HomeMy WebLinkAboutWPO202000003 Bond Estimates 2020-04-28 (2)Project Name: VSMP Plan for 2511 Avinity Dr WPO file number: WP0202000003 TM P(s): 09000-000-00-035LO Date Estimate Completed: 04-10-2020, K.Rucker Erosion and Sediment Control Bond Estimate Item Item Number I stablization (PS, TS) 2 silt fence (SF) 3 safety fence (SAF) 4 diversion (DID, FD, RWD) 5 temporary slope drain (TSD) pipe length 6 Sediment Basin #1 7 earthwork for trap/basin 8 9 10 11 12 13 14 15 16 17 18 19 structures for basin 20 21 22 23 jjjj,ft pipe diameter -in height of dam at toeLIt t cut at high sideOft height of fill at facet length of damt top width (area above transition 16 sf (total width of dam) 4 ft (height below transitio 0 ft (area below transition, 0 sf (total fill volume) 15.4 cy length of spillway =ft width of spillway ft riser heightMin ft riser diameterin (riser unit price) $0.00 barrel lengthft base plate or fdn -cy barrel diameter (barrel unit price) $0.00 24 barrel collars 25 baffle length ft 26 Sediment Trap #2 27 earthwork for trap/basin 28 29 30 31 32 33 34 35 36 37 38 39 structures for basin 40 41 42 43 height of dam at toeOft cut at high side 0 ft height of fill at faceftlength of damft top width ft (area above transition 0 sf (total width of dam) 0 ft (height below transitio 0 ft (area below transition, 0 sf (total fill volume) 0.0 cy length of spillway =ft width of spillway ft riser heightMin ft riser diameterin (riser unit price) $0.00 barrel lengthft base plate or fdn barrel diameter (barrel unit price) $0.00 barrel collars baffle length ft 44 45 46 47 Pump -around diversion 48 silt fence inlet protection (IP) 49 stone inlet protection (IP) 50 outlet protection (OP) -El length 51 outlet protection (0P)-F1 length 52 outlet protection (OP) Basin#1 length 53 channel (SCC, matted) length 54 check dam depth in channel 55 construction entrance (CE) 56 wash rack 57 paved construction entrance 58 rip -rap, placed depth 59 width 60 61 survey and layout (price per 0.1 mi.) acres 62 mobilization 63 64 65 66 WP0202000003_2511_Avinity_Dr_ESC_bond_est_09-27-17 67 68 0 ft cut at face 0 ft length of cut ft width of cut ft (area below transitic 0 sf (total width of cut) 0 ft (depth below transit 0 ft (area above transitic 0 sf (total fill volume) 0.0 cy (TOAL CY estimate 0 cy (spillway stone tons 0 to 0 It width 0 ft 0 It width 0 ft 0 ft width 0 ft 0 ft width 0 ft 0 ft channel width 0 ft �ft length - ft (tons) C traps and basins 01 No. Unit Unit Cost (installed) acres $5,000.00 ft $5.00 ft $5.00 ft $13.00 $0.00 Cost $5,600.00 $2,660.00 $2,250.00 $3,770.00 $0.00 cut at face ft length of cut ft width of cut ft (area below transitic 114 sf (total width of cut) 56 ft (depth below transit 6 ft (area above transitic 132 sf (total cut volume) 164.0 cy (TOAL CY estimate 169 cy $13.00 $2,197.00 (spillway stone tons 2.8 to $50.00 $140.00 $200.00 $200.00 $50.00 $13.00 $50.00 $200.00 $200.00 $50.00 1I 7N,.00 II $10000.00 $200.00 0 $0.00 Ot $0.00 d $0.00 0 $0.00 $2,500.00 1 $2,000.00 1 $3,500.00 $60.00 $0.00 $0 $0.00 $0 $0 $0.00 $0.00 $0.00 $0 $0.00 $0 $0 $0.00 $0.00 $1,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,000.00 $3,500.00 $0.00 $1,060.00 $2,500.00 cost sum $27,077.00 contingency $2,707.70 Total $29,790 4/10/2020