HomeMy WebLinkAboutFDP201900011 Plan - Approved 2020-05-26RIVANNA WATER AND SEWER AUTHORITY (RWSA), VIRGINIA 40 CROZET FLOW EQUALIZATION TANK AND PROJECT AREA PUMPING STATION UPGRADE Chwp ns v ale t Or Piz THIS Po-w . ,D0 a - 20 �= kM1 Ednarn Forest e guckinq _ - LOCATION MAP SCALE: 1 " = 5000' BARRACKS LA Vill tC Ircle ' • �� k�Edt�a�e d � � � L + _ �! 1 PROJECT DESCRIPTION: THIS PROJECT CONSISTS OF THE INSTALLATION OF APPROXIMATELY 290 FEET OF 24" GRAVITY SEWER, ABANDONMENT OF APPROXIMATELY 270 FEET OF EXISTING 18" GRAVITY SEWER, INSTALLATION OF A 1.0 MG FLOW EQUALIZATION TANK, AND VARIOUS PUMPING STATION UPGRADES. Schnabel ENGINEERING P�- P�- A� 05700-00-00-035R2 PL iNch' cRFF� ,0 057CO-00-00-01400 / PROJECT AREA 05700-00-00-035AO 05700-00-00-03500 V 05700-00-00-041CO PROJECT CONTACTS: RIVANNA WATER AND SEWER AUTHORITY, VIRGINIA PROJECT MANAGER: SCOTT SCHILLER, P.E. 695 MOORES CREEK LANE CHARLOTTESVILLE, VA 22902 (434) 977-2970, EXT. 206 PL 05700-00-00-041BO V A� CROZET PUMPING STATION NO. 4 4466 ROCKFISH TURNPIKE CHARLOTTESVILLE, VA 22902 05700��0-041 05700-00-00-041F0 O GREELEY AND HANSEN PROJECT MANAGER: JUN MENG, P.E. 9020 STONY POINT PARKWAY, SUITE 475 RICHMOND, VIRGINIA 23235 (804)355-9993 EXT. 1405 GREELEYAIMCIIIHAIMSEIM Q� PL 05700-00-00-04000 P- Q�. 05700-00-00-040A2 O O 0\—00-00-040000 05700-0C40— �/_ 04000 05700-00-00-04000 O�PO\ LN 05700— 0-00-04000 M00 Qv O� O Q., 05700-00-00-04000 A Qv 05700-00-00-04OA1 i VICINITY MAP SCALE: 1 " = 200' Q� APPROVED by the Albemarle County Community Development Department Date 05/26/2020 File FDP201900011 APRIL 2020 ALBEMARLE COUNTY WP0202000012 0 Q 0 w m m w o� 0 N 0 N 0 \ N c� 0 N 0 CD 0 1 0 0 / U 0 CD z m 0 LO 0 N / 0 0 Q U N 0 CD z w J W m Q z U 0 / GENERAL NOTES: A DISTINCTION BETWEEN NEW AND EXISTING MATERIALS, EQUIPMENT AND STRUCTURES HAS BEEN MADE ON THE DRAWINGS BY LINE WEIGHT AND/OR DENSITY. HEAVY REPRESENTS NEW. LIGHT AND/OR SCREENED REPRESENTS EXISTING. 2. THE CONTRACTOR IS RESPONSIBLE TO MAKE ALL MEASUREMENTS NECESSARY TO LOCATE, FABRICATE, ERECT, CONSTRUCT AND OTHERWISE PROVIDE ALL NEW WORK IN LOCATIONS SHOWN AND RELOCATE AND REWORK EXISTING WORK AS REQUIRED FOR A COMPLETE TROUBLE -FREE OPERATING INSTALLATION. 3. THE CONTRACTOR IS RESPONSIBLE TO FABRICATE, ERECT, CONSTRUCT AND OTHERWISE PROVIDE ALL NEW WORK CONNECTING TO EXISTING WORK. THE CONTRACTOR IS ALSO RESPONSIBLE TO MAKE ANY ADJUSTMENTS IN FABRICATION, ERECTION, CONSTRUCTION AND INSTALLATION NECESSARY TO CONSTRUCT AND FIT NEW WORK AND RELOCATIONS TO EXISTING CONDITIONS AND LOCATIONS TO CONFORM TO THE ARRANGEMENTS AND GENERAL DESIGN SHOWN. ADJUSTMENTS PROPOSED OR CONTEMPLATED BY THE CONTRACTOR SHALL CONFORM TO REQUIREMENTS AND STANDARDS OF THE CONTRACT DOCUMENTS. 4. THE CONTRACTOR IS RESPONSIBLE TO MAKE RELOCATIONS SHOWN TO MATCH THE MATERIAL AND QUALITY OF THE WORK TO BE RELOCATED. RELOCATIONS SHOWN ARE TO BE ARRANGED TO PRODUCE PERFORMANCE, UTILITY AND ACCESS EQUAL TO THE EXISTING WORK. 5. AN ASTERISK (*) AT NEW CONSTRUCTION DENOTES LOCATIONS, ELEVATIONS, DIMENSIONS AND OTHER INFORMATION DEPENDENT ON THE CONTRACTOR'S SUBMITTALS. THE CONTRACTOR SHALL DEVELOP AND SHOW THE INFORMATION MARKED WITH AN ASTERISK (*) ON HIS SUBMITTALS. ALL INFORMATION FOR ASTERISKS (*) ARE THE RESPONSIBILITY OF THE CONTRACTOR TO DEVELOP AND ASSURE COMPATIBLE INTERFACING FOR A COMPLETE, COORDINATED AND TROUBLE -FREE OPERATING INSTALLATION. ALL REQUIREMENTS HEREIN SHALL BE BASED ON FINAL PROCESSING AND/OR REVIEW OF THE CONTRACTORS SUBMITTALS OR SELECTIONS. 6. LOCATIONS, ELEVATIONS AND DIMENSIONS OF EXISTING PIPING, EQUIPMENT, STRUCTURES AND OTHER EXISTING WORK ARE BASED ON INFORMATION FURNISHED BY VARIOUS SOURCES, INCLUDING EXISTING RECORD DRAWINGS AND CONTRACT DOCUMENTS, AND IN SOME INSTANCES FIELD MEASUREMENTS. LOCATIONS, ELEVATIONS AND DIMENSIONS OF NEW WORK CONNECTING OR ADJACENT TO OR INTERFACING WITH EXISTING WORK HAVE BEEN DEVELOPED AND ARRANGED BASED ON THE FOREGOING INFORMATION AND FIELD MEASUREMENTS. THE CONTRACTOR IS RESPONSIBLE TO FIELD CHECK AND MEASURE LOCATIONS, ELEVATIONS AND DIMENSIONS AND TO FIT THE NEW WORK TO ACTUAL EXISTING LOCATIONS, ELEVATIONS AND DIMENSIONS FOR A COMPLETE AND TROUBLE -FREE OPERATING FACILITY. 7. THE EXISTING GRADE ELEVATIONS SHOWN ARE APPROXIMATE. WHERE ACTUAL ELEVATIONS AND LOCATIONS ARE NECESSARY FOR THE WORK, THE CONTRACTOR IS RESPONSIBLE TO FIELD MEASURE AND CHECK EXISTING GRADE ELEVATIONS. 8. EXISTING FACILITIES AFFECTED BY THE CONTRACTOR IN PERFORMANCE OF THE WORK UNDER THIS CONTRACT SHALL BE JOINTLY INSPECTED BY THE RIVANNA WATER AND SEWER AUTHORITY AND CONTRACTOR PRIOR TO STARTING WORK. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR, MODIFY, UPGRADE, PROTECT, SUPPLEMENT OR SUPPORT EXISTING FACILITIES TO OBTAIN THE DEGREE OF SERVICE REQUIRED BY THE CONTRACTOR TO PERFORM THE WORK. THE CONTRACTOR SHALL RETURN EXISTING FACILITIES TO ITS FUNCTIONAL EQUIVALENCY FOUND PRIOR TO THE START OF THE CONTRACTOR'S WORK TO THE SATISFACTION OF THE ENGINEER. 9. THE CONTRACTOR SHALL LIMIT ALL CONSTRUCTION OPERATIONS TO WITHIN PUBLIC RIGHTS -OF -WAY AND THE LIMITS OF CONSTRUCTION SHOWN. 10. ALL WORK AND COSTS ASSOCIATED WITH COMPLIANCE WITH THESE GENERAL NOTES SHALL BE INCLUDED IN THE PRICES BID FOR THE VARIOUS CONTRACT ITEMS AND NO SEPARATE PAYMENT WILL BE MADE THEREFOR. 11. EXISTING FACILITIES SHALL BE REMOVED TO THE EXTENT SHOWN AND SPECIFIED AND AS NEEDED TO BE COMPATIBLE WITH AND ACCOMMODATE NEW WORK OR REPLACEMENT WORK. 12. THE CONTRACTOR IS RESPONSIBLE TO ACCEPT ALL EXISTING FACILITIES FOR WORK IN THE STATUS AND CONDITIONS THAT OCCUR WHEN WORK AT THE FACILITY COMMENCES. THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO PREPARE AND MAINTAIN THE EXISTING FACILITIES AS NEEDED TO PERFORM ALL WORK UNDER THE CONTRACT. THE CONTRACTOR IS RESPONSIBLE TO REMOVE AWAY FROM THE SITE OF THE WORK TO HIS OWN PLACE OF DISPOSAL ALL EXCESS ITEMS, MATERIAL AND SUBSTANCES REMOVED. AS PART OF THIS WORK THE CONTRACTOR IS RESPONSIBLE TO FURNISH ALL DESIGN, FABRICATION, ERECTION, LABOR, EQUIPMENT, MATERIALS AND SERVICES. 13. DESCRIPTIONS NOTED ON PLAN SHEETS REFER TO THE TYPE OF EXISTING SURFACE ONLY. ALL SURFACE RESTORATION SHALL BE IN KIND, UNLESS OTHERWISE SHOWN OR SPECIFIED, AND SHALL MATCH EXISTING GRADE, SHAPE, THICKNESS, SIZE, QUALITY AND PERFORMANCE. 14. THE CONTRACTOR SHALL PROVIDE AT LEAST 72 HOURS NOTICE TO ALL THE VARIOUS PRIVATE AND MUNICIPAL AGENCIES IN ORDER TO PERMIT THE LOCATION OF EXISTING UNDERGROUND AND OVERHEAD UTILITIES IN ADVANCE OF CONSTRUCTION, BY CALLING MISS UTILITY (1-800-552-7001) OR, IF NECESSARY, BY CONTACTING THE AGENCIES INDIVIDUALLY. 15. WHEREVER ANY ABANDONED CONDUITS OR PIPES ARE CUT OR BROKEN DURING CONSTRUCTION THEY SHALL BE FILLED WITH GROUT OR CLASS D CONCRETE AND SUITABLE BULKHEADS, AS DETERMINED BY THE ENGINEER. GROUT, CONCRETE AND BULKHEADS SHALL BE INSTALLED SO THAT NO MOVEMENT, SETTLEMENT OR LOSS OF BACKFILL MATERIAL SHALL OCCUR. 16. DIMENSIONS NOTED BY A DOUBLE ASTERISK (**) SHALL BE CHECKED BY THE CONTRACTOR TO OBTAIN ACTUAL FIELD MEASUREMENTS AND DIMENSIONS AND CONSTRUCTION ADJUSTED TO FIT NEW CONSTRUCTION TO ACTUAL LOCATIONS OF EXISTING CONSTRUCTION AS SHOWN AND REQUIRED. 17. IF THERE IS DISAGREEMENT IN WORK SHOWN OR SPECIFIED SUCH DISAGREEMENT SHALL BE RESOLVED BY APPLYING THE PRECEDENCE IN THE CONTRACT DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE THE MINIMUM WORK NEEDED TO SATISFY FUNCTIONAL, CONTROL AND INTERFACING REQUIREMENTS AND PROVIDE A TROUBLE -FREE OPERATING INSTALLATION UNDER THE PRECEDENCE. 18. IN COMPLYING WITH ALL RESPONSIBILITIES AND REQUIREMENTS UNDER THESE GENERAL NOTES, THE CONTRACTOR SHALL PROVIDE ALL DESIGNS, LABOR, EQUIPMENT AND SERVICES NEEDED FOR SUCH COMPLIANCE. 19. TRANSPORT AND DISPOSE OF SURPLUS EXCAVATED MATERIAL AND EXCAVATED MATERIAL UNSUITABLE FOR BACKFILLING OR EMBANKMENTS TO AN APPROVED OFF SITE DISPOSAL LOCATION. OBTAIN THE OFF SITE DISPOSAL LOCATION. SUBMIT RELEASE FROM PROPERTY OWNER OF OFF -SITE DISPOSAL LOCATION AFTER ALL CONTRACTOR WORK IS COMPLETED OR PRIOR TO FINAL INSPECTION. 20. ALL ROADWAY CONSTRUCTION AND MATERIALS SHALL CONFORM WITH STANDARDS AND SPECIFICATIONS OF THE VIRGINIA DEPARTMENT OF HIGHWAYS AND TRANSPORTATION'S LATEST EDITION, EXCEPT WHERE ALBEMARLE COUNTY STANDARDS ARE APPLICABLE, OR AS SPECIFIED OTHERWISE. 21. THE CONTRACTOR SHALL NOTIFY AND OBTAIN PERMISSION FROM THE AUTHORITY 72 HOURS PRIOR TO MAKING ANY ADJUSTMENTS TO THE WATER OR SEWER SYSTEMS. 22. THE LOCATIONS OF ALL EXISTING UTILITIES AND LATERAL CONNECTIONS SHOWN ON THE PLAN ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UTILITIES ALONG THE LINE OF HIS WORK AND PROTECTING OR RELOCATING SAID UTILITIES AS REQUIRED. 23. AFTER NEW SANITARY SEWER IS IN FULL OPERATION, FILL EXISTING SANITARY SEWERS WITH FLOWABLE FILL INCLUDING ABANDONED JUNCTION BOXES AND MANHOLES. 24. ABANDON EXISTING MANHOLES WHERE SHOWN. 25. CONSTRUCTION ENTRANCES FROM PUBLIC ROADWAYS SHALL HAVE SIGNS COMPLYING WITH VDOT AND COUNTY REGULATIONS ON EACH APPROACH DIRECTION. 26. RESTORE ACCESSES AND STAGING AREAS EQUAL TO PRECONSTRUCTION CONDITIONS. IF GRANULAR MATERIAL IS USED IN THE STAGING AREAS, REMOVE TOP 4" OF SOIL AND STOCKPILE PRIOR TO PLACING GRANULAR MATERIAL. AT END OF CONSTRUCTION COMPLETELY REMOVE GRANULAR MATERIAL, REPLACE STOCKPILED SOIL AND SEED AND MULCH DISTURBED STAGING AREA. PROVIDE DUST CONTROL IN STAGING AREAS AND ACCESS ROADS. NO ERODIBLE MATERIALS SHALL BE STORED IN STAGING AREAS. COMPLY WITH APPLICABLE EROSION AND SEDIMENT CONTROL STANDARDS. 27. MANHOLES SHALL BE CONSTRUCTED 18 INCHES ABOVE EXISTING GRADE UNLESS OTHERWISE SPECIFIED OR SHOWN ON DRAWINGS. 28. FIELD SURVEY MANHOLES AND ADJUST NUMBER AND LOCATIONS OF SERVICE LINES INTO THE MANHOLE PRIOR TO SUBMISSION OF SHOP DRAWINGS. 29. ALL LIMITS OF DISTURBANCE AND EDGE OF EASEMENTS SHALL BE FIELD LOCATED AND MARKED WITH EITHER SILT FENCE, BARRIER TAPE, OR FLAGGING. ALL MARKINGS SHALL REMAIN IN PLACE WHILE WORK IN THE CURRENT DIVISION IS BEING COMPLETED. THE CONTRACTOR SHALL NOT WORK OUTSIDE OF THE MARKINGS. 30. PROVIDE TEMPORARY CONSTRUCTION ENTRANCES AT THE ENTRANCE TO THE SITE ALONG THE EASEMENT AT THE END OF THE PUBLIC AND/OR PAVED ROAD. 31. CONTRACTOR SHALL USE DUE DILIGENCE TO MINIMIZE CONSTRUCTION DISTURBANCE TO EXISTING EASEMENT AREAS WHICH ARE OUTSIDE EASEMENTS AND WORKING LIMITS SHOWN ON PLANS. MINIMAL DISTURBANCE WILL BE PERMITTED WHEN NECESSARY FOR TIE-INS AND EXISTING STRUCTURES ABANDONMENT. DISTURBANCE OF EXISTING EASEMENT AREAS OUTSIDE OF EASEMENT AND WORKING LIMITS SHOWN SHALL BE SUBJECT TO ENGINEER APPROVAL. 32. ADDITIONAL PROPERTY FOR LAY DOWN OR STAGING DURING CONSTRUCTION IS CONTRACTOR'S RESPONSIBILITY. CVEC GENERAL NOTES: 1. THE MINIMUM DISTANCE REQUIRED BY OSHA SHALL BE MAINTAINED BETWEEN ELECTRICAL CONDUCTORS AND ANY PART OF THE ENCROACHMENT OR EQUIPMENT USED IN THE INSTALLATION OR MAINTENANCE OF THE ENCROACHMENT. THE MINIMUM CLEARANCE SHALL BE GOVERNED BY THE CLEARANCE REQUIRED FOR THE 230 kV LINE. 2. DO NOT STORE MATERIAL OR EQUIPMENT ON THE CVEC RIGHT-OF-WAY. 3. PROVIDE RWSA AT LEAST 10 DAYS ADVANCE NOTICE OF ANY ACTIVITIES BEING PERFORMED WITHIN CVEC RIGHT-OF-WAY. 4. BLASTING ON RIGHT-OF-WAY IS TO BE AVOIDED IF POSSIBLE, BUT IF UNAVOIDABLE, A MINIMUM EXPLOSIVE CHARGE AND MATTING MUST BE USED TO PREVENT DAMAGE. NOTICE MUST BE GIVEN TO RWSA AND CVEC 5 DAYS IN ADVANCE OF ANY BLASTING. 5. MOTOR VEHICLES MAY BE PARKED ON THE RIGHT-OF-WAY PROVIDED THAT THEY DO NOT EXCEED A HEIGHT OF 13'-6", ARE NOT HOUSE, OFFICE OR CONSTRUCTION TRAILERS, DO NOT CARRY EXPLOSIVES OR FLAMMABLE CARGO, ARE OPERATIVE AND THE PARKING IS OF A TRANSIENT NATURE, AND SHALL HAVE CURRENT INSPECTION DECALS AND SHALL NOT VIOLATE ANY LOCAL ORDINANCES. GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS: 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE 0 SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. GENERAL CONSTRUCTION NOTES: 1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE PERMIT SHALL GOVERN. 2. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT UNLESS OTHERWISE NOTED. 3. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION. 4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED. 5. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTAL:VERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED. 6. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 7. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES. 8. UNLESS OTHERWISE NOTED ALL CONCRETE PIPE SHALL BE REINFORCED CONCRETE PIPE -CLASS III. 9. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). GENERAL CONSTRUCTION NOTES FOR STORMWATER MANAGEMENT PLANS: 1. ALL CHECK DAMS AND CONSTRUCTED FILL TO BE WITHIN 95% OF MAXIMUM DRY DENSITY AND 2% OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL TO BE APPROVED BY A GEOTECHNICAL ENGINEER. A GEOTECHNICAL ENGINEER IS TO BE PRESENT DURING CONSTRUCTION OF CHECK DAMS. 2. PIPE AND RISER JOINTS ARE TO BE WATERTIGHT WITHIN STORMWATER MANAGEMENT FACILITIES. 3. FOR TEMPORARY SEDIMENT TRAPS OR BASINS WHICH ARE TO BE CONVERTED TO PERMANENT STORMWATER MANAGEMENT FACILITIES; CONVERSION IS NOT TO TAKE PLACE UNTIL THE SITE IS STABILIZED, AND PERMISSION HAS BEEN OBTAINED FROM THE COUNTY EROSION CONTROL INSPECTOR. 4. CLAY CUT-OFF COLLARS ARE TO BE INSTALLED ALONG THE PIPELINE AT REGULAR INTERVALS TO MINIMIZE THE LINEAR FLOW OF GROUNDWATER IN THE PIPE TRENCH. Schnabel ENGINEERING NLT0 GI x11 �... Ma-GREELEYAND HANSEN RIOCHMOND20 NVIR�INA 23235INT AY, SUITE 475 DESIGNED JM DRAWN DRH CHECKED RJC fi� -�j /,- G'' APPROVED L ROGER J. CRONIN Y Lic No. 016431 �r� 4/24/2020 ww `��o _ �; SCALE RIVANNA WATER AND SEWER AUTHORITY CROZET FLOW EQAULIZATION TANK AND PUMPING STATION UPGRADES GENERAL GENERAL NOTES, STANDARD CONSTRUCTION AND DETAILS NOTES PROJECT NO.: 01713.01 DWG: G 2 SHEET: 3 OF 33 N0. DATE APPD REVISION DATE: APRIL 2020 REv: 0 - _ - - Z5902 I - _ —LL/ . _ I -50, ,0 I I L590 / CE EXISTING ACCESS ROAD I I \ \ L5 Z� I I PROVIDE EXISTING ACCESS \ l \ / ROAD WITH 6" COMPACTED J\\' ." / / I I VDOT 21A AFTER TANK CONSTRUCTION COMPLETED \ \ � � //• // � I EXISTING 18" FORCE•— i / I MAIN TO CROZET PS NO. 3 FLOODWAY LIMITS / */�• CRSLL- SOIL BOUNDARY (TYP) I I PL ; PL � PL ........... I I I LIMITS OF I PL PL RIVANNA WATER AND SEWER AUTHORITY DISTURBANCE (TYP) OL TAX MAP AND PARCEL NUMBER: J i5° }l j PL 05700-00-00-035AO (D.B. 825 PG. 698) a Z�5907 / '� 05908 PL I � i / '� / � x x� I I I •I EXISTING FENCING PL P.Lx SF �1•-�L-x�x—x— _ .F' SF TS �I x PS MU al III PERMITTED STAGING AREA, OFFICE TRAILER, AND/ OR MATERIAL I I HANDLING AND STORAGE AREA D�►► C I MH-3 II SF S II 100-YEAR 12+00 EXISTING 18" DI SEWER I FLOODPLAIN LIMITS -------- - - x CRS Fx-- x y x x x x x x i Mai-4• MH-5= I x 05906 I SAN S N 0- o U Q i 13+00 o . LiI" SF 18" ABANDONED IN PLACE h / I 01 GRAVEL ACCESS TS ROAD AND PARKING LOT PS MU i \ I 5 I. EXISTING can 01 x SUMP 0 1 1 'e BM C / a FET DRAIN ) "I UE — UE VALVE VAULT ODOR 24" DI SEWER MH-2 CONTROL UNIT x x x- \ -1 / 1l / /' /' " / S \ ► '� ► 1 I '` 1 EXISTING 12" DI > CROZET SF OVERFLOW o- PLUG BM B PS NO.4 00 24" DI SEWER 24". DI 59 MH-1 O ` , SAN SAN .S m I 12 FILL E EXISTING 0 SF x x x x x x x x FET-1 ---MANHOLE ----------------- x x-rx x� • �" TS Lu a + PS MU B-01 A SOIL BORING PS MU 12" FM SEE DETAIL 2/C5 . -A oN 100-YEAR BASE SF (TYP) f- ' x�� x �x v> BM A o FLOOD ELEVATION CONTOUR B-02 _�,1° � CONTOUR � o + - y°9'- .. % 6" FLUSH j �j A5912 FET INFLO AND Ld �jf/ FLUSH VA L E VAULT EXISTING FUEL TANKLij pt CD �+ ' 512 rs -� \ \+ 3-f SEE NOTE 1 \ pt I EXISTING o �j a 51 +� RIVANNA WATER AND SEWER AUTHORITY i�� PS MU < D GENERATOR ` TAX MAP AND PARCEL NUMBER: /ref j 05700-00-00-03500 (D.B. 5239 PG. 482) \t I i l 0 PL \` + +/ OE o PL L x j�e� , I I I II OF \\ I p� P Pt- L x— x10 � Lc) 001,y�° — 4D \Al 00 \I F a I I s o � 0 Q U N / Schnabel z ENGINEERING w J W m Q = DESIGNED JM OWN GREELEYANo HANSEN u�I DRAWN DRH 9020 STONY POINT PARKWAY, SUITE 475 o RICHMOND, VIRGINIA 23235 CHECKED RJC / vi r® EROSION AND SEDIMENT CONTROL PLAN SCALE: 1 " = 20' ��ALTH OF Lf APPROVED l%,.�� SCALE U ROGER J. CRONIN Y Lic No. 016431 20 0 20 40 FT I I 1"=20' ADO 4/24/2020 w� o _ -tcA NO. DATE APPD REVISION RIVANNA WATER AND SEWER AUTHORITY CROZET FLOW EQAULIZATION TANK AND PUMPING STATION UPGRADES GENERAL E&S CONTROL PLAN TABLE OF PROPERTY OWNERSHIP PARCEL OWNER CROZET PS RIVANNA WATER & SEWER AUTHORITY NO. 4 SITE RIVANNA WATER & SEWER FET-1 SITE AUTHORITY ADJACENT DAVID GREGORY MITCHELL PARCEL FORREST ROTGIN MITCHELL EROSION AND SEDIMENT CONTROL LEGEND ROCK CHECK DAM TREE PROTECTION TP TREE PROTECTION LIMITS - - - - - - INLET PROTECTION ao CULVERT INLET PROTECTION CIP0 SILT FENCE SF —x x x— SAFETY FENCE SAF TEMPORARY FILL DIVERSION FD > > MULCHING (EXTENDS) MU PERMANENT SEEDING (EXTENDS) PS TEMPORARY SEEDING (EXTENDS) TS CONSTRUCTION ENTRANCE CE CONSTRUCTION ROAD STABILIZATION CRS DUST CONTROL DC BARRIER TAPE a — LIMITS OF DISTURBANCE TURBIDITY CURTAIN TC RMA LIMITS RPA LIMITS SOIL LEGEND SOIL BOUNDARY • • • • ASHE LOAM (15-25% SLOPES) 4D ASHE LOAM (25-45 % SLOPES) 4E HAYESVILLE CLAY LOAM (15-25% SLOPES) 37D3 HAYESVILLE CLAY LOAM (25-45% SLOPES) 37E3 RIVERVIEW-CHEWACLA COMPLEX 77 RIVERVIEW LOAM 7s NOTES: 1. CHANNEL DRAINAGE AREA AND FLOW RATE MEET SILT FENCE DESIGN CRITERIA (VAESCH SPEC 3.05). A. DRAINAGE AREA, A = 0.12 ACRE B. RATIONAL RUNOFF COEFFICIENT, C = 0.3 C. RAINFALL INTENSITY (10-YR), 1 = 5.94 INCH/HR D. PEAK DISCHARGE (10-YR), Q = 0.22 CFS PROJECT NO.: 01713.01 DWG: G 3 SHEET: 4 OF 33 DATE: APRIL 2020 REV: 0 0 Q 0 w m m w m ai 0 N 0 N 0 N c� 0 0 CD 0 1 0 0 / U 0 CD z m 0 LO 0 N / 0 0 Q U N 0 CD z w J W m Q z U 0 / vi 2. EROSION AND SEDIMENT CONTROL NARRATIVE PROJECT DESCRIPTION THE PURPOSE OF THIS PROJECT IS TO INSTALL A ONE MILLION GALLON FLOW EQUALIZATION TANK FOR THE LICKING HOLE CREEK PUMPING STATION (CROZET PS #4) IN CROZET, VIRGINIA. THE CONSTRUCTION WILL INCLUDE NEW SEWER INSTALLATION, VAULTS, MANHOLES, AND A GRAVEL ACCESS ROAD. DURING STORM EVENTS THE TANK WILL PROVIDE STORAGE TO PREVENT DOWNSTREAM OVERFLOWS OF COMBINED SEWAGE. THE COUNTY OF ALBEMARLE IDENTIFIED CROZET AS A GROWTH AREA AND ARE PROACTIVELY INCREASING SEWAGE CAPACITIES TO PREPARE. A TOTAL OF APPROXIMATELY 1.26 ACRES WILL BE DISTURBED FOR THE REGULATOR INSTALLATION. I23t,�IIRe�1iIIIwde]►IQIINP►!r THE TANK SITE LIES ADJACENT TO THE EXISTING PUMPING STATION CROZET PS #4 AND WILL BE ACCESSIBLE VIA A NEW GRAVEL ACCESS ROAD, THE SURROUNDING VEGETATION CONSISTS OF FORESTED WOODLANDS WITH RIPARIAN AREAS. THE TANK SITE IS SLOPED NORTH. THE SITE DRAINS TOWARDS AN EXISTING DITCH. ALL VEGETATION SURROUNDING THE PUMP STATION AND TANK WILL REMAIN AFTER CONSTRUCTION. THE RIVANNA WATER AND SEWER AUTHORITY (RWSA) OWNS THE SITE. 3. ADJACENT AREAS I's 5 R 7 Q we THE TANK PROJECT SITE IS SURROUNDED BY THE EXISTING ACCESS ROAD AND DENSE MOUNTAINOUS FOREST LAND. ADJACENT VEGETATED AREAS WILL NOT BE DISTURBED DURING CONSTRUCTION. THERE ARE NO OFF -SITE (BALANCED OR BORROWED) AREAS ASSOCIATED WITH THIS PROJECT. ALL DEMOLITION DEBRIS AND OTHER SPOILS WILL BE HAULED TO A LICENSED LANDFILL. SOILS THE NATURAL RESOURCES CONSERVATION SERVICE (NRCS) DATA IDENTIFIES THE SOILS ON -SITE AS HAYESVILLE CLAY AND LOAM, RIVERVIEW LOAM, AND RIVERVIEW-CHEWACLA COMPLEX WITH VARYING DEGREES OF EROSION AND PERCENT SLOPES. THE NRCS DATA DOES NOT ATTRIBUTE AN ERODIBILITY (K) VALUE TO THESE SOILS. ANY POTENTIAL EROSION RESULTING FROM THE CONSTRUCTION WILL BE CORRECTED BEFORE DEPOSITION INTO A WATERWAY. CRITICAL AREAS THERE ARE NO CRITICAL AREAS ASSOCIATED WITH THIS SITE. THE LAYDOWN AND CONSTRUCTION AREAS WILL RECEIVE ALL THE APPROPRIATE SEDIMENT AND EROSION CONTROL MEASURES TO PREVENT THE DISCHARGE OF SILT AND OTHER FORMS OF WATER POLLUTION OFF -SITE. EROSION AND SEDIMENT CONTROL MEASURES UNLESS OTHERWISE NOTED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (LATEST EDITION). STRUCTURAL PRACTICES A. SAFETY FENCE: STD. AND SPEC. 3.01. A SAFETY FENCE SHALL BE INSTALLED WHERE REQUIRED TO LIMIT ACCESS OF THE SITE TO THE PUBLIC. B. TEMPORARY CONSTRUCTION ENTRANCE: STD. AND SPEC. 3.02. A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE INSTALLED WHERE REQUIRED. C. CONSTRUCTION ROAD STABILIZATION: STD. AND SPEC. 3.03. TEMPORARY CONSTRUCTION ROADS SHALL BE STABILIZED AS REQUIRED TO PREVENT EROSION AND SEDIMENTATION. D. SILT FENCE: STD. AND SPEC. 3.05. SILT FENCE SHALL BE PLACED AROUND THE SITE TO INTERCEPT SEDIMENT AS SHOWN ON THE EROSION CONTROL PLAN. E. ROCK CHECK DAMS: STD. AND SPEC. 3.20 ROCK CHECK DAMS SHALL BE PROVIDED WHERE INDICATED ON THE PLANS TO REDUCE THE VELOCITY OF CONCENTRATED STORMWATER FLOWS. F. DEWATERING STRUCTURE: STD. AND SPEC. 3.26. DEWATERING STRUCTURES SHALL DISCHARGE IN A MANNER WHICH WILL NOT ADVERSELY AFFECT FLOWING STREAMS, DRAINAGE SYSTEMS OR OFF -SITE PROPERTY. G. TURBIDITY CURTAIN: STD AND SPEC 3.27. TURBIDITY CURTAINS SHALL BE INSTALLED WHERE DESIGNATED ON THE EROSION AND SEDIMENT CONTROL PLANS TO PROVIDE SEDIMENTATION PROTECTION FOR A WATERCOURSE FROM UP -SLOPE LAND DISTURBANCE OR FROM DREDGING OR FILLING WITHIN THE WATERCOURSE. H. DUST CONTROL: STD. AND SPEC. 3.39. DUST CONTROL MEASURES TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES AND REDUCE THE AIRBORNE SUBSTANCES WHICH MAY PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT LIFE WILL BE EXERCISED THROUGHOUT THE PROJECT DURATION. I. WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS, EXCAVATED MATERIAL IS TO BE PLACED ON THE UPHILL SIDE OF EXCAVATIONS. VEGETATION PRACTICES TEMPORARY SEEDING STD. AND SPEC. 3.31. ALL AREAS ROUGH -GRADED DURING THE INITIAL PHASES OF CONSTRUCTION SHALL BE SEEDED WITH FAST GERMINATING, TEMPORARY VEGETATION WITHIN 7 DAYS FOLLOWING GRADING WHEN EXPOSED SOILS ARE NOT TO BE PERMANENTLY STABILIZED WITHIN 30 DAYS. SEEDING MIX OF GERMAN MILLET (SETARIA ITALICA) AT A RATE OF 50 LBS/ACRE WILL BE APPLIED AS TEMPORARY SEEDING FROM MAY 1 THROUGH AUGUST 31. SEEDING MIX OF 50/50 MIX OF ANNUAL RYEGRASS (LOLIUM MULTI-FLORUM) AND CEREAL (WINTER) RYE (SECALE CEREALE) AT A RATE OF 100 LBS/ACRE FROM SEPTEMBER 1 THROUGH FEBRUARY 15. 10. PERMANENT STABILIZATION ALL AREAS ON THE SITE WHICH ARE DESIGNATED FOR GRAVEL SHALL BE STABILIZED IMMEDIATELY AFTER GRADING. ALL OTHER AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING FINISH GRADING. GRADED AREAS SHALL BE FERTILIZED, SEEDED, AND MULCHED ACCORDING TO STDS. AND SPECS. 3.32 AND 3.35 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND THE CONTRACT DOCUMENTS. SEEDING MIX OF 90% K-31 FESCUE, 5% RED TOP GRASS, AND 5% IMPROVED KENTUCKY BLUEGRASS. MIXTURE APPLIED AT A RATE OF 200 LBS./ACRE. IN ADDITION, ALL AREAS DISTURBED WITHIN THE RPA WILL BE STABILIZED AND MITIGATED IN ACCORDANCE TO THE GUIDANCE PROVIDED IN THE DCR RIPARIAN BUFFERS AND MODIFICATION AND MITIGATION GUIDANCE MANUAL (LATEST EDITION). 11. PHASING OF LAND DISTURBING ACTIVITIES A. SILT FENCES, SAFETY FENCES, TURBIDITY CURTAINS, AND ALL OTHER PROJECT SPECIFIC EROSION AND SEDIMENT CONTROL TEMPORARY IMPLEMENTS SHALL BE IN PLACE BEFORE ANY CONSTRUCTION BEGINS. B. ALL E&S MEASURES SHALL BE MAINTAINED DURING DEMOLITION. C. CONSTRUCTION SHALL BE SEQUENCED SO THAT EXCAVATION OPERATIONS CAN BEGIN AND END AS QUICKLY AS POSSIBLE. D. AS NECESSARY GRADING OCCURS, CONSTRUCTION ROAD STABILIZATION SHALL BE INSTALLED TO PREVENT SEDIMENT TRANSPORT. E. TEMPORARY SEEDING SHALL OCCUR WITHIN 7 DAYS AFTER GRADING UNTIL FINAL GRADING IS ACHIEVED. F. PERMANENT STABILIZATION OF THE SITE SHALL OCCUR IMMEDIATELY FOLLOWING FINAL GRADING AND FINAL CONSTRUCTION OPERATIONS. iFAM-1Its] :ik►T,►I_r921:0Ir_Vr_Tel21k121al THE POST CONSTRUCTION IMPERVIOUS SURFACE OVER THE TANK SITE INCREASES SLIGHTLY WHEN COMPARED TO THE PRE -CONSTRUCTION CONDITIONS. STORMWATER ANALYSIS HAS DEMONSTRATED NO NEGATIVE EFFECT ON DOWNSTREAM WATERS OR IMPACT TO THE FLOODPLAIN. NO IMPROVEMENT MEASURES ARE REQUIRED PER MS-19, OR THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK. 13. REMOVAL OF TEMPORARY MEASURES ALL TEMPORARY EROSIONS AND SEDIMENT CONTROL MEASURES SHALL BE DISPOSED OF WITHIN 30 DAYS AFTER THE FINAL SITE STABILIZATION IS ACHIEVED OR AFTER TEMPORARY MEASURES ARE NO LONGER NEEDED. TRAPPED SEDIMENT AND OTHER DISTURBED SOIL AREAS RESULTING FROM THE DISPOSAL OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED. 14. MAINTENANCE ALL INSTALLED EROSION AND SEDIMENT CONTROL MEASURES MUST BE IN ACCORDANCE WITH REQUIREMENTS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (LATEST EDITION). ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL ANY DAMAGE CAUSED BY RAINFALL OR CONSTRUCTION ACTIVITIES MUST BE REPAIRED BY THE CLOSE OF THE DAY. THE FOLLOWING ITEMS MUST BE CHECKED IN PARTICULAR: A. ALL SEEDED AREAS MUST BE CHECKED TO SEE THAT A GOOD STAND IS MAINTAINED. THE AREA MUST BE RESEEDED AS NEEDED. B. SILT FENCES SHALL BE CHECKED DAILY AND AFTER EACH RAIN FOR UNDERMINING. REMOVE AND DISPOSE OF ANY ACCUMULATED SEDIMENT. C. PERMANENT AND TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. 15. E&S QUANTITIES TABLE: EROSION AND SEDIMENT CONTROL PRACTICE QUANTITY SILT FENCE 1,247 LF CONSTRUCTION ROAD STABILIZATION 2,650 SF CONSTRUCTION ENTRANCE 840 SF CHECK DAM 2 MULCHING 48,180 SF TEMPORARY SEEDING 48,180 SF PERMANENT SEEDING 48,180 SF 16. POST CONSTRUCTION SUPPORTING INFORMATION TOTAL GROSS SQUARE FOOTAGE AREA OF 54,825 SF / 1.26 ACRES DISTURBANCE TOTAL LAND AREA COVERED BY BUILDINGS/IMPERVIOUS STRUCTURES (SQUARE 3,835 SF / 0.09 ACRES FOOTAGE/ACREAGE) AMOUNT OF OPEN SPACE ON SITE (ACREAGE) 48,180 SF / 1.1 ACRES AMOUNT OF PAVED OR GRAVEL AREA 2,810 SF / 0.06 ACRES, 5.1 % (IMPERVIOUS AREA) ON SITE (ACREAGE AND %) NUMBER OF PARKING SPACES 2 PARKING SPACES NUMBER OF RESIDENTIAL UNITS OF EACH TYPE 0 RESIDENTIAL UNITS DCR 19 MINIMUM STANDARDS (1) SOIL STABILIZATION -PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE -TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS, BUT LESS THAN ONE YEAR -PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. (2) SOIL STOCKPILE STABILIZATION DURING CONSTRUCTION, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. TEMPORARY PROTECTION AND PERMANENT STABILIZATION SHALL BE APPLIED TO ALL SOIL STOCKPILES ON SITE AND BORROW AREAS OR SOIL INTENTIONALLY TRANSFERRED OFF SITE. (3) PERMANENT STABILIZATION PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS: -UNIFORM -MATURE ENOUGH TO SURVIVE -WILL INHIBIT EROSION (4) SEDIMENT BASINS & TRAPS SEDIMENT BASINS, SEDIMENT TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS, AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. (5) STABILIZATION OF EARTHEN STRUCTURES STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES, AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. (6) SEDIMENT TRAPS & SEDIMENT BASINS SEDIMENT TRAPS AND BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN AS FOLLOWS: SEDIMENT TRAPS -ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES -MINIMUM STORAGE CAPACITY OF 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA SEDIMENT BASINS -CONTROL DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES -MINIMUM STORAGE CAPACITY OF 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA -THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A TWENTY-FIVE YEAR STORM OF 24-HOUR DURATION (7) CUT AND FILL SLOPES DESIGN & CONSTRUCTION CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. (8) CONCENTRATED RUNOFF DOWN SLOPES CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME, OR SLOPE DRAIN STRUCTURE. (9) SLOPE MAINTENANCE WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. (10) STORM SEWER INLET PROTECTION ALL STORM SEWER INLETS MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE STORMWATER CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED/TREATED TO REMOVE SEDIMENT. (1 1) STORMWATER CONVEYANCE PROTECTION BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND THE RECEIVING CHANNEL. (12) WORK IN LIVE WATERCOURSE WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED: -PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT, AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION -NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS -EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS (13) CROSSING LIVE WATERCOURSE WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. (14) REGULATION OF WATERCOURSE CROSSING ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. (15) REGULATION OF WATERCOURSE CROSSING THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. (16) UNDERGROUND UTILITY LINE INSTALLATION UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: -NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME -EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES -EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY -MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION -RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS -COMPLY WITH APPLICABLE SAFETY REGULATIONS (17) VEHICULAR SEDIMENT TRACKING WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS: -PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE -WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY -SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER (18) REMOVAL OF TEMPORARY MEASURES ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. (19) STORMWATER MANAGEMENT PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION, AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY, AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA FOUND IN VESC REGULATION 4VAC50-30-40 MS-19 PARTS A-K. -CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE, OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. GENERAL NOTES: 1. ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE PERFORMED IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL LAW (TITLE 10.1, CHAPTER 5, ARTICLE 4 OF THE CODE OF VIRGINIA. 2. ALL REGULATED LAND -DISTURBING ACTIVITIES MUST COMPLY WITH THE 19 MINIMUM STANDARDS SPECIFIED IN SECTION 4VAC50-30-40 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS THAT ARE APPLICABLE TO THE SPECIFIC PROJECT. 3. LOCATION OF TEMPORARY CONSTRUCTION ROADS SHOWN ON THE PLANS IS FOR ILLUSTRATIVE PURPOSES ONLY. TEMPORARY CONSTRUCTION ROAD MAY BE LOCATED ANYWHERE WITHIN THE CONSTRUCTION LIMITS. SEDIMENT AND EROSION MEASURES SHALL BE ADJUSTED ACCORDINGLY. SEE SPECIFICATIONS REGARDING LIMITATION ON USE OF TEMPORARY CONSTRUCTION ACCESS ROADS. 4. THE CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO PREVENT THE DISCHARGE OF SILT, SILTED OR TURBID WATER TO THE JAMES RIVER. MEASURES MAY INCLUDE BUT ARE NOT LIMITED TO ROCK CHECK DAMS AND TEMPORARY SEDIMENT TRAP(S). MEASURES MAY BE LOCATED AS REQUIRED TO PERFORM THEIR FUNCTION AND TO ALLOW THE CONSTRUCTION OF THE WORK. STANDARD E&S NOTES 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN, DORMANT (UNDISTURBED) FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 2. EXCESS EXCAVATION DISPOSED OF OFF THE SITE SHALL BE DISPOSED OF IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 3. EROSION AND SEDIMENT CONTROLS SHALL BE INSTALLED IN ACCORDANCE WITH VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND SHALL BE PLACED PRIOR TO OR AS THE FIRST STEP OF THE LAND DISTURBING ACTIVITY. 4. EROSION AND SEDIMENT CONTROLS SHALL BE MAINTAINED SO THAT THE SEDIMENT CARRYING RUNOFF FROM THE SITE WILL NOT ENTER STORM DRAINAGE FACILITIES. 5. EROSION AND SEDIMENT CONTROLS SHALL BE MAINTAINED UNTIL THE DISTURBED AREA IS STABILIZED. 6. PROPERTIES ADJOINING THE SITE SHALL BE KEPT CLEAN OF MUD OR SILT CARRIED FROM THE SITE BY VEHICULAR TRAFFIC OR RUNOFF. 7. THE DISPOSAL OF WASTE MATERIALS REMOVED FROM EROSION AND SEDIMENT CONTROL FACILITIES AND THE DISPOSAL OF THESE FACILITIES SHALL BE IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 8. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 9. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. Schnabel ENGINEERING NLT0 GI x11 ��.. Ma-GREELEYAN� HANSEN �- RIO20 CHMONDNVIR�INA 23235INT AY, SUITE 475 DESIGNED JM DRAWN DRH CHECKED RJC fi� -�j /,- G'' APPROVED L ROGER J. CRONIN Y Lic No. 016431 �r� 4/24/2020 ww `��o _ �; SCALE RIVANNA WATER AND SEWER AUTHORITY CROZET FLOW EQAULIZATION TANK AND PUMPING STATION UPGRADES GENERAL E&S CONTROL STANDARD NOTES PROJECT NO.: 01713.01 DWG: G 4 SHEET: 5 OF 33 N0. DATE APPD REVISION DATE: APRIL 2020 REV: 0 CONSTRUCTION OF A SILT FENCE (WITH WIRE SUPPORT) SET POSTS AND EXCAVATE A 4"X4" 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THE LINE OF POSTS. FLOW III I 4 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. r G FLOW L101- =1 EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. FILTER FABRIC qIU WIRE Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, PLATE. 3.05-1 & v; 1992 0 Q 0 w m m w 0 N 0 N 0 N c� 0 'n Source: Va. DSWC 0 c� 0 0 III - 353 0 c� 0 c� z 0 LO 0 N 0 0 Q U N F_ / Schnabel z ENGINEERING w J W m Q z DESIGNED JM U GREELEYAND HANSEM DRAWN DRH 9020 STONY POINT PARKWAY, SUITE 475 �I 0 RICHMOND, VIRGINIA 23235 CHECKED RJC vi 3.35 TABLE 3.35-A ORGANIC MULCH MATERIALS AND APPLICATION RATES RATES: MULCHES: NOTES: per Acre Per 1000 sq. ft. Straw or Hay 1' - 2 tons 70 - 90 lbs. Free from weeds and coarse (Minimum 2 matter. Must be anchored. tons for Spread with mulch blower winter cover) or by hand. Fiber Mulch Minimum 35 lbs. Do not use as mulch for 1500 lbs. winter cover or during hot, dry periods.* Apply as slurry. Corn Stalks 4 - 6 tons 185 - 275 lbs. Cut or shredded in 4-6" lengths. Air-dried. Do not use in fine turf areas. Apply with mulch blower or by hand. Wood Chips 4 - 6 tons 185 - 275 lbs. Free of coarse matter. Air- dried. Treat with 12 lbs nitrogen per ton. Do not use in fine turf areas. Apply with mulch blower, chip handler, or by hand. Bark Chips 50 - 70 cu. 1-2 cu. yds. Free of coarse matter. Air - or yds. dried. Do not use in fine Shredded turf areas. Apply with Bark mulch blower, chip handler, or by hand. * When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum rate of 2000 lbs./ac. or 45 lbs./1000 sq. ft. CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE SUPPORT) 1. SET THE STAKES. 2. EXCAVATE A 4"1 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. 6' MAX. FLOW - 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. U 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. II FLOW - SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) I POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control,VA. DSWC PLATE. 3.05-2 Sherwood and Tyant 1992 3.32 TABLE 3.32-D SITE SPECIFIC SEEDING MIXTURES FOR PIEDMONT AREA Total Lbs. Per Acre Minimum Care Lawn - Commercial or Residential 175-200 lbs. - Kentucky 31 or Turf -Type Tall Fescue 95-100% - Improved Perennial Ryegrass 0-5% - Kentucky Bluegrass 0-5% High -Maintenance Lawn 200-250 lbs. - Kentucky 31 or Turf -Type Tall Fescue 100% General Slope (3:1 or less) - Kentucky 31 Fescue 128 lbs. - Red Top Grass 2 lbs. - Seasonal Nurse Crop * 20 lbs. 150 lbs. Low -Maintenance Slope (Steeper than 3:1) - Kentucky 31 Fescue 108 lbs. - Red Top Grass 2 lbs. - Seasonal Nurse Crop * 20 lbs. - Crownvetch * * 20 lbs. 150 lbs. * Use seasonal nurse crop in accordance with seeding dates as stated below: February 16th through April ...................... Annual Rye May 1st through August 15th ..................... Foxtail Millet August 16th through October ...................... Annual Rye November through February 15th ................... Winter Rye ** Substitute Sericea lespedeza for Crownvetch east of Farmville, Va. (May through September use hulled Sericea, all other periods, use unhulled Sericea). If Flatpea is used in lieu of Crownvetch, increase rate to 30 lbs./acre. All legume seed must be properly inoculated. Weeping Lovegrass may be added to any slope or low -maintenance mix during warmer seeding periods; add 10-20 lbs./acre in mixes. III - 303 STONE CONSTRUCTION ENTRANCE GROUND 70' MIN. A FILTER CLOTH 6" MIN. I Al SIDE ELEVATION 12' MIN. 70' MIN. B WASHRACK I F_ (OPTIONAL) L VDOT #1 I �� POSITIVE DRAINAGE COURSE AGGREGATE B TO SEDIMENT TRAPPING DEVICE * MUST EXTEND FULL WIDTH PLAN VIEW OF INGRESS AND EGRESS OPERATION ... SECTION A -A REirvr umur-ij l urm mr- I r- 1JKHLV zwAUL 10, EXISTING PAVEMENT 5:1 MOUNTABLE BERM (OPTIONAL) 7 10' MIN. EXISTING PAVEMENT 10' MIN. SECTION B-B SOURCE: ADAPTED from 1983 Maryland Standards for Soil erosion and Sediment Control, and Va. DSWC Plate 3.02-1 R 0 CK CHECK DAM VDOT #1 COARSE AGGREGATE FLOW 2-10 ACRES OF DRAINAGE AREA: VDOT #1 COARSE AGGREGATE FLOW SOURCE: VA. DSWC 6" CLASS I RIPRAP PLATE. 3.20-1 SPACING BETWEEN CHECK DAMS L = THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION SOURCE: VA. DSWC PLATE. 3.20-2 ROCK CHECK DAMS SHALL BE INSTALLED IN SERIES WITH HEAVY WOVEN, PERVIOUS FILTER FABRIC TURBIDITY CURTAINS. SEE BELOW FOR DETAIL. SEE PLAN SHEETS FOR INSTALLATION LOCATIONS. ���PLTH OF Lf APPROVED ��' �� SCALE RIVANNA WATER AND SEWER AUTHORITY ROGER J. CRONIN Y Lic No. 016431 4/24/2020 ww� CROZET FLOW EQAULIZATION TANK N0. DATE APPD REVISION AND PUMPING STATION UPGRADES GENERAL E&S CONTROL STANDARD DETAILS PROJECT NO.: 01713.01 DWG: G 5 SHEET: 6 OF 33 DATE: APRIL 2020 REV: 0 _ — — — 5902 I — 1 I ' I ' I I I LL- LL- 30 -0" / / / �' i UTILITY SEMENT I 30,ss — FqS }- \.1 EXISTING 18" FORCEMAIN TO CROZET PS NO. 3 I PL PL I I I III: I / EXISTING / / I PL — PL I / / ACCESS ROAD / / / I L J� RIVANNA WATER AND SEWER AUTHORITY P TAX MAP AND PARCEL NUMBER: I I I PL 05700-00-00-035AO (D.B. 825 PG. 698) 05907 / / / L A5908 pL \ I II I PL PL EXISTING FENCING I PL I I \ , PLPL PLC I � I• I � I � PL 01 II — �I � �I I I 05 00 ; I PHASE B 12" HDPE DISCHARGE — EXISTING 12 04/ i al LIMITS OF CLEARING (TYP) o, SEE NOTE 2 AND DETAIL 2/C5 BYPASS CONNECTION c WITH 12" GATE VALVE EXI TING SUMP / DEMOLISH FENCE ANDI SUMP PUMP I BM C UE — UE II / CL 0' cc� o, I I I \ EXISTING `yam i PHASE A ) PHASE B PUMPS BM B CROZET �� (2) 12" HDPE 504 PHASE B (SEE SCHEDULE) - \ PS NO.4 - — — — — — _ — — F` SUCTION PIPELINE (2) 12" HDPE / SEWER ABANDON IN PLACE AT SUCTION PIPELINES OTHER LOCATION AND FILL REMOVE 18" WITH FLOWABLE FILL UNDER NEW TANK EXISTING w ���i I a�5906 505 ADNOLISH ADD NEW MHE 1 ` 0 WELL — SAN SAN SAN 0 N SAS. SAN Gj 5910 o 12" DISCHARGE m o SAN /� ZAN / SEE NOTE 4 o J o L a m MANHOLE CZI-MH- 3 PHASE A SUCTION I -D _---------------- ---/— SEE NOTE 3—_----- --_ "mac / . DEMOLISH 18" SEWER PHASE A PUMPS I \ EXISTING SEE NOTE 3 \ PHASE A 12 HDPE DISCHARGE i� Lu GENERATOR N a 50�� B-01 A SEE NOTE 1 AND DETAIL 1 /C5 EXISTING ai FkL 'MN K BM A 0 \08, t9 B-01 B-02 0 509- 0 I O5 J 510 �' _ W p N a 511 NOTES: 1. PHASE A BYPASS PUMPING; PROVIDE BYPASS o 512 Q� :D i I / PUMPING FROM UPSTREAM EXISTING MANHOLE CZI-MH-63 TO EXISTING WET WELL DURING 0 \ / �i II / DEMOLITION OF 18" SEWER AND INSTALLATION OF 0i a 513. / _ P� / i II / NEW 24" SEWER. 0 0 / c� 0 c� z 0 Ln 0 N / 0 0 Q U N / Schnabel z ENGINEERING w J W m Q U u, GREELEYANo HAIVSEIV I 9020 STONY POINT PARKWAY, SUITE 475 o RICHMOND, VIRGINIA 23235 / BYPASS PUMP SCHEDULE PHASE N UMBER OF PUMPS MINIMUM PUMP CAPACITY/ PER PUMP A 2 2100 GPM AT 50 FT TDH B 2 2100 GPM AT 110 FT TDH RIVANNA WATER AND SEWER AUTHORITY TAX MAP AND PARCEL NUMBER: 514 05700-00-00-03500 (D.B. 5239 PG. 482) 2. PHASE B BYPASS PUMPING; PROVIDE BYPASS PUMPING � R 515 OF 12" BOM NEW MANHOLE BYPASS CONNECTION CN AS SHOWN I OTING SHOWNIN PLAN PL PL S \ OF \\ I % I DURING PUMP STATION IMPROVEMENTS. 13. REMOVE EXISTING MH TOP AND CONE TO ALLOW INSTALLATION OF (2) 12" HDPE SUCTION PIPE LINE S 8 \ I IoF h-- I AND THEN REPLACE MH CONE AND TOP AFTER 00 I h i I BYPASS PUMPING COMPLETED. \ h I 4. PROVIDE 12" RESTRAINED DROP PIPE TO EL 492.0 \ AND DISCHARGE TO BYPASS SCREEN CHANNEL. CONTRACTOR TO CLEAN BYPASS BAR SCREEN DURING BYPASS PUMP OPERATION. DEMOLITION AND PHASED BYPASS PUMPING PLAN SCALE: 1 = 20 ��ALTH OF Lf v�1�� SCALE RIVANNA WATER AND SEWER AUTHORITY CIVIL DESIGNED JM APPROVED '� � PROJECT NO.: 01713.01 U ROGER J. CRONIN Y DWG. l 1 DRAWN DRH Lic No. 016431 20 0 20 40 FT v CHECKED RJC 4/24/2020 1 1 1 »=20p CROZET FLOW EQAU LI ZATI O N TANK SHEET: 9 of 33 O ,v�y(`w �h_1 It NO. DATE APPD REVISION AND PUMPING STATION UPGRADES SITE DEMOLITION AND BYPASS PUMPING PLAN DATE: APRIL 2020 REV: 0 5902 — I I A590 .� DITCH LINE (TYP) I \ I I \ i 1� NEW 12 CULVERT / PROVIDE EXISTING ACCESS \ GRAVEL ACCESS : \ ROAD (21A) SEE I i ROAD WITH 8 COMPACTED 1 TANK SEE DETAIL 4/C6 I CONSTR CTIONECONPLETED \\ i I ... ,3 I I.. /�� ...... 0 CC so,o„ T II I / FLOODWAY LIMITS E, S� EqS I II I I I 1 �,c 88 Fiy • I . � � / . p� FNT •I I ......... I I I PL I I PL i EXISTING / I I _ PL \ ACCESS ROAD PL RIVANNA WATER AND SEWER AUTHORITY / "' OL PL TAX MAP AND PARCEL NUMBER: i PL 05700 00 00 035A0 (D.B. 825 PG. 698) a / 05907 / L 05908 \\\ f • , / � EXISTING FENCING � \ .• I PL CONNECT EXISTING I I I I Fy FENCE TO NEW FENCE (TYP) 01 X WP09 .� � I I I NEW FENCE I I / I I SEE DETAIL _ I 05 00 / 0 04 i TREE LINE (TYP) 2/C2 i NEW GATE o- v, EXISTING SUMP / 1 \ PERMITTED STAGING AREA, OFFICE SEE DETAIL AND SUMP PUMP / I zZ � _ TRAILER, AND/ OR MATERIAL 3/C3 C HANDLING AND STORAGE AREA IPARKING LOT - WP07 BM C // a c / i (21 A) / WATERTIGHT EXISTING CHEMICAL 1499a/j i i � I � \ '• MANHOLE (TYP) FET DRAI I \ STORAGE T NK AND VALV FEED I / / c� WP08 `� EXISTING CRIOZING ET // / nJ- 100-YEAR WP03 0, \ JIB CRANE BM B PS NO.4 / FLOODPLAIN LIMITS _50� WP04 t ODOR CONTROL / ------ -- _ i UNIT OCU-1 t i SEE DETAIL 4/C7 EXISTING / WELL w a0 906 5 WP01 O w 05 \ / / N DETAIL 1/ C3 ° I / o (TYP)) CONTROL POINT WP18 `) EXISTING FET-1 TANK SEE SCHEDULE ON o MANHOLE 100-YEAR BASE CONCRETE CURB DWG G1, TYP > L FLOOD ELEVATION SEE DETAIL 1 /C3 FET INFLOW AND o a COUNTOUR _� _ WP05 1 FLUSH VALVE VAULT WP17 m _ _ _ _ WP02 WP06 m — /— — — — — — — — — - - - - - SOIL BORING \\ (TYP) \• - EXISTING a_ J \S0, FET-1 TANK B-01A i GENERATOR c� a ' J EXISTING 0-) S ` 1 /C ��J\� l I' FUEL TANK BM A 0 509 05912 / o a CONNECT EXISTING \ _-�� FENCE TO NEW ` ip FENCE (TYP) c-)— �� _ _NEW SLOPE / ' FLOOD STORAGE SUMMARY (13FE 507RIVANNA WATER AND SEWER AUTHORITY �— - (SEE DWG C3) Pt �1 TAX MAP AND PARCEL NUMBER: 514� /�j'—� _ �� I / LOST FLO 0 D STORAGE COMPENSATORY N 05700-00-00-03500 (D.B. 5239 PG. 482) �� ". � ��__ j � O 51 �. �_— F \ I / STORAGE ET PL PL V j/ -- OF \ I P� 1 CU YD TANK VOLUME BELOW BFE CU YD GRADING BELOW BFE CU YD \ I 1 229.00 253.42 24.42 �1/C3 \\ I 10F a °° SITE CUT FILL SUMMARY \ a \ \ I \ a i CUT FI LL Q 545 � I \\ a I NAME FACTOR FACTOR 2 DS Q FT CU AREA C U D GRADING 1 1 18663.47 284.73 N FI LL NET CU YD CU YD 139.91 144.82<CUT> '\ SITE PLAN CD Schnabel SCALE: 1" = 20' w ENGINEERING � ALTIH-1 f w Q v�1�� SCALE RIVANNA WATER AND SEWER AUTHORITY CIVIL = DESIGNED JM APPROVED PROJECT NO.: 01713.01 � OWN GREELEYANo HANSEN tU ROGER J. CRONIN > DWG: DRAWN DRH Li c No. 016431 20 0 20 40 FT Cj 2 ,_ 9020 STONY POINT PARKWAY, SUITE 475 I I 1 1 1 "=20' C ROZ ET FLOW EQAU LI ZATI O N TANK SHEET: 10 OF 33 j RICHMOND, VIRGINIA 23235 A� 4/24/2020 CHECKED RJC � S NO. DATE APPD REVISION AND PUMPING STATION UPGRADES SITE PLAN DATE: APRIL 2020 REV: 0 w00 z O 'I U cv A V) w J Ld Of Q O m� 0 It 00 SHEETING 4" MIN. 12" MAX. CL W/ ECCENTRIC CONE EXISTING GRADE 2" OR 3" REINFORCED C.I. FRAME & COVER CONC. ADJUSTING RINGS. WATERTIGHT — — — — — — — — — — — — 8" 8" SET FRAME AND/OR ADJUSTING RINGS — — L — — — — — — — — — IN CEMENT MORTAR BED. NON -SAG — — — — — — — — — — — — — — — JOINT SEALER SHALL BE USED IN — — — — — — — — — AREAS SUBJECT TO FLOODING. - — — — — -- — _ _ _ _ SLOPE CONFORMING ------------ %/ VARIES — — — — — — REQUIREMENTS rz -�!---------------`�- SEE PROFILE L — — — — — — COMPACTED ° - — — — — — — — — — — — — COMMON FILL — ° - — — — — — — — — — — TRENCH BACKFILL — EXCEPT WHERE 2411 I.D. / / / 0j ALTERNATIVE FILL IS SPECIFIED OR SHOWN NEW PIPELINE CL- ------------------------------- ° ALL JOINTS TO HAVE "0" RING GASKET, GASKETS SHALL BE PER ATSM C443 PIPE BEDDING / ° PIPE O.D./8 PLASTIC LINING (VDOT SIZE NO. 57) /A OR 4" MIN d ° d — S AUTHORIZED IN WRITING BY THE ENGINEER d PAYMENT LIMITS FOR AUTHORIZED ADDITIONAL EXCAVATION AND --------------------------Z -- d RESILIENT CONNECTOR PER ATSM C923 SELECT FILL MATERIAL SHEETED UNSHEETED TRENCH TRENCH PAY ENT LIMITS FOR 5„ MIN AUTHORIZED FILTER CLOTH 48" TO 72" DIA c STUB °d PIPE O.D. + 3'-0" BENCH 3" NOTES: SLOPE 1. BENCH SHALL BE CLASS C d ---------- CONCRETE. CONCRETE. O U 0 z 3-#6 R DOWELEI BASE SL Ln ... ...... . BEDDING N I I r I I 12" MIN \ �,t I 12"-18" I ,`� 1 2 PIPE �:. DIA MIN d . i d 9 .. °oOOOOOOOOOOOOO( °. ° d ° d 00 QOO QOO QOO d 94.O�n9�0�n94.0�n9�05 2. MANHOLE CONSTRUCTION SHALL CONFORM TO ASTM SPEC. C-478. "SUPPORT PIPE ON #57 STONE BEDDING 12" OF STONE BEDDING .DETAIL 1 ZC6 EXISTING GRADE STANDARD 48" TO 72" PRECAST CONCRETE MAN H 0 L NOT TO SCALE DETAIL 6 f C6 0 0 Q U MY TrJ/ JI%./1\L BEDDING JCE IS GREATER THAN IARD DROP CONNECTION IPE CROWNS MATCH CTION PIPE SHALL BE N MANHOLE DROP CONNECTION DETAIL 2/C6 TRENCH AND PIPE BEDDING NOT TO SCALE EASEMENT WIDTH VARIES (CLEARING LIMITS) NORMAL WIDTH 20' 8'-0» CL ROAD 6" COMPACTED VDOT 21A 12" COMPACTED #5 AGGREGATE- L COMPACT SUBGRADE WITH ROLLER. EXCAVATE SOFT SPOTS AND REPLACE WITH COMPACTED AGGREGATE. DETAIL 4/C6 ACCESS ROAD NOT TO SCALE LLJ U' CL Z d w w cl. O O LL. DETAIL 7/C6 MANHOLE INVERT NEENAH R-6460-G1 WATERTIGHT C.I. FRAME & COVER OR EQUAL r � 3'-0" CLEAR OPENING PLASTIC LINING 5'-0" NEW PRECAST MANHOLE DETAIL 8/C6 MH-1 BY-PASS PUMP SUCTION MANHOLE 1 /2" = 1'-0" F_ z ° ° LL1 LZ d . J d. LL. LL_ LLI Z INFLUENT EFFLUENT PIPE PIPE z_ d ° MANHOLE ° d d d ° ° , d o ° ° z_ O iD NOTES: 1. CONCRETE CHANNEL NOT SHOWN. 7/8" p-� �_oio'::.:io. EW PLAN VIEW DETAIL 3 C6 PUMPING STATION NEW 24" SEWER INLET SCALE: 1/2" = 1'-O" 27 1/2- DIA 1 [698mm] [37mm] 1/2- (4) i" (25mm) DIA HOLES 7" ON 226 1/4" DIA ,d4 [178mm]BOLTC*I [667mm] �I 24" DIA I ' I` [614mm] ^1 28 3/16" DIA [716mm] 36" DIA [914mm] (4) 1 " (25mm) DIA HOLES ON 32 3 4" (834mm) DIA BOLT CIRCLE. 1 1/2" (38mm) LETTERS FRAME SECTION (RECESSED FLUSH) 26" [660mm] 1 1/2" 13/16" [38mm] [20mm] CAM BOLT SEE ASSEMBLY 141 3 1 /8' 1/2" DETAIL [79mm] [13mm] 1/4" (6mm) DIA (2) coRED 22 13/16" NEOPRENE GASKET PICKBARS [579mm] 0 25" 1 1/8" (29mm) DIA BOSS [635mm] O.D. OF GKT GROOVE SECTION VIEW 3 13/16" 2 1 /8" [97mm] [54mm] 1 3/8" (2) WSHR 1/16 X 5/8 X 1 1/2 0 11/16" 35mm] 9/16" PART# 00981045 [1/16 [14mm] (RUBBER2) BLT HEX 5/8-11X3 1/2 SS PART# 00981250 (2) WSHR 5/8 ID 1.50 OD SS PART# 00981318 .1800" 1 [5mm] " 2400 1 /2" [42mm ] (2) NUT HX 5/8-11 ZN NYLK [6mm] [13mm] 63 DIA. STAINLESS STEEL ROD PART# 00981284 (2) NUT HX JAM 5/8-11 ZN PART# 00981228 PICKBAR & LOCKLUG HOLE DETAIL (2) 1935R LOCK LUG (SHORT) PART# 00193585 LOCK LUG ASSEMBLY NOTES: 1. ALL MANHOLES WITHIN 100 YEAR FLOODPLAIN OR LOCATED IN AREAS SUBJECT TO FLOODING SHALL HAVE WATERTIGHT FRAME & COVER. 2. ALTERNATIVE DESIGN FOR WATERTIGHT COVERS WILL BE CONSIDERED. 3. COVERS SHALL BE FIXED TO FRAMES WITH LOCKING LUGS OR SIMILAR ASSEMBLY. 1-1 "' NOT TO SCALE NOT TO SCALE REVISION OCT 2015 TYPICAL WATERTIGHT DRAWING NUMBER: DATE: MANHOLE FRAME & COVER is Schnabol SCALE: TALI° RIVANNA WATER AND SEWER AUTHORITY SEWER 6 w ENGINEERING � ,NLTIHI w Q '�� SCALE RIVANNA WATER AND SEWER AUTHORITY CIVIL = DESIGNED JM APPROVED PROJECT NO.: 01713.01 � OWN GREELEYANo HANSEN U ROGER DWG: _I DRAWN DRH Lic No. 016431 C 6 9020 STONY VIR6INA PARKWAY, SUITE 475 A CROZET FLOW EQAULIZATION TANK SHEET: 14 OF 33 RICH0 CHECKED RJC �0 4�24�2020 w S NO. DATE APPD REVISION AND PUMPING STATION UPGRADES D ETAI LS DATE: APRIL 2020 REv: o 30"x3O" ACCESS 9" x 9" x 2" MANHOLE ABOVE FLOOR SUMP ACCESS LADDER 12" DRAIN VALVE WITH SEE DETAIL 3/C7 MODULATING MOTOR 1 /C 7 OPERATOR TV-1 B 1 /C 7 FROM FET-1 12" SOLID SLEEVE VALVE OPERATOR SHAFT (TYP) SECTIONAL PLAN 5'-0II N 30"x3O" ALUMINUM WATERTIGHT ACCESS HATCH SEE DETAIL .., TOP PLAN DRAIN VALVE MOTOR OPERATOR 30" x 30" ALUMINUM ACCESS HATCH LOVE GRADE DRAIN VALVE MOTOR OPERATOR TV-1 B CONCRETE HOLE WITH MINIMUM OF 1 /2" CLEARANCE ALL AROUND THE VALVE STEM (TYP) EL 505.0 12" INLET VALVE MOTOR OPERATED TV-1 A 9" X9"X2" FLOOR SUMP 30"x30" ACCESS 5'-0" MANHOLE ABOVE ACCESS LADDER SEE DETAIL 3/C7 12" TO FET I N LET 2/C 7 A. - 12" FROM PS 2/C 7 0 o R R 12" HARNESSED FLANGE ADAPTOR R 12"x6" PExMJ REDUCER 6" TO FET FLUSH 2/C 7 30"x3O" ALUMINUM WATERTIGHT ACCESS HATCH SEE DETAIL 3/ R RESTRAINTED JOINT (TYP) VALVE OPERATOR SHAFT (TYP) 6" DRAIN VALVE VALVE MOTOR OPERATED TV-1 C 6" HARNESSES FLANGE ADAPTOR SECTIONAL PLAN rl nil "��VE GRADE FET VALVE MOTOR -RATOR TV-1 A TOP PLAN ���.� GRADE FET FLUSH VALVE MOTOR OPERATOR TV-1C 30" ALU WELD 3" x 3" x 1 /2" x 2 1 /2" (SEE ALUMINUM BENT PLATES TO BAR RAILS LOCI AND BOLT TO FLOOR WITH 1 /2" 0 STAINLESS STEEL EXPANSION ANCHORS FOP- 3/C7 1'-6" 3" x 1 /2" x 12 LONG BENT ALUMINUM BRACKET 0 4'-0" OC - WELD TO RAILS AND FASTEN TO WALL WITH 1 /2" 0 STAINLESS STEEL EXPANSION BOLTS . UR SAFETY POST a 4— 3/C7 SECTION 3/C7 DETAIL 3_/C7 ACCESS HATCH AND LADDER SCALE: NOT TO SCALE ;ISTING 84" DIA )SORBER VESSEL PROVIDE WATERTIGHT HATCH WITH EXTERIOR HATCH FRAME WATER DRAIN INLET VALVE MOTOR OPERATOR NEW FAN (4) 5/8" X 14" BASE (400 CFM) RELOCATED 6" STEEL 30" x 30" CONCRETE HOLE WITH MINIMUM CONCRETE ANCHORS) BASE ACCESS ALUMINUM OF 1 /2" CLEARANCE ALL LADDER VALVE 12" PLUG VALVE TV-1 B ACCESS HATCH AROUND THE VALVE STEM (TYP) I NEW CONCRETE BASE PRECAST STEM MOTOR OPERATED CONCRETE 12" SOLID GROUT WATERTIGHT AFTER EL 505.0 N VAULT SLEEVE PIPE INSTALLATION (TYP) T/C EL 506.0 GRADE EL 505.5t 12" PLUG VALVE TV-1A - - - ITI-IT1=1Ti o -III=III=11 MOTOR OPERATED -III-III #5® 12" EWEF lil-lil=lii- -III-I I 1=1L=TI- T ACCESS FROM FET-1 1=1 I I- 11-TI- I - rz, /I iLADDER VALVE GROUT WATERTIGHT AFTER _ - I L i1Tliii� PRECAST STEM PIPE INSTALLATION (TYP) CONCRETE =1 I 1=1-I i-' -I i I� I1=1I1=' _ ;I I1= III o VAULT R ,�,- > EL 491.0 Q C) _ INV EL 493.1 1 -012" VDOT 57 STONE Lj 0 m -N 9"x9"x2" FLOOR SUMP EL 495.3 (TYP ) = PIPE SUPPORT (TYP) - INV EL 497.3 SECT A —A SEE DETAIL 3/M6 a_ 2'-0" 5'-0" 2'-0" -N 9"x9"x2" FLOOR SUMP N PIPE SUPPORT (TYP) TANK EXTERIOR 9'-011 SEE DETAIL 3/M6 2'-0" 5'-0" 2'-011 12" FRP FOUL AIR CL EL 508.75 SECTION 1 /C7 9 -0�� - 6" CONC CURB 12" VESSEL OUTLET o Lo N SECTION 2/C7 NEW 12" FLEXIBLE NEW CONCRETE BASE D ETAI L 1 C 7 CONNECTOR 0 - - to FET D RAI N VALVE VAULT D ETAI L 2ZC 7 o SCALE: , /4" _ ,'-o" FET INLET VALVE AND FLUSHING VALVE VAULT _ ' �� EXISTING 84" DIA 1 b ADSORBER VESSEL o SCALE: 1 /4" = 1'-0" A A o - - - o u�-oo NEW 12" PIPE z SUPPORT, SEE + DETAIL 3/M6 0 12" VESSEL Ln NEW FAN INLET c° (400 CFM) i " 13'-6" 6" BASE ANCHOR 6 o BOLT (TYP) 0 Q 14'-6" N 2 DETAIL 4/C7 Schnabol ODOR CONTROL UNIT OCU-1 PIPING PLAN w ENGINEERING w is l ��ALTH OF L! SCALE: 1 /4" = 1'-0" Q v�'�. SCALE RIVANNA WATER AND SEWER AUTHORITY CIVIL = DESIGNED JM APPROVED 2 PROJECT NO.: 01713.01 OWN GREELEYANo HAMSEIV U ROGER J. CRONIN v DRAWN DRH Lic No. 016431 4 0 4 8 FT DWG: C 7 0 9020 STONY RIICHMOND, VIRGOINT INA 23235AY, SUITE 475 CHECKED RJC A 4�24�2020 I I I I 1/4"=1'-0" 0 CROZET FLOW EQAULIZATION TANK SHEET: 15 OF 33 �0 w NO. DATE APPD REVISION AND PUMPING STATION UPGRADES FET VAULTS PLANS AND SECTIONS DATE: APRIL 2020 REv: o