Loading...
HomeMy WebLinkAboutSDP202000020 Action Letter Initial Site Plan 2020-05-08o � COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 May 8, 2020 Kelly Schwietemian CESO 3601 Rigby Road Miamisburg, OH 45342 5DP2020-20 Valvoline - Initial Site Plan Kelly Schwieterman, The Agent for the Board of Supervisors hereby grants administrative conditional approval to the above referenced site plan. This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer submits a final site plan for all or a portion of the site within one (1) year after the date of this letter as provided in section 32.43.1 of Chapter 18 of the Code of the County ofAlbcmarle, and thcrcaf# r diligently pursues approval of the final site plan_ In accordance with Chapter 18 Section 32.4.2,9 Early or Mass Grading may be permitted after the following approvals are received: 1 _ Engineering approval of a VSmP plan meeting the requirements of Chapter 17 of the Code of the County of Albemarle. 2. Approval of all easements for facilities for stormwater management and drainage control_ 3. Submittal of tree conservation checklist with areas for tree preservation identified. The final site plan will not be considered to have been officially submitted until the following items are received: 1. A final site plan that satisfies all of the requirements of section 32,6 of Chapter 1$ of the Code, 2. A final site plan fee of S1,613 & a Fire Rescue fee of $100. Please submit 11 copies of the final plans to the Community Development Department or follow the digital submission process. The assigned Lead Reviewer will then distribute the plans to all reviewing agencies. Once you receive the first set of comments on the final site plan, please work with each reviewer individually to satisfy their requirements. The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the attached conditions, and ARB conditions which will be forwarded to you when available, from the following agencies/reviewers have been obtained: SRC Members: Albemarle County Planning Services (Planner) - 2 copies [Paty Saternye ext. 32541 Albemarle County Planning Services (ARB) - 1 copies [Kris Taggart ext. 32781 Albemarle County Engineering Services (Engineer) - 1 copy [Matthew Wentland ext. 3458J Albemarle County Information Services (E911) - 1 copy [Brian Becker ext. 3031] Albemarle County Department of Fire Rescue - 1 copy [Shawn Maddox 434-326-2623] Virginia Department of Transportation - 1 copy [Adam Moore 434-422-9894] Albemarle County Building inspections — I copy [Michael Dellinger ext. 32281 Albemarle County Service Authority (ACSA) - 3 copy [Richard Nelson 434-977-4511] Rivanna Water and Scwcr Authority [Dyon Vcga 434-977-2.970 cxc 170] Virginia Department of Health [Alan Mazurowski 434-972-4306] If you have any questions about these conditions or the submittal requirements please feel free to contact me at Extension 3250. psalernye@albemarle.org. Sincerely„ Senior Planner CC: First Gold Leaf Land Trust P.O. Box 5548 Charlottesville„ VA 22905 Valvoline 100 Valvoline Way Lexington, KY 40509 or AZB� �7RGI13l�' County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Phone 434-296-5832 Memorandum To: Kelly Schwieterman From: Paty Saternye, Senior Planner Division: Planning Date: April 23, 2020 Rev. 1: UPDATE May 8, 2020 Subject: SDP202000020 Valvoline — Initial Site Plan Fax 434-972-4126 The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] Comments to be addressed prior to the Initial Site Plan 1. The fees paid for the site plan need to be adjusted to ensure that the fee for public notices has been paid and fees paid for reviews not required with this site plan are refunded. It appears that the notices fee of $435 has not been paid, but a fee for a Special Exception of $457 was paid when none was requested and a fee for a Tier 3 Groundwater Assessment of $548 was paid even though the parcel is served by public water. Work with the review coordinator to ensure this is corrected. Rev. 1: Comment has been addressed. A refund for the portion of the fees that was an overpavment will be processed and forwarded to the person or entity that made the payment. Please note that this process takes a minimum of a month. Please contact the planning review after that time if the refund has not vet been received. Comments to be addressed with the Final Site Plan submission: 2. A site plan meeting all the requirements of section 32.6 of Chapter 18 of the Code. [32.5.1(c), 32.5.2(a), & 4.201 Revise the setback in to address the following: Revise the setback description and linework to fully, consistently and correctly specify the setback requirements. Address the following: a) Show all required setbacks and ensure what is listed on the coversheet and what is shown on the site plan are consistent. The setback for Gander Drive is shown differently on the plan views than is specified on the cover sheet. b) Revise the front setback to include the wording about when the sidewalk is outside of the ROW. c) Revise the front setback to specify that the front setback applies to both Route 29 & Gander Drive, since Gander Drive is a private street. d) Please note that since this parcel is on Route 29 the maximum front building setback does not apply to this site plan. e) Show the location of the existing sidewalk along Route 29. Whether the sidewalk is within or outside of the right- of-way impacts where the setback is measured from. f) The front setback for Gander Drive should be measured from the edge of the private street easement, and not the parcel line. Ensure that the setback lines are shown in the correct location and clearly labeled for both front setbacks. See the comment on easements about clearly delineating the private street easement. g) Provide a pedestrian connection from the parcel to the sidewalk along Route 29. In the approved site plan SDP2006-61 this sidewalk was shown between the subject parcel and the bank parcel, in order to provide pedestrian access from both parcels. Rev. 1: This comment is being revised to the following: Provide a pedestrian connection from the parcel to the sidewalk along Route 29 and across the parcel to the existing sidewalk along Gander drive. In the approved site plan SDP2006-61 this sidewalk was shown between the subject parcel and the bank parcel and along the Gander Drive frontage, in order to provide pedestrian access from both parcels and to the rest of the development. This is the only pedestrian connection between the Northtown development and Route 29, was approved on previous site plans, and was mentioned in the staff report for the approval of the Special Use Permit for the bank. Depending on the location of the pedestrian path a crosswalk may be required for a portion of it. [32.5.2(a)] Revise the following general information on the site plan: a) Specify the Source of Topography. If it is the same as the source of survey, please specify that in the same area on the cover sheet. Some site plans have different sources for the survey and topography. b) Shown the departing lot lines for all of the adjoining lots. c) Please include on the coversheet "Sheet List Table" a "Total Number of Sheets" at the bottom of the table. d) Include in the Zoning area of the cover sheet the Entrance Corridor overlay district and the Airport Impact overlay in the "Zoning:" portion of the Property Data. [32.5.2(b) &32.5.2(n)] Information regarding the proposed use; Existing and proposed improvements. Revise the following information on the proposed use on the site plan: a) In reference to parking: i. Revise the Property Data to specify the total area of the building, including any other floors. A basement was specified on the application and a total building area of 3,776 sq ft. ii. Ensure the total sqft of the building is used in the parking calculation and not just the building footprint. iii. Provide a required parking calculation on the cover sheet in the Parking Calculation area. This should show the specific category of parking calculation being used and show the calculation itself and not just the outcome of the calculation. It appears that the shopping center calculation, used on the approved SDP2006- 61 final site plan, is being utilized but not the full size of the building is additional floors are proposed. Rev. 1: Comment still valid. Address the comment. However, note that either the previously approved shopping center parking calculation or the automobile service station calculation would be acceptable in these circumstances. iv. Include a separate calculation, updating the Phase I overall parking, and ensure that the removal of the parking along Gander Drive will not put the provided parking for all of Phase I below what will be required when factoring in this site plan. b) The maximum amount of area of impervious cover. The percentage was provided but not the area. 6. [32.5.2(h)] Floodplain and related information. Revise the floodplain note to include the FEMA map number and date. [32.5.2(i)] Revise the following in reference to streets, easements and travelways: a) An access easement is specified on sheet C3.0. Include the deed book and page number of this recorded document and easement. b) The existing conditions sheet shows that the parking for the adjoining bank parcel is going into the subject parcel. Show any existing easement that exists or show a proposed easement. Any proposed easement will require a separate easement plat submission (separate application and fee) and the easement plat must be approved prior to final site plan approval. Rev. 1: Comment still valid. Address the comment. However, if an existing agreement addresses shared access, parking and maintenance of the parking and improvements that cross the parcel boundary then submit it with the final site plan. County review of the legal document will be required in order to ascertain if the existing agreement covers all requirements for these circumstances. c) Although the Gander Drive access easement is a variable width easement, add a label specifying that and dimension its width directly in front of this parcel. See significance of this private street easement line in the comments on setback. d) There is a 3-4' wide planting area, next to 4 parking spaces, but 10' away from the Gander Drive travelway. Although the parking can not be extended closer to the private street easement, because of setback requirements, the island should be extended to the edge of the travelway to allow for a larger landscape area (for trees and shrubs) and to avoid confusion with access between the areas within the site and Gander Drive. 8. [32.5.2(j)] Revise to show and label the existing stormwater management drainage easement(s) for the whole parcel. 2 [32.5.2(k) & 32.5.2(1)]] Private & public easements; Existing and proposed utilities. Address the following: a) If any offsite easements will be required, provide their location and dimension. b) Since the existing water line in Gander Drive has a portion of water line from the right of way to the water meter that does not appear to be in an existing ACSA easement shown on the existing conditions sheet, show any other existing easement for that portion of the that connection or show any proposed easements. c) If any easements are required an easement plat must be submitted (separate application, fee and submission) and approved prior to the approval of the final site plan. 10. [32.5.2(m)] Ingress and egress. Provide the distance to the centerline of the nearest existing street intersection(s). 11. [32.5.2.(e), 32.5.2.(p) & 32.6.20)] Landscape plan. A landscape plan is required in the final site plan that complies with section 32.7.9. A landscape plan was submitted but requires additional information for the final site plan. Such information should include, but is not limited to, the following: a) Revise all landscaping calculations to be based on the whole parcel and not just the leasable area. b) Revise the canopy calculation to include only landscaping in the area used in the calculation. If only the leasable area is used for the calculation (based upon 32.7.9.8(c) & 4.7(c)(1)) then only landscaping in that area can be used to meet the requirement. c) Revise all notes and calculations to not include what appears to be references to codes for other municipalities (ex. Section 34-870). d) Revise the note about the definition of a parking lot. Parking lots are defined as those containing 5 or more spaces. Revise landscape plan as appropriate. e) Revise the landscape plan to include a calculation for the maximum amount of paved parking and other vehicular circulation area for use in the calculation mentioned below. f) Provide the calculations for planting beds in the parking area being the equivalent area of 5% of paved and vehicular circulation area, 1 large or medium shade tree per 10 parking spaces, and ensure that the minimum requirements are met. g) Ensure that all previously approved planting within the parcel are shown as either existing or proposed (if missing) or specify alternative plantings that would need approval of planning and engineering. i. One of the previously approved street trees on Route 29 (SDP2006-61) appears to no longer exist. Revise the landscape plan to show this missing tree being replaced. Additional trees were shown as part of the rain garden (see below) and additional trees may be required by ARB. Refer to the ARB comments once they are provided to you (see comment below on ARB conditions of approval). ii. On the previously approved site plan (SDP2006-61) there are rain garden plantings between Route 29 and the leasable area (Rain Garden #3). The bond for this raingarden has not been released, but the plantings should be shown on this site plan since they are part of the development requirements for this development and lot. iii. On the previously approved site plan (SDP2014-34) there are stormwater management/biofilter plantings on the south side of the parcel (labeled as Biofilter #1 in SDP2006-61 when originally approved). This Biofilter is not planted according to the previously approved plans. Revise the landscape plan to show this required landscaping. The Water Resource department has stated that they have requested that the owner plant the required vegetation. h) Revise the existing conditions sheet to include the required information on the existing trees. i) Include in the site plan a filled out, signed and dated conservation checklist. j) Include in the existing conditions, grading and landscape sheets tree protection fencing around all existing trees and required landscaping that is to remain and include tree protection fencing details in the site plan. k) Provided a detail of the screening wall around the dumpster location. 1) Once additional landscaping is shown on the site plan, based upon the comments above and ARB comments, ensure that the screening extends sufficiently to block the view of the service bays from the public street. m) Revise the scale of the landscape plan to use the same type of scale (engineering) as the other sheets of the site plan. 12. [32.5.2(n) & 32.6.2(k)] Outdoor lighting. In reference to the photometric plan address the following: a) Revise the Luminaire Schedule to have LLF value for all fixtures and update the table accordingly. b) Revise the Luminaire Schedule to have values for the total lamp lumens. c) Ensure that the all product numbers in the "Description" can be found in the manufacturer cutsheets provided in the site plan, including the "ELS-EAL-ABL-BLCK". 13. [Comment] The leasable area of the site has heavy linework and is bearing and distances. Since it is labeled as the leasable area, and not a new subdivision of the parcel, no comments on a subdivision have been provided. If subdivision will be proposed additional comments may be required prior to final site plan approval. 3 14. [Comment] ARB comments are not available at this time. Because of COVIDI9's impact on public meetings the ARB comments will be provided when they become available. The final site plan approval will not be granted until ARB has approved the site plan. 15. [Comment] See the SRC comments from most of the reviewers attached. All SRC reviewer comments must be sufficiently address prior to final site plan approval. Please contact Paty Saternye in the Planning Division by using psaternyeQalbemarle.orq or 434-296-5832 ext. 3250 for further information. Review Comments for SDP202000020 11nitial Site Plan Project Name: VALVOLINE - INITIAL Date Completed: Tuesday, Apnl 14, 2020 DepartmentlDivisionlAgency: Review Sys: Reviewer: Matthew Wentland -E CDD Enginee I Requested Changes 1_ The V MP plan will need to be approved prier to Final Site Plan approval_ n _ A Stormwater Management Facility easement will need to be shown on the Final Site Plan (covering the UO storage and line out to the existing facility) and recorded prior to F P approval_ A Deed of Dedication will need to be signed and recorded for the WM facility easements_ This will filled out by the County and forwarded to the applicant when the plat is nearing approval_ Page: County of Albemarle Printed On: 10412112020 Review Comments for SDP202000020 11nitial Site Plan Project Name: ALOLINE - INITIAL Date Completed: Monday, March 30, 2020 DepartmentlDi+visionlAgency: Review Status: Reviewer: Shawn Maddox Fire Rescue Requested changes 1 _ A hydrant should be added in the vicinity of the entrance The building currently sits greater than 250' from a hydrant.- _ A knox box is required_ Please add a note indicating this requirement and that the location can be coordinated with the fire marshal's office- 3- Provide the ISO needed fire flow for the site- 4- If the building is to be sprinklered then the FDD must be shown and must be located within 100' of the hydrant- 5- Provide a recent fire flow test showing the available fire flow currently on site_ Page: County of Albemarle Printed On: 10412112020 Review Comments for SDP202000020 11nitial Site Plan Project Name: ALOLINE - INITIAL Date Completed: Tuesday, Apnl 21, 2020 DepartmentlDi+visionlAgency: Review Status: Reviewer: Richard Nelson -E ACSA I Requested r-hanges Nd 0 0-04- 1: commenticonditions received fromAOSA by email: I recommend approval for SDP 0 0- 0 Valvoline I P SRC with the following conditions * There is an existing sewer lateral stubout for this parcel_ If it is not going to be used, it will need to be abandoned at the sewer main- * Planters Bank has a sewer lateral crossing this site_ Ensure it will not be impacted with what is proposed * Provide fixture counts to confirm water meter size- * The irrigiation meter should not be behind the domestic water meter- * Pressures in the area are above 80psi_ A private pry will be needed- * Confirm if Fire/Rescue will require a hydrant for this site_ Page: County of Albemarle Printed On: 10412112020 Review Comments for SDP202000020 11nitial Site Plan Project Name: AL OLINE - INMAL Date Completed: Thursday, Apnl 09, 2020 DepartmentlDi+visionlAgency: Review Sys: Reviewer: Michael DelIinger �� Inspections Requested changes Add the following note to the general notes page: ALL water lines, sewer lines, and fire lines from the main to the structure MUST have a visual inspection performed by the. building department_ Add the following to the general notes page: All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks_ Sheet CT handicapped parking signage is not in conformance with Virgina standards. Correct to provide the proper wording Add a detailed accessible parking space diagram to plans_ Page: County of Albemarle Printed On: 10412112020 Stephen C. Brich, P.E. Commissioner COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1401 East Broad Street Richmond, Virginia 23219 March 24, 2020 Patricia Satemye County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SDP-2020-00020 — Valvoline — Initial Site Plan Dear Ms. Saternye: (804) 786-2701 Fax: (804) 786-2940 The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced Valvoline, as submitted by CESO, Inc., dated March 6, 2020 and find it to be generally acceptable. A VDOT Land Use Permit will be required prior to any work within the right of way. The owner/developer must contact the Charlottesville Residency land Use Section at (434) 422-9399 for information pertaining to this process. If you have further questions please contact Max Greene at (434) 422-9894. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING Review Comments for SDP202000020 11nitial Site Plan Project Name: ALOLINE - INITIAL Date Completed: Tuesday, Apnl 21, 2020 DepartmentlDi+visionlAgency: Review Status: Reviewer: - RWSA No Objection 00-04-1: RWA has reviewed the Valvoline Initial Site plans dated March 6th 2020 and has no conflicts with this project_ Page: County of Albemarle Printed On: 10412112020 COMMONWEALTH of VIRQINIA In Cooperation with the Thomas Jefferson Health District ALBEMARLE- CHARLOTTESVILLE State Department of Health FLUVANNA COUNTY (PALMYRA) 1138 Rose HIII Drive GREENE COUNTY (STANAROSVILLE) LOUISA COONTY(LOVISA) Phone (434) 972-6219 P. O. Box 7546 NELSON COUNTY (LOVINGSTON) Fax (434)972-4310 Charlottesville. Virginia 22946 April 10, 2020 Patricia Saternye, Senior Planner Albemarle County Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Valvoline Initial Site Plan Review SDP2020-20 Ms. Saternye: As requested, I have reviewed the Initial Site Plan, dated 3/6/20, for the proposed development, referenced above. Since both water and sewer will be provided by ACSA, and it does not appear any existing wells or onsite septic systems will be impacted, I have no objection to the proposed development. If there are any questions or concerns, please give me a call, 434-972-4306. Sincerely, Alan Mazurowski Environmental Health Supervisor Thomas Jefferson Health District alan.mazurowskikvdh.vir-ig nia.gov Review Comments for SDP202000020 11nitial Site Plan Project Name: ALOLINE - INITIAL Date Completed: Fnday, March 27, 2020 DepartmentlDi+visionlAgency: Review Sys: Reviewer: Brian Becker CBB E911 No Objection No objection Page: County of Albemarle Printed On: 10412112020