 11 J- / DA'4 �� �/i ��,- /�i � 11 / �/ z�L/ / / ;FLOW PATH GTH 127 FT- ��- � - -_' - - - �, '- - �I - - -- _ _ 0.323AC_ �, //// i / / LENGTH __- -- o-,-�� -1 - - �_ - -_ _ - - _ -_ -__ - - ___- / -_ _ _ _ - - - DA 3 1 978 AC - I- - - - - l --- - - - 17 `; \\� \\\ �os9s / _ _ — sue/ - / / /\ - \ \\ \ ' -- _ \ _ / / FLOW PATH LENGTH 159 FT _ _ _„ asi// - _ _ % / -4- - / I _ \ - - - - --��� �� 7 j \\\ \,\- / _-_-- sC�os �los ios �losT_ / / / / /// \/+ __ \ \ v v v _ - �o _ -� _ _ / / -=- � " v _ __ - v \\ _ - -' - �- vA / / / -- - -os-� _ A - s� / / / /v / / / _ v �/" / / / / i / I / �� 10 - - - �,-_��tiv� vv v v�vvvvv V .x /,' �` _ �/ / / ' // 7-- �_ v v '- - v A - / / / / / / I _ y, - - - - l _ A .V A A\ - cos _ / / / / - 1 \ - ��- - - \ \_ \ / - / // / / / \ o vim'--'/'/'/ it �// / / /, I - - �� v v vvv v ��� FLOW PATH LENGTH 307 FT = °s /, / //� // - 1 v v v \ V / / / / / / / / / / I / / - - AAA V A A �� v�.v� �v vvv /i, ,oi _-__-__`0_."----_-/ / /// / / / / \ / _ �T v / - - _ 1 V � �� � - vv A / / / - -.A vv A\�� ��// - / / 6' // / / / / \ \ �_ / V / - / / // / / / / / , / -- -I � A/ , / - - - r- - A -A vviv ���v��v�� �� _ __ / / / / �� os �.----------_ -- - _---/ / ,/ /, / / / A \� \ PEN SPAC \ ��� v �������� � / / / // --- � ---/ // - ' / V A \ - I A \ \-- -- /// / ///////////////'����� �A� / / - /A�, '�Po �������wA�V� ��� ����-/ 0.510AU/ /// �7 �'-v \\ ------ --_-j//////// //\ VA A A V A / i / / / / j // //� �_ MATCH LINE / v ---- ----ieoo-----=-- / v v / v /// v� \ v 1 \ / / v � v vvv vv / A v V �� ,�.�- -- / - / / / / / j / / ///�� AA '- l� ��v ��v � / / // / / /------------- _- / - , / / / /� V A r,�� v / °s/ //// / _ v v v v v v XISTING POND /� / / vv - - / v ��� - vvv - / / / --- --- _ ' - v - v / !a4,0 - / / eb\ - / / ios / i / ///// / --- T--/ / / -/i / j-\\/ \ \\ \\ \\ ti \ \ \ \ I / / .WATERSHED DIVIDE/ / // ///r\� \\\-:�_--/ \\ _ _ = j° / / // - --, - \ \ \ \ _ -/ \ l \ _ _ _ _ / / / / / POST SOUTH DRAINAGE AREA 89.26 AC _ / / / / 1 I \ / / 1 / / / / / / /'- i/' / / / l / �1U2Q,\.\\\ --� - --\ \ % - -.. _1_�� _, _ ' '''� / / // /// // --_ � //i/ / `� / / / / \---_ / / / I / __ _ __ as / / / / INCLUSIVE OF NEW IMPERVIOUS AREA &FUTURE - / / / /�i �' �- / l l l /l l l l�/���� LIMITS OF �rrw - �� _��f_ - /////// /// /////�, / __ � �, /� V I /// // / V -- _- / '/ T / / v _/ / / / / /// �/- _-/'/ l l I l r--A n ����� ������� ---' / // / /// ///// / /, DEVELOPMENT AREAS -' // V I / I \--- - -- - -� I l /// / I I ' I l l Il / / DISTURBANCE v � - __ - ,°s / / / / l /i _ _ _ t 1 I - I / I / / / / / / / - -�� _ v-v / / / / / / / FPL: 2,273 FT / - - _ - / / / / / / ///- �- - - J l I / / A. _ vvvvvv��___- °s�- -_ - / // // / // / __��� / /'-'-'/ ----- _ - 1 -- I I \\ / / / , / / /- - - - -� l /I / - - - - vvv vvvv _ ---- / / / l / / /, / / / / � --' ----- -- --� I I � / - -- - J / V /� v i -i- vvvv -'%� _ -/ / / l //� / / �/ / / - - I\ / / / / ////�/ -- / / / �� --� V v- °s __- - ,/// / /',. / / / - 948-_ - - %/// / I -I I I �' / / / / / // � - - --// /I/ / / /� -� I I ,- v�" v� _ �� --- -- / / /// /// / v - , / _" -- - \ 1V I I -� v / /// / / / / / A v / / / / / / I I V A v / - - - / / / // - ins - /i/ / /// / / \ /� / / I ----- - -1 _ -_-- / / / / / / ///(r -- - ' �/�//; A - -����v - /`-1a2�_- - �� -�/ /// ///// ///////��/� �� � � ��///�%//%��- __ / /// / / / I 1 --- -_-- �� V A I 1 1 - / / / / \ �� / // / / // // / / v' / // / / ( 1 - / / v / v / / t -� V A / l -- - - / / / \ \y- s_ _ --- i / -- , / / / / / / / - - - I/ // / /A \ V A A �_-_--- - / / // / / // // v v i / - ` % I --- 1 A / / // ///// /- /// vv v vv v v v =- y°� _ - ;/ / / / /TREE LINE- _, / / I --- _ -- I I / / // / / / / r- / \\ ���� \ ------ / / / //'//' v / ' / / //.// / I - -1 I /1 / i i / l//// / / / / - I - / // A A A \ V A \ �' "-v` ----- �.--------'/'/i i%'//%/ /// /'/' // v�A�� �x / / / I / I -- - ^/ 1 / 1 / ! I - -��� - / / // / / / _ / /A \ V A - v A / /// // / / / -'v / // � -- (/ / // // v /� � - / / / , - A / / / / / - / A \ \ / / - / / / / //- v / / / l _ - / / / / , / / / / / / / / A v V V A ----- \ / - ---/ / / / / /// / /// -� v x� // / / --_- / / / - / v -, /, / / / // / // / / ( / / - --I -- / /V v v VA \ V ' /- -- - A /�--- // / / /// / %- /. / / ` - _ __ /// // / // / / I I I 1 I I I l I I' - /- 6g \\V \ / - - v A /'I� r- // ' // �\ / A � / --- l //' _� �_ / // / - - - _ '�\ vA\\ v v v v / / ----�--- i o4d / / / / / / / , / / / y v / / / / / / / v / / /- / I� I I f - v \v\ --�--- --- _ �� /--' //ice / / '/� // / / l �-\ X /, // / I �� / / \� -- __ i / v v / / / I 1 - ' - -� \V A\ \V - � \ A / / /// / / / �\ �.' / / i� /--------- ��_�_ / / \\ \\ / / I 1 - Avvv vv _ --J / / , // / // / / - / / /-// I / -_ // - / / / I I III 1 I 1 - �-A VAA v�v _- T 1 / /' /'_/ / /// / / //�// // ////// /7,v ----'' -' ,// /I/ //I. j /�� _ / / / / // / / / - \\vv v, vv /- / / / V A \ I I v v v v �__--- / �° - / / / - / / / I v / v v I - / / / / / / I - v v v - --/ -� I - v VA VAA � --- - V A = / / / // / / / / ///// / // ///�� - --- --' / �� -_ _-- / / / A \ \ \V A / / / I h` 1 V / / --- / 1 A III v -- - / / / / / / / / / - k` V A ---- / /,( / / v --,\ v v v I�-- - /- - �' / / A A\ II -_'94o_ � v '-_ _ _-_ J--- - OVA---- , -,/ // / / / //i / / / l l l i%/ / A \�v-- / /'/ 11�1 V A\\v v�--------7 // / / / / l l l v 11 �'/_� V A \ \ \\ \V - _---- �� _ - - / / / / / \ \, -/ v _ / / / / / I v / \ -- / / ! �-, � � v --__ , - -/ / / / / / / / / l i1 / / 1\ A ___- \ \ 1---- / / / \ -- / - --- --- - - - - / / / / / / / / / / / / / / \ / / \ \ \ \ \ \ \ / / / - v v v v �- --_ -i / / / / / /i / / / 1 / / I \ \ v / / v / // A A \ \ _-_-- / I � ��vv v v_----___ - --- -- / / / // / // / //// // A -- % I I A -- �-- / / / / // / / / / - v / / / \ A ��� ------ -- \ \ �'- - �_--- / / - ---- / / ' / / / / \ \ \ / /// \ \ / / / //// // / / \ - - / % / / / / // \ \ \ \ VA --_ fi -' /' / '�/ // / // / / ��� �V 1 �__-� / / / / _ �/ �v �� _ / / / ' / / / - - - - -"- _ / / I may' -- _'/ -' /I / 11 / / / // / / - , l // // // / / / / - / / / �v�- 1 / //III I _ - -- / / / // / / // // /� / - % --/� v A / / /// / // / - v, / /� '-�-_�_ �� ----- / / n / 1 -OPEN SPACE -- _ - � / / /,/ / � / / // /, _ / / / / / r` \ / / / // // / _ \ il'/' / / /I// 1 Il 1 \ � -- -__ --_-- -11 / j'/ / / / / // / / _\ \ \ / / / ( I l \ / / // �/ - -� _-- / / //////I I I vv _ _ - �/v / , // // / -�'/ ,� / _ / /� I V / / // v - --- /l / /I ///// l / / 1 \ V� I --- _-- - �, �' // //// / / - /// ///`i __ �_ ---.i / / / I I 1 \ --, / / _ ,as / / / / / // A / / / / / / / / / / I/� - - / / /// / / // / / / // / / -' / / A -J / /������ -- / // // // v - / / / / //- _ _ _ I - v - /// //_ __--, I ----_� / - / / /// A V v � _ - - - / / / // /// /// // //`, / -- _// -94Q_ \---- / // / _ v _ / �� / / / l / / v v� 1� ---__ / / / ' / '' / / � / / // y /� �— - / I �� - \ -- / / / - --� I I I _ _ _ // // / - / / / / / / v v ���- / �� �/' '� / / /' / '/ // // / ///// \ I \ - / �/ / - / / / �- / / / v A I --_ - - - ,- // / / / /// / // / \ _- -- �J / �� - I I / / ////// / / / / ` _ / / /' / / / / / / ---- i v / / / / / - I I I --_,�,_ / / / / -- / / / / / / // // I// � // -v v v _-___ - /// // // /,/ ///// / / //// ///� /,/ I - EXISTING POND WATERSHED �� -/// ;�/� _ _ III 1111 / /-_ / / / / / / / /l l/ l / / v v v v--/'///' / // / / / I / / / I > > DRAINAGE DIVIDE / - / //� I I I I I _ v / \ - TREE UN)- // // /,� / I \ \ \ \ // �/ I I I I l / V A - \ �I - r, -� / - �� / / / / 1 / / / \ - - / I I --/ I I / / / / / / / / / /#I I / V A I _ / / - / / / / / v / --- �/ / / / / J (// /�// ///I o A - '// -/ / // /'/ I I Icpl/ 1///� I I , A - / _ _ -- //// / I I 1/ 1 I I I ( /v I 'I I i I, /��LIMITS OF --__`v �� // / / / I I I I I I III I / V I I I I 11 \_�\ / / / // / I I 1 1 1 1 1 111 I / \ I ll I I I)I ---"'/ /; // DISTURBANCE v v �v / // // 1 1 I I I I I I V A k _/ �� / ---vv v vv v-' -_ / // / / / I I I I I I 1 I I / V A \ I �� v� � - -- " - // v v v vv / / / / / / / / / / I 1 III V A \ �� -� ' / --- v v v - - / vv v v v v- - ' // // / / / / I 1 A \ ;� - ems` °s /% - T � % v V A A A A - -/ / / // I A Fri _ f -, \V A A� ` \` - '- -' //'/ /'// / J i l-% /i ice/ ��- -' - - -- vvv v vTREE LINE / illl ve,e % /-/ ' -/ — /�� - _ / TREE LINE / ; MA CH UNE / \\ \ --- - / / �%-��os s� -- i �/ v v v EXISTING POND ATERSHED / /' / �'%'///4i %� ,1/ /, v� `� . DRAINAGE DIVIDE // I TREE LINE ///�/ /i 11 vvv v ----- _-__ /' / V III �+ Ikk 3� �, -'- ''-/' ;//"'/�/ 11 � _ - -- FN OUT =1 842.J _ - / / \ \ --- / ,� - / %- / v v v v _ - - - �� - rll/� / / 0�h/ v ����-- _ _ -'� / - _-- EXISTING // / II I v v_ -� �" _----�0 -� I t v / POND / / / / / I v v \i `� - _ LIMITS OF DISTURBANCE / \ �v v,1 / / 7� �1 v vvv ( l / I�/N v - - A \vI A v v- V A vv - - ---- _ 11 I A / / III I /V v v v,- - /� ll,) V v II PorvDl.� /// / I I v v v - OPEN SPACE ----_--- / „/ „(I BSIv vv -,\ `--__----- ��------- °� irk/ TREE LINE / / j111. 111 I II v I �/ \_ _ __ 5/ - / / /II 11111 1 1j 4 \5 vvvvv ----`���_ � --_ - -- I- / / I / III�II IIIIII I A\ v1 \ g v v v / v -- os - -i--- \ \ \--------- --- SLIM DISTURBANCE Illlli \ I'l,, �_ ITS OF R vvvvvv------- �s v�1`__ I /�yi/�, ,/- llili�/ I111 �� v v v-------' ° vvvv x - ,/�///� v �II II1II lllly� �� vvvv vv -- TREE LINE --ems _- �����_ v�` �, /%%ii-° OINT OF ANAL,Y, IIS I� �v V v ,- ---- - ������� ,�,�\v wA V I''VA ,'V` I \ -� _ - X \ I v v v -- - /' , -" - \ �, vv vim- , 4 v -----_ 'tom/ - v v v� vvv /ONT ,-L$8 4 -//_ , DA-9 _I / T 5.76 AC - +� � - \\ \ \\ * I /�/--- ����� Z/ONEj ` - / // 1, _ _ FPL: 663 G� - - - a-_ , I v v , �� , 1�///, / / / / ---� i y V \ - 11i-/-_� / / / //� , / "� -_ _/ i // �/� -/ PONT OF ANALYSIS ____ -� �� �� � / ._ /,// �' / TREE LINE ` o�__ � / // �Z/// /I I -/ // / / - II , \ V ° I I 1\A \ \ V I �--� °sI// // // / / / / / v � I V A \ A \ 1 I I 1 i/ % / / / / ////'// /� > vv vv A gal V A \ V A \ �' // // / / / V \ \ /-- os / / / /' // / / // ,- - / / ) I`s� v v v vvvvv v v " � LIMITS OF DISTURBANCE // / �\ I I // /� �-I AV A\\\ \ 1 Ili I �- _bLtR� / WATER // / �' /� I �l / / / -/ �1 I �iy/� -j -_ _C`T3EEK 1, ' // /, PROTECTION �/ �v I I ,/' � //// / �•��/ / / // WAT€R71ED / � / ORDIN/F(NC�F/ �� �� / //� / /'' / �/ BUFFER/ �/ / OPEN SPACE s /;// ,� ///', -/, / / / //vvvv / _ -�� A - v�� y A �� E_// ////--1 / � //// / I I / I // ��\ - - -- v / // / / / / / � // / - - - � -�' - / // / -,o / / / / / / I � v / / SCALE: 1' = 150'-0' v - s°s �11 - -�V ( / / / /I v� \ azov \ ) I / / � \ / I � / \ 15d J 0 150 600 / ' // / \\ \ // / GRADING NOTES: • WORK EXCEEDS SURVEY LIMITS, CONTRACTOR TO ENSURE REASONABLE TYING OF GRADES. v- - - ---- ---- ----- _ - \ \ ��� \ V -- -- -- __ — — — — — � — / X z / , / / � � \ \ V A � LOS �- - - -- - VA \ — — _ — — — SOS L L0S —� LOS �— LOB. A� \ \ V� V -� - — — LOS \ \ \ � - � �'oso v11-1 �A �\ — — — _ LOB �� / _� V \ VAEEE �� \ \_:� / / — _ — � / / °�/ / � � \�\V� 1070 os 6 v V \ — — _ - j i �o� v \ S - � �� �- / � _ �ZO�S 1075 VA v v \� V � \ \ � V � \ __ � LO 1066 / 1077. — � — \ � v \ V �� � 08° _ ,oI \ \ \ \ / � —�- SOS �� _ / /O/ -�__ \ \ \ _ /_ _ 1- FLOW PATH LENGTH 344 FT V A \ \ \ \ \ \ �LOS� � — _ / — loco � _ �ioz7.� A/V� � \ ��� Los i 10� / / — 1075 \___v A / _ PROPOSED POND — \ __ - a \ \ \ \ \ \ \ \ \D \\\ _ / // / i= WATERSHED _ __-- �L76.9 DA - 7 \ �� __ / _ // — DRAINAGE DIVIDE DA - 6 -- __ - ----' � , 0.994 AC _ -- --- \ V��� \ / / �// 0.420 AC / ___ - - \ \ \S \�\ \\\\X — / /// / _ � - / _ \ / \ O // �� 1085 - i 77�� i/�// V �V\ V\\ \\xA-// ////ice �— - 1090 �v \VA\ \\ //i//�� _ % ----�` "—' \ \ OS \\�\ �� \\ —/ //DA - 5 \ \ l oso ��� �� ����� \\\ / /� ,�--,,,-'- 0.304 AC , - I \ ��� '� FLOW PATH �� ��� - �-_ \ l I „- LENGTH 528 FT \�� �� �\ FLOW PATH LENGTH 366 FT -'� I m \ ^^ � _ o 11 ° s.�s - / ^z - _ o / w\\� \\VA\� \\ VA\ '� " — " "— v V _ na /) / / 077.E / ���V\� \\\\ \V�� \\�� V 1000 """"" �� � �/ ��\ \\ v A \ v A - _ -- ---- -- --- � /\ ,moo _ 'LIMITS OF ��� \ \ �" �\ / e V ��/ DISTURBANCE \ � LIMITS OF DISTURBANCE\\ � 1pg5 — � ---- �___ \ �E 1 083 / A / / / / 11 --- \ 1 \ ---- � _ ---- \\ / I � \\ \ \ \ ' \\ Y O / 1 / / / / / \ v A � 110 1100 � 1095 I/ � \ 4 0 1090 ,vO cP � / � � � � � � 1 70 , _ � A v _ -- - --- - ��� s ��' �/ / �/ O --- i I � - / I I / � \ NNNJ \\ _____ — — >>IS , — o - 11 \ -- /,o _ 1105 � _ — FLOW PAT LENGTH 227 FT /_ - 0.323 AC , 1100 _ \ ; / -�� \__ 1100 �, — — ,� \ . p _ � eI \ �>p 9S - - \ \ -- _V� � i— LOW ATH LENGTH 307 FT 10 \ DA-2, �� 0.5 �� V'-�, A�� 6 \ �� ., / 1105 v v \, � __ � _ _-_- — -_,! ' � � / _ _ R_II / // \ -- / � / O5 / / i / �� / _ — I� \ \ /Z — v / i / / — / �\ v _\ � I � / — . / / � h V \� �/ v / / �� / / / \ � � 10T9 / / -� \\ \ \ / /_,��_ �_ / / y _---- ///� // \ I - - i / ,�o _ _ /� �/ /// DA-80.259AC /� �� / / / //ii �/ - �� I \ \` \ I I I I _ / � / FLOW PATH _ - DA - A2 0.742 AC 1095 -- \ \ ��� -_ /� LENGTH 127 FT FLOW PATH LENGTH 214 FT � \ / ��� � i � / \ � / // POST DEVELOPMENT 10YR-24HR . � _�__- ___ / / � � �� '� � � � / , � � ' - �� - FLOWRATE: 2.011 CFS + 0.546 CFS = 2.557 CFS � � 1055 �` 1, - v -- �s I , / ////� i// i_ — -- _ � - - _ ,_ ii� i � i _ // /- / /_ , - _ - — — � \ I � -; I I I / \ DA - 3 DA - 4 j j/ \ j / FLOW PATH _ �� - - 1 0.183 AC 1.978 AC -�j/// j/ i LENGTH 620 FT - -- _ _ -- — � 1050 / / _ \ o / / / /' ///// � � — — _ _ — ____ FLOW PATH LENGTH 159 FT ///� ,Z�/ // //� -- ' — — — — - - / //i - - __ - -- — — / _ s s� �s� —w� a l / / //A / //� // / �p , , / / % ///i /—�� - - - - - _ _ _ _ o4s ��/ ��/ // �� -� ///// /i��� - - _ ---- -- - -- L j // / //// // /// // / _ — _ �� y 10g9 , V / /// / /// - - /I ////�/�/ // // /////i/�i/ -- - -- yv�� � / � //// // / --- -- -- -, �� ��1/,, /X// % ��/r/�i �i��/, /�ii �iii,�% - — _� Lis I _ I �S — Los� H SETH R DERICK �- Lic. No. 0414541;6 W 0� Nov. 2-1,2019 �W _ NAL _ 0) o CO � O p o`er, � O N O O U O 0 Q � � � 'I� CC) No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE PROPOSED DRAINAGE PLAN Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C-6.02 / � I I'' I I' I , ; � \ V A .V A .\ .V A _ - —r , , I i -� L- - —/ ,/ V A A I , I , i l / I /' /, , , / / ___--V A A v I \ \`--- / ,- /� / / Iv -V A 1 1 A \ ��iiII�I��I11 Ilii� ��������v v� v y / I/ll///IIIII�iI�( \__)i -vv � i0)�r/ // / //// /i/ v � �� _z'z __-_--- �� �� � � � � � l l l l l \VAl\ VA\VA v� vv v vvvvvv/ 1 -v A vv vv l I I I I I I I I ��-�//-- \ \ 1 I I I I l / l / / / / / /// / �/ / / / / /- v- vv vvv v v_- _�� /� / / --_ - �v v \ V A 11111 \ VA\ VAAA\ VA\Vvv v vvvvv v 1 1 1 1 V A vv vv 1 1 1 1 1 1 1 1 1 ��'/'��� A \ \ I I / I / // / / / / / / �'// I lI / / //// / - '/- _ vv , � /' /' /'�/'_-_- ------ vv vv V A \\ V A \ 11 I111\VA\VAAA\VAVv vv v v v v 1 I I v vv v v I I I I I I I I IIIIIII l /-///v�--_ __\ \ VA V 1 II/I// I I I l / I II/ /r // /// vv -'/ ' --- v v \ V vvv V A \ I I I I1 \\ V A\ V AAA\ VA v '- v v v V v I I I I I V ,' , A I I // I I 1 I I I \/'/' /i' - _ _-_\\ \ V A 1 I I I// I I I -_//vvv / I I I /' /// / /- �_\ ``- _ _ --___ --_vvvv vV \ v A I A \ / 111 \ \ VA \ VAvv�vvvv� v`v� vvv` 1 \� IV , vv �\ v\ v �\ I I I / l l l l l �v\v �'- -� _ --v� vv v\ (\� 1 111111� I I v -,- -�'/ l I li / '�� - - --- -_ �� � � �_v v. v �,_.- v \ j // />> v v v v v vv ��� ////// �// /i\/i >� vvVA\V A1� v A \ II 111 \ / /'/ - \\\\\\\\ \v\v- //i// ' �' - --------- v v V v \ \ /////� // / / / I 1 _ --- - ///////////// / -/ z >A11 v I I I I I// I I I v/ / // AVAVAVA\ AAA\VA -_� _/ / /---- v v v A V A I- / / / // // //�/ / ��II1111 A ) I I I I I I /// / I 11_ /// /---- \��\\VAVAVA\ VAAAV��_/ ---- _ _//,/�// /- �� ---___ _ 15"HDPECULVERT--- _ _ v v \\\\\\' \ \ V 1 // ///// /' //,/ /z � "JIIII / ) I I I I I l 1 \\((( / / I__� ////�� ,;;.-\\ \\\\\\\\ \\\\\`_--_-----__ / - ___ _ _ _ _ /// / / / // // / - - / J II \ \ \ \ \ \\\\\ \ \_ ' i '/ - \\\ \ \\\\\\\\ ----- _ _// ` // //'' / ---- \ -- ---- _ \ \ \\\ \ \ \ \� // / / _ - \\\ \ -- _ / / _ 218LF 1/0 \ \\ \ \ \ \ \ /�///////j j j// // /�'�/-i'/'/II �' l \ \ \\ \\\\\ `-__ \i ///// _--\\\\\\\\\\\\\\\\� �_--_- _--- ------ - -'_, / �' --- = ------------\ �\ \ .\ \ \\ \\\ \ \ �� \ / /(/\C�'/�'I/ - /'/'/ / / ') ��/ -- / I I \ \\ \\\\`---_ /,//// / _�"\\\\\\\\\\\\\\\\� _ - - - ---- _ _� /���_ \\\\� / - _-- \��\�\\��s \ \ \ \ \\ \\ �\ \ /--- /.. _ — / oos cos cos _os s V \ A _ IN 1079 25 \\\ \\ \\\\\\ \ \ \ < � / /- - -,I - / - f I \ \---- / / / - \\ \ \ _ _ _ -----' / / \ _ OUT_1077.07 s = ` _ \ \ \ \ \ \ \ -- 24 NYOPLAST BASIN' / /�- \ \ °5 _� _ _ - \' �'- \ `\�` \ �\ \ \\ _- - - \ \ \\ - __ // / / --\ \ \\\\\\ \ _ n — �\�\ \ \\\\ � � \ / _- _--- I \ \ _ \ \� / / / \ \\ ..\\ �� - Los- ��� = \\\ \ \ \ \\ \\\\\\ \\ \ \ \ \ \ I \\\ \ \\ \ \ 1 1 I / - - __/ - --\ \ \ \\/ // / /' \\\ \ `\ \\�, W/H-20GRATE LIMITS OF ;\ \�\\\�\ \ \\\\\\\\\ \�\\ \ \ \ / \\\\ \\ \\\ I I I r r ---/ - _ - RIM:1082.25 __ D _ \ \ \\ \ \\ \ \ I I - \ _ , // \ \ v �� \\\ i NCE - _- �� - / \ \ \ \ \ \ \ - \\ - \ \ \ \ \ \ \\\ \\ \ \ - / / / _� \ � / � � - ,moo m` _---�\\\�\ \\ \\� \\ \\\ \\ \ \ \ /----- -' / J _ ` �_ _ ter/ \ \ \ \ \ \ \ \ ✓ '.- OUT:1080.0 s' - \� \,ous ../\\ _ _ -_ -'°so \\ \\ \\ \ \\\\ \ \\ \ / / / / I - _ - / \ \ \ \ \ o o / \\\ --__-_ _ � \\\\ \\\ \ \ \\\\\ \ \ / ///////j///////lJ1/ III// / // // /� \\—_ _� \_ -'_� ///I \ \\ \\\\\\\\ \\\�Y n - \- _ -- - �\ \\\\\�\\\\\\\\ \ \\ --- / / // / / / // / / / // / / I / / / / / _ _; \ \\ \ /,a, 15 HDPE CULVERT \\\ - - - \\ \ \ \ \\\ ` \ // // / / // / // // // �// / / / / / / /'/ /- ---_ - -- - _ - _ // / / / ///// / / // l / �- - - - --- - I - \ i \ , \\\\- - o I 1 \ - \\\ \ \ \ \\\ \ / // / / / // / //' j // / / l l / / - - I \ -- \\ \ \ \ \ \ \\i'ii 55 LF @ 1 /o „ \\ \ = --\\\ \ \ \ \ \ \ \ \ \ \ \ \ \ 5 \ \ \\ - _ - \ \\ \ \ \\ \ \ \ \ \ _ _ \\\ \ \ \ \ \ \ \ \ \ / / // / / / / / / , / / / �_ ///- IN:1080.0 �s �o RIP RAP \ \ \ -\ / / / / / / / / / / \ \\\\\\ \i \/// / j// /////// // // //\ jj j' /// /// l / /ll\__ \ \ \ I \ \ - y _ ' o..\\ ::\'\ \ \ \' OUT:1079.45 0 +/`+o „w N D_50: 6° 1 -----_ \ \ - 11 \1\\ \\\ \\\ \� \ \\\\\_ \- \\`_ \ \ a o La: 10 _ \ \ \ t \ \ \ \\ \ \ \ \ i///i/////// i/ i///i////�- �/ / I /// //// --� \ \ /I \ I_ --- i - LIMITS OF DISTURBANCE \ �,� / /l // /// // /1 / i i'/ / / / 1 ( 1 I I - / 5 \ \\ \\ \ \� - RIP-R o / FFE,°83 / ;., 1 1 1 I I \ \ \ / / / / / / / _ - AP / ;; W: 13.75 / _ // // /// / II \ \ \ \ \ \ \ \\ \\\ \\ I \ \ n - /11 j/ ,//,�11/I I I \ \ \ \ \ \ \ \ \ / /// / / / I - / '0� D 50.6 s1�--�- / ,, = 3Do:3.75 /,- _ / // I I 1 \ \ \ \\ \\ \ / 11/l/l//// // ///l// //// /,/i- / __/ y / °` I� � ' / i/ - ems_ / / \ - _ /, / — _ —//% / v v v v / // // // / / / /-- -- \ \ I I // //I ,I /� „os <.' / ---� � \ \ -- i`° -' - % i -i//j / i / \ \ \\ \ \ jlll/lull//////// I ////////l/ // / / \\\ I / °y111\- / \ i ® Tana �� ' i \\' \ \ - _-- � _ _ �,/ \ \ \ ////// / / // ( I / /1 \V I\ I - --_� I ,- _-/ i5 1 \_ RIP -RAP-/ - - /? /// vvvvv-- -�- -i ----_ - - ' / A V v V v A v / / / / / / / / / / / I 1 I \ -I- - - - - / J /1 `\_ _ -_ _ D_50. 6 -r--- _ ,� / / - \ \ \-,,,, = _-_ _ - - / // // / / /// /, /// / 1 I 1 I \ -- �I 1 \ I/\ / -- - / ' -- , 1-= - - - \ - - _ \ / ( ( _ \ 11 - ' / -----I-_ - / o ^ /<' W: 12.25 - FLOW OFF IMPERVIOUS �� _ \ \\ I I III 11 1 \ 1 1 I I 1 I I \\ �o \ / I/ / / / ----___I � �e---- � _=_%=_ -- ° /'/' 3Do: 2.25 - -__ SURFACES TO BE RELEASED AS �' --- \ I I I 1 I 1 I I I \ \\__ /// '/ �/ --__ f�,lPy/ ,,�/ / ' / - - - -_- -==SHEET FLOW OVER PRESSURE ��� \\\\ --_-/ I I 1 1 _ _ \ I III 1 I I I I I \\ \\ ' /' ///- ''/� __4------;- -: _ _- \ _ _ — / / / / / //- ; --__\_-_ TREATED TIMBER LEVEL SPREADER � I \ \ \ lI I I I I I ) l I I I I I I I I I 1 v �/ /// /,''/ /� I - - --, �'_ - �/ / / / - _ - -_ = v v --- '-- \\ I I - / '/ /''/ , ,/ -_ - _j�oe - — - - -=_� -- 1 '� � C / / / /' / '/ /' -' - _ � __ = LENGTH 155 FT -� \ \\ > \ \ / I / I 1 I l I) I I I \\ /' ' /' / - 1; _ _= \� - �� `/ /// - _ ___` RIM: 1072.25' - \\ - - - \ \ \ 1 / I - / / / / /r _ - �- \ \ \ \ \ / / _ \ - \ / / \ / \ / / l / l I I I I I I \ i i / / j // - _ _ -\ \ \ - _ / / / / / / ' / = � - -- os °s—c°s - - ° i / / / \ \ \ - _ _ - \ 1 \ l / / l l l I I I I / / _ -- _ — — -- —� _ I \\\\ \ \ a�' % / / / // / /// - _ os-��osC moo\ �� `� / // /" - '`7— \ _\ \ — —__ �— \� I \ \ 6.616ACSTORMWATER'/i , / -___ _ _ --' - - ` —::f � %, ` \;; \"�- / ,,//�/ / / / - - - os- ___ \ _--=----'' -'--/ -�- \ _, \ I I l I I I I _ -- --- s v�� w v v v� -_ - / / / / / / ' �'/ ' ��° _ - - -- -/ iiii'i- - ' \ �� v _- - \ /- - I I I III FOREST/OPEN SPACE EASEMENT / /- i -' - / -- , _\\ \° � -5 /; / / / ��/ / / sue- - --- ' - \ \ \ - \ I I I / / _ \ - - - \\ \\ /i / . / / / ao/-- -- / /d / / / - \ \ 1- \ \ \ / 1 1 I I I I I I I I 1 I I 1 —\ \ '..� / /" /// / //'-�\ _\� I\\ j/// �— i �_��\yam \\ �\ —_\�\\��\\ \..-\ __--_---------_ // � /////— / /-\ \ \ \ \ \ \_ \ I I I v --// , / / // / ////�� �060�v - -- - R,�jvvv �� �_ v��� v ----------------- �i/ ,' _ \\ - v v V FLOW OFF IMPERVIOUS v v - v v vv v v v v - - / / // /iii�^ ��� i� - ; NE v `� v _ SURFACES TO BE RELEASED AS _ v v v III I I I 1 I ( - /� /; -, - �� 24'DRIVEWAYTO =------------- -1� �'/ �-/- - v y vv v v �v v vI _ ___ _-sow-___ -�/ / / / / / SHEET FLOW OVER PRESSURE - ._ - _ \ \ \ \ / / // V A A o _ - - / / // /// / _�v vIv _ - HAVE MAXIMUM ---_- _ - _- r' _� vv vvvv vv A_-- v\ \ l - - / �/ 4�v -_ TREATED TIMBER LEVEL SPREADER v v 111 V A\ \v �- --/-/ �� i'' ' - / // /////// v v -- - - 'V At -1 - SLOPE OF 16°/ & - v ----_- � _ __ - i _ '- - \ \\v % --/ \ A \ v I I \ - / - / / / _ v - - - z o LENGTH 54 FT v e - - v '/ v v A V A v / / / / - / / - /// / / VAl ---- iA + - �7 �v - vv v-_-_- --- - t--- /' // i - \V > /7 \\ ---- ' / �/ l '- r _/ / / \ - RIM: 1096.25' - - - / - '/ - / / / / �\ \ / / / 11 I I V A V Av v v - /' ' -'- ii' -' / / / // / / / �,62� .A -� v CURVES NO LESS ---- --- - _ � i------' i/ -�� I I l / / / / A _ -_� I / / // / l --'\ _ - _ v II\1�v v� vvv vv vv A --' ' ' /- -' / // / / / / / /� _ I L MITS OF �y _ THAN 40' RADIUS __ ---- _ �___ - I 1 I l l / / I v --- / //' / I \ v v 08 v - / / / / / / - - - - A ii � �` v __=�w�� - °sue - -, ,�v__ - --- ,-i ,_ - - /, I / / / I V I v A \ \ v v v e v v - - / / / / / / / - - - -1 / l l I /r _ v DISK RBANCE - _ - _ I - - _ I v A\\V v v v v - / / / / / - /-'- - - J 1 I / l \ I - - ��vvvv - '/ v _---- -- / __- I ---- I V I \ VA \\V v vv vv v v_ - / / / /,' - - , I / // / / �v - - /' ) - _ _ vvvvv vvv °s v_ / /- - --/ ' - 1 _ I I I I I 1 v _-' g VA \\ v _ / / // // - i /// / �v ! I I ,vvv ��=_ —s- -- �v '/'-i - _ -----I - -- �� \-- - / / / / / // - --- 'oeJ --- - vy,,�� vv %° �vv _ � _ ;-_ 18.87 AC STORMWATER -- --- I I I V A v \ \A \ v vvvv v �- - / / / - - - // // // �v _ _ � I - - vv ��___ /` /'. /'-''' ' v_--'' v - / / / / / / - ' - - - - _v A\ �� _ \ \\ \\ \ \ \ _ �__- -- / / / // j--- _ - / //� / //�_ \ - �\�\ \-_ 'n'-,-Q2 / /' \ _\ \\ / --- - I I 1 y o v v v _ - / / / // r- - - /, ////�-vvvv v \ \ I _ vvvv �` -- - - _ - '/ / FOREST/OPEN SPACE EASEMENT ---- v 1\ I 1 - ----- V A \\v vv vv _ - - / / - - - / / / V A V Ay s- vv _ -- v v /' / - - -- I ��v --- V - - - / / A \ - v - -- -- ,V A A v -vv -- ,-' / // / ////' -I - - - -� / V A\\ VA \ vvvv , --�- -- ---- -' z/// / / /; v v 'lz // - - -- - I I I I - - V V v v -- --- -/ - / // �� _-- - -/ / / \ ° - \ ------ - -- / / / ///i, /� v �A / _ -1 I v - __ - / \ V \ v \ v, s / / - I _ q ,00 VA v v � v v --- I/' / /l - - -- - - // A VA S �_v�,�r-'_` \ - -- //// //// /i'/ v v ' � / - - / � _ \ \ v v vv // / // / l / - - -- - / / V 'vt \ \ V A �> ---- A� ---- ' / / i/ /�' v :� _-_-_v I / / �' --- ---, l l / l _-_ �v - \ \ v __� / ' / // l /// // l , -� - _- / / \v IvA \\ \ \ / \ /- _ ---- i i/// // // / ///--_ v v x X 'i i / l/ // �� / // //// / / I I � -v \ ---_- / / / / / - A v V - / / / - / / A v v A \ / �` _ \ --- - / / / ////////// - v v A v v v v v / / / / / \ /---_ - / / / / // // // v A/ v/ / , --- / , / -v -- -- //// / v_-- �__ �\ \V A-- /- VA v v v_ ' / / // l l l l - / \ vI AVA \ //---� -- A/ /' -- 'i i / / /��/ /// //� / l/ /l _ v - _ l Il v , - v - VA v �v vv ---- -/' / / -�/ // / / I I / III - -- gvvA I A - - _- -- ,v - / // / / "� -, v / / / / _ - % / / / --- -- \ \\\\\ \\\ --- _ / / / / /// ( I III I I I I I _- _- --� �_\A `\\\\\�-� /'--_v--- - -�\ io90 / I -- - - / / /// ///////i/////// \\ � \� j' / / / --- llI / l � l , \- _ / / / / // l \\ -- \ \ \ \ \ \ \ _i / / / / _ __ _---- -- \\� v\\\\\ \\ \ -- ---/ ///-" /// / / I I I 111 I 1 1 I I I f -' -- _-\ \I\ \\\\\�-- -'- --- \ \ / I / -i'/ j j/ // // /// / l \ / \\ _- ,, / / _ /Ill I l _- ----� - _ / l l / -_- --_ \\ \\J v v _ --- / - / / / I I I 1 1 1 - - AT v vv_-_ v �I _- / / / / , / �/ ///�/ / ////� x� --- / / / // / / / / -=`T/ / / / / / / / vv- ----- �v v v vv v v,, v vv -_ ---- �' r 1 - - , VAA V�\-' _- y / / �'-' �,'/ / / / // i / l l l l -�� v v_---'' -' / / / / 1 I v �� -7 / / / / / / < --� -- A \ V v vA_ -� vvv v v vv ----- / // //- I 11111 yA1II(-vvvAIAvvv�___----/---- V\ I_- - / / i - �/ / // i //l // /- vvv / / /II V 1 lv v _ - // ///l l I V - A v A V v vv -- - --' / J V A I I V AA AA----------�- V A-----'-/ / / / /-/ / / /, // / / // // v v - -- / I __-- / / / / / / / / I /� -- \ \ \\ \\ V / / / / I I -- v I V vim_-_----- / / / / / / / // v --- / V A - A A \�_ v v v v /-- / / / / / / / A A I I I I I I r ow v v v�-------------- VA-__-- _ --// - / / / / / //i / / / l l i7/ / A \ -- - I I v V A \v ----- / / / v �� V A \ \ \ v-----__� v v v-_--___ _---- / / / / / / / 1 11 v vIv vvv_---______ ---- \---�so-- - / / / / / / / / / / / / /.f / A v_ -- V v _-/ / / / / / / v / / / / A A\ A \ - ----- v -_' v --�------- / / / / / / ) I1 I I l l / v ---- - � \------'- / - / / / / / / - - ll I / v _ / / / / / / / / 1)IIII///// _ vv i ' v ---_ i - - \ w1�'-----' - /-/-/--/ //i�// / / l� l /� Av 111 \\ \ _---_ j'/ / ///////// / l l vvv v/I / / vVA� \ \ \-------- _� / / I / / / /-_ �vv� v� � n - / , ', - /, i /////// l/ A _ \\ / / v v / / / \\ A V �\ \ �\ ----__--------/ / / _ -- _ _ / / / \ --_ \ I /--------- v - -' / / / / / / 1111 /I �vv�v�� - - �---- --- - / / /' /'-�'�/ /////// // v _I I1 I ---- / / / / / / / / / / v / / //�v \ \ v _ \ \ --- - -- - - __ v v v ---_ --- / / / /// / IIIII ---v v -_--' �� _ - / / /, / /// // / / - v v 1 __' /� / / / / / / v/ __v _ _ _--- -----_ v v -_ --- __ / I / / I \\ VA 11- _-�6a - / / / / � / // // / / / / / / / _ �� / / / I _ _-_______ sae -- vvv v---_-_- - ----/ / I I / // llllll� I� 111--�A� IA �___ i - -/-/ //i /,// //,/ //// / //- / --�A v 1 A , / / ' / / / / I / / v-�- -_�__� -- A v v v v-_ ---- - / - I / / / / / / / / I I I I " -v i -- _ � -- - � / / / / / / - - v> / I/ ' / // /� ----- \ / / / / / / - - / A v / v v - v v v -- --� / / / / / // / /1/ I I I- vvvv ��-/ v � - -__�- // / / /v / / / // // _-/ / //- _-v v- 1 / /'/ / ( I I I / V / / // �/ vim_--- �\ \ _-- \\ \ , ---_ __ ----- --- / l- / / / 111 /III I 1 _ \\ � , � ---_' - - - - / // /' / // // '/ / /' / / --\ \ - / / / // / l I I I -- \ \ J / // /� _ \ ---- - /z / / _ / v _ _ - - - / / / - / v _ / _ _ �-\\\ \\ \ -----' /I/ / / /////// I ! 111 \ \ ` - / / // // // // / / - / //'' --_-\_ _- -- / // / I \\ \ \ J / // ,_ _ -- \_ v /// / / — - / / / / / _ _ %� v_ _ / _ _ _ _ 3� A A V A __ A --- / / / / / A V vI �� v v , _ — — - / ,/ / / / / / // /// - r __ // -- _ _ — I \— v v v v-_- _ / / / �7V///// l l Ill v v � �� v sao -- - // , / / / / / / / / / /-_ � _ - I - --v A AvV - vv --- -_/ /-I //X/// / / / // / /- vvv v - -A- --__ ------ --i/ / / // ///// / /-j /// //// / V „�_--/ \ I \ \ \ \\y- -- ///// �/'/---___ -- I I I II I _-- \ _ - / I / / / / /� _ _ / I v v /�` /-///X/// I v v , / i - - / --/!� / / // // / / /// /// /// / _- I \ � // ///- I I I v \ v _ _ v - / / i - - / - / // / / / / A v �v / ' _ / _ _ � / l l / / �v v __ -- '- i - /�� / / / / // // / / / / i ' - _ -i _ I I I v v� _ �� 7 / / / //�� lll�/�-v� v �� - i/ / / l // / //// -/. - ---/ /�/�- I / / / / // I \ �)- - / I/ / \ _ _ _� _ - - -/ /-_ / / �-//// / l/ /I /_--� V Al _-' - - v / / / / / // I / _ - - - --- /_ / / - _ - - / / / / / / - _ I I �_�__ _ _ �� / / / / �'1-1-{%1-171 / / A A I 1 1 -- - - --/�'/ - - /'_ /// // /// //// I/�� l l �'--- l / llrr = , j/ -� II I I I I _ — / - // / / ( — I _ _ v / / / / / V 1 I - - - i - - / / / - i / /'/ / l I I I I - ---- �aa_ �� ��-'-- _____11 / / / / / 1 I 11 / o'-V A W / / - - / /,- - -, /I / / l �' //I A V \ / 11 I-- _-- I I I v _____ _ ---__ �- / / / / / // I I �I l 11 (Il1 I (/ I //�-'/-�/'' j jam' -- i II /// l /l / \ vv / /l /� V I 1 111 I I I I I //- I I I I I I L v v `--- _ / l pI l A I - - --__ -----_ -_--vv vvv v__ // / / // /' / j I I I I I'I I I I I \ I d I /'/'/ - // / / / ,//; 1 \ \ � ,/ �_ II I 1 �- -\� V A `\ \ I_��-1 �v� v v---- - _ / I I LIMITS OF - /� I // v I v v A v v v _ _ _ _ _ 18.87 AC STORMWATER -_-_---___- --- _vvv v vv- / // / // // / 1 1 1 1 I 11111 I I / V I II 1 I 1)------- I ,-'/' -/ " /- / / / , \ --- / A \ V 1 v A \ v v _ _ _ _ _ _ _ _ / / I I I v ISTURBANC - / / / / FOREST/OPEN SPAC ASEMENT / I III \ v v v A V 1 / vv v vv v v \ _ D E - / sao_-_-- _- -- _ v v vvvv v --�� i / ,/// ,/ I I 1 �111 I A A \\ �� v.�`s ��y�`°s /i / - - - �- /-� -1 �l / // ///C A\ 11 l/ v 1 \v `------_----///// /I \\ \\\\\\I\I\II11 I II I/ / \VAVAIv��vvvvv\\V A\\\\\----- \ \ \ \ _ I I I III \ \ \ \ \ - - - - -- -_v , , � '\ / / 111111 \\\\ V � � - _ -� ��s _---_--/ _ /- ) // 111 I I \ 1 1 , vv // / / VA111III I I r V�� -v A \ VA \ - _------- --- _°s ----- / / / I III A �^� -_ ��- --i ��'\ --- _ � '/ /' ' l/ I ) / I 1 I --- 1/ /' I II I I I -'\v v v v vvv \ VA ---- / / 1 I Iv v ��� -/-- - , - / / ' _�� / / / ) I V y L-, I I v v v v v v � A \ ----- - I z-,. � -, - - - / \\ v I _ / / ' III \ �' ROAD TO / I \ _ - =-/ ' -_= ---' ' '� / / / / \ \ \ --------- / / I I III I h r_-\� � � � \ \ \\ - - ' - , // ,, _ / / \ A / / \ -------- - /s / / v _- / / v v v v v v - / FOLLOW V A °, I / / _ - /' %'/ ii'' ! ' / / V A vvv \- -----_ / /' III I I I I I / I v v v v v � � _ -seo-____--- - _ _ _ ' EXISTING MATCH U1VE -' ' '�A 5�" / / / v\ / I ze _ /_-� / / v v _ -- - -. _ — — / i -- cos �`` ' / / os/ / — 1 \ \ / / /II IIIf / _ \\ \ \\\\\_- \ _ - _ J I 1\/ \ \\\\\ \ _ / / iv ���� ," / V - / / ROADBED& II I1 I �"` /�� �-1 /'/ I v 1 / / --- -- / /J� \\\ vv GRADE TO 30 � ate/ �_ ' /i / A / �� / AI / ( / --_- / ' / / VAI\I / / v v �� v _ i r,, / / / 11 1 v v + 18 P �s �� / i �� ��"ii - /� ,' / �' i�-' Av \ _ -----' -' ' / / V v v vv- ---_ EXTENT C / / >- -N ' '� _ v A v \ _ - - / / 1 / v v p /T - ii- /ir %/ /: / / /� A \ \ \ _- - - - / / / V A� vyam _ i - ___ ---. - PRACTICAL �I aJ42. / /�_�-- 'i/�� -/j / , //'// //�ti \ A I I v A�---.'- - -' _---_ -'--_ '-/ / / A \ VA / A - v _-- -- + - - ✓/ i /f� / A A \ v v / \ I ramv / I II ''� __ -%�%:- G. / / / i // /l v V I vv v -- / -----__-''_ ' -- / ) V AVA / v --v ' — —_ � �/i '% -_ ' � �/ / e�/ l l / 1 A V v / - — / / A V A \ 1 - - \ vv y --- ' I I 1 ++ / s''', - j/�-- / ,, / / / / /// / / / to r/-------_ A A Av v- vvv �_ - ' / / / - -__ ---- ---- \VAVAA / � vv -V Avv v I - --__ VA _v v v --- - - -- - / /� �/ / I I ( I \ '- v v v vv vvvv �v___ __ - i'�/// // - - _,-- \ VA \ vv vvv _ - -- v v v v v - - __ / � / / / ---- --- V A v v \ _ I I v , - __-- - _ / / �� - / /' / / I I _ A v v v / / / --- A V - \ ----- __ \ \ _ / EXISTING" ,// \ _ / / ----- \ \ \ \ v v_ v v v --v / / / tl l l 1 V v _ e---- / // / A v _ I' - v v`vvvv - �\� s POND // ///III v v�_ V ��__ 11 / / / /___-_ ---- -- / AVAA V A vv vv -$8� I I 1 I I I _ vvv vv v �) LIMITS OF DISTURBANCE �V v ! I m I l �l //l1 V v v v� ---- - 1 I I _ _-- _III / / / /__- __ -__� -/ /AAA v A , 1 1 I I v „ _ - __ ��� �V A �'I l ,/ I�01 v v v� I I 11 1 / v_-- -- / / AAV A I v _ ) �� \/v v v A� - I I v _ --- - I , I I _ --- ,, , , A l / ;1 ; //ill/ /VIv v � -'-- --_-- � I I ��_ vvv vvv vv-__ - � -- , .>� , I 1 / Ivv v��------ - \ V A AI � - _ --- / 24 D I __----- RIVEWAYTO I / /I 11� I\ \ �� -- --- -X, / / / / I --------- / \ 1 / 1 - �' I v -- --- --_ °s� ° II I \ yvv�/_yv� ------ I I I vv vvv vv__-- / '// // / / /vv_ �-_--_--- --- I� 1 11 11 / 1\ - / / / / / v /� SLOP OFI 6t/M �/ I I v/ v°y� I 1 I I - / / / / / / v I / 1 v A - _ _ / / \ ROAD TO FOLLOW EXISTING � � - -_ _ _ _ -_ V / \ _ \ I I / / - � _ � l II _--- - / / � / / v v ROADBED & GRADE ► %„/ I� 1 v - 1 I vv ,' / / / / / / _- _--- v v v __ _-/ / / / / / // v vvvv TO EXTENT PRACTICAL - % / I 1V /__ /-- —vv v� v / / / / / // / -vv I v v v v / \ \ \ _ _ - / LIMITS OF DISTURBANC i1\o / \ I \ -/ , / / / / - ---____-- \ \ \\\ \---- aw ------j / / / / / / ,�v , v - _ v �kw � /- v v_ 'I ,1 �� / / V A ---_ v \ - / / / '--__ __-_A \ \ - _ _- vv _ �O i // - v v I ' A v A \ / �� / / / / / V A \\ 4\ - / \ __ - --' / / / / _-- fir— _ �VAA� �°'a �A0 �/ '%/�///� A A y- -/� /I \ �o �1 / /' I __ ' V A / ' /' /' ��^_ \ _ - y v w �� r�i/ \ ��° ��� vv � �� AA v- �� / �s III � I V / // // l I I --- ---- I �1 \V -- / / / _ __-- \ 3.77 AC STORMWATER _ �___ v v �7� / / / ' v v \ v\ V vI --- - OPEN SPACE EASEMENT - %J-- - - - - _- ����� � `1y vvv vw v E I N� ;,/ 214 Y 1 I �� -,' / / I - 1 v v , - _ l / l / / / v V \ �� v r / - , / / / / 340--- / / / A � -- v - - - - FOREST/ v „�,, ' I v _ / / v ----_ - l h �v --��-' - -- V - "1 \\ \ \ ��� ��iii'' ;/f' / // / ) �) ' /' _� 1 I v v /' /' -- // / / /' /' V I --� -- v I 1 --v / z/ 1 / I v --�' - --- /'--' - --� " \ AAA /-�� �/ ' // I // // /1 vv �' -- / // I 1/ // // ��\I I A-- - vv \I / / / / \ \ \ _ / / - - - - �\ - / _ \ \ \ I I 1 I \ -----_- - ,- �) I I I _ / / / / _ - --� A A V` V '� � / / / / / / / 1/ v / / / / / y A / / - / I I _ - / / / -- \ - - - i / / � / \ \ _l _ / I \ / 1 1 - / / / - -_- - -- - o / \ l / / _ / - / \ ( - i 1 /' -' / / ' / / ' - - - - --- A s / / / / // / / 1 \ \ - - < \ V A / I _ - - A A V ' - / / -- '----- / / // / // ----- --Iv (.A - _ / /� / / ( / / / / 1/ A V - -_ - - - V A __ /' v`--- / I / / / / / / // / _ A - / // � T. A -� _- -' A V A A\\\ / /-� \ \ _ - / �_ - / / / / ---- -��� °s n I / / A _ - _-- A V --_ _ - / - / / / < - / A _ � \ V A _ -\ -' _ --' --' / / / // / / / / // � A -V� -% � - / / 11' ( I I I� I / / / // / v v _-_ /--------\ I V ' V A V A A11\ II _ V vv v- A ----- - -' +� --/ / / / I 1 / / / � \ os� // es-- � SEE SHEET C-9.05 FOR // \ 1 1 i/ /// // v` v_ --- __ v v v v vv I I v \ /� \/- _-__ ----v / / / ° A - / A v / - I� V A V A V '-_v v vv / / / / ' l ir\ \ \ \ \ 1 _ = "/ SPILLWAY DETAILS / I I l ' / / / A I \\ - --_�, 1 \ \\ \ \ I\ \ \ \ \ \ \ / \\ / _ --- \ -----_ '//' /- / v v I \ / v _ - / _ // / / / / / — A \v v \ �/ 1 V A \\ 1 V -� � / / / / / / /I I _ --�� -- --'I V V A A VA \ \ V /\ /v v _ /— ----' -- / '/ / — v v v v v v / / �' / / / / / / / — /, v v v v ' — — vvvvv v Yv i �� _---/ �< / / / - v v V v v -v / � // / v v - - / VAV\\ \\ v \ / I \ \VA �, // / / v/ / ' )A A\V vvv v - v v 1- / /--� / / /� / s\ v LIMITS OF DISTURBANCE l / r v v - 1 I _ / , / v I -- / / z //// � I /' / /� �I A\ \\\ 1 11 V� o _ -_ - / // // // , / / / v v /' --/ - II / / / // // Ay\\\\\\\\\\\V �vv /�-- �\ \V I v / I I / A / I /� / v v / _ / A - v / / ,'�. � �i, 1 1 -� / ) I I I I i+ / __---�°° / / / / / l / /- _ v v vim/ -- -' 1 __ / / \ V A V\�� / A I / � - /bI _ / / / v I /� \ V A \ I v _/--,/ / // ' �'/� y� -' - / � I 6 / l / / / A I l l / / r v v /' ' �_ / / / / V A \ \ v - - v / /� / / T � / I // o ' / / i�// / I / . --- / / / / v / A I / / / v y v \ / -� -1 1 _ / i / -/ \ V A I I v - ---- / / /- l // i / //A / / /r ----& / / v / / / I A 1 \ V / / \- x ,- l l \ \ \\V A-' �� I V v "/ / / - --���--"� / / 1 / ✓ '_ _ �/ ' / / I /I \ v vv ' ' --__- �_ _x --_/ / / I A \�- A \ V v � �/ /G/ /, / / / A / I v - - -_sae / 1 / /I I \ VA - - \\ \ \ v '� / ' / /'/' �/� / I \ /`' / /f / / ',erg' / ' / /-\' / / / \ \-- / / \ \ \ \ \ \ / / / / / / / / / \ \ o / I , \ -' —' / \ \ / / // / // I / // -- - l V � o/i i f / / / b I - % '/ / % I �/ / / V �I / v� -- // -- / / / AvA / V A v\ // / i - \ \ \ /ii�i' �- // � /// I l /l // ) \\ I - A V - I 1 / / A V � \ vvv v l v �_ ---�� - - , , - , , 1 I / , A \ 1 I / �_ - J / , , \ / ! _� �� _--- �- � -� - _ / // / / y // / / // / / I I I � / / \ \ V A V A�1 1 r--_- - i / / / l A \ v v , - -'< < - v v 1 A v - � / // 1 I / V A \ ' 1 A\ __ - ---- --- / )( l l l A v v < �__��� A v \ / / /// // V A \ \\\\\ \ /_ - --V 1 / / I / I / A \v vv vv —__-- v v v v v v 1 v v , s - _=�_ / / // I I I v v v v v� v— \ - / v / v / /— / /I v v v v v v �_ v v v _ - v/ v v v / / I ------ v v , — V ( / / // v vv vv _ A v _ ----- __ / / / / v v \ 2 \ \ \ — /os / y \ \ \ \ �\ \ / V A \\ agov\ \ V A \ \ / F-_�-I / / A V A AV -I\ \v A vvv A A -/ V/ A V A ", // /�v_ / / --� / I // / vv v� - / / / v / ---- / — \ \ / / \ / \ \ \ \ \ \\ _ \\ _ -- — ---------- / / / r _ _ \ ---- v v v v v \ \ -/ / / T �' / v- v v v / v v ` \� v v / / / / / - A / / � / / V V � � - _-- ----- /' - i / A _ / - - - A \ /8�' / // / V / / \\vv v A \ /------- -� -' '- /- - 1 / / / - / / \ _--- // " > / / / / // / \` / / \ / _ \\\\ \ \ \\ � \ __----- -/- --' /' /--- // // \ / / / / / / / I / ( ( 1 \ / / \ \ \ \ \\ /\ \\ \ � ------ - // --- ----- '/ / / '- / / / /' / // \ / \ \ I \ / I / \ \\\ \\ \ \ \ \ -/ \ `---------- - ' - ' --- '-_ - \ I I / 1 I � / I \ V - - / / / / I I ' I v / / / A \� / \ \ V vv _--- -- -' / / _- I I / 1 A \ 1 - / /� -' // // / I I I v �v l / / / 1 AI \ \1\� I \ VAvv vv _--- _ - -fie/ / -- / ' // \ / I ( \ A V /'" / / / - / / I I v v / / \ \ \ \ \ VAv \ V A vv ---�- - �� -' / /- _� / v 1 26.00 AC TO BE PLACED IN FOREST/OPEN SPACE EASEMENT TO MEET STORMWATER QUALITY REQUIREMENTS. STORMWATER POND AND RISER SIZED FOR 3.50 AC OF IMPERVIOUS AREA IN FUTURE DEVELOPMENT TO ADDRESS QUANTITY AND CHANNEL PROTECTION. STORMWATER QUALITY REQUIREMENTS FOR FUTURE DEVELOPMENT ARE NOT ADDRESSED IN THIS PROJECT. ANDERSONS CREEK -ROCKFISH RIVER ARE NOT COLD WATER TROUT STREAMS. EXISTING POND WATERSHED- 86.75 AC PROPOSED POND WATERSHED: 89.26 AC GENERAL CONSTRUCTION NOTES FOR STORMWATER MANAGEMENT PLANS 1. A GEOTECHNICAL ENGINEER SHALL VERIFY THE SOIL COMPACTION OF THE POND EMBANKMENT, SHOULD COMPACTION REPORTS FROM CONSTRUCTION NOT BE OTHERWISE AVAILABLE. VERIFICATION SHALL INCLUDE SOME COMBINATION OF BORINGS WITH SOIL ANALYSIS AND STANDARD PENETRATION TESTS. OTHER METHODS MAY BE UTILIZED IF DEEMED SUFFICIENT AND RESPONSIBLE BY THE ENGINEER AND COUNTY REPRESENTATIVES. 2. PIPE AND RISER JOINTS ARE TO BE WATERTIGHT WITHIN STORMWATER MANAGEMENT FACILITIES. 3. FOR TEMPORARY SEDIMENT TRAPS OR BASINS WHICH ARE TO BE CONVERTED TO PERMANENT STORMWATER MANAGEMENT FACILITIES; CONVERSION IS NOT TO TAKE PLACE UNTIL THE SITE IS STABILIZED, AND PERMISSION HAS BEEN OBTAINED FROM THE COUNTY EROSION CONTROL INSPECTOR. GRADING NOTES: 9 WORK EXCEEDS SURVEY LIMITS. CONTRACTOR TO ENSURE REASONABLE TYING OF GRADES. SCALE: 1' = 150'-0" ^`e�w�®e�•A�°s!B';jze�l•A�°sb�®�°a�®e�•a�®e�•a��.e� e�. �i:;i,-Sf�Oe�mh�OiemA�Oi.J�A:CrOiemA�Of;J:.S • • • •• 0 OF T I � ' �'' SETH ). ODERICK � � Lic. No. 041454 W O W � Apr 9, 2020 ���I�NAL ���~ Q Z `'/ , Q � 0) Q M Z W W �LO Z Z) O Q 0) _zIoN o� - o (z o�S N _O W Q �(D0�,� CDZ�66Q J � LO Jrn v No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 5 County Review Comments 4/9/2020 PRELIMINARY ISSUE NOT FOR CONSTRUCTION STORMWATER MANAGEMENT PLAN Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR ■ C 6 03 _ -- -- / OS�� LOS�LO�S�LOS�—LOB. -- - O SOS \ v •�\ �1070 7pss -Los �\ /\ " 24" NYOPLAST BASIN ��aS — W/ H-20 GRATE �l 1) \ 1075 �p RIM:1082.25 i 5 \ 1 VA 10 7. LOS 0 / — — -- -- - 06.9 \\\ OS 1085 \ — \ 1 77.5 / v / \ 1090 15 HDPE CULVERT ! 15" HDPE CULVERT 55LF@1% 218LF@1% / O IN:1080.0 IN:1079.25 , \ 1080 / RIP -RAP OUT:1079.45 OUT:1077.07�„D _ � .,. ,; \ � 50:6" \ o La: 10 ��A\ 85 — \ 1090 o�' tea_ \ 1 76/ �, W: 13.75 • P �• � s . � a Std+ 077.5( 3 / �O V 6" HDPE ROOF LEADER TYP. RIP -RAP o / / % �o� , - 'LIMITS OF LIMITS OF DISTURBANCE 5 _ �,/ DISTURBANCE \ \\\\ \\� �( 8" HDPE ; �- TRANSPORT SWALE vvv \ 1095 6" HDPE ROOF LEADER TYP. �`' / / 110° 1100 � � , o �, COLLECTOR (TYP.) - � � � TO LS2 I7o , Ia< I EF ;N _FUTURE \ \ 1085 T TDEVELOPMENT AREA \ i \� 1105 \ \ EJ��� � '�•� 8" HDPE COLLECTOR TYP. � �„•,�__, / ��. RIP -RAP 79 V �% �� \ ��n��� t. — D L 0: 6" / \ a 10 3Do:2.25 LEVEL SPREADER SIZING REQUIRED LEVEL SPREADER LENGTH 13FT/CFS LEVEL SPREADER IS NOT USED OR CREDITED FOR STORMWATER QUALITY MANAGEMENT. LEVEL SPREADER 1 - 54 FT 10YR-24HR STORM FLOWRATE: 4,156 CFS LEVEL SPREADER 2 - 155 FT 10YR-24HR STORM FLOWRATE: 11.93 CFS TRANSPORT SWALE TO LS2 BOTTOM WIDTH: 16.5' SIDE SLOPES: 3:1,3:1 TOTAL DEPTH: 2. 0' SLOPE: 1.2% MANNINGS N: 027 10YR-24HR FLOW: 1,93 CFS WATER DEPTH: 0.28 FT VELOCITY: 2.46 FT/S GRADING NOTES: • WORK EXCEEDS SURVEY LIMITS. CONTRACTOR TO ENSURE REASONABLE TYING OF GRADES. P \\ \OOR DRAINS 8 HDPE P - /�/ - �� �79 °�`' \ VVI— - /� 10 MATCH LINE 771s 1100 o `I 7 �V�� i, I.' ���j\ _ -. gyp. A �� � iEE HDPE COLLECTOR (TYP.) 1095 � zx o OF LEADER (TYP.) I // / // / FLOW OFF IMPERVIOUS A \� / \ g55- 1105� sR/ / / / � %. 6 HDPE R _ SURFACES TO BE RELEASED AS 8" HDPE COLLECTOR TYP. A �,s,��. 1 // / ` SHEET FLOW OVER PRESSURE / \ 865 - / TREATED TIMBER LEVEL SPREADER 851 377 - \ LENGTH 155 FT � / \ / / / �i I z RIM: 1072.25' — 8421 � i #I _ — _ 1 2 ROAD FOLLOW EXISTING ROADBED & \ 1100 / \ \ / SWM FACILITY MAINTENANCE EASEMENT — -— \\\ `,_ -_ � ,GRADE TO EXTENT PRACTICAL AROUND LEVEL SPREADER�840�� \ / (BMP OPERATION AND MAINTENANCE, CONT'D)0190 ioss_= _ 5 FACILITY MAINTENANCE ACTIVITIES: i STORMWATER MANAGEMENT STRUCTURES FLOOR DRAINS WITH NSPECTIONS AND SPOT CHECKS: THE OWNERS, DESIGNATED AGENT OR CONTRACTED 6" HDPE PIPE % 1095 �• --- -- \ \ FLOW OFF IMPERVIOUS � � ' ° \ SURFACES TO BE RELEASED AS >>oo %' x —�09° �io�j MAINTENANCE WILE INSPECT AND CERTIFY THE STORMWATER MANAGEMENT STRUCTURES � � � \ ��/ AND ASSOCIATED STORM SYSTEM ON THE INDIVIDUAL PROPERTY CONTINUE TO LIMITS OF DISTURBANCE SHEET FLOW OVER PRESSURE FUNCTION AS DESIGNED AND INSTALLED. INSPECTION FINDINGS SHALE BE DOCUMENTED --- \ TREATED TIMBER LEVEL SPREADER LENGTH 54 FT _ - N DETAIL WITH NOTES AND PHOTOS IN THE PROJECT FILE, THE INSPECTOR SHALL RIM: 1096.25' SWM FACILITY MAINTENANCE EASEMENT PROVIDE WRITTEN NOTIFICATION TO THE LANDOWNERS AND DESIGNATED AGENT OF THE AROUND LEVEL SPREADER EXISTING S POND SWM FACILITY MAINTENANCE EASEMENT I / l / I / AROUND PONDING STRUCTURE \ \ ANNUAL INSPECTION AND FINDINGS. THE OWNERS/DESIGNATED AGENT SHALL BE BMP OPERATION AND MAINTENANCE PLAN RESPONSIBLE FOR REMEDYING ANY DEFICIENCIES FOUND. - / \ \ 11 POND --- --- - l 1 1 I l\ ) VIREMOVE BLOCKAGES FROM INFLOW STRUCTURES: ANY TRASH OR DEBRIS THAT IS - --- - '0 ( \ \/ \\//\ I� �II / I \ \ \ LANDOWNERS CURRENT AND FUTURE OF HILLCREST VINEYARD LOCATED AT 8585 DICK WOODS RD. AFTON, BLOCKING OR IMPEDING OPERATION OF AN INFLOW STRUCTURE AND/OR FOREBAY - - - - � 60o_ \ \ l ' / / I \ VA. OR DESIGNATED AGENT SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF THE BMP LOCATED ON SHALL BE REMOVED. IN ADDITION, LANDSCAPE TRIMMINGS SHALL BE PROPERLY SITE. DISPOSED OF TO PREVENT CLOGGING BY THE VEGETATIVE DEBRIS. BLOCKAGES HAVE THE STORMWATER MANAGEMENT PLAN CONSISTS OF DEDICATED FOREST AND OPEN SPACE EASEMENT AND THE ABILITY TO RAISE THE DESIGN WATER LEVEL IN THE FACILITY, BE AWARE OF AN EXISTING FARM POND. NUTRIENT MITIGATION REQUIREMENTS FOR THIS PROJECT ARE MET THROUGH 26 POTENTIAL SOURCES OF ILLICIT DISCHARGES WITHIN THE DEBRIS. IF THE BLOCKAGE �O I _ o CID ACRES DEDICATED OPEN SPACE. CHANNEL PROTECTION AND FLOOD PROTECTION REQUIREMENTS ARE MET REQUIRES PHYSICAL ENTRY INSIDE THE STRUCTURE, PLEASE OBSERVE ANY CONFINED _ _= 8 LIMITS OF DISTURBANCE 1 �' 1 THROUGH MODIFICATIONS TO THE POND SPILLWAY. THE POND WILL DETAIN ADDITIONAL RUNOFF FROM THE SPACE REQUIREMENTS. Oc� \\ ' 24' DRIVEWAY TO HAVE MAXIMUM SLOPE OF 16% 1 I I \ / \ _ IMPERVIOUS SURFACES WITHIN THE WATERSHED. THE POND WILL RELEASE THE WATER THROUGH AN � \ / / i � I REMOVE BLOCKAGES FROM OUTFLOW STRUCTURES: ANY TRASH OR DEBRIS, EITHER \ _ \ \\ \\ �� /\\ / // '\O1-1 � SPILLWAY STRUCTURE AT OR LESS THAN PRE -DEVELOPMENT FLOWRATES THAT MEET ENERGY BALANCE "NATURAL OR "MAN MADE, THAT IS BLOCKING OR IMPEDING OPERATION OF AN �� 850 \� \� I \ REQUIREMENTS. THE SPILLWAY STRUCTURE AND PIPES ARE SIZED TO ACCOMMODATE 3.5 ACRES ADDITIONAL ROAD TO FOLLOW EXISTIN \ �// /' x \ R� 1 / OUTFLOW STRUCTURE SHALL BE REMOVED SO THAT THE OUTFLOW IS FULLY IMPERVIOUS AREA FOR FUTURE DEVELOPMENT. FUNCTIONAL AGAIN. BLOCKAGES HAVE THE ABILITY TO RAISE THE DESIGN WATER ROADBED & GRAPE i �� // \ /�/ lb/ \ \ / TO EXTENT PRACTICAL \ �� // LEVEL IN THE FACILITY, BE AWARE OF POTENTIAL SOURCES OF ILLICIT DISCHARGES _ Xo 00 WITHIN THE DEBRIS. IF THE BLOCKAGE EXTENDS INTO THE OUTLET STRUCTURE 1.1. MAINTENANCE AGREEMENTS 5 QUI///�/ \ \ ► I ( \ RERING PHYSICAL ENTRY INFI SIDE THE STRUCTURE, PLEASE OBSERVE ANY CONNED IF THE VIRGINIA STORMWATER MANAGEMENT REGULATIONS (4 VAC 50-60) SPECY THE CIRCUMSTANCES \ _ _ \ \� \ UNDER WHICH A MAINTENANCE AGREEMENT MUST BE EXECUTED BETWEEN THE OWNER AND THE VSMP SPACE REQUIREMENTS. AUTHORITY, AND SETS FORTH INSPECTION REQUIREMENTS, COMPLIANCE PROCEDURES IF MAINTENANCE IS REMOVE ACCUMULATED SEDIMENT > 5": ALL FACILITY INLETS, BASINS, SUMPS, PIPES, NEGLECTED, NOTIFICATION OF THE LOCAL PROGRAM UPON TRANSFER OF OWNERSHIP, AND AND STORMWATER STORAGE AREAS SHALL BE CLEANED OF SEDIMENT TO RETURN THE RIGHT -OF -ENTRY FOR LOCAL PROGRAM PERSONNEL. AREA TO ORIGINAL DESIGN GRADES AND ENSURE FUNCTIONALITY, SEDIMENT SHALL BE • RESTRICTIVE COVENANTS OR OTHER MECHANISM ENFORCEABLE BY THE VSMP AUTHORITY MUST BE IN DISPOSED OF IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS. CARE �\vPLACE TO HELP ENSURE THAT STORMWATER MANAGEMENT STRUCTURES ARE MAINTAINED, AS WELL AS SHALL BE TAKEN TO MINIMIZE THE EXTENT OF ANY LAND DISTURBANCE AND TO LEAVETO PASS THE KNOWLEDGE ALONG TO ANY SUBSEQUENT PROPERTY OWNERS. ACCESS TO STORMWATER MANAGEMENT STRUCTURES SHOULD BE COVERED BY AN EASEMENT TO ALLOW THE SITE IN NONEROSIVE PREMAINTENANCE CONDITION. OPERATIONS SHALL FOLLOW C \\ \\`\\\\\\ \ CONTRACTOR TO GROUT EXISTING I I , ACCESS BY THE VSMP AUTHORITY TO CONDUCT INSPECTIONS AND PERFORM MAINTENANCE WHEN ANY STATE AND/OR CITY ESC STANDARD AND NUTRIENT MANAGEMENT PLAN. TO �S �\ \ U \\��\ \ \\ \\\\\\\\ 0 18" CPP SOLID TO PREVENT WATER 1 I o I� / NECESSARY. PREVENT FUTURE SEDIMENTATION, THE SOURCES MUST BE IDENTIFIED AND REMEDIED.\\ \\\ \ \\\\\\\ SEEPAGE AND COLLAPSE • ALL STORMWATER MANAGEMENT STRUCTURES MUST INCLUDE A LONG TERM MAINTENANCE AGREEMENTS REPAIR EROSION: THIS INCLUDES UPLAND DRAINAGE AREAS THAT MAY BE \\ \\ \ \ \\\\\\ \�\\ \ 825__�\\\\\\\ \ \\ \\ \ \/�%\ CONSISTENT WITH THE PROVISIONS OF THE VSMP REGULATIONS, AND MUST INCLUDE THE RECOMMENDED CONTROLLABLE SOURCES OF SEDIMENT OR EROSION. EROSION CAN CONTRIBUTE TO , MAINTENANCE TASKS AND A COPY OF AN ANNUAL INSPECTION CHECKLIST, SEDIMENTATION IN THE BASIN AND ALSO MAY WEAKEN THE STRUCTURE, DEPENDING ON -SOS_/\I%��%��/g • THE MAINTENANCE AGREEMENT SHOULD ALSO INCLUDE CONTACT INFORMATION FOR OWNERS TO GET ITS SEVERITY AND LOCATION. EROSION SHALL BE CORRECTED BY SEEDING, GRADING, - \ \\ \ \ \� /\ INV 815 LOCAL OR STATE ASSISTANCE TO SOLVE COMMON NUISANCE PROBLEMS, SUCH AS MOSQUITO CONTROL, AND OR INSTALLATION OE SOIL STABILIZATION MATTING TO CORRECT THE DEFICIENCY. ` ���\\\\\\\\ \ \ \ \/�//� GEESE, INVASIVE PLANTS, VEGETATIVE MANAGEMENT AND BEAVER REMOVAL. / EXT ND RI -RAP TO - \ \\ \\ \\ EXISTING STREAM CHANNEL O \ 9.1. MAINTENANCE INSPECTIONS VEGETATED OPEN SPACE MAINTENANCE OF STORMWATER MANAGEMENT STRUCTURES IS DRIVEN BY ANNUAL INSPECTIONS THAT NO MAJOR DISTURBANCE MAY OCCUR WITHIN THE CONSERVED OPEN SPACE DURING OR / / EVALUATE THE CONDITION AND PERFORMANCE OF THE STRUCTURE, INCLUDING THE FOLLOWING: AFTER CONSTRUCTION (IE., NO CLEARING OR GRADING IS ALLOWED EXCEPT TEMPORARY ` \ \\ \ / �// // FOREST OPEN SPACE EASEMENT • MEASURE SEDIMENT ACCUMULATION LEVELS IN FOREBAY. - \\ / /j i / i • MONITOR THE GROWTH OF WETLANDS, TREES AND SHRUBS PLANTED. RECORD THE SPECIES AND THEIR DISTURBANCES ASSOCIATED WITH INCIDENTAL UTILITY CONSTRUCTION, RESTORATION OPERATIONS, OR MANAGEMENT OF NUISANCE VEGETATION). THE CONSERVED OPEN - -- - � � � •• /�� � / / <0 APPROXIMATE COVERAGE, AND NOTE THE PRESENCE OF ANY INVASIVE PLANT SPECIES. SPACE AREA SHALL NOT BE STRIPPED OF TOPSOIL. • INSPECT THE CONDITION OE STORM WATER INLETS TO THE STRUCTURE FOR MATERIAL DAMAGE, EROSION -- OR UNDERCUTTING. THE LIMITS OF THE CONSERVED OPEN SPACE SHOULD BE PROTECTED DURING • INSPECT THE BANKS OF UPSTREAM AND DOWNSTREAM CHANNELS FOR EVIDENCE OF SLOUGHING, CONSTRUCTION BY ACCEPTABLE SIGNAGE AND EROSION CONTROL MEASURES. ANIMAL BURROWS, BOGGY AREAS, WOODY GROWTH, OR GULLY EROSION THAT MAY UNDERMINE GRASSED AREAS MAY BE MOWED A MAXIMUM OF 4 TIMES A YEAR. RIP- AP EMBANKMENT INTEGRITY. D_50:18" • INSPECT STRUCTURE OUTFALL FOR EROSION, UNDERCUTTING, RIP -RAP DISPLACEMENT, WOODY GROWTH, A LONG TERM VEGETATION MANAGEMENT PLAN MUST BE PREPARED TO MAINTAIN THE ETC. CONSERVED OPEN SPACE IN A NATURAL VEGETATIVE CONDITION. GENERALLY, • INSPECT CONDITION OF PRINCIPAL SPILLWAY AND RISER FOR EVIDENCE OF SPALDNG, JOINT FAILURE, CONSERVED OPEN SPACE MANAGEMENT PLAN DO NOT ENCOURAGE OR EVEN ALLOW S LEAKAGE, CORROSION, ETC. ANY ACTIVE MANAGEMENT. HOWEVER, A SPECIFIC PLAN SHOULD BE DEVELOPED TO /v\ 840 '�� S E S / / / HEFT C-9.05 FOR • INSPECT CONDITION OF ALL TRASH RACKS, REVERSE SLOPED PIPES OR FLASHBOARD RISERS FOR MANAGE THE UNINTENDED CONSEQUENCES OF PASSIVE RECREATION, CONTROL INVASIVE 1 84 PILLWAY DETAILS -�� \ \ / SPECIES, PROVIDE FOR TREE AND UNDER -STORY MAINTENANCE, ETC. MANAGED TURF �O \ ) \ - I EVIDENCE OF CLOGGING, LEAKAGE, DEBRIS ACCUMULATION, ETC. � � i •, �O \ • INSPECT MAINTENANCE ACCESS TO ENSURE IT IS FREE OF WOODY VEGETATION, AND CHECK TO SEE IS NOT CONSIDERED AN ACCEPTABLE FORM OF VEGETATIVE MANAGEMENT, AND ONLY \ / _ // \ WHETHER VALVES, MANHOLES AND LOCKS CAN BE OPENED AND OPERATED, THE PASSIVE RECREATION AREAS OF DEDICATED PARKLAND ARE ELIGIBLE FOR THE $as • INSPECT INTERNAL AND EXTERNAL SIDE SLOPES OF THE STRUCTURE FOR EVIDENCE OF SPARSE PRACTICE, ALTHOUGH CONSERVATION AREAS CAN BE IDEAL TREATMENT PRACTICES AT NOTE: TIE PROPOSED SLOPE/(g55 VEGETATIVE COVER, EROSION, OR SLUMPING, AND MAKE NEEDED REPAIRS IMMEDIATELY, THE EDGE OF TURF -INTENSIVE LAND USES. AT G ADES SHOWN TO EXISTING SLOPE / \ • BASED ON INSPECTION RESULTS, SPECIFIC MAINTENANCE TASKS WILL BE TRIGGERED. EXAMPLE CONSERVED OPEN SPACE MUST BE PROTECTED BY A PERPETUAL EASEMENT OR DEED BEYOND LIMITS OF SURVEY MAINTENANCE INSPECTION CHECKLISTS FOR STORMWATER MANAGEMENT STRUCTURES CAN BE ACCESSED RESTRICTION THAT ASSIGNS THE RESPONSIBLE PARTY TO ENSURE THAT NO FUTURE 8s0 IN APPENDIX C OF CHAPTER 9 OF THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK (2010). DEVELOPMENT, DISTURBANCE, OR CLEARING MAY OCCUR WITHIN THE AREA. <\, OF T I SETH ). ODERICK Lic. No. 041454 W o� w Apr 9, zozo '_"I ONAL Q � Mu) � ) Q 0) z 1 0 N �°�SNvO o �z �00L, Q LL CLO')� J °° J r�^ ) v No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 5 County Review Comments 4/9/2020 PRELIMINARY ISSUE NOT FOR CONSTRUCTION ENLARGED SWM PLAN & NOTES Project number Date Drawn by Checked by 19004C June 21, 2019 ETS SOR C-6.04 N\\"\EXISTING CONDITIONS.THE OWNER OF THE PARCEL HAS BUILT A NEW DAM TO ENLARGE THE POND FOR \\ AGRICULTURAL PURPOSES. THE AREA PROPOSED TO BE DISTURBED BY THIS PROJECT HAVE ALREADY BEEN DISTURBED AND GRADED IN THE PAST YEAR. THE DISTURBED AREA IS DENSELY VEGETATED WITH \ \ GRASS / GROUND COVER PER E&S STANDARDS. E&S MEASURES TO BE PLACED IN THE STREAM BUFFER SHALL DISTURB AS MINIMAL AREA AS POSSIBLE. GENERAL NOTES: 1. STREAM BUFFER ON SITE SHALL BE 100' FROM TOP OF EXISTING STREAM BANKS. \ \ 2. ALL PROPOSED DISTURBED AREAS WITHIN 100 STREAM BUFFER SHALL BE REPLACED AT 2:1 \\ '.•.� � � �� RATIO FOR MITIGATION. \ 3. MITIGATION AREAS SHALL BE PROTECTED BY A MAINTENANCE AGREEMENTS, TO BE EXECUTED BY THE OWNER PRIOR TO PLANTINGS. 4. ALL MITIGATION PLANTINGS SHALL COMPLY WITH THE RIPARIAN BUFFERS MODIFICATION AND \ / MITIGATION GUIDANCE MANUAL BY VIRGINIA DEPARTMENT OF CONSERVATION AND RECREATION - REPLANT ZONE 3 CHESAPEAKE BAY LOCAL ASSISTANCE. \ DISTURBED AREA WITH / DENSE GRASS / (5128 SF)///� \1 x BUFFER DISTURBANCE AREA TABLE BUFFER AREAS TO BE DISTURBED ZONE 1 0 SF ZONE 2 698 SF ZONE 3 14,120 SF TOTAL AREA 14,828 SF BUFFER AREAS AND TYPES TO BE REPLANTED ZONE 1 0 SF ZONE 2 174 SF DENSE GRASS 140 SF DENSE GRASS ZONE 3 5,514 SF DENSE GRASS 5,678 SF DENSE GRASS TOTAL AREA BUTTER MITIGATION LEGEND RIP —RAP CHANNEL PROTECTION DENSE GRASS PLANTINGS CONCRETE SPILLWAY STREAM BUFFER TREE HNE HMITS OF SURVEY —LOSS PROPOSED CONSERVED FOREST— — — — — — — — & OPEN SPACE EASEMENT GRADING NOTES: • WORK EXCEEDS SURVEY LIMITS. CONTRACTOR TO ENSURE REASONABLE TYING OF GRADES. PLANTING DENSITY REQUIREMENTS PLANT/REPLACE DISTURBED AREA AT A 2:1 RATIO FOR EVERY 400 SQFT UNIT OR FRACTION THEREOF ONE (1) CANOPY TREE @ 1.5"-2" CALIPER OR LARGE EVERGREEN @ 6' TWO (2) UNDERSTORY TREES @ 3/4"-1.5" CALIPER OR EVERGREEN @ 4' OR ONE (1) UNDERSTORY TREE AND TWO (2) LARGE SHRUBS @ 3'-4' THREE (3) SMALL SHRUBS OR WOODY GROUNDCOVER @ 15"-18" REQUIRED MITIGATION DISTURBED BUFFER AREA: 14,828 SF REPLACEMENT PLANTING AREA: 29,656 SF - 75 PLANTING UNITS 75 LARGE TREES 150 UNDERSTORY TREES 225 SHRUBS NOTE: 1. PLANT LOCATIONS SHOWN ARE GENERAL AND LOCATIONS MAY BE ADJUSTED IN THE FIELD DUE TO ROCK 2. PLANT SPECIES MAY BE SUBSTITUTED WITH LIKE SIZE AND TYPE AS PROVIDED IN RIPARIAN BUFFERS MODIFICATION AND MITIGATION GUIDANCE MANUAL BY VIRGINIA DEPARTMENT OF CONSERVATION AND RECREATION - CHESAPEAKE BAY LOCAL ASSISTANCE. VARIETY BETWEEN SPECIES SHALL BE MAINTAINED. BUFFER MITIGATION PLANTING TABLE SYMBOL QUANTITY SPECIES COMMON NAME TYPE SIZE AR 38 ACER RUBRUM RED MAPLE LARGE TREE 1.5" CAL IP 37 ILEX POACA AMERICAN HOLLY LARGE TREE 1.5" CAL CC 50 CERICIS CANADENSIS REDBUD UNDERSTORY 3/4" CAL CF 50 CORNUS FLORIDA DOGWOOD UNDERSTORY 3/4" CAL JV 50 JUNIPERUS VIGINIANA EASTERN RED CEDAR UNDERSTORY 3/4" CAL AC 112 AMALANCHER CANADENSIS SERVICE BERRY SHRUB 15" TALL KL 113 KALMIA LATIFOLIA MOUNTAIN LAUREL SHRUB 15" TALL AR IP CC CIF JV AC KL 0 4RDERICK SETH 5 Lie. No. 041454 W Nov. 2-1, 2019 �W SI ONAL No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE STREAM BUFFER MITIGATION PLAN Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C-6-05 rnNCRETE PAD FOR DUMPSTER SHALL LOPE %4"/FT. TO FRONT ;ONCRETE PAVING. SEE CONCRETE 'AVING DETAIL, NOTE: ENCLOSURE WALL SHALL BE 7'-0" HIGH MIN. SINGLE DUMPSTER ENCLOSURE SCALE: N.T.S. CV 113"- 0" �'xC DUMPSTER (BY OTHERS) SCREEN FENCE 6" DIA. STEEL PIPE BOLLARD, FILLED W/ 3000 LB. CONCRETE AND PAINTED SAFETY YELLOW (NO HDPE SLIP ON COVER) ALIGN 24"X48" DETECTABLE WARNING WITH CENTERLINE OF LANDING AREA AND BACK OF o°o PAINTED PARKING DELINEATOR .°°°° EDGE OF -Z PAVEMENT 7 7////;1 4 6' WHEEL STOP 4" PAINTED BLUE STRIPE (TYP.) H4" PAINTED WHITE STRIPE (TYP.) 18' 0" INTERNATIONAL BLUE F- SYMBOL. 6" 3'-0" 6" 4' X 4' WH IT 4' 0" wi� 4'-0" SQUARE BACKGROUND 4 4 96" 96" 96" O KEYNOTES: 01 4" WIDE PAINT STRIPES - TYPICAL. O2 SIGNAGE DENOTING RESTRICTED PARKING PER R7-8, R7-8D, AND VAN ACCESSIBLE SIGN (AS REQUIRED). O3 FIRST REQUIRED SPACE TO BE VAN ACCESSIBLE, 5' OTHERWISE. ® PAVING SLOPE NOT TO EXCEED 1:50 IN ANY DIRECTION AT ACCESSIBLE PARKING SPACES & ACCESS AISLES. NOTE: STRIPING AND CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE AND CITY OF HARRISONBURG CODES AND SPECIFICATIONS. VAN ACCESSIBLE V-0" RI -SERVE[ PAHKING V 6" VAN ACCESSIBLE SIGN F VAN 318" (TYP.) AccSIGNIBLE (AS REQUIRED) 318" (TYP.) SIGN R7-8 R7-8 6" MIN, HEIGHT 3" POWDER COATED STEE POSTS MAXIMUM FINISHE GRADED 9" PENALTY $250 R7-8D COLORS WHITE SYMBOL ON BLUE BACKGROUND LEGEND & BORDER -- GREEN BACKGROUND -- WHITE BOTTOM OF R SIGN 7-8 R7-8D THE INTERNATIONAL SYMBOL OF ACCESSIBILITY L SHALL 84" HAVE 6" MIN. HEIGHT (UNOBSTRUCTED FIELD WITHIN WHICH THE SYMBOL IS LOCATED) ACCESSIBLE PARKING SIGNAGE Paving Detail - Light Duty Parking 2" SM-9.5 ASPHALT 8" 21 B AGGREGATE COMPACTED SUBGRADE NOTES: 1. SUBGRADE SHALL BE FREE OF ORGANICS, TOPSOIL, POOR SOILS, LARGE STONES, AND THE LIKE. 2. SUBGRADE MATERIAL, DENSITY, AND PLACEMENT SHALL CONFORM TO THE REQUIREMENTS SET FORTH BY SECTION 308 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS. 3. AGGREGATE MATERIAL, DENSITY, AND PLACEMENT SHALL CONFORM TO THE REQUIREMENTS SET FORTH BY SECTION 309 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS. 4. ASPHALT MATERIAL, DENSITY, AND PLACEMENT SHALL CONFORM TO THE REQUIREMENTS SET FORTH BY SECTION 315 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS. 5. IF SUBGRADE IS PROVEN TO HAVE A MIN CBR OF 10, AGGREGATE LAYER MAY BE REDUCED TO 6", PENDING ENGINEER APPROVAL. Paving Detail - Heavy Duty Parking 2" SM-9.5 ASPHALT 3" BM-25.0 ASPHALT 8" 21 B AGGREGATE COMPACTED SUBGRADE NOTES: 1. SUBGRADE SHALL BE FREE OF ORGANICS, TOPSOIL, POOR SOILS, LARGE STONES, AND THE LIKE. 2. SUBGRADE MATERIAL, DENSITY, AND PLACEMENT SHALL CONFORM TO THE REQUIREMENTS SET FORTH BY SECTION 308 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS. 3. AGGREGATE MATERIAL, DENSITY, AND PLACEMENT SHALL CONFORM TO THE REQUIREMENTS SET FORTH BY SECTION 309 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS. 4. ASPHALT MATERIAL, DENSITY, AND PLACEMENT SHALL CONFORM TO THE REQUIREMENTS SET FORTH BY SECTION 315 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS. 5. IF SUBGRADE IS PROVEN TO HAVE A MIN CBR OF 10, AGGREGATE LAYER MAY BE REDUCED TO 6", PENDING ENGINEER APPROVAL. CII T E- E- NInL= CE-E- NInTE- 0 00000 'D 000 D 0 0 0 0 AGG. COURSE /�O O 0 O CRUSHER RUN OR 21B AGGREGATE III=IIII=T H EDREST ACCCS DR VE TYD CAE SECT 0 N SURFACE COURSE 2" SM 9.5 ASPHALT AGG. BASE COURSE 8" 21 B AGGREGATE SUBGRADE COMPACTED SUBGRADE TYPICAL MINIMUM PAVEMENT SECTION CONCRETE PAVING SAWCUT 1/8"-1/4" d d/4 MIN d MIN CONTROL JOINT 36"MIN TURNED DOWN EDGE 0,2d OR 2" 1 MIN THICKENED EDGE BUTT CONCRETE PAVING NOTES: JOINT 1. CEMENT SHALL CONFORM TO THE LATEST REVISED STANDARD SPECIFICATION FOR PORTLAND CEMENT, AMERICAN SOCIETY FOR TESTING AND MATERIALS, ASTM C150, OR STANDARD SPECIFICATION FOR BLENDED HYDRAULIC CEMENTS, ASTM C595. CEMENT SHALL CORRESPOND TO THAT CEMENT ON WHICH THE SELECTION OF CONCRETE PROPORTIONS WAS BASED. 2. CONCRETE AGGREGATES SHALL CONFORM TO THE LATEST REVISED STANDARD SPECIFICATIONS FOR CONCRETE AGGREGATES, ASTM C33. MAXIMUM COARSE AGGREGATE SIZE SHALL BE NOT MORE THAN ONE-FOURTH THE SLAB THICKNESS. 3. ALL MIXING WATER SHALL BE CLEAN AND FREE FROM DELETERIOUS AMOUNTS OF ACIDS, ALKALIES, OR ORGANIC MATERIALS. 4. EXPANSION -JOINT MATERIAL WHERE REQUIRED SHALL BE z IN. -THICK ASPHALT -IMPREGNATED PREMOLDED FIBER CONFORMING TO THE LATEST REVISED STANDARD SPECIFICATION FOR PREFORMED EXPANSION JOINT FILLER FOR CONCRETE, ASTM D1752. 5. CURING COMPOUND SHALL CONFORM TO THE LATEST REVISED STANDARD SPECIFICATIONS FOR LIQUID MEMBRANE -FORMING COMPOUNDS FOR CURING CONCRETE, ASTM C309. 6. AIR -ENTRAINING ADMIXTURES FOR CONCRETE SHALL CONFORM TO THE LATEST REVISED STANDARD SPECIFICATIONS FOR AIR -ENTRAINING ADMIXTURES FOR CONCRETE, ASTM C260. 7. MINERAL ADMIXTURES SHALL CONFORM TO ASTM C618 EXCEPT THAT LOSS ON IGNITION SHALL BE 3.5% OR LESS. 8. ALL OTHER MATERIALS USED IN THE CONCRETE SHALL CONFORM TO CURRENT APPLICABLE ASTM SPECIFICATIONS. 9. CONCRETE SHALL BE MANUFACTURED AND DELIVERED IN ACCORDANCE WITH THE LATEST REVISED STANDARD SPECIFICATION FOR READY MIXED CONCRETE, ASTM C94. CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 4500 PSI AND CONTAIN A TOTAL AIR CONTENT OF 6% PLUS OR MINUS 1 1/2 BY VOLUME. CONCRETE SLUMP SHALL BE:1 - 4 INCHES IF PLACEMENT AND CONSOLIDATION IS BY MECHANICAL METHOD SUCH AS VIBRATORY SCREED; OR 1 -5 INCHES IF PLACEMENT AND CONSOLIDATION IS BY OTHER MEANS, UNLESS A SUPER PLASTICIZER IS USED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 10. FOR LIGHT VEHICULAR PARKING AREAS AND DRIVEWAYS, A 4" MINIMUM PAVEMENT THICKNESS IS REQUIRED. 11. FOR LIGHT TRUCK TRAFFIC LANES, A 5" MINIMUM PAVEMENT THICKNESS IS REQUIRED. 12. THE BOTTOM OF THE EXCAVATION OR THE TOP OF THE FILL SHALL BE KNOWN AS THE PAVEMENT SUBGRADE AND SHALL CONFORM TO THE LINES, GRADE, AND CROSS SECTIONS SHOWN IN THE PLANS. IN MOST SITUATIONS WITH MOST SOILS, SIMPLE REMOVAL OF TOPSOIL AND EXCAVATION DOWN TO THE DESIRED PAVEMENT SUBGRADE IS SUFFICIENT PREPARATION FOR THE DIRECT APPLICATION OF CONCRETE PAVEMENT. 13. IN SITUATIONS WHERE THE SUBGRADE CONTAINS SECTIONS OF SOFT AND YIELDING SOIL, SUCH SOIL MUST BE REMOVED. IT MUST BE REPLACED WITH A MATERIAL (OR SOIL) THAT WILL, AFTER COMPACTION, BRING THE SUBGRADE TO A FIRM, UNYIELDING; AND UNIFORMLY DENSE CONDITION. (IF SOIL IS USED AS A REPLACEMENT MATERIAL, IT SHOULD BE COMPACTED AT OR SLIGHTLY ABOVE OPTIMUM MOISTURE.) 14. BEFORE PLACING CONCRETE, FREESTANDING WATER, SNOW, ICE, OR OTHER FOREIGN MATERIALS SHALL BE REMOVED FROM SUBGRADE. ALL FORMS SHALL BE THOROUGHLY CLEANED, SECURED IN POSITION, AND COATED WITH A FORM RELEASE AGENT. 15. CONCRETE SHALL NOT BE PLACED ON A SOFT, SPONGY, FROZEN, OR OTHERWISE UNSUITABLE SUBGRADE. THE SUBGRADE SHALL BE DAMP WHEN CONCRETE IS PLACED. 16. CONCRETE SHALL BE PLACED, STRUCK OFF, AND CONSOLIDATED TO PLAN GRADE WITH A MECHANICAL PLACEMENT MACHINE, VIBRATING SCREED, OR BY HAND FINISHING METHODS WHEN APPROVED. IN LIEU OF FIXED FORMS, THE CONTRACTOR MAY PLACE CONCRETE WITH A SLIPFORM PAVER DESIGNED TO SPREAD, CONSOLIDATE, SCREED, AND FLOAT FINISH THE FRESHLY PLACED CONCRETE IN ONE COMPLETE PASS OF THE MACHINE. PAVEMENT SHALL BE PITCHED TO AREA DRAINS OR PERIMETER AREAS TO REMOVE WATER. 17. NO REINFORCEMENT IS REQUIRED. 18. AFTER CONCRETE HAS BEEN STRUCK OFF AND CONSOLIDATED, A BULLFLOAT MAY BE USED TO REMOVE ANY HIGH OR LOW SPOTS. BULLFLOAT USE SHALL BE CONFINED TO A MINIMUM. MECHANICAL FINISHING MACHINE FLOATING IS ACCEPTABLE; HOWEVER, UNDER NO CIRCUMSTANCES SHALL THE CONCRETE SURFACE BE STEEL TROWELED. A FINAL SKID RESISTANT FINISH SHALL BE MADE WITH A BURLAP DRAG OR BROOM. 19. CONCRETE MUST BE CURED BY PROTECTING IT FROM LOSS OF MOISTURE, RAPID TEMPERATURE CHANGE AND MECHANICAL INJURY ACCORDING TO THE LATEST EDITION OF ACI 301. USE MEMBRANE -FORMING CURING COMPOUND APPLIED TO ALL SURFACES AT MAXIMUM RATE OF 200 FT2/GAL TO CURE. 20. WHEN CONCRETE IS BEING PLACED IN COLD WEATHER AND THE TEMPERATURE MAY DROP BELOW 35•F., STRAW, HAY, INSULATED CURING BLANKETS, OR OTHER SUITABLE MATERIAL SHALL BE PROVIDED ALONG THE LINE OF WORK TO PREVENT FREEZING OF CONCRETE. CONCRETE INJURED BY FROST ACTION SHALL BE REMOVED AND REPLACED AT THE CONTRACTOR'S EXPENSE. 21. UNLESS SHOWN ON THE PROJECT DRAWINGS, A JOINING PLAN SHALL BE PREPARED BY THE CONTRACTOR AND APPROVED BEFORE PAVING BEGINS. 22. TYPICAL DRYING SHRINKAGE CRACKING MUST BE MINIMIZED AND CONTROLLED BY PROPER JOINTING. TO MINIMIZE AND CONTROL CRACKING, JOINTS SHALL BE: A) CONTINUOUS ACROSS THE SLAB; B) SYMMETRICAL (IN SQUARES OR RECTANGLES WHERE POSSIBLE); C) SPACED AT NO MORE THAN 2 1/2 TIMES IN FEET THE SLAB THICKNESS IN INCHES (15 FT MAX SPACING). 23. ISOLATION JOINTS (EXPANSION JOINTS) SHALL BE USED TO ISOLATE FIXED OBJECTS ABUTTING OR WITHIN THE PAVED AREA. THEY SHALL CONTAIN PREMOLDED JOINT FILLER FOR THE FULL DEPTH OF THE SLAB. 24, CONTROL JOINTS (CONTRACTION JOINTS) SHOULD BE PRODUCED BY SAWING. JOINT DEPTH SHALL BE A MINIMUM OF ONE-FOURTH THE SLAB THICKNESS. HAND -TOOLED JOINTS SHALL HAVE A MAXIMUM EDGE RADIUS OF 1/4 INCH. SAWING OF JOINTS SHALL BEGIN AS SOON AS THE CONCRETE HAS HARDENED SUFFICIENTLY TO PERMIT SAWING WITHOUT EXCESSIVE RAVELING. ALL JOINTS SHALL BE COMPLETED BEFORE UNCONTROLLED SHRINKAGE CRACKING OCCURS. 25. CONSTRUCTION JOINTS (JOINTS ENDING A DAY'S POUR) MUST ALLOW WHEEL LOAD TRANSFER ACROSS THE JOINTS WHERE NECESSARY. IN SUCH CASES, THESE JOINTS SHALL BE THICKENED EDGE BUTT JOINTS. 26. JOINTS SHALL EXTEND COMPLETELY THROUGH THE CURB WHEN THE CURB IS INTEGRALLY FORMED WITH THE SLAB. 27. CONSTRUCTION AND CONTROL JOINT OPENINGS WIDER THAN 1/4 INCH SHALL BE CLEANED AND SEALED BEFORE OPENING PARKING AREA TO TRAFFIC. 28. WHEN APPROVED, THE CONTRACTOR SHALL BE PERMITTED TO MAKE MINOR ADJUSTMENTS IN JOINT LOCATION TO MAKE THEM COINCIDE WITH DRAINAGE OR OTHER STRUCTURES. 29, PROVIDE A TURNED DOWN EDGE AT ALL FREE EDGES OF THE CONCRETE PAVING. 71Z21 15"� MIN. 18" MAX. -2 0 __- 10'-0" r NOTES: 1. ROAD SHALE NOT EXCEED 15% IN LONGITUDINAL SLOPE. 2. PAVEMENT LAYERS SHALL BE STEPPED DOWN AT 45°. J. SUBGRADE SHALL BE FREE OF ORGANICS, TOPSOIL, POOR SOILS, LARGE STONES AND THE LIKE. 4. SUBGRADE MATERIAL, DENSITY, AND PLACEMENT SHALL CONFORM TO THE REQUIREMENTS SET FORTH BY SECTION 308 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS. 5. AGGREGATE MATERIAL, DENSITY, AND PLACEMENT SHALL CONFORM TO THE REQUIREMENTS SET FORTH BY SECTION 309 OF THE VDOT RAOD AND BRIDGE SPECIFICATIONS. 6. ASPHALT MATERIAL, DENSITY, AND PLACEMENT SHALL CONFORM TO THE REQUIREMENTS SET FORTH BY SECTION 315 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS. 7. IF SUBGRADE IS PROVEN TO HAVE A MIN CBR OF 10, AGGREGATE LAYER MAY BE REDUCED TO 6", PENDING APPROVAL BY ENGINEER. 8. CHECK DAMS SHALL BE INSTALLED IN DITCH/CUT SECTIONS UPON INITIAL CONSTRUCTION AND SHALL BE MAINTAINED ACCORDING TO VESCH STANDARD AND SPECIFICATION 3.20. CHECK DAMS SHALL BE REMOVED FOLLOWING STABILIZATION AND PRIOR TO OPENING OF ROADWAY TO GENERAL VISITOR TRAFFIC. 9. SILT FENCE SHALL BE INSTALLED ALONG TOES OF FILL SLOPES UPON INITIAL CONSTRUCITON AND SHALL BE MAINTAINED ACCORDING TO VESCH STANDARD AND SPECIFICATION 3.05. SILT FENCE SHALL BE REMOVED FOLLOWING STABILIZATION. J-HOOKS SHALL BE USED EVERY 50' WHEN SILT FENCE IS PLACED ON LONGITUDINAL SLOPE. �4,�1 2" R 4 4 4- _4- 4 6 4 4 SEE NOTE 4- - 4 -4 a- -a 4- 4 - p 4 2" RADIUS a 4 6" a= SURFACE 4- 4 4 BASE a 12" ACCEPTABLE ALTERNATIVE IF CURB IS EXTRUDED SPECIFICATION REFERENCE 105 502 CG-2 NOTES 1. THIS ITEM MAY BE PRECAST OR CAST IN PLACE. 2. CONCRETE TO BE CLASS A3 IF CAST IN PLACE, 4000 PSI IF PRECAST. 3. CURB HAVING A RADIUS OF 300 FEET. OR LESS (ALONG FACE OF CURB) WILL BE PAID FOR AS RADIAL CURB. 4.THE DEPTH OF CURB MAY BE REDUCED AS MUCH AS 3" (15'' DEPTH) OR INCREASED AS MUCH AS 3" (21" DEPTH) IN ORDER THAT THE BOTTOM OF CURB WILL COINCIDE WITH THE TOP OF A COURSE OF THE PAVEMENT SUBSTRUCTURE. OTHERWISE THE DEPTH IS TO BE 18'' AS SHOWN. NO ADJUSTMENT IN THE PRICE BID IS TO BE MADE FOR A DECREASE OR AN INCREASE IN DEPTH. 5.CG-2 IS TO BE USED ON ROADWAYS MEETING THE REQUIREMENTS FOR CG-6 AS SHOWN IN APPENDIX A OF THE VDOT ROAD DESIGN MANUAL. SURFACE BASEBASE SUBBASE STANDARD 611 CURB VIRGINIA DEPARTMENT OF TRANSPORTATION AT`THEcOPTION OF THE"CONTRACTOR REV. 9/06 201.01 CG-6 NOTES: 1. THIS ITEM MAY BE PRECAST OR CAST IN PLACE. 2. CONCRETE TO BE CLASS A3 IF CAST IN PLACE, 4000 PSI IF PRECAST. 3. COMBINATION CURB & GUTTER HAVING A RADIUS OF 300 FEET OR LESS (ALONG FACE OF CURB)SHALL BE PAID FOR AS RADIAL COMBINATION CURB & GUTTER. 4 FOR USE WITH STABILIZED OPEN -GRADED DRAINAGE LAYER, THE BOTTOM OF THE CURB AND GUTTER SHALL BE CONSTRUCTED PARALLEL TO THE SLOPE OF SUBBASE COURSES AND TO THE DEPTH OF THE PAVEMENT. 5. ALLOWABLE CRITERIA FOR THE USE OF CG-6 IS BASED ON ROADWAY CLASSIFICATION AND DESIGN SPEED AS SHOWN IN APPENDIX A -- - - 'DOT ROAD DESIGN MANUAL. THE BOTTOM OF THE CURB AND GUTTER MAY BE CONSTRUCTED PARALLEL TO THE SLOPE OF SUBBASE COURSES PROVIDED A MINIMUM DEPTH OF 7" IS MAINTAINED. SPECIFICATION REFERENCE COMBINATION 611 CURB & GUTTER 105 REV. 9/06 502 VIRGINIA DEPARTMENT OF TRANSPORTATION 201.03 SETH R DERICK Lic. No. 041454 c 0 1� Nov. 21, 201,7 �W SI DNA L No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE DETAILS Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C-9.01 SCALE: N.T.S. /ice O l0 (�' �/� _ I l l MUMUM-) TYPICAL CONCRETE BASE TYPICAL STEEL BASE SOURCE: VA. DSWC ANTI- SEEP COLLAR SOURCE: VA. DSWC PLATE. 3.14-3 PLATE. 3.14-4 SOURCE: VA. DSWC PLATE. 3.20-1 DESIGN HIGH WATER (25YR. STORM ELEV.) 0.5' 111►==1 67 C.Y./ AC. - DRY " STORAGE 67 C.Y./ AC. WET STORAGE SEDIMENT CLEANOUT POINT (" WET " STORAGE REDUCED TO 34 C.Y./ ACRE) MIN. 1.0' RISER CREST DEWATERING DEVICE DCESOGN ELEVATDONS WDTH EMERGENCY SP�LLWAY DESIGN HIGH WATER (25YR. STORM ELEV.) MIN. 0.5' 67 C.Y./ AC. - DRY STORAGE 67 C.Y./ AC. - WET " STORAGE T MIN I K 3. 0' MIN. 1 .0' RISER CREST DEWATERING DEVICE SEDIMENT CLEANOUT POINT' U DESIGN ELEVATk:)NS WLFHOUT EMERGENCY SPA LL Y (RISER PASSES 25—YR. EVENT) SOURCE: VA. DSWC CONTROL SECTION EMERGENCY SPILLWAY c�I InI II n ninT nr SOURCE: VA. DSWC CREST OF EMERGENCY i SPILLWAY Sediment Basin Component ELEVATION Basin Bottom 1072 Sediment Cleanout Elevation 1074 Wet Storage 1075.25 9" Orifice Elevation 1075.25 Dry Storage 1077.2 Riser Crest 1077.2 2yr water elevation 1077.58 Emergency Spillway 1078.3 25yr water elevation 1078.41 Dam Crest 1079.8 D// MEMO III Wows l VVL I �) I UKHhL KtUUUtU TO 34 C.Y./ ACRE) PLATE. 3.14-2 PLATE. 3.14-5 ANTI DEVI CON( , 11 MCI // // lilpl 91 H = HEAD ON PIPE THROUGH EMBANKMENT h = HEAD OVER RISER CREST L = LENGTH OF PIPE THROUGH EMBANKMENT Dp = DIAMETER OF PIPE THROUGH EMBANKMENT Dr = DIAMETER OF RISER SOURCE: VA. DSWC 1992 APPI CHAT PLATE. 3.14-7 EXCAVATED EARTH SPILLWAY WATER SURFACE STAGE (Hp) MAN 2% �, nnrc,T nnln nnniTnnl c,rnTlnni X— LENGTH OF EXIT CHANNEL CONTROL SECTION EXIT SECTOR LEVEL OR GREATER — APPROACH —III—III CHANNEL S —II PROE[E E ALONG OENTERUNCE 2100' 1 I —< d b CROSS-SECTION AT CONTROL SECTION 3.14 O l j� SETH R DERICK Lie. No. 041454 W Nov. 2-1, 2019 �W SI ONAL No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE DETAILS Project number Date Drawn by Checked by 19004C June 21, 2019 ETS SOR Source: VA. DSWC. SOURCE; VA. DSV Plate 3.141 PLATE. 3.14-1 SOURCE: USDA—SCS PLATE. 3.14-9 C-9.02 Albemarle County Design Standards Manual — Engineering I STONE CONSTRUCTION ACCESS STONE CONSTRUCTION ACCESS- —� 70' MIN' 3"! SM-2A ASPHALT '0P COURSE- 2% � r 5" MIN. 2'A AGGREGATE. BASE PROFILE 70' M!N. O '�SPHALT PAVED ,ASHRACK EXIS PAVEMF'!- U EXISTING 2% 2% PAVFVFVT-' t Z% '2' M N.* *MUST EXTEND FUL_ 'WIDTH L---0 POSITIVE DRAINAGE OF INGRESS AND EGRESS I TO SEDIMENT OPERATION 1 TRAPPING DEVICE PLAN 12' VIN. POSITIVE DRAINAGI 27 TO SEDIMENT TRAPPING DEVICE -FILTER CLC-1I SECMI A —A A uiniuiuuii water tap of 1 nrch must be uistalled with a mu1fiuwu l-uich_ballcock Slititoff-'ah'e supplb-iirg a wash hose Width a diameter of 1.5 niches for adequate constant pressure. Wash water must be carried away from the entrance to an approved settling area to rernoN,e seduneut. All seclnrrent shall be preN,ented from enteric, storin clranis, Glitches or watercotu; e�2 PAVED WASH RACK NO S I EXISTING GR❑UND N � .� 11 F�, l �� 11 l �/� � l � 11 �•� ,� � �� 70' MIN CA FILTER CL❑TH 6" MIN. I q OE F�_ETON 12' MIN.* 70' MIN. B WASHRACK I F (❑PTI❑NAL) VD❑T #1 I P❑SITIVE DRAINAGE C❑URSE AGGREGATE B T❑ SEDIMENT TRAPPING DEVICE * MUST EXTEND FULL WIDTH OF INGRESS AND EGRESS p OPERATION PLAN REIINF LIN Eli � LJIN FIE I E_ EXISTING PAVEMENT 5:1 MOUNTABLE BERM (❑PTHINAL) ° 10' MIN. 10, MIN EXISTING PAVEMENT 10' MIN y llKH11V JY'Hl,t — FLOW D FILTER BAG po° dpp°°ODpdd°°dda I I d° d ° ----- ---------- PUMP DISCHARGE HOSE 12 IN MIN. MULCH, LEAF/WOOD COMPOST, PLAN VIEW WOODCHIPS, SAND, OR STRAW BALES STRAP SLOPE FLOW 5% MAX. ELEVATION FILTER BAG 8 IN MIN, CONSTRUCTION SPECIFICATIONS 1. TIGHTLY SEAL SLEEVE AROUND THE PUMP DISCHARGE HOSE WITH A STRAP OR SIMILAR DEVICE. 2, PLACE FILTER BAG ON SUITABLE BASE (E.G., MULCH, LEAF/WOOD COMPOST, WOODCHIPS, SAND, OR STRAW BALES) LOCATED ON A LEVEL OR 5% MAXIMUM SLOPING SURFACE. DISCHARGE TO A STABILIZED AREA. EXTEND BASE A MINIMUM OF 12 INCHES FROM EDGES OF BAG. 3, CONTROL PUMPING RATE TO PREVENT EXCESSIVE PRESSURE WITHIN THE FILTER BAG IN ACCORDANCE WITH THE MANUFACTURER RECOMMENDATIONS. AS THE BAG FILLS WITH SEDIMENT, REDUCE PUMPING RATE. 4, REMOVE AND PROPERLY DISPOSE OF FILTER BAG UPON COMPLETION OF PUMPING OPERATIONS OR AFTER BAG HAS REACHED CAPACITY, WHICHEVER OCCURS FIRST. SPREAD THE DEWATERED SEDIMENT FROM THE BAG IN AN APPROVED UPLAND AREA AND STABILIZE WITH SEED AND MULCH BY THE END OF THE WORK DAY. RESTORE THE SURFACE AREA BENEATH THE BAG TO ORIGINAL CONDITION UPON REMOVAL OF THE DEVICE. 5, USE NONWOVEN GEOTEXTILE WITH DOUBLE STITCHED SEAMS USING HIGH STRENGTH THREAD. SIZE SLEEVE TO ACCOMMODATE A MAXIMUM 4 INCH DIAMETER PUMP DISCHARGE HOSE. THE BAG MUST BE MANUFACTURED FROM A NONWOVEN GEOTEXTILE THAT MEETS OR EXCEEDS MINIMUM AVERAGE ROLL VALUES (MARV) FOR THE FOLLOWING: GRAB TENSILE 250 LB ASTM D-4632 PUNCTURE 150 LB ASTM D-4833 FLOW RATE 70 GAL/MIN/FT' ASTM D-4491 PERMITTIVITY (SEC-') 1.2 SEC-' ASTM D-4491 UV RESISTANCE 70% STRENGTH @ 500 HOURS ASTM D-4355 APPARENT OPENING SIZE (AOS) 0.15-0.18 MM ASTM D-4751 SEAM STRENGTH 90% ASTM D-4632 6. REPLACE FILTER BAG IF BAG CLOGS OR HAS RIPS, TEARS, OR PUNCTURES. DURING OPERATION KEEP CONNECTION BETWEEN PUMP HOSE AND FILTER BAG WATER TIGHT. REPLACE BEDDING IF IT BECOMES DISPLACED. SEDIMENT FILTER BAG SCALE N.T.S. FILTER CLOTH CLASS Al RIPRAP SPLASH,BLOCK 1' DEPTH PUMP DISCHARGE o 0 0 0 0 �f 2 STAKES PER 0 BALE (TYP.) NOTE FILTER CLOTH 0 COVERS ENTIRE o 6'-0" MIN. 0 INSIDE FACE OF SQUARE STRAW BALE DIKES. L EXCAVATED 0 INSTALL AS PER STD. AREA & SPEC. 3.05, SILT 0 3'0" FENCE. EXIST'"'r' ORO PLAN VIE 4" BOTTOM CROSS—S CTION A —A 1'-6" FLOW �� 2 7 VDOT #25 OR #26 AGGREGATE (4 DEPTH) — EXCAVATED AREA DRY RIPRAP lI i71 CLASS Al C R O S e S,7 C M N B— D DIVERSIONS 10% SETTLEMENT TYPICAL PARABOLIC DIVERSION 10% SETTLEMENT 0.3' FREE BOARD DESIGN FLOW DEPTH TYPICAL TRAPEZOIDAL DIVERSION 10% SETTLEMENT 0.3'FFREEBOARD T DESIGN FLOW DEPTH TYPICAL VEE SHAPED DIVERSION Source: Va. DSWC TEMPORARY FILL DIVERSION FILL SLOPE EARTHEN RIDGE 9" EIN 2' SOURCE: VA. DSWC ArI' lam' i 1121=1011 CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE S IIPPOR T) 1. SET THE STAKES. 2. EXCAVATE A 4"X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. 6'MAX. FLOW 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. 4" 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control,". DSWC Plate 3.12-1 Sherwood and Wyant EARTHEN DIKE PROVIDE INLET CORRUGATED METAL (COMPACTED) PROTECTION EXTENSION COLLAR A �( WATERPROOF SEAL 24:1 D D+s" PROVIDE OUTLET PROTECTION STANDARD FLARED END SECTION SECTION VIEW NOTE: SEDIMENT MAY BE CONTROLLED AT OUTLET IF UPLAND PONDING WILL CREATE PROBLEMS EARTHEN DTVV (COMPACTE SECTION A - A 1D+6" � 4.5' min. SOURCE: VA. DSWC Cnmpacted Soil G A VEL AND TIRE MESH DROP INLET SEDIMENT FIL TER 18" MIN. PLATE. 3.05-2 PLATE 3.091 GRAVEL *(12"MIN. DEPTH) RUNOFF WATER WITH SEDIMENT Ll V D ' 4 a ° ICI a SEDIMENT WIRE MESH FILTERED WATER SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY CONCENTRATED FLOWS ARE EXPECTED, BUT NOT WHERE PONDING AROUND THE STRUCTURE MIGHT CAUSE EXCESSIVE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. * GRAVEL SHALL BE VDOT #3, #357 OR #5 COARSE AGGREGATE. j� O A l & SETH R DERICK Lie. No. 041454 W 0� Nov. ASS, 21, 201,7 �W ONA L 1 �� Q� C/) � r M O � (Y) LO 0 0) z � � N U) ,,6 o �z O LLl 0 o L I- Q.. 66 J � 00 J C/) Z Q No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11 /21 /19 CONSTRUCTION ISSUE DETAILS Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C-9-03 SOURCE: ADAPTED from 1983 Maryland Standards for Soil erosion and Sediment Control, and Va. DSWC Plate 3.02-1 SOURCE: Va. DSWC SOURCE: VA. DSWC PLATE: 3.26-3 PLATE 3. 1 5— 1 SOURCE: VA. DSWC PLATE. 3.07-2 Virginia Stormwater Management Handbook, Chapter 9 July 2013 9-C.16.0. EXTENDED DETENTION PONDS: O&M CHECKLIST Inspection Date Project Site Plan/Permit Number Location Date BMP Placed in Service Date of Last Inspection Inspector Owner/Owner's Representative As -Built Plans available: Y / N Facility Type: Level 1 Pond characteristics and functions (check all that apply) ❑ Water quality treatment ❑ Channel protection ❑ Ties into groundwater Hydraulic Configuration: ❑ On-line facility ❑ Off-line facility Level 2 Type of Pre -Treatment Facility: ❑ Sediment forebay (above ground) ❑ Vegetated buffer area ❑ Grass filter strip ❑ Grass channel ❑ Other: Ideally, Extended Detention Ponds should be inspected annually. ED Ponds are prone to a high clogging risk at the ED low -flow orifice. Ideally, the orifice should be inspected at least twice a year after initial construction. The constantly changing water levels in ED Ponds make it difficult to mow or manage vegetative growth. The bottom of ED Ponds often become soggy, and water -loving tees such as willows may invade and will need to be managed. Periodic mowing of the stormwater buffer is only required along maintenance rights -of -way and the embankment. The remaining buffer may be managed as a meadow (mowing every other year) or forest. Frequent removal of sediment from the forebay (every 5-7 years, or when 50% of the forebay capacity is filled) is essential to maintain the function and performance of the ED Pond. Sediments excavated from ED Ponds are usually not considered toxic or hazardous, so they can be safely disposed of either by land application of land filling. Z Z Z Element of t`• ai c_ Who Will Potential Problem E y How to Fix Problem Address Comments BMP 2 la Problem to d a > p� Adequate vegetation Supplement as needed. Owner There is excessive Remove immediately. Owner or trash and debris professional Contributing There is evidence of Owner or Drainage Area erosino and/or bare or Stabilize immediately. professional exposed soil e There is excessive Owner or landscape waste and Remove immediately. professional yard clippings There is adequate Professional access to the pre- Establish adequate access and, perhaps, treatment facility the locality There is excessive Remove immediately. Owner or Pre -Treatment trash and debris professional There is evidence of Immediately identify and erosion and/or correct the cause of the Owner or exposed soil. erosion and stabilize the professional eroded or bare area. 9-C-52 Virginia Stormwater Management Handbook, Chapter 9 Virginia Stormwater Management Handbook, Chapter 9 July 2013 Virginia Stormwater Management Handbook, Chapter 9 z Z Z Element of ai C�- Who Will BMP Potential Problem E 5 m How to Fix Problem Address Comments °' NM Problem o +r m Io m a > c Dredge the sediment to Sediment deposits restore the design capacity; are 50% or more of sediment should be dredged Professional forebay capacity. from forebays at least every 5-7 years, and earlier, as needed. The sediment marker Adjust the sediment depth Pre -Treatment is not vertical. marker to a vertical Professional (continued) alignment Clear blockages of the riser There is evidence of or orifice(s) and make other clogging adjustments needed to meet Professional the approved design specifications There is dead Revegetate, as needed Owner or vegetation professional The inlet provides a Stabilize immediately, as Owner or stable conveyance needed, and clear professional into the pond blockages. There is excessive Owner or trash, debris, or Remove immediately professional sediment. There is evidence of Repair erosion damage and Owner or erosion/undercutting restabilize professional at or around the inlet There is cracking, bulging, erosion or Repair and restabilize Professional sloughing of the immediately. Inlet forebay dam. There is woody Remove within 2 weeks of growth on the forebay discovery. Professional dam. Animal burrows must be There is evidence of backfilled and compacted. nuisance animals. Burrowing animals should be Professional humanely removed from the area. There is more than 1 Add fill material and compact Owner or inch of settlement. the soil to the design grade Professional The inlet alignment is Correct immediately. Owner or incorrect. Professional Determine if existing plant Plant composition is materials are consistent with consistent with the the general Wet Pond design Professional approved plans criteria, and replace inconsistent species. Invasive species are Remove invasive species present. immediately and replace Professional vegetation as needed. Vegetation Trees planted in the buffer and on wetland Consider watering every 3 islands and days for first month, and Owner or peninsulas need then weekly during first year professional watering during the (April — October), depending first growing season on rainfall. Mow at least twice a year) Grass around the to a height of 4"-9" high and Owner or facility is overgrown remove grass clippings. professional 9-C-53 July 2013 Virginia Stormwater Management Handbook, Chapter 9 Z Z Z Element of C ai � Who Will BMP Potential Problem E y How to Fix Problem Address Comments °' rn Problem to d a > Removal of woody species There is woody near or on the emergency Owner or growth on the spillway should be done professional spillway. when discovered, but at least every 2 years. There is excessive Owner or Overflow/Emer trash, debris, or other Remove immediately. professional obstructions. gency Spillway There is evidence of Repair erosion damage and Owner or erosion/backcutting reseed professional There are soft spots, Reinforce, fill and stabilize Owner or seepage or sinkholes. immediately. professional Only one layer of Reinforce rip -rap or other stone armoring exists armoring materials. Professional above the native soil. The outlet provides a Stabilize immediately, as Owner or stable conveyance needed, and clear professional from the pond. I blockages. There is woody growth within 5 feet of Prune vegetation back to Owner or the outlet pipe barrel. leave a clear discharge area. Professional There is excessive Owner or Outlet trash, debris, or other Remove immediately. professional obstructions. There are excessive sediment deposits at Remove sediment. Professional the outlet. Discharge is causing Repair, reinforce or replace undercutting, erosion or displaced rip -rap at rip rap as needed, and Professional or around the outlet. restabilize. Establish adequate access. Access to the facility Remove woody vegetation Professional or its components is and debris that may block and, perhaps, adequate. access. Ensure that the locality hardware can be opened and operated. Collapsed fences must be Fences are restored to an upright inadequate position. Jagged edges and Professional damaged fences must be repaired or replaced. Water levels in one or Clear blockages of the riser more cells are or orifice(s) and make other Overall abnormally high or adjustments needed to meet Professional low the approved design specifications. Complaints from local Correct real problems. Owner or residents professional Eliminate stagnant pools and stock the basin with mosquito fish to provide natural mosquito & midge Mosquito proliferation control. Treat for mosquitoes Owner or as needed. If spraying, then professional use mosquito larvicide, (e.g., Bacillus thurendensis or Altoside formulations) only if absolutely necessary. 9-C-55 July 2013 Z Z Z Element of r• ai C". Who Will BMP Potential Problem E a y How to Fix Problem Address Comments °' rn Problem .0 O �'' y M a > c OC Encroachment on the Inform involved property Owner or pond or easement by owners of BMPs status ; professional Overall buildings or other clearly mark the boundaries (and perhaps (continued) structures of the receiving pervious the locality) area, as needed Safety signage is not Provide sufficient, legible Owner or adequate. safety si na e. professional pF AL COUNTY OF ALBEMARLE �y Department of Community Development Construction Record Drawings (As -built) for VSMP The following is a list of information required on construction record drawings for stormwater facilities (reference Water Protection Ordinance 17-422). It is preferable that the construction record drawing be prepared by someone other than the designer. Please do not provide design drawings as construction record drawings. A. A signed and dated professional seal of the preparing engineer or surveyor. B. The name and address of the firm and individual preparing the drawings on the title sheet. C. The constructed location of all items associated with each facility, and the inspection records to verify proper dimensions, materials and installation. The items include, but are not limited to the following: 1. Inspection Records and photographs for pipe trenches and bedding, including underdrains. 2. Video Pipe Inspection for any pipes which are not accessible or viewable. 3. Updated Location with geo-coordinates of all facilities. 4. Verified Drainage Area maps for the drainage area treated, and for drainage to the facilities. 5. Current physical and topographic survey for all earthen structures. Ponds should include a survey of the pond bottom. Surveys should verify pond volumes are per design. Corrections may be required for alterations from the design. 6. Plants, location and type. 7. Plans and profiles for all culverts, Pipes, Risers, Weirs and Drainage Structures - Display the installed type of drainage structures, culvert/pipe size, weirs, materials, inlets or end treatment(s), inlet and outlet protection, alignment and invert elevations compared to design. 8. Computations: For significant deviations from design, provide sealed computations verifying that the as -built condition is equivalent or better than design. 9. Ditch Lines - Display the constructed location of all ditch lines and channels, including typical sections and linings. 10. Easements - Show all platted easements with dead book references labeled. Facilities and drainage must be within platted easements. Provide copies of recorded documents. 11. Guardrail, fences or other safety provisions - Display the constructed location of all safety provisions; fences, guardrail, including the type, length and applied end treatments, compared to design. 12. Material layers — biofilter media, stone layers, sand layers, keyways and cores must be verified as to material types and depths. Include inspection reports, boring or test pit reports and materials certifications. Biofilter media must be an approved state mix. 13. Access roads — show location of access roads, surface treatment, drainage, etc, as applicable. 14. Compaction reports are required to verify fill compaction in dams. 15. Manufacturers certifications for proprietary BMP's certifying proper installation and functioning. iJ E Ib Lai r� July 2013 Z z Z Element of C...c, Who Will BMP Potential Problem E How to Fix Problem Address Comments m rn L Problem o m m a > c Vegetation Vegetation is dead or reinforcement planting Remove and replace dead or Professional (continued) is needed. dying vegetation. There is excessive Remove immediately Owner or trash and/or debris. professional There is evidence of Repair and stabilize physical sparse vegetative damage, and reseed or plant Owner or cover, erosion or additional vegetation. professional slumping side slopes. Permanent Pool and Side Animal burrows must be Slopes There is evidence of backfilled and compacted. Owner or nuisance animals. Burrowing animals should be professional humanely removed frm area. There is significant Conduct a bathymetric study sediment to determine the impact to Professional accumulation. design volumes, and dredge if necessary. There is adequate Professional access to the riser for Establish adequate access and, perhaps, maintenance. the locality Pieces of the riser are deteriorating, misaligned, broken or Repair immediately. Professional missing. Adjustable control valves are accessible Repair, as needed. Professional Riser/Principle and operational. Spillway and Reverse -slope pipes Low -Flow and flashboard risers Repair, as needed. Professional Orifice(s) are in good condition. Seepage into conduit Seal conduit Professional Clear blockages of the riser There is evidence of or orifice(s) and make other Professional clogging adjustments needed to meet the approved design specs. There is excessive trash, debris, or other Remove immediately. Owner or obstructions in the professional trash rack. There is sparse veg. cover, settlement, Repair and restabilize cracking, bulging, misalignment, erosion immediately, especially after Professional rills deeper than 2 major storms. inches, or sloughing. There are soft spots, Reinforce, fill and stabilize seepage, boggy areas immediately. Dam/ or sinkholes. Embankment Animal burrows must be and Abutments There is evidence of backfilled and compacted. nuisance animals. Burrowing animals should be Burro humanely removed from the area. Removal of woody species There is woody near or on the embankment vegetation on the and maintenance access embankment. areas should be done when discovered, but at least every 2 years. 9-C-54 I 1 1 t . II ', q L 1�►�r�. 1 MNR I •' jj d l! I � rR 1 µ je. � 1 r� i��IIIiIIpII�IIYII:IIllul'�� +� r dMimi 1`1111 II ' 1,1IIlr,Il 1 � i ��������l� � �Iliillil• ��I�� I� � n?i� �'I��ii u �Iiii qqII III I oiir � 1 Ild 1 1 Ia �hl III r.9 II ill •I�iFl:1�yy++ �+ {I I I I/,� w u1ru �m 1 �' �•.ii+l�n�,�d��:��ni#1 ,li+ III�I .I�IIII I I i 1 u �I rw �II�II� II��Ii i J�-r A..F0.�'�'fjfl°I�°'III'��I'I IIIIIIININIIII� null I�III,I ulnl'.:���illl���l�l�� 111 RIL� I IIIII�I�IIII�� t11N1!'ii dll ■ + I , 1 p IIIIIIIMINIIIII ;, ,1 .,1111 IIIIII I I � uu�Q4 11f!�� IIIIIIII IIIIIIII I Ij ! I �P� .au r IIIIIIIIINIIIIIIIIEII� 1I11�1I1�jI1p Hill I�[I�il 1. 1111 IIIIIIlII II IIIIJHIMII I�IFI� IIIIIIIIIIIIIIIIIIHH 11 IIYIJIillillliil Il11lI � � ' j1�I I � !I� IfIII��1I 11�u�1lI I�I� I IIY I�,pryy1���IIIjjl�fry�� III„I ,00�,, 'ry��1�]]�I1 Ij1111Ij��{�Iry�I1'I � ,�1j1� II I��IF F ++ IIII�IIIryI1F IIIIIIIdFlllll IIII�I4 FyH�Yi��II��IJllil I.� u ■'.' �Aln I I . • J ldl,Ilil.�l�lidi. 1 9H11111 III IlQldlllll Illi ftI111Elil�l� I� I I � � �• I � � M1 I `allll'I i 1 i 11 Ih ID N �H G SETH R DERICK ' Lic. No. 041454 W O� Nov. 2-1, 201,7 �W SI DNA L CJ Q o 0 � M � W W o o�, Z�o� _zLO �oN o �z CO u UJ Q I _ U� 66 Lo J _ 00 J � No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE DETAILS Project number 19004C Date June 21, 2019 Drawn by ETS Checked by SOR C-9.04 Ek TIP i R _ N V W nN T CONCRETE TO BE 5" MINIMUM THICKNESS 17' W W W W......... W W W W W W W W W W W W W W W W W W W W. W W. W W. W W. W W W W W W W W W W W W y W y W y W.............. W W W W W W W . . . . . . . . . W . . W . . W . W W W W y W CON C ETEWHEA©WALEW WWyWW WWyWWWWWyWW WWyWW WWyWWWWWWWWWWWWWWWWWWWWWWWW & WI WWAI�L W W W W W W W WWW W WWW W WWW W WWW W WWW W WWW W WWW W WWW POND NORMAL POOL W� W W� W W� W W� W W� W W� W W� W W W W W W W W W W W W W Qzi a 20' a a a 17' a 2p 50' a a a QI a a III - QII a a 24' a a a a GQ I Q a 4� a a 4 Q Q a Q a <II a a a a RP -RAP D 50: 18' oU`- o�oo�oo�oo�oo�oo�o EXTEND RIPRAP CHANNEL PROTECTION TO EXISTING STREAM CHANNEL 1.11' FREEBOARD �00000 00 �� � �� yW&��/UING WA�LNWWW�WWWWW�WWWWW�WWWWW�WWWWW�yWW�W�yWW�W�yWW�W�yWW�WWyWW�WWyW �oo�o WW ..W...W. W .. WWWW. WWW . W .... . W ..WW W y W W .WW ..W...W ��� �WWW�W�WWW���WWWW��WWWWW�WWW���WWW���WWWW��WWWWW�WWW�W�WWW�W�WWW�W�WWW�WWW�W�WWW� o WW�WWWWW�WWWWW�WWWWW�WWWWW�WWWWW�WWWWW�WWWWW�WWWWW�WWW�W�WWW�W�WWW�W�WWW�WWWWW�WWWW � yW� �WyW� �WyW� �WyW� �W�WyW�WWW�W�WWW�WWWWW�WWWWW�WyW�WyWyWW �WyWW �WyWW �WyW� �WyW j� WWWWyWWWWW WWWWW W y W W W W y W W W W y W W W.. W...W...W... W W y W W W W W W W W W W WWWWW WWW j��WWW�W�WWW�W�WWW�W�WWW�W�WWW�W�WWW�W�WWW�W�WWW�W�WWWWW�WWW�W�WWW�W�W�W�W�W�W�WWW�W�WWW� WWWWW WWWWW WWWW�WWWWW� WWWW�WWWWW�WWWWW�WWWWW�WWWWW�WWWW �WWWW WWWWWWWWWWW WWWWW WWWW �W�WWWWW�WWWWW�WWWWW�WWWW��WWWW��WWWW��WWWW��WWWW��WWWW��WWW���WWW�W�WWW�W�WWW�WWWWW�WWWW W WW yW y yW........... y W W WW WW -(4) 66 LF 24" HDPE PIPES @ 2% DRNE 5 0' c a d 9 a d d 2 24" HDPE PIPES 66 LE @ 2.0% INVERT IN 838.00' INVERT OUT — 836,68' (2) 24" HDPE PIPES/ 66 LF @ 2.0% NVERT IN = 838.50' INVERT OUT — 837.18' 20' TIE TO EXISTING GRADE SIDE SLOPE @ 10% CONCRETE WINGWALL CONCRETE HEADWALL EXTEND HEADWALL AND WING WALL 1' BELOW PIPE INVERTS LE DEL SPREADER LAST 20' OF DIVERSION NOT TO EXCEED 1% GRADE DIVERSION FLOW LEVEL SPREADER STABILIZED SLOPE CHANNEL GRADE 0% UNDISTURBED OUTLET 6' MIN. 6X6 SALT TREATED TIMBER NOTE: ALL TEMPORARY BERMS, SWALES AND LEVEE SPREADER DITCH MUST RECEIVE TEMPORARY SEEDING IMMEDIATELY AFTER INSTALLATION SOURCE: ADAPTED FROM N.C.Erosion and Sediment Control Planning and Design Manual PLATE: 3.21 —1 // VEL PR % % % %» VDOT #3, #357, #5, #56 OR #57 COARSE AGGREGATE IN VARIABLE (MIN. 7') po— GALVANIZED WIRE MESH BASKET SECURE WIRE MESH TO TIMBER * FILTER CLOTH 6X6 TREATED TIMBER SECURE WIRE TO GROUND 6" MIN. WITH WIRE STAPLES #5 REBAR TO SECURE TIMBER -- —ICI—III II�IIIII�IIIII�IIIII�IIIII�IIIII�IIIII�IIIII�IIIII�IIIII�IIII=I�I�I `III��IIIII�IIII� �I�IIIII�I� I 7' MIN. 3' —III—I—I UNDISTURBED —III—III—III—III—III—III—III III —III —III —III 2:1 OR SOIL — — — — _ _ _ — — — — FLATTER MIN. 6' * MIN. PHYSICAL REQUIREMENTS OF FILTER CLOTH NOTED IN STD. & SPEC. 3.19, RIPRAP SOURCE: VA. DSWC AND N.C. Erosion and Sediment Control Planning and Design Manual PLATE: 3.21-2 � SETH R DERICK � � Lic. No. 041454 W �.� Nov. 21, 2019 DNA LC/) No. Description Date 1 County Review Comments 8/02/19 2 County Review Comments 9/19/19 3 County Review Comments 1 1 /06/19 4 County Review Comments 11/21/19 CONSTRUCTION ISSUE DETAILS Project number Date Drawn by Checked by 19004C June 21, 2019 ETS SOR C-9-05