Loading...
HomeMy WebLinkAboutARB201900145 Correspondence 2020-05-07Presidio ARB Submittal Updates April 1, 2020 Staff recommends approval with the following conditions: Key: BLACK -- MARGARET COMMENTS ORANGE -- COMMENT RESPONSES Revise the Cobble Stone siding color to one that is warmer and more muted to blend better into the landscape. Three color options for siding will are available for staff and ARB consideration. Cobble Stone is a muted, creamy tone. Renderings are not true to color, so please see below to determine staffs preferred color option. 3 COLOR OPTIONS. JAMES HARDIE - COBBLE STONE, NAVAJO BEIGE, MONTEREY TAUPE COBBLESTONE NAVAJO BEIGE MONTEREY TAUPE Consider using a stone veneer that emphasizes the warm color tones of the nearby hospital. The Stone Veneu, r . r to include more warm tone colors from the Ashford Ashlar Landmark Series to complement the color palette of the hospital. We are now showing a 50/50 mix of the Glen Gery-Ashford and Glen Gery-Kentucky Grey. The added warmth of the Ashford mix more closely emulates the warm tones included in the stonework of the Martha Jefferson Hospital. PDF LINK SHOWING STONE VENEER MIX Coordinate submitted material samples with materials and colors listed in the color rendering packet and the line drawing elevations/notes. Noted. The building elevations have been corrected and are now consistent with material samples and the color rendering packets. PDF LINK TO CORRECTED ELEVATIONS Specify colors in the Elevation Key Notes. Colors are now specified in Elevation Key Notes. Identify mechanical equipment on the plan. Mechanical equipment is now identified on the ARB Site Plan Set. See sheets 4 and 5. PDF LINK TO ARB SITE PLAN SET Add the standard mechanical equipment note to the architectural elevations. Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. This note is includea on the ARB Site Plan Set ana the Architectural Elevations. Revise the site plan to clearly indicate all tree preservation areas and show adequate tree protection fencing. The ARB Site Plan Set has been revised to indicate tree preservation areas and tree protection fencing. See sheets 11-13. Consider a retaining wall block color that blends better with the landscape. Anchor Diamond Pro "James River" has been approved for other Entrance Corridor locations. We have substituted Anchor Diamond Pro 'James River", as requested by staff. Revise the lighting plan to specify a warm white light (2700-3000K). The lighting plan has been revised to incorporate this comment. See note on sheet 15. Reduce the height of parking lot pole lights to 20' maximum, including bases. ,giiuiig pole hei,�, e note on sheet 15. Add the standard lighting note to the plan. "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." Standard lighting note has been added to the ARB Site Plan set. See note on sheet 15. Provide trees, 40' on center, 2-1/z" caliper at planting, along the full parcel frontage of Peter Jefferson Parkway. Trees have been added. See sheet 12. Shift trees to locations outside of utility easements. Complete. Consider revising the Eastern Red Cedar screen to a mix of trees for a more natural appearance. Landscape Plan has been updated. See sheet 13. 2