Loading...
HomeMy WebLinkAboutWPO202000014 Approval - County 2020-04-28COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Avon Industrial Park Project file number: WP0202000014 Plan preparer: Shimp Engineering [keane @ shimp-engineering.com] Owner or rep.: Duane Snow [duanesnow@gmail.com] Date Received: 6 March 2020 (Rev. 1) 15 April 2020 Date of comments: 14 April 2020 (Rev. 1) 28 April 2020 Reviewer: Matt Wentland County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary. 1. The SWPPP is acceptable at this time. A digitally stamped and approved copy of the SWPPP and the plan will be uploaded to CountyView and should be printed out and brought to the pre -construction meeting by the applicant. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. The PPP is acceptable at this time. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved, and the reasons are provided in the comments below. The Stormwater management plan content requirements can be found in County Code section 17-403. 1. Under DEQ Guidance Memo 15-2003 (even though this project is not subject to DEQ), this linear project is not required to provide quality and quantity measures as there is no change to the pre - development site characteristics. D. Erosion and Sediment Control Plan (ESOP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESOP. Engineering Review Comments Page 2 of 2 This plan is approved and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Remove the note on C5 stating a wash rack will not be necessary for this site. (Rev. 1) Comment addressed 2. Show silt fence for the disturbances or include a note that all disturbed areas will be adequately stabilized on a daily basis (this note can replace the `Contractor may use silt fence...' note on C5). (Rev. 1) Comment addressed 3. Include a note on the ESC sheets that the Inspector may require additional measures depending on site conditions. (Rev. 1) Comment addressed The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforms.asp?department=cdengwpo File: WP0202000014 Avon Industrial Park approval 04-28-20.doc