HomeMy WebLinkAboutSUB200400311 Review Comments 2005-08-25pF AL
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax 434) 972 -4126
August 25, 2005
Buddy Edwards (B. Aubrey Huffman)
P.O. Box 6124
Charlottesville, VA 22906
RE: Sub - 2005 -00243 Proffit Ridge final subdivision plat
Dear Mr. Edwards:
I have reviewed the final plat submitted on August 8, 2005 for Proffit Ridge Subdivision,
and the following items are required prior to final approval.
1. [14 -303 S.] Control points.
2. [14 -310] Health Department approval for all lots less than 5 acres. (Soils report
has been forwarded to the health department)
3. [14 -311] Infrastructure improvements plans, computations and documents.
4. [ 14 -316] Per VDOT, "We request that a 25' right of way donation be made, and if
that is not possible we will need dedicated sight easements to conform to the
Minimum Standards of Entrances to State Highways. Road plans designed in
accordance with the Subdivision Street Standards and drainage computation will
be required before final approval. A permit for the entrance will also be
required."
5. [14 -435] All bonds must be posted.
Please contact me if you have questions or require additional information.
Sincerely,
Steve Tugwell
Planner