July 13, 2005
David Jensen
W W Associates
1402 Greenbrier Place
Charlottesville VA 22901
RE: SDP - 2005 -146 Westhall Phase 3 Preliminary Plat
Dear Sir:
The Department of Community Development hereby grants administrative approval to the above - referenced
preliminary plat.
The approval of the preliminary plat is valid for one (1) year in accordance with Subdivision Ordinance
Section 14 -22 LA. Therefore, the preliminary approval shall expire on July 13, 20006. If the preliminary
plat approval expires, a new application must be filed and processed.
Please work with each department listed below to address the remaining conditions for final approval. Once
all of the requirements and conditions listed below have been met please submit, eight (8) tentative plat
copies, this letter as a checklist, a final plat checklist, a final plat application, the final plat fee, and a copy of
all written tentative approvals to the Department of Community Development.
The final plat will be subject to all subdivision requirements (subdivision ordinance Section 14 -206), in
addition to the following conditions:
1. The Zoning & Current Development Division shall not accept submittal of the final site plat for
signature until tentative approvals for the following conditions have been obtained.
❑ A. Planner approval to include:
❑ 1. The final plat will be subject to the subdivision requirements required by
Section 14 -206
❑ B. The engineering review for current development needs to review and approve all applicable
items as specified in the Design Standards Manual, section 903 B, before recommending
tentative approval to the final subdivision plat including:
❑ 1. The sight distances and associated easements at the intersection of Tremont Avenue
and Brookwood Road need to be shown on the final plat for Phase III. If the
easement affects the available buildable area on Lot 50, then Lot 50 may need to be
reconfigured on the final plat. [DM903A5]; and,
❑ 2. The review of the public road plan and drainage for Westhall Phase III will include
the temporary cul -de -sac shown in Phase V along the eastern property line of Phase
III. [14 -304]; and,
❑ 3. The final plat, for Westhall Subdivision Phase I, needs to be recorded before the
final plat for Phase III can be recommended for approval.
❑ C. E911 approval to include:
❑ 1. The road name on the final plat shall be changed from Tremont Avenue to
Brookwood Road.
❑ D. Fire Rescue approval to include:
❑ 1. Verification that adequate fire flow is available. Required fire flow is 1500
GPM @ 20 PSI.
❑ E. Albemarle County Service Authority approval to include:
❑ 1. Approval of final water and sewer construction drawings, which shall be submitted
directly to the Service Authority.
Please contact me at your earliest convenience if you have any questions or require additional information.
Sincerely,
Francis H. MacCall
Senior Planner
Zoning & Current Development
fmaccall @albemarle.org
Copy: File: SUB- 2005 -146