HomeMy WebLinkAboutSP200500009 Legacy Document 2005-07-27 (2)pF AL�
aid M
�jRGltsl�`
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5823 Fax (434) 9724126
July 26, 2005
Marcia Joseph
481 Clarks Tract
Keswick, VA 22947
RE: SP 2005-009 Cedar Hill Mobile Estates Extension (Sign #32) - Tax Map 32, Parcel 221
Dear Ms. Joseph:
On July 6, 2005, the Albemarle County Board of Supervisors took action on SP 2005-009 requesting
reapproval of an expansion of an existing Mobile Home Park from 77 lots to 109 lots (SP 03-06) in
accordance with Section 15.2.2.14 of the Zoning Ordinance which allows for mobile home subdivisions
on Tax Map 32 Parcel 22I in the Rio Magisterial District. This special use permit was approved based on
the following conditions:
1. Pending the satisfaction of all conditions of approval for the special use permit and modifications
and waivers, a maximum of thirty-two (32) new mobile home lots shall be allowed in the mobile
home park. Those new lots shall be arranged generally in the areas and configuration shown on
the application plan, dated January 27, 2003;
2. No mobile home units shall be relocated or installed, nor shall any new construction activity take
place in the expanded area as illustrated on the application plan dated January 27, 2003 until after
a site plan has been approved. No change in unit location shall occur on the existing or expanded
areas without a site plan approval;
3. A landscape plan shall be submitted for review with the required site plan; and
4. The stormwater and utility improvements illustrated on the application plan dated January 27,
2003 may be adjusted as approved by the agent on the final site plan if the agent determines the
adjustments to be more site sensitive, environmentally sensitive, visually sensitive, and less
obtrusive method to achieve the same results.
Please be advised that although the Albemarle County Board of Supervisors took action on the
project noted above, no uses on the property as approved above may lawfully begin until all
applicable approvals have been received and conditions have been met. This includes:
SP 2005-009 Cedar Hill Mobile Home Park
July 26, 2005
compliance with conditions of the SPECIAL USE PERMIT;
approval of and compliance with a SITE PLAN; and
approval of a ZONING COMPLIANCE CLEARANCE.
In the event that the use, structure or activity for which this special use permit is issued is not commenced
within twenty-four (24) months from the date of Board approval, it shall be deemed abandoned and the
permit terminated. The term "commenced" means "construction of any structure necessary to the use of
the permit."
If you have questions or comments regarding the above -noted action, please do not hesitate to contact
Keith Lancaster at 296-5832.
Sincerely,
V. Wayne Cilimberg
Director of Planning
Cc: Beard, C Ray - Trustee of the C Ray Beard Living Trust
2073 Cypress Drive
Charlottesville, VA 22911
Amelia McCulley
Tex Weaver
Chuck Proctor
Keith Lancaster