Loading...
HomeMy WebLinkAboutARB202000048 Review Comments 2020-04-14W48W %*me Architectural Review Board COUNTY -WIDE MinorAmendment Completeness check ❑ 2 collated copies A. Written description of the proposal 1[EY" Provide a description of the proposed work.�(��;� �. 2p-' Explain how the proposal is compatible with the surrounding area and the Entrance Corridor. B. For Minor Site PU Amendments, provide a plan showing the approved site condition and the following (drawn to th6 sclale of 1 "=20 , clearly legible): 1 ❑ Location and identification of all proposed changes, including new site features and features to be demolished such as but not limited to: a ❑ parking, travelways, walkways b ❑ mechanical equipment, trash containers, loading and service areas, and associated screening c ❑ proposed grading changes drawn with contour intervals of 5-feet or less d ❑ proposed utilities and easements or changes to utilities and easements, identify easement type and extent N\pr e ❑ changes to stormwater management facilities f ❑ retaining walls with top and bottom elevations, maximum wall heights, proposed materials, and material and colorsamples g ❑ changes to site lighting (see the lighting checklist) h ❑ existing landscaping and changes to landscaping, including landscaping to be removed with location, size and species; proposed landscaping with a landscape schedule indicating plant species with common and botanical names, quantity, size at planting, and symbol used; location and height of above -ground utilities and associated easements, and location of below -ground utilities and associated easements; tree protection fencing and limits of work on the landscape, grading and E&S plans. C. For Minor Amendments to Architectural Plans, provide the following: L[ . 'Dimensioned architectural elevations of the existing condition and the proposed changes. Elevations must be drawn to the scale of 1/8"=1%0". Include a building materials schedule and key on the elevation drawings. One set of material and color samples for all proposed materials. — l o A floor plan adequate to show exterior walls, windows and doors. _ he �and 'tionalmaterial Sheetnuber, total number of sheets, date of the drawing, date and description of the latest revision, contact information for the firm preparing the drawings in the title block on all drawings. For revised drawings, clearly identify revisions made. 2 EMk Labeled, color 8-'/2" x 11" photos of the site as seen from both directions on the Entrance Corridor. Signatures Architectural Review Board Final Site Plan Checklist — 1 VAW ..ro COUNTY -WIDE CERTIFICATE OF APPROPRIATENESS Minor amendments to architectural designs DESIGN CRITERIA Structure Design Changes to the architectural design of building should be consistent with the design of the building as it was originally approved by the ARB or consistent with the design of a building that otherwise meets the EC Guidelines. For buildings that have not been approved by the ARB and do not meet the EC Guidelines, changes should increase the consistency of the building with the EC Guidelines. COUNTY -WIDE CERTIFICATE OF APPROPRIATENESS Minor amendments to site plans DESIGN CRITERIA Grading Revised grading should not change If revised grading adds a retaining wall the relationship of the building to or increases the height of a retaining the site, or the site to adjacent wall: Any wall 6' in height or more properties, or change the general shall be terraced and the terraces shall view from the EC. be planted. Retaining wall material must be coordinated with the building and site design, oversized blocks will not be approved if visible from the EC. Planting Species changes can be approved if All planting guidelines apply to new or the proposed species is included in increased parking areas. the "recommended" or "acceptable" plant lists in "Context Sensitive Site Design", if the specie is similar in character to the ARB-approved species, and if the species is consistent with the general character of the approved site plan. Phasing Planting along the EC will likely be required to be included in the first phase. NOTES See criteria for screening, fencing, additions, lighting, and equipment for other requirements.