HomeMy WebLinkAboutSDP201900068 Review Comments Final Site Plan and Comps. 2020-05-19 (2)County of Albemarle Department of Community Development Memorandum To: Tori Kanellopoulos From: Emily Cox Date: 13 Dec 2019 Rev. 1: 18 May 2020 Subject: Spring Hill Village — Final Site Plan (SDP201900068) The final site plan for Spring Hill Village has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WP0201900042 is approved, however this site plan does not match the WPO Plan. For example, the grading behind the lots on the southern end of the property shows a retaining wall on the WPO plan, but not on this site plan. The final site plan cannot be approved unless it matches the WPO Plan. Please submit a WPO amendment to match this plan. Rev. 1: WPO amendment submitted. Must be approved before final site plan can be approved. a. As part of that WPO amendment, please include an over lot grading plan, as required by proffer number 3 in ZMA201300017. Ensure all items a j are met. Rev. 1: Comment addressed. Sheet 15 in the WPO Plan ;� — --IM —Ai— „ inn 2. Road plan (SUB201900158) must be approved before final site plan can be approved. Rev. 1: Comment not addressed. 3. Professional seal should be signed and dateo. xev. 1: Comment addressed. 4. Private vs. public street labels need to match the road plan. Rev. 1: Comment addressed. 5. Perpendicular parking is not allowed on streets. Angled parking is allowed, but must follow County Code 18-4.12.16. Rev. 1: Comment addressed. 6. Signed and sealed professional designs of the retaining walls must be provided before final site plan can be approved. Rev. 1: Comment addressed, however, please ensure these plans match the wall plans. 7. Grading on southern end of property needs to tie in further away from the property lines. Some contours are even tying in outside of the property line. (this may change based on the WPO, however, this comment is based on this plan submission) Rev. 1: Please double check how all contours tie in on the existing topography. One specific example is contour 634 in the northern end of the property. 8. Ensure all retaining wall are completely off of lots. Rev. 1: Comment not addressed. 9. Provide guardrail wherever necessary. The alley appears to need them. Rev. 1: Comment addressed. 10. Grading must show positive drainage away from all houses/structures for the l' 10 ft around the entire house/structure. Rev. 1: Comment not addressed. Please check all areas, especially lots along Loyola way. Provide spot shots showing positive drainage away from house. 11. Grading must show positive drainage to inlets (create swales/flow paths/spot shots to the inlets, not just arrows). Rev. 1: Comment addressed. 12. Yard inlets and drains must be in easements. Rev. 1: Comment addressed. 13. Velocity in storm drains should not exceed 15 ft/s. Rev. 1: Comment addressed. Engineering Review Comments Page 2 of 2 14. Trees should be placed as far away from storm drains and inlets as possible. One example is lot 38. There is a tree directly on top of a structure. Rev. 1: Comment addressed.