Loading...
HomeMy WebLinkAboutWPO201800059 Review Comments 2020-04-22April 22, 2020 David James County of Albemarle Department of Community Development 401 McIntire Road, Room 227 Charlottesville, VA 22902 RE: VSMP Permit Plan Review — UVAF Tennis WP0201800059 (Amendment 1) (Rev. 1) Dear Mr. James, In response to the VSMP comments issued via email dated March 2020 we offer the following responses: A. General 1. Cover sheet —Please add 'AMENDMENT TO VSMP PLAN (WP01800059)' to the title. (Rev. 1) Addressed. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary 1. Please submit new DEQ Registration Statement. 2. Update the SWPPP sections with the amendment plan approval. (Rev. 1) Addressed. C. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Update the SWPPP with PPP changes. (Rev. 1) Addressed. D. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17- 403. 1. There are undetained areas of the site that must meet post -development requirements under 9VAC25-870-66. Water quantity. 9.33(disturbed) — 7.2+/- (routed to pond)=2.0+/- ac remaining of disturbed to meet Water quantity requirements. Show where do these undetained areas discharge runoff to post- development, and state how they meet Part 1113 Water quantity requirements. It's not clear how these areas will reach the point of analysis shown on sheet 6.06. (Rev. 1) Acknowledged. 2. Assume half -clogged condition for the sizing of the grate inlets in parking area and stm 17. Use procedure 9.5.4 (Grate in sag) or similar. (Rev. 1) Acknowledged. Mr. David James UVA Foundation Tennis Apri 1 2020 Page 2 of 2 3. Sheet Clarify area of Ex. Stm and location. (Rev. 1) Addressed. E. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Sheet 3.13/3.18 - Tie-in grading. Grading shown outside limits of disturbance (to be included). 2. Sheet 3.15/3.20 —Tie in grading. 3. Sheet 3.12/3.17 —Tie in grading. (Rev. 1) Not addressed. Dewberry Response: Grading adjusted to tie in. See grading plan sheets. 4. (Rev. 1) Show these contours tying in as well. Dewberry Response: Grading adjusted to tie in. See grading plan sheets. Thank you for your attention in this matter. Please contact me with any questions or concerns at (804) 205-3356 or email cpalmore@dewberry.com Sincerely, F. Cameron Palmore, P.E., L.S. Dewberry Dewberry