Loading...
HomeMy WebLinkAboutSP201900009 Review Comments Special Use Permit 2020-05-05C� OF ALg�' J �'IRGINZ�` County of Albemarle Department of Community Development Memorandum To: Cameron Langille, Senior Planner From: Lea Brumfield, Senior Planner Division: Zoning Date: 5/5/2020 Subject: 2"d Zoning Comments for SP201900009 I S.L. Williamson Replacement Asphalt Plant The following comments are provided regarding the above noted pre -application meeting: sss�:1 I A Howe��er-, the Site Data on sheet 1 of the SpeGial USe Permit c-onGept plan shows the iease aFea is not the size of the requested area of the SpeGiai USe PeR*t. Comment 2) The applicant's proposal to replace the existing S.L. Williamson Company, Inc. asphalt plant on TMP 08800-00-00-01800 requires the following considerations: peGiol Use —eFmif c) Development in the water PrOteGtiOn eFdinanGe 100 feet stFearp buffer-. The submitte GORGept plan shows the Greatien of a read we# within the 4 00 feet stream buffer-. W-h#e The applicant has asserted that the travelway has been reconfigured to be located in the landward 50' of the stream buffer. d) Zoning 2nd Comments SP201900009 floodplain may not be further disturbed or develepe . The applicant has asserted that the floodplain will be adjusted following the acceptance of a LOMR which will be accepted prior to the Board hearing. e) P_a44ng, fighting, appropr4ateness of use. The Gurrently proposed plan satisfies these aloes 3) Suggested conditions of approval will likely include: a) SP201900009 shall be developed in general accord with the concept plan titled "Proposed Layout Plan Special Use Permit SL Williamson Asphalt Plant @ Red Hill Quarry," with the layout changes recommended by staff. The Zoning Administrator may approve revisions to the concept plan to allow compliance with the Zoning Ordinance; b) Approval of the special use permit is contingent on the acceptance and approval of an Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) to the County's 100-year floodplain map to remove the plant and all its associated construction and land disturbance from the 100-year floodplain; c) Use of the asphalt plant authorized by this special use permit shall expire when the adjacent quarry is no longer in operation; d) up„rs of epora fiop of the asphalt plant shall be etw_eep 7,40 a.m. and 40.--00 p.m., Monday through Saturday-, pr-ovided that for no more than s4ty days per year-, the hours efopeFataep may be between 7.nn o m_ pd 42.40 a. m. ploy through at In light of the applicant's prior operation without noise complaints, and the remote location of the application in question, staff recommends hours of operation of the asphalt plant shall be between 7:00 a.m. and 12:00 a.m., Monday through Sunday, provided that for no more than sixty days per year, the hours of operation may be between 12:01 a.m. and 12:00 a.m., Monday through Sunday. However, staff cannot recommend an unlimited 24-hour operation. The Special Use Permit for the Luck Stone asphalt plant located at 2981 Richmond Road was previously approved with limited hours of operation, and these recommendations are based on those conditions. e) Sound/noise barriers and attenuation measures will be provided as necessary to comply with the County's noise ordinance (section 18-4.18); f) Plant site lighting will comply with the County's outdoor lighting ordinance (section 18- 4.17). g) Height of the asphalt plant and all associated structures will be limited to 80 feet. 4) The supporting documentation for the authorized signatories are: (1) for a board of directors, the articles of incorporation or a shareholders agreement may limit the board's statutory authority (Virginia Code § 13.1-673); (2) for a person expressly authorized by the board of directors, written evidence of that authorization, such as a board resolution or board minutes; (3) for a committee, an action of the board of directors authorizing the committee to act; the articles of incorporation or the by-laws may limit the statutory authority (Virginia Code § 13.1-689); (4) for a corporate officer, the by-laws or the delegating resolution of the board of directors (Virginia Code § 13.1-694). Zoning 2nd Comments SP201900009 5) Critical slopes shown on the County GIS's Steep Slopes Overlay may be determined to have been created as part of the prior development and operation of the asphalt plant by a field survey prepared by a licensed surveyor.