HomeMy WebLinkAboutSDP201900026 Review Comments Final Site Plan and Comps. 2020-04-23Short Review Comments Report for: SDP201900026 - BROOKHILL - BLOCK 8 - SENIOR LIVING Q SubApplication Type: IFinal Site Development Plan Date Completed: 06/11/2019 Reviewer: Megan Nedostup Division: CDD Planning Review Status: Requested Changes Reviews Comments: Date Completed: 06/14/2019 Reviewer: Emily Cox Division: CDD Engineering Review Status: Requested Changes Reviews Comments: Date Completed: 07/03/2019 Reviewer: Heather McMahon Division: CDD ARB Review Status: Requested Changes Reviews Comments: The ARB reviewed this project at its July 1, 2019 meeting. Motion: Mr. Van der Werf moved for approval of the Final Site Plan with the conditions listed in the staff report, amended as follows. 1. Provide the south and west elevations perspectives prior to approval of the final site plan for ARB board review. 2. The sample board provided by the applicant at the July 1, 2019 ARB meeting showing the originally proposed color palette is acceptable. 3. Revise the building elevations to provide the exact height of the building and to provide a 4. Clarify what the 8' measurement at the top of the building corresponds to. 5. Revise the plan to show the 100' buffer and the required reforesting the full length of Block 8A, all the way down to Polo Grounds Road. 6. Provide all the brand names and colors of the proposed exterior materials on a revised "Exterior Materials" sheet and provide physical samples. Ensure that all proposed materials are identified. 7. Ensure that the building elevations provided correspond correctly with the footprint of the proposed building as provided on the site plan set. 8. Provide key plans on the elevation drawings. 9. Provide additional drawings to clarify the appearance of the "Espresso" cement board where it appears in large, blocky areas. 10. Provide the standard window glass note to the architectural drawings: Window glass in the Entrance Corridors should meet the following criteria: Visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. 11. Provide a detail of the proposed dumpster enclosure in the site plan set. 12. If roof -mounted mechanical equipment is proposed, provide a roof -plan showing the mechanical units' locations and heights as well as elevations that include the mechanical units. Clarify whether the large white rectangles on the one-story block on what is labeled the East Elevation is in fact mechanical equipment and/or screening. Show how visibility of all equipment from the EC will be eliminated. 13. Include the standard mechanical equipment note on the architectural drawings: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 14. Ensure that spillover into the public right-of-way at the northeast corner of the site does not exceed half (0.5) of a footcandle. 15. Show all wall -mounted lights on the architectural elevations and account for them in the lighting plan (C-801) of the site plan set. 16. Provide the finish color of the proposed poles on the cut sheets provided on C-802. 17. Shift the one willow oak on the north property line, east of the 5 proposed parking spaces, so that its center does not fall within the 20' sanitary sewer easement. Page: 1 of 4 County of Albemarle Printed On: April 23, 2020 18. Ensure that there are no conflicts between the proposed placement of large shade trees and freestanding lights. 19. Fill out and sign the tree conservation checklist reproduced on C-702. Mr. Wardell seconded the motion. Date Completed: _ 06/03/2019- Reviewer: Andrew Slack Division: CDD E911 Review Status: No Objection Reviews Comments: I No objection. ...... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... Date Completed: ... ... ... ... ... ... ... ... ... ... ... ...................................................................... 07/02/2019 Reviewer: Adam Moore Division: VDOT Review Status: No Objection Reviews Comments: Date Completed: Reviewer: Richard Nelson Review Status: Pending Reviews Comments: Date Completed: 06/03/2019 Reviewer: Michael Dellinger Review Status: No Objection Reviews Comments Division: ACSA Division: CDD Inspections Date Completed: 06/10/2019 Reviewer: Shawn Maddox Division: Fire Rescue Review Status: No Objection Reviews Comments: IThank you for addressing all previous comments. Fire Rescue has no objections. SNM Date Completed. 07/10/2019 Reviewer: Heather McMahon Division: CDD ARB Review Status: Requested Changes Reviews Comments: The ARB reviewed this project at its July 1, 2019 meeting. The full list of 19 conditions were sent to the applicant. Most pertained to the architectural elevations and materials samples. The following six comments are repeated following staff review of the revised site plan set dated 7/1/19: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Page: 2 of 4 Provide a detail of the proposed dumpster enclosure in the site plan set. Ensure that spillover into the public right-of-way at the northeast corner of the site does not red half (0.5) of a footcandle. Show all wall -mounted lights on the architectural elevations and account for them in the ng plan (C-801) of the site plan set. Provide the finish color of the proposed poles on the cut sheets provided on C-802. Shift the one willow oak on the north property line, east of the 5 proposed parking spaces, so its center does not fall within the 20' sanitary sewer easement. Ensure that there are no conflicts between the proposed placement of large shade trees and standing lights. 07/25/2019 Emily Cox Division: CDD Engineering Requested Changes County of Albemarle Printed On: April 23, 2020 Reviewer: Richard Nelson Division: ACSA Review Status: Pending Reviews Comments: Date Completed: 07/30/2019 Reviewer: Megan Nedostup Division: CDD Planning Review Status: Requested Changes Reviews Comments: Date Completed: 09/27/2019 Reviewer: Cameron Langille Division: CDD Planning Review Status: Requested Changes Reviews Comments: See comment letter dated September 27, 2019 and uploaded to Laserfiche for Planning Division comments (3rd review). Date Completed: 09/23/2019 Reviewer: Patricia Saternye Division: CDD ARB Review Status: Requested Changes Reviews Comments: 2019-09-23: ARB2019-61 Brookhill Blk 8A Senior Living Facility comments uploaded to this project SDP2019-26 as ARB comments for SDP. Date Completed: 09/24/2019 Reviewer: Emily Cox Division: CDD Engineering Review Status: Requested Changes Reviews Comments: Date Completed: 09/30/2019 Reviewer: Richard Nelson Division: ACSA Review Status: See Recommendations Reviews Comments: I SDP201926 Brookhill Senior Living is currently under review. Date Completed: 11/06/2019 Reviewer: Cameron Langille Division: CDD Planning Review Status: Requested Changes Reviews Comments: See comment letter dated 11-6-2019 for Planning Division comments on this resubmittal. Letter is uploaded to Laserfiche. .............................................................................. Date Completed: 11/07/2019 Reviewer: Emily Cox Division: CDD Engineering Review Status: No Objection Reviews Comments Date Completed: 11/13/2019 Reviewer: Patricia Saternye Division: CDD ARB Review Status: No Objection Reviews Comments: 2019-11-13: Certificate of Appropriateness for ARB2019-61 issued. See ARB201900061 for uploaded version of the CoA letter. 2019-11-12: Hard copies of revised site sections sumitted during meeting. 2019-11-9: Applicant contacted about revisions needed on the two site sections. 2019-10-30: Revised site plan sheets, elevations and site sections provide. 2019-10-25: The following was requested by phone and in two follow up emails: 1. Two site sections: a. A site section from (and showing) the north bound lane of Rt. 29, from southwest direction, and through Rt. 29, the site, building and mechanical equipment on the roof. Ensure the tallest equipment near the southwest corner of the building is shown (Elevator Hoistway T.O. Penthouse 65" Page: 3 of 4 County of Albemarle Printed On: April 23, 2020 ove roof and T.O. Vent 85" above roof). b. A site section from (and showing) the south bound lane of Rt. 29, from northwest direction, and ough Rt. 29, the site, building and mechanical equipment on the roof. Ensure the tallest uipment near the northwest corner of the building is shown (Elevator Hoistway T.O. Penthouse 65" ove roof and T.O. Vent 85" above roof). Sheet C-900: a. Revise the "Dumpster Detail" to show all walls of enclosure. b. Revise the "Section Detail at Fence and Pad" to specify that it is for the Dumpster. Sheet C-301 — revise note 2 to match required mechanical equipment note's wording. Revise the elevation views to: a. Show all of the mechanical equipment. b. Be fully scalable, including the mechanical equipment shown on the roof. Date Completed: 11/05/2019 Reviewer: Alexander Morrison Division: ACSA Review Status: No Objection Reviews Comments: I See email correspondence dated 11-5-2019 and 11-7-2019 for ACSA approval. Date Completed Reviewer: Review Status: Reviews Comments: 04/23/2020 Cameron Langille Division: CDD Planning Approved Page: 4 of 4 County of Albemarle Printed On: April 23, 2020