HomeMy WebLinkAboutWPO201800077 Correspondence 2020-03-27March 27.2020 Frank V Pohl, PE, CFM / County Engineer Albemarle County ®iGCi 401 McIntire Road Charlottesville, VA 22902 OLD TRAIL VILLAGE RE: Block 32 Site Development Schedule Dear Frank, I'm presenting to you this schedule for the site stabilization of the block 32 Phase I & H development. As you are aware in our site plan approval we had requested and received approval to phase this project into 2 parts. We intend to continue with the phasing of this development project but request an extension so that we can extend the limits of phase I for additional lots. This new phasing limit is shown on the attached exhibit. I've also provided a schedule from AG Dillard as to their proposed completion of the new Phase I area. Based upon their schedule we are planning to have the site completely stabilized by June 1, 2020 or sooner. Our plans for the second phase are to wait approximately 6 months where we will only need to extend water/sewer main lines, install laterals to the remaining lots and complete the loop road to the West. All Mass Grading is intended to be completed in the phase I schedule. We anticipate this second phase will take approximately 3 months from start to finish and re -stabilization of the site. This new phasing limit provide several advantages of having a safer and more contiguous circulation of traffic for the project site and more lots available to give time for completion of the second phase. It also allows for time to plan and mitigate the catastrophic complications from the Covid 19 outbreak. We hope you will find this acceptable and allow for the extension of our site permit. Please let me know if you have any questions or if we can modify this schedule in any way to meet your concerns. Warm Regards Mar;rockman ntain Properties, LLCZ. av Executive Vice President Development A.G. Dillard, Inc. P.O. Box 7427 Charlottesville, VA 22906 Pho: (434) 977-3750 Cell: (434) 989-0044 Fax: (434) 979-8026 www.agdillard.com March 25, 2020 Job: Block 32 B I c D E G I H 1 2 Task Name Status Start Date r End Date 04/20120 nbnb0311V20041201200311612004/20120 3 Concrete tie ins Complete 0U23120 D3/28120 100% 4 Raise box, fix man hole Complete 03/23/20 03/28/20 100% 5 Sackful behind curb Grade bishop gate and Bicknell Street Complete 03/16/20 03/17/20 03/16/20 53118120 100% b 7 Pave 0412D120 04/20/20 8 Water Llne is In but no latnals shown on plan Now only for future 9 DI Box protection E and 5 03/18/20 04/05/20 10 11 121 Seed and Straw Concrete tie ins Complete Complete 03/18/20 03/30/20 03/18/20 04120120 03/31120 1 100% 100% 13 ESackfill behind curb Grade Pave Complete 03/16/20 04/01/20 04/20/20 03/16/20 04/02/20 04/20/20 100% 14 1s 1G ❑I Boxes E and S protection Seed and Straw Concrete tie in at W 29 driveway to box 04/01/20 03/18/20 03/23/20 04/01/20 03/18/20 03MI20 100% 17 Complete 18 19 20 03118120 04120120 21 Concrete tie ins Backfill behind curb 04107T20 D4109T20 100% 22 Complete 0411D120 D411DT20 23 Grade road stone it needed 04/08/20 D4/09120 24 Pave 04/20/20 04/20/20 25 DI Box protection 04109/20 04/10/20 26 Seed and Straw Complete 03/18/20 3/18/2020 100% 271 At Lot 28 Manhole at Curb needs In Progress to be raised 04/06/20 04/06/20 25% Concrete crew working on this now. Turned to fit and need to raise 28 29 30 Water taps 04105M D4/10120 31 Gradelstone 0411D120 D4/12120 32 curb and the ins 04/15/20 D4/18120 33 Pave Lots 1- Mass grade only 517T2020 VD2020 No water, no sewer. no storm no curb no stone - sub grade only 34 4/28/2020 517 Cd9=20 5I9 35 361 37 sub grade chancery Lots 55-58 Water Laterals Grade/Stone 4128 4129 4/10/2020 5172020 4110I2020 4/15/2020 4117T2020 4/20/2020 4/21/2020 4/23/2020 55, 57, 58 water laterals 38 39 75 41 42 Curb both sides of roe 43 Pad Ready complete Done Done 44 Pave 5172020 517202O 45 46 47 48 Water Laterals 4/18/2020 4/23/2020 49 Curb lot side only Gravel Road 4/23/2020 4/23/2020 50 141=2020 1412512020 51 A.G. Dillard, Inc. P.O. Box 7427 Charlottesville, VA 22906 Pho: (434) 977-3750 Cell: (434) 989-0044 Fax: (434) 979-8026 www.agdillard.com B C D I E G H 52 Lots fit and 63; Emergency J16, access Grade and stone 4/17)2020 1411712020 4/20/2020 4/1712020 53 54 55 IOts B4- Mass grade lots Seed and straw 56 In Progress 03/17/20 4/10/2020 04/03/20 25% 57 58 4/12/2020 59 GradefStone Pave up to or close to Charnwood 60 G1 Lots 79- Curb Concrete Tie ins In Progress 3/18/2020 03/161M 03116120� 3/31/2020 03MI20 03/31/20 25.00%( 25% the pond - f.2 73 64 In Progress In Progress 65 Mass Grade 66 seed and straw 04/02/20 04/05/20 67 Grade/Stone 4/6/2020 4/6/2020 68 Pave 4/20/2020 4/20/2020 1 want to be able to do this earlier than later. 69 70 n rrn Line PhaW Remove dirt pile Brush Pile removal Removal trees in woods In Progress 03106M In Progress 03/06/20 Complete 03/17120 Complete 03/18/20 03/20/20 04/25120 0=0120 03/20/20 f 1 20% 1 100% 100% 1 72 73 74 75 76 77 21Page SS INSTALLED SS NOT INSTALLED WL INSTALLED WL NOT INSTALLED STORM INSTALLED LOTS MASS GRADED/FUTURE AVAILABLE I P, LOTS PAD READY W/ FULL OR PARTIAL SERVICE/READILY AVAILABLE r LO' 16- BIS HA (D SA CO BE CONSTRUCTED WITH PHASE 1 AS NECESSARY. STORM SEWER STRUCTURES AND SEWER MAIN DESIGNATED WITH "B" ALONG THE SOUTERN PORTION SHALL BE CONSTRUCTED WITH PHASE 1. ALL OTHER STRUCTURES AND SEWER MAIN SHALL BE CONSTRUCTED WITH PHASE 2 AS NECESSARY. TEMPORARY TURNAROUNDS MAY BE REQUIRED DURING THE TRANSITION FROM PHASE 1 TO PHASE 2 AND CONSTRUCTED ROAD SHALL DRAIN PROPERLY TO / INSTALLED STORM SYSTEM AS NECESSARY. WATERLINE OFFSITE EXTENSION UNDER SEPARATE COVER. SEE "OLD TRAIL VILLAGE BLOCK 32 OFFSITE WATER EXTENSION FOR DETAILS AND CONSTRUCTION PLAN." ft- I.-, - — \011,/ '5946 So F DENSTOCK R 26 ,/D _1 =660. = 356.45 8„ SOR 26 o ®6. 029. 8 SOR 26 E w�nN a no_o 363 \ g. a� Sp \�2 i I JP QJ .Y1 'h \ o w 120 I� I II II I' 1 1 1 1 II 11 11 Y a 0 � O U N m l N C) Ir 0-4 � o LL O Z O J Z 2 >Q OLO LU w �LO � W "V Z crW N � Wc�cc?=� � O� UN Y v1 O Lij 2 ir OO LL J Y V)co W C LU04 Z HO Y 1 fMt Lu- cc CC :�j 9 ,t!�n Lu aW ;tM !� It W Z Z LuO O I REVISIONS COUNTY COMMENTS December 21, 2018 ACSA/COUNTY COMMENTS March 4, 2019 March 18, 2019 March 25, 2019 COUNTY COMMENTS May 23, 2019 CONTOURS DATE September 10, 2018 SCALE 1'=60' "t, ,J H OF `r�P �4 O GA Chi � � � � y Jimmy L. Taggart Lic. No. 22841 07-09-19 tip' �4S10NAL z w z a z J Q a �JN> J Cl) z J > z En a jJUo O 06 J -' w 0 m Q >. Q O C) m J Q O O FILE NUMBER 8053 SHEET 04 OF 37