April 3, 2020
Steve Mundt
Grimm & Parker
123 E. Main Street, Second Floor
Charlottesville, VA 22902
RE: ARB-2019-100: Scottsville Elementary Addition and Improvements (130000000025130)
Dear Mr. Mundt,
I have reviewed the architectural plans with revision date of 1/27/2020 submitted for the above referenced
project. The changes made in these plans address the remaining conditions of ARB approval. You may
consider this letter your Certificate of Appropriateness.
This approval is specifically conditioned on the following:
1. Execution of the design indicated on the final approved plans, attachments, materials, samples, and
other submittal items presented.
2. Mechanical equipment shall not be visible from the Entrance Corridor.
Please note the following:
1. Any changes in the approved design will require a new application and additional review.
2. Changes made to the site or architectural plans after issuance of a Certificate of Appropriateness can
delay the signing of final site plans and the approval of building permits. It is in the applicant's best
interest to notify ARB staff of such changes and to initiate the review of amendments to ARB-approved
plans to avoid future delays.
3. Certificates of Appropriateness are valid for the same period that the corresponding site plan is valid. If
there is no site plan required for the proposed work, the Certificate of Appropriateness is valid for 3
years. Applicants requesting an extension of the period of validity must do so in writing. The letter must
be received by the Director of Planning prior to the expiration date.
If you have any questions, please do not hesitate to contact me.