Loading...
HomeMy WebLinkAboutWPO202000008 Plan - Revision WPO VSMP 2020-05-27RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINIA WATER & SEWER AUTHORITY MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY ENGINEERING BUILDING ADDITION 0 WPO 2020-00008 MAY 2020 TH O �. 20205.2�1 08: 4-04 o L. MICHAELZ SANTOWASSO a en Lic. No. 045376 Z HAZEN AND SAWYER SToNAL �� 4011 WESTCHASE BLVD, SUITE 500 RALEIGH, NORTH CAROLINA 28217 CERTIFICATE OF AUTHORIZATION NUMBER: 2771 DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT SIGNATURE PANEL: p m J 0 U z U 7i U W O J 0 0 U U J - 0 U U U m} 0 �m U7�; CDd 0 0 N �o M O J N of N N LO �w M Q o� 0 J ii a GENERAL NOTES: 1. SITE INFORMATION HAS BEEN PROVIDED BY SITE SURVEY PREPARED BY DRAPER ADEN ASSOCIATES DATED OCTOBER 10, 2019. 2. HORIZONTAL CONTROL IS REFERENCED TO NAD 83, VIRGINIA SOUTH ZONE, AND VERTICAL CONTROL IS REFERENCED TO NAVD 88. 3. FLOOD PLAIN ELEVATIONS FROM FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) FLOOD INSURANCE RATE MAP FIRM PANEL 0289D MAP NUMBER 51003CO289D DATED FEBRUARY 04, 2005 THE PROJECT IS LOCATED IN ZONE X, AREA OF MINIMAL FLOOD HAZARD. 4. CONTRACTOR SHALL VERIFY FIELD CONDITIONS BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL VERIFY EXISTING ELEVATIONS AND DIMENSIONS WHERE NEW WORK WILL MATCH EXISTING. DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR RESOLUTION PRIOR TO THE COMMENCEMENT OF WORK. 5. CONTRACTOR SHALL OBTAIN ALL THE NECESSARY PERMITS FROM THE APPROPRIATE AUTHORITIES, DEPARTMENTS, AND/OR AGENCIES HAVING JURISDICTION PRIOR TO COMMENCING WORK. 6. CONTRACTOR SHALL TAKE CARE TO AVOID DAMAGE TO EXISTING PAVEMENT, TREES, VEGETATION, STRUCTURES, AND UTILITIES THAT ARE NOT INDICATED TO BE DEMOLISHED OR REMOVED. ANY DAMAGE TO EXISTING PAVEMENT, TREES, VEGETATION, STRUCTURES, AND UTILITIES NOT INDICATED TO BE DEMOLISHED OR REMOVED SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. 7. UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE SURVEY INFORMATION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THEIR EXACT LOCATION AND TO AVOID DAMAGE TO THEM. THE CONTRACTOR SHALL CONTACT VIRGINIA 811 AT PHONE NUMBER 811 OR 1-800-552-7001 TO REQUEST UNDERGROUND UTILITY LOCATION MARK -OUT AT LEAST THREE (3) WORKING DAYS BUT NO MORE THAN TEN (10) WORKING DAYS PRIOR TO BEGINNING EXCAVATION, INCLUDING SOIL DRILLING. THE CONTRACTOR SHALL ALSO CONTACT AND REQUEST UTILITY LOCATION MARK -OUT FROM BURIED UTILITY OWNERS WITH UTILITIES ON THE PROJECT SITE THAT ARE NOT PARTICIPANTS OF VIRGINIA 811. 8. WHERE PROPOSED WORK IS IN THE VICINITY OF UTILITY POLES, SUCH THAT SUPPORT OF THE POLE(S) WILL BE REQUIRED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE UTILITY OF THE WORK. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE UTILITY FOR SUPPORT OF THE POLE. 9. WHERE OVERHEAD POWER LINES ARE PRESENT, CONTRACTOR MUST CONTACT THE UTILITY PRIOR TO CONSTRUCTION ACTIVITIES TO DETERMINE THE MINIMUM REQUIRED EQUIPMENT CLEARANCE (MEC) DISTANCE BASED UPON LINE STRENGTH. 10. DURING EXCAVATION AND PLACEMENT OF UTILITIES THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE SAFETY REGULATIONS AND SHALL SUBMIT TO THE ENGINEER FOR REVIEW SHEET PILING, SHORING AND/OR BRACING DESIGNS AS MAY BE NECESSARY TO COMPLY WITH THESE REGULATIONS. 11. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DESIGN AND INSTALLATION OF ALL EXCAVATION SUPPORT AT LOCATIONS AS MAY BE SUGGESTED ON CONTRACT DRAWINGS OR FOR THEIR OWN CONVENIENCE. CONTRACTOR SHALL SUBMIT ALL NECESSARY CALCULATIONS, DRAWINGS, ETC. PREPARED BY A PROFESSIONAL ENGINEER REGISTERED IN THE COMMONWEALTH OF VIRGINIA AS MAY BE NECESSARY FOR REVIEW BY THE ENGINEER PRIOR TO INSTALLATION. REQUIREMENTS FOR EXCAVATION SUPPORT DESIGN MAY BE FOUND IN SPECIFICATION SECTION 02200 EARTHWORK, SECTION 3.03. 12. GROUNDWATER FROM ALL DEWATERING OPERATIONS SHALL BE DISCHARGED TO AN ENVIRONMENTALLY ACCEPTABLE LOCATION IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, OR AS DIRECTED BY THE ENGINEER. 13. ALL TEMPORARY FACILITIES ARE SUBJECT TO THE SAME HEALTH AND SAFETY REQUIREMENTS AS PERMANENT FACILITIES, AS SPECIFIED IN THE CONTRACT DOCUMENTS AND HEALTH SAFETY PLAN (HASP). 14. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS GENERATED DURING THE PROJECT OFF SITE AT A PROPERLY PERMITTED DISPOSAL FACILITY. 8 TEL PED POWER POLE TB20 SOIL BORING ® ROCK OUTLET PROTECTION SLOPE STABILIZATION MATTING MANAGED SLOPES - - - SOIL TYPE BOUNDARY 1 1 REGULATORY REVIEW REV ISSUED FOR SYMBOLS PROJECT ENGINEER. - DESIGNED BY: DRAWN BY: CHECKED BY: 15. CONTRACTOR SHALL MAKE EVERY EFFORT TO SAVE AND MAINTAIN ALL PROPERTY IRONS, MONUMENTS, OTHER PERMANENT POINTS AND LINES OF REFERENCE AND CONSTRUCTION STAKES. A REGISTERED VIRGINIA LAND SURVEYOR AT THE CONTRACTOR'S EXPENSE SHALL REPLACE PROPERTY IRONS, MONUMENTS, AND OTHER PERMANENT POINTS OF REFERENCE DESTROYED BY THE CONTRACTOR. 16. FOR REFERENCE BENCHMARKS, SEE DRAWING C101. TABLE OF EXISTING MONUMENTS NO ELEVATION SHOWN ON A 363.80 C101 17. ALL ACCESSIBLE FEATURES INCLUDING PARKING AND ROUTES MUST COMPLY WITH ICC A177.1-2009. 18. ALL WATER LINES, SEWER LINES, AND FIRE LINES FROM THE MAIN TO THE STRUCTURE MUST HAVE A VISIBLE INSPECTION PERFORMED BY THE BUILDING DEPARTMENT. 19. ALL ROOF DRAINS SHALL DISCHARGE IN A MANNER NOT TO CAUSE A PUBLIC NUISANCE AND NOT OVER SIDEWALKS. 20. BUILDING PERMITS REQUIRED FOR NEW TRAILER INSTALLATION. Al Al STRUCTURE LIFE SAFETY INFORMATION: 1. PROPOSED OFFICE TRAILER IS 1410 SF. EXISTING OFFICE TRAILERS ARE 3082 SF, FOR A OVERALL OFFICE TRAILER COMPLEX AREA OF 4492 SF. EXISTING STRUCTURES ARE NOT SPRINKLED AND PROPOSED STRUCTURE WILL NOT BE SPRINKLED. 2. PROPOSED TRAILER IS TYPE 5 B UNPROTECTED CONSTRUCTION, OR AS NOTED OTHERWISE BY TRAILER MANUFACTURER. 3. BUILDING OCCUPANCY CLASSIFICATION IS BUSINESS GROUP B. SILT FENCE SF NEW DEMO EXISTING SOIL STABILIZATION BLANKETS BUILDING/STRUCTURE OUTLET PROTECTION TEMPORARY SEEDING PERMANENT SEEDING TREE PROTECTION FENCE LIMITS OF DISTURBANCE IF THIS BAR DOES NOT 05/2020 LMS IMEASURE 1" THEN DRAWING DATE By IS NOT TO FULL SCALE A. MARCH A. MARCH B. EDWARDS 0 1/2" 1" TPF PRELIMINARY DRAWING DO NOT USE FOR CONSTRUCTION GRAVEL ROAD CONCRETE CURB AND GUTTER 9a e CONCRETE PAD/PAVING _ 20:05.21 08: 58:26-04`K o L. MICHAEL SANTOWASSO Lic. No.045376 \��'ONAL LEGEND NEW EXISTING ,I\LJL I II VL V V I '.'� 3p0. 302.00 SITE INFORMATION PROJECT DESCRIPTION: THE RIVANNA WATER AND SEWER AUTHORITY IS PROPOSING SITE IMPROVEMENTS TO FACILITATE THE EXPANSION OF THE EXISTING ENGINEERING BUILDING OFFICE SPACE. THE OVERALL PROJECT INCLUDES THE ADDITION OF AN OFFICE TRAILER AND AN EXPANSION TO THE EXISTING PARKING AREA. THE SITE IMPROVEMENTS WILL INCLUDE CONCRETE PIERS TO SUPPORT THE PROPOSED ENGINEERING BUILDING, AND A RETAINING WALL AROUND THE PARKING LOT EXPANSION. A CANOPY WILL BE ADDED TO THE WALKWAY BETWEEN THE EXISTING AND PROPOSED ENGINEERING BUILDINGS. THE OFFICE TRAILER WILL BE PROVIDED AND PLACED ON THE PIERS BY OTHERS. ALL OTHER SITE IMPROVEMENTS, INCLUDING UTILITY HOOKUPS AND PIERS, ARE THE RESPONSIBLY OF THE CONTRACTOR UNDER THIS CONTRACT. THIS PROJECT WILL RESULT IN APPROXIMATELY 0.43 ACRES OF DISTURBANCE. EXISTING SITE CONDITIONS: THE PROJECT IS AT THE MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY (MCAWRRF) LOCATED AT 695 MOORES CREEK LANE, CHARLOTTESVILLE VA 22902. THE PROPERTY IS LOCATED IN UNINCORPORATED ALBEMARLE COUNTY. THE PROPOSED TRAILER WILL BE LOCATED DIRECTLY ADJACENT TO THE EXISTING ENGINEERING BUILDING, AND THE PROPOSED PARKING IS AN EXPANSION TO THE EXISTING PARKING LOT. TOPOGRAPHY IN THIS AREA IS GENTLY SLOPED ALONG THE EXISTING INFRASTRUCTURE, RANGING IN ELEVATIONS FROM 365 FT TO 368 FT. IMMEDIATELY SOUTH OF THE ENGINEERING BUILDING AND PARKING LOT GRADE SHARPLY DROPS OFF TO A 2:1 HILLSIDE. THERE ARE A FEW TREES ADJACENT TO THE ENGINEERING BUILDING AND PARKING LOT, AND THE HILLSIDE IS DENSELY WOODED. THE NEAREST BODY OF WATER IS MOORES CREEK, WHICH IS APPROXIMATELY 200 FT DOWNSTREAM FROM THE PROJECT AREA. MOORES CREEK ULTIMATELY DISCHARGES TO THE RIVANNA RIVER. ACCORDING TO THE 2016 TMDL REPORT, MOORES CREEK STREAM SEGMENT IS SEVERELY IMPACTED FOR ITS AQUATIC LIFE USE. SEDIMENT WAS SELECTED AS THE MOST PROBABLE STRESSOR. THE PROJECT IS LOCATED IN ZONE X, AREA OF MINIMAL FLOOD HAZARD. THE MCAWRRF PARCEL IS BOUND TO THE SOUTH BY THE 1-64 CORRIDOR. TO THE WEST AND NORTH ARE MULTIPLE OPEN PARCELS, ZONED RURAL AND LIGHT INDUSTRIAL. TO THE NORTHEAST AND EAST ARE TWO ADDITIONAL PARCELS, BOTH OWNED BY RIVANNA WATER AND SEWER AUTHORITY. OFF -SITE AREAS: NO OFFSITE DISTURBANCE IS PROPOSED AS A RESULT OF THIS PROJECT. SOILS: SOIL TYPES FOUND AT THE MCAWRRF SITE WERE IDENTIFIED BASED ON INFORMATION OBTAINED FROM THE UNITED STATES DEPARTMENT OF AGRICULTURE (USDA), NATURAL RESOURCE CONSERVATION SERVICE (NRCS). THE SITE LIMITS OF DISTURBANCE IS COMPOSED OF TWO TYPES OF SOILS, COLVARD FINE SANDY LOAM, 0 TO 2 PERCENT SLOPES (83), AND RABUN CLAY LOAM, 15 TO 25 PERCENT SLOPES (71 D). COVARD FINE SANDY LOAM IS IN HYDROLOGIC SOIL GROUP (HSG) A, AND RABUN CLAY LOAM IS IN HSG B. CRITICAL EROSION AREAS: A PORTION OF THE IMPROVEMENTS ARE LOCATED ON 2:1 SLOPES, CLASSIFIED AS MANAGED STEEP SLOPES BY ALBEMARLE COUNTY. TO PREVENT EROSION, ALL DISTURBED STEEP SLOPES WILL BE STABILIZED WITH GRASS COVER AND SOIL STABILIZATION BLANKETS. RETAINING WALLS IN THE MANAGED SLOPES HAVE BEEN LIMITED TO U TO CONFORM TO THE ALBEMARLE COUNTY ORDINANCE. EROSION AND SEDIMENT CONTROL MEASURES: TEMPORARY MEASURES: • SILT FENCE PER STD 3.05 • TEMPORARY SEEDING PER STD 3.31 PERMANENT MEASURES: • RIPRAP OUTLET PROTECTION PER STD 3.18 • SOIL STABILIZATION BLANKETS PER STD 3.36 • PERMANENT STABILIZATION: AREAS OF THE SITE THAT WILL NOT BE PAVED WILL BE SEEDED AND MULCHED ACCORDING TO THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK REQUIREMENTS. FENCE CONCRETE SIDEWALK CONTOUR SPOT ELEVATION PROPERTY LINE EASEMENT STORMWATER RUNOFF CONSIDERATIONS: QUALITY THE VIRGINIA RUNOFF REDUCTION METHOD (VRRM) SPREADSHEET FOR RE -DEVELOPMENT WAS USED TO DETERMINE THE NUTRIENT REDUCTION REQUIREMENTS. THE PROPOSED PROJECT IS REQUIRED TO REDUCE THE TOTAL PHOSPHORUS LOAD BY 0.21 LBS/YR. TO MEET THIS REQUIREMENT, 0.21 LBS/YR OF PHOSPHORUS WILL BE PURCHASED FROM A NUTRIENT BANK WITHIN JAMES RIVER BASIN. THIS PROJECT AREA IS IN THE 02080204 - JAMES 8 DIGIT HUC, AND PURSIANT TO THE CODE OF VIRGINIA SECTION 62.1-44.15:35 NUTRIENT CREDITS WILL BE PURCHASED FROM A BANK WITHIN THE NEIGHBORING 8 DIGIT HUC (02080203). QUANTITY PEAK FLOW WAS CALCULATED FOR THE PROJECT AREA USING TR-55 METHODOLOGIES. THE PRE -DEVELOPMENT PEAK FLOW FROM THE 2 AND 10-YR 24-HR STORMS ARE 0.8 CFS AND 1.7 CFS, RESPECTIVELY. THE POST -DEVELOPMENT PEAK FLOW FROM THE 2 AND 10-YR 24-HR STORMS ARE 1.2 CFS AND 2.3 CFS, RESPECTIVELY, UNDER PRE -DEVELOPMENT CONDITIONS, RUNOFF FROM THE PROJECT AREA SHEET FLOWS AWAY FROM THE ENGINEERING BUILDING AND PARKING LOT AND DOWN A STEEP HILL. NO CHANGE IN OVERALL DRAINAGE PATTERNS IS PROPOSED POST -DEVELOPMENT. THE INCREASE IN SHEET FLOW FOR THE 2 AND 10-YR 24-HR STORM IS 0.4 CFS AND 0.6 CFS, RESPECTIVELY. AT THE POINT OF OUTFALL THE DRAINAGE AREA OF MOORES CREEK IS APPROCIAMTELY 35.1 SQUARE MILES. GIVEN THE MINIMAL INCREASE IN PEAK FLOW AND THE LARGE DRAINAGE AREA OF MOORES CREEK, THE PROPOSED DEVELOPMENT WILL NOT CONTRIBUTE TO DOWN -GRADIENT EROSION, SEDIMENTATION, OR FLOODING. THE PARKING LOT EXPANSION WILL BE CURBED AND RUNOFF WILL DISCHARGE THROUGH A CURB CUT. A RIPRAP OUTLET PROTECTION PAD HAS BEEN DESIGNED IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (VESCH) TO ENSURE FLOW IS NON -EROSIVE FOR THE 2 AND 10-YEAR STORMS. EROSION AND SEDIMENT CONTROL MAINTENANCE NOTES: IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED AFTER EACH RAINFALL OR WEEKLY, WHICHEVER IS MORE FREQUENT, AND SHOULD BE CLEANED AND REPAIRED ACCORDING TO THE FOLLOWING SCHEDULE: 1. EROSION AND SEDIMENT CONTROLS WILL BE CHECKED REGULARLY FOR UNDERMINING OR DETERIORATION AND BUILDUP OR CLOGGING WITH SEDIMENT. CORRECTIVE ACTION SHALL BE TAKEN IMMEDIATELY. 2. FREQUENT INSPECTIONS AND CLEANING OF MUD AND DEBRIS FOUND OUTSIDE OF THE LIMITS OF DISTURBANCE IS REQUIRED, ALONG WITH ANY OTHER REMEDIES REQUIRED BY THE COUNTY. 3. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND OF GRASS IS MAINTAINED. AREAS SHALL BE RESEEDED AS NEEDED. TEMPORARY STABILIZATION WILL BE USED AS REQUIRED BY THE COUNTY. NEW EXISTING APPROXIMATE WOODLINE ----- YARD PIPING -------- STORM DRAIN LINE *0 ���� MANHOLE Hazen RIVANNA WATER &SEWER AUTHORITY CHARLOTTESVILLE, VIRGINIA 11 a YARD INLET 12)�■ CURB INLET 13 1 FLARED END SECTION (F.E.S.) HAZEN AND SAWYER MOORES CREEK ADVANCED WATER RESOURCE 4011 WESTCHASE BLVD, SUITE 500 RECOVERY FACILITY RALEIGH, NC 27607 1 ENGINEERING BUILDING ADDITION ABBREVIATIONS EOP EDGE OF PAVEMENT LOC LIMITS OF CONSTRUCTION OHE OVERHEAD ELECTRIC FOC FIBER OPTIC CABLE LP LIGHT POLE UGE UNDERGROUND ELECTRIC PP POWER POLE SITEWORK CIVIL GENERAL NOTES AND LEGEND G GAS SS SANITARY SEWER W WATER R PROPERTY LINE rt CENTER LINE RECM ROLLED EROSION CONTROL MATTING DATE HAZEN NO CONTRACT NO.: DRAWING NUMBER: MAY 2020 1 31442-002 01 q i6 J 0 U z U 7> U U) N O J 0 0 U U J — 0 U U U m} 0 �m U7�; C d 0 0 N �o M O J N QCD of N N Lo �w M Q o� 0 J ii a 1 REV 9VAC25-840-40. MINIMUM STANDARDS. A VESCP MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS: 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED, PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. a. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. b. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. 7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. 8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. 9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. 12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. 13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. 14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: a. NO MORE THAN 300 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. b. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. c. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. d. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. e. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS CHAPTER. f. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH. 17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. PROJECT ENGINEER. - DRAWN BY: CHECKED BY: IF THIS BAR DOES NOT REGULATORY REVIEW 05/2020 LMS MEASURE 1" THEN DRAWING ISSUED FOR DATE gY IS NOT TO FULL SCALE 18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS: a. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. b. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER: (1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR (2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS. (b) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND (c) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM. c. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL: (1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL, THE BED, OR THE BANKS; OR (2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES; (3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TEN-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR (4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE VESCP AUTHORITY TO PREVENT DOWNSTREAM EROSION. d. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS. e. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT CONDITION OF THE SUBJECT PROJECT. f. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN APPROVAL FROM THE VESCP OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. g. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATORS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL. h. ALL ON -SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. i. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY. j. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS. k. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. I. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (1) DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (II) DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (III) REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT. C It 1 . O A. MARCH A. MARCH B. EDWARDS 0 1/2" 1" PRELIMINARY DRAWING DO NOT USE FOR CONSTRUCTION l20.05.21 08:58:49- L. MICHAEL SANTOWASSO Lic. No.045376 \��'ONAL m. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§ 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH LAND -DISTURBING ACTIVITIES ARE IN ACCORDANCE WITH 9VAC25-870-48 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS. n. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF SUBDIVISION 19 OF THIS SUBSECTION. STATUTORY AUTHORITY § 62.1-44.15:52 OF THE CODE OF VIRGINIA. HISTORICAL NOTES FORMER 4VAC50-30-40, DERIVED FROM VR625-02-00 § 4; EFF SEPTEMBER 13, 1990; AMENDED, VIRGINIA REGISTER VOLUME 11, ISSUE 11, EFF. MARCH 22, 1995; VOLUME 29, ISSUE 4, EFF. NOVEMBER 21, 2012; AMENDED AND RENUMBERED, VIRGINIA REGISTER VOLUME 30, ISSUE 2, EFF. OCTOBER 23, 2013. SOIL UNIT LEGEND OVERALL EROSION & SEDIMENTATION CONTROL NOTES 1. THE CONTRACTOR IS ENCOURAGED TO PHASE CONSTRUCTION TO MINIMIZE EXPOSED SOIL AREAS THROUGHOUT THE PROJECT. 2. ALL ONSITE ACTIVITIES SHALL BE MANAGED TO INSURE NO ADVERSE IMPACTS TO WATER QUALITY OCCUR DURING AND AFTER CONSTRUCTION. THE ACTIVITIES, AS DESCRIBED IN SPECIFICATION SECTION 02276, AND OTHERS, REQUIRE OVERSIGHT THROUGHOUT THE CONSTRUCTION AND DEVELOPMENT PROCESS TO ASSURE THAT ALL WATER QUALITY STANDARDS ARE PROTECTED. SEE SPECIFICATION SECTION 02276 FOR FURTHER REQUIREMENTS. 3. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL NECESSARY EROSION CONTROL MEASURES WHETHER OR NOT SHOWN ON THE PLANS TO PROTECT ADJACENT CREEKS, RIVERS, ROADWAYS, ETC. FROM SILTATION AND EROSION. 4. EACH EROSION AND SEDIMENTATION CONTROL MEASURE SHALL BE INSPECTED AT LEAST ONCE EVERY FOUR BUSINESS DAYS OR AT LEAST ONCE EVERY FIVE BUSINESS DAYS AND NO LATER THAN 48 HOURS FOLLOWING A MEASURABLE STORM EVENT. IN THE EVENT THAT A MEASURABLE STORM EVENT OCCURS WHEN THERE ARE MORE THAN 48 HOURS BETWEEN BUSINESS DAYS, THE INSPECTION SHALL BE CONDUCTED ON THE NEXT BUSINESS DAY. 5. ALL PIPE WORK SHALL BE INSTALLED IN ACCORDANCE WITH STANDARD CONSTRUCTION TECHNIQUES. ONLY THE LENGTH OF TRENCH IN WHICH PIPE CAN BE INSTALLED IN ONE DAYS TIME SHALL BE OPEN AT ANY TIME, WITH SPOIL MATERIAL PLACED ON THE UPHILL SIDE OF THE TRENCH. PIPING SHALL BE CAPPED AT THE END OF EACH WORK DAY TO PREVENT SEDIMENT FROM ENTERING PIPE. TRENCH SHALL BE BACKFILLED AT END OF EACH WORK DAY AND DISTURBED AREA SEEDED WITH TEMPORARY SEEDING MEASURES, AS APPROPRIATE. 6. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE, MAP UNIT PERMANENT VEGETATION IS ESTABLISHED ON ALL DISTURBED AREAS, AND APPROVAL BY THE SYMBOL MAP UNIT NAME HSG ENGINEER IS GIVEN. AREAS WHERE EROSION AND SEDIMENTATION CONTROL MEASURES ARE REMOVED SHALL BE REGRADED AND SEEDED TO MATCH ORIGINAL SITE CONDITIONS. 12E CATOCTIN SILT LOAM, B EROSION & SEDIMENTATION CONTROL CONSTRUCTION SEQUENCING 25 TO 45 PERCENT SLOPES 1. NO CONSTRUCTION OR LAND DISTURBANCE ACTIVITIES SHALL BEGIN UNTIL TEMPORARY 71D RABUN CLAY LOAM, g SEDIMENT AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. CONTRACTOR SHALL 15 TO 25 PERCENT SLOPES INSTALL SILT FENCE AS SHOWN ON THE DRAWING FOR TEMPORARY PERIMETER EROSION CONTROL. 83 COLVARD FINE SANDY LOAM, A 0 TO 2 PERCENT SLOPES, 2. ONCE ALL SILT FENCE HAS BEEN INSTALLED ALL DEMOLITION AND CLEARING ACTIVITIES MAY OCCASIONALLY FLOODED BEGIN. ONCE THE SITE HAS BEEN CLEARED AND GRUBBED, GRADING ACTIVITIES FOR RETAINING WALL CONSTRUCTION MAY BEGIN. Hazen HAZEN AND SAWYER 4011 WESTCHASE BLVD, SUITE 500 RALEIGH, NC 27607 3. TEMPORARY SEEDING MEASURES SHALL BE EMPLOYED THROUGHOUT THE DURATION OF CONSTRUCTION ACTIVITIES ON ANY AREA WHICH WILL REMAIN UNDISTURBED FOR MORE THAN 7 WORKING DAYS OR 14 CALENDAR DAYS, WHICHEVER IS SHORTER. ALL SLOPES STEEPER THAN 3H:1V SHALL BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION WITHIN 7 CALENDAR DAYS. ALL OTHER SLOPES OF 3H:1V OR FLATTER, EXCEPT THOSE GREATER THAN 50 FT IN LENGTH, SHALL BE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR OTHER STRUCTURES SUFFICIENT TO RESTRAIN EROSION WITHIN 14 CALENDAR DAYS. 4. PERMANENT SEEDING SHALL BE INSTALLED, IN THE PROPER PLANTING SEASON, FOR ALL AREAS REACHING FINAL GRADE WHICH WILL NOT BE DISTURBED AGAIN. IF PLANTING SEASON IS NOT APPROPRIATE FOR PERMANENT SEEDING CONTRACTOR SHALL RE -SEED AREA WITH PERMANENT SEEDING WHEN SEASON ALLOWS. 5. UPON COMPLETION OF FINAL GRADING, PERMANENT STRUCTURAL OR VEGETATIVE STABILIZATION SHALL BE ESTABLISHED. 6. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION ACTIVITIES AND THE SITE HAS BEEN PERMANENTLY STABILIZED WITH STRUCTURAL AND/OR PERMANENT VEGETATIVE MEASURES. 7. CONTRACTOR SHALL PERFORM SITE INSPECTION AND MAINTENANCE ONCE EVERY5 BUSINESS DAYS AND WITHIN 48 HOURS AFTER MEASURABLE STORM EVENT. 8. ONCE PERMANENT STABILIZATION HAS OCCURRED, TEMPORARY SEDIMENT CONTROL MEASURES MAY BE REMOVED UPON APPROVAL FROM THE ENGINEER AND ALBEMARLE COUNTY. ANY AREAS DISTURBED BY THE REMOVAL OF EROSION CONTROL MEASURES SHALL BE RETURNED TO THE ORIGINAL, OR BETTER, CONDITION BEFORE SEEDED, MULCHED, AND FERTILIZED. RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINIA MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY ENGINEERING BUILDING ADDITION SITEWORK CIVIL EROSION AND SEDIMENT CONTROL NOTES DATE: MAY 2020 HAZEN NO.: 31442-002 CONTRACT NO.: 01 DRAWING NUMBER: C002 NOTES: Q co 0 N O N O N Lo (D (6 J U U z U U m U) O J U U U j z U U U m} �m U c:, d O N O d. N �o M O J N QCD of N N Lo �w M Q o� o ii a 1 1 REGULATORY REVIEW REV I ISSUED FOR REMOVE Wi HAND RAIL, REMOVE CC TREE REM( PROJECT ENGINEER. - DRAWN BY: CHECKED BY: IF THIS BAR DOES NOT 05/2020 LMS MEASURE 1" THEN DRAWING DATE By I IS NOT TO FULL SCALE C It 1 . o A. MARCH A. MARCH B. EDWARDS 0 1/2" 1" PRELIMINARY DRAWING DO NOT USE FOR CONSTRUCTION _.�0.05.21 08:59:09-04rb o L. MICHAEL f SANTOWASSO Lic. No.045376 \��'ONAL PLAN SCALE: 1" = 20' Hazen HAZEN AND SAWYER 4011 WESTCHASE BLVD, SUITE 500 RALEIGH, NC 27607 RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINIA MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY ENGINEERING BUILDING ADDITION 1. CONTRACTOR SHALL COORDINATE WITH PLANT STAFF ABOUT RELOCATION OF SPEED LIMIT SIGN. 2. CONTRACTOR SHALL HAVE VIRGINIA LICENSED SURVEYOR ESTABLISH NEW BENCHMARK TO REPLACE BENCHMARK DEMOLISHED IN NEW LOCATION WHICH WILL NOT INTERFERE WITH CONSTRUCTION ACTIVITIES. 3. COMMUNICATIONS STRUCTURE SHALL BE LOCATED OUTSIDE OF PROPOSED PARKING LOT AREA. CONTRACTOR SHALL COORDINATE RELOCATION WITH CENTURY LINK. 4. DEMOLITION OF WOODEN RAMP AND HANDRAIL SHALL BE COORDINATE WITH PLANT STAFF. TIMEFRAME EXISTING ENGINEERING BUILDING IS WITHOUT ADA ACCESS SHALL BE KEPT TO A MINIMUM. 5. THE PROJECT AREA IS OUTSIDE THE 100-YEAR FLOODPLAIN, 100 FT STREAM BUFFER, AND STATE DAM BREAK INUNDATION ZONES. THE PROJECT AREA IS WITHIN THE FEDERAL DAM BREAK INUNDATION ZONE. RELOCATE COMM. STRUCTURE, SEE NOTE 3 RELOCATE SIGN, SEE NOTE 1 AREA TO BE CLEARED AND GRUBBED. TYP BENCHMARK B ELEV:369.55 CHISELED SQUARE ON CORNER OF CONC. PAD TREE REMOVAL ELECTRICAL STRUCTURE TO BE MODIFIED, SEE ELECTRICAL PLANS SITEWORK CIVIL EXISTING CONDITIONS AND DEMOLITION PLAN DATE: MAY 2020 HAZEN NO.: 31442-002 CONTRACT NO.: 01 DRAWING NUMBER: C101 Xe 2 cc a) U) J O U Z U U a) U) N O_ J U OU J — j Z U_ U g U mi o m U g N d O N O N N CM O J N Q O � N N Lo W H M Q � I- 0 = J LL d SOIL: 12E W ENGINEERING BUILDING aFFE = 366.20 F �LL 0 o XIS'F re 1 INTERNAL PROPERTY LINE I --- -- 64 00 0000 0 0 0 DODO 1 �� ENGINEERING BUILDING I ® � SOIL: 71D w aftill km MANAGED SLOPES \ 3 55� 353 ME 5 i rr TPF - 71 SLOPE STABILIZATION MATTING DC2 SILT FENCE, TYP 0227000 TREE PROTECTION FENCE, TYP Q DC2 LIMITS OF DISTURBANCE, TYP c RIPRAP OUTLET PROTECTION PAD, SEE NOTE 2 °0243300 TREE LINE, TYP O SOIL TYPE BOUNDARY, TYP. SEE SOIL UNIT LEGEND ON C002 _ CONCRETE PIER, TYP i� \� SCALE: 1" = 10' 61� I I I I 163 I ,\ TPF SOIL: 71 D TPF — TPF LL \ 360 J 0 111 3 \ 000 W W U) 355 LL Z J 3 � W \34 1 \ NOTES: co 1. ANY AREA DISTURBED WITHIN THE MANAGED SLOPES OVERLAY SHALL BE STABILIZED WITH SOIL o II STABILIZATION MATTING, SEE DETAIL 1/DC2. cn I-- 2. RIPRAP OUTLET PROTECTION PAD SHALL BE 12' I o I CONTRACTOR WIDE X 10' LONG X 2' THICK WITH TYPE II OO LAYDOWN AREA TS PS LIMITS OF DISTURBANCE, TYP SEPARATOR GEOTEXTILE UNDERNEATH. RIPRAP TPF PF LL SHALL BE CLASS I PER VDOT ROAD AND BRIDGE = v) U- I SPECIFICATIONS. �_ — SF SF I I TPF SF ~ O I I SILT FENCE, TYP 3. CONTRACTOR SHALL KEEP EXISTING ROADWAY I FREE OF SEDIMENT AT ALL TIMES. IF SEDIMENT �------- - r —� TPF � rPF` I 0227000 SF 1 —I I Z TRACKING DOES OCCUR, CONTRACTOR SHALL W 3 5 a TpF sp U) TREE PROTECTION FENCE, TYP w DC2 TAKE ACTION IMMEDIATELY TO REMOVE DEBRIS W SF FROM EXISTING ROAWAY. � TpF F _ I SF — SF -TPF Z TS PS M ` SF I IISF SF SF SF SF SF — — TPF F J a I I n— TPF TIP TPF TPF TPF TPF TPF_ � U TPF TPF ~ II I 0 LIMITS OF DISTURBANCE = 0.43 ACRES Q - II SOIL: 71 D 10 5 0 10, I I SLOPE STABILIZATION MATTING 1 SCALE: 1" = 10, �_W '� ' 1 W AR I DC2 SCALE: 1" = 10' PROJECT ENGINEER: B. EDWARDS AL H RIVANNA WATER &SEWER AUTHORITY DATE: MAY 2020 DESIGNED BY: A. MARCH 2 .05.21 08:59:28-04 CHARLOTTESVI LLE, VI RG I N IA HAZEN NO.: 31442-002 PRELIMINARY DRAWING o L. MICHAEL �� SITEWORK DRAWN BY: A. MARCH DO NOT USE FOR u SANTOWASSO � _ CIVIL CONTRACT NO.: 01 CHECKED BY: B. EDWARDS CONSTRUCTION Z� Llc. No.045376 HAZEN AND SAWYER MOORES CREEK ADVANCED WATER RESOURCE EROSION AND SEDIMENT CONTROL PLAN DRAWING IF THIS BAR DOES NOT 0 1/2" 1" ' 0NUMBER: � � 4011 WESTCHASE BLVD, SUITE 500 RECOVERY FACILITY 1 REGULATORY REVIEW 05/2020 LMS MEASURE 1" THEN DRAWING SIONAL RALEIGH, NC 27607 ENGINEERING BUILDING ADDITION C102 REV ISSUED FOR DATE BY IS NOT TO FULL SCALE 75 a M M O N O N O N Lo p N (6 J 0 U z U 7> U U) co O J U U U j z U U U m} �m N d O C,, O 4 N �o � N M O J N Q O of N N LO v w M Q o� o J ii 0- U • r "b4 � 0 - - 36� �t M 0 ENGINEERING BUILDING FFE = 366.20 ALUMINUM LANDING AND ADA RAMP TO BE PROVIDED BY TRAILER SUPPLIER WALL MOUNTED LIGHTING FIXTURE, TYP SEE ELEC DWGS E CANOPY TO BE RESTRUCTURED TO ACCOMMODATE PROPOSED TRAILER / 3q3 mmw� ENGINEERING BUILDING FFE = 366.20 60' X 23.5' 116 Q 0 I I 1 INTERNAL PROPERTY LINE, TYP CURB AND GUTTER N 1 0242000 ASPHALT PAVEMENT o 0251000 0 E___4 0 TIE SIDEWALK INTO EXISTING ELEVATIONS, 1:48 MAXIMUM SLOPE A, o PARKING LOT ° CURB AND GUTTER 0242000 EXISTING SPACES: 8 0 PROPOSED: 20 0 LANDSCAPING, TYP \ 4' SIDEWALK, TYP 0245000 ASPHALT PAVEMENT 0251000 ADA CURB RAMP WITH Z DETECTABLE WARNING STRIP, - SEE NOTE 2 I Q0 PAVEMENT JUNCTION I co 0251301 - - - - - - I ADA PARKING SPACE, SEE NOTE 1 LANDSCAPING ISLAND, 6' SEE NOTE 4 rn� 5' _ \ 0011 y - - 9', TYP -- --_-- _ _ 1 co � I �— 3.57% ------------- - O_ o GRADE: 365.00 2.30% LIP 365.50 GRADE: 366.00 - 1 BW: 363.52 TW: 366.50 GUARD RAIL BW: 361.62 - GRADE: 367.00 _ TW: 367.50 0244503 - BW: 361.89 360 0 1 358 350 - 348 345___� 342 - 340 0 PLAN SCALE: 1" = 10' 3 RETAINING WALL, HEIGHT VARIES DC1 CURB AND GUTTER, TYP 0242000 TREE LINE, TYP 4' CURB CUT WITH RIPRAP - OUTLET PROTECTION PAD - STAIRS WITH LANDING AND HANDRAIL TO BE PROVIDED BY TRAILER SUPPLIER #57 STONE, SEE NOTE 3 (CONCRETE PIER, TYP, SEE STRUCTURAL DRAWINGS LIGHT POLE, TYP _ SEE ELEC DWGS C NOTES: 1. ACCESSIBLE PARKING SPACE AND ACCESS AISLE SHALL BE AS PER THE REQUIREMENTS OF THE AMERICANS WITH DISABILITIES ACT (ADA). ACCESS SPACES SHALL HAVE PAVEMENT MARKINGS, SIDEWALK ACCESS RAMP AND SIGNAGE. SIGN MUST INCLUDE PHRASE "VAN -ACCESSIBLE." SIGNS SHOULD BE MOUNTED SO THAT THE LOWER EDGE OF THE SIGN IS AT LEAST SEVEN (7) FEET ABOVE THE GROUND. SEE DETAIL 1 ON DC1. 2. CURB RAMP SHALL HAVE A MAXIMUM SLOPE OF 1:12 AND A MAXIMUM CROSS SLOPE OF 1:48. SIDE FLARE MAY HAVE A MAXIMUM SLOPE OF 1:10. PROVIDE A LANDING PAD WITH MINIMUM DIMENSIONS OF 26" X 48" AT TOP OF CURB LAMP. 3. PROVIDE 6" THICK SECTION OF #57 STONE IN AREAS BETWEEN EXISTING AND PROPOSED ENGINEERING BUILDING, DIRECTLY UNDER TRAILER, AND 4' BEYOND TRAILER WALLS ON SOUTH AND EAST SIDES. PROVIDE TYPE II GEOTEXTILE SEPARATOR BENEATH GRAVEL LAYER. 4. CURB AND GUTTER SHALL BE INSTALLED TO ALLOW DRAINAGE THROUGH BACK OF CURB ISLAND TO CURB CUT. 5. PER ALBEMARLE COUNTY CODE 30.7.5.; RETAINING WALLS SHALL BE A MAXIMUM HEIGHT OF 6 FT. MAXIMUM RETAINING WALL HEIGHT AS DESIGNED IS 5.6 FT. 340 360 358 355 353 GRADE: 368.00 TW:368.50 BW: 364.00 SCALE: 1" = 10, � 36$ GRADE: 368.40 TW: 368.90 BW: 365.55 0 1 1 1 m m m m m ME PROJECT ENGINEER: B. EDWARDS � T RIVANNA WATER &SEWER AUTHORITY DATE: MAY 2020 0.05.21 08:59:47-04' CHARLOTTESVI LLE, VI RG I N IA 31442-002 DESIGNED BY: A. MARCH � SITEWORK HAZEN NO.: DRAWN BY: A. MARCH PRELIMINARY DRAWING 0 L. MICHAEL CONTRACT NO.: 01 DO NOT USE FOR SANTOWASSO CIVIL CHECKED BY: B. EDWARDS CONSTRUCTION 0 Lic. No,0453'76 AV HAZEN AND SAWYER MOORES CREEK ADVANCED WATER RESOURCE GRADING AND DRAINAGE PLAN DRAWING NUMBER: Ar 1 REGULATORY REVIEW 05/2020 LMS IF MEASURE IR DOES NOT DRAWING 0 1/2 1 �SIo ����� 4011 WRA EIGHENC 27607ITE 500 RECOVERY FACILITY NAB ENGINEERING BUILDING ADDITION C103 REV ISSUED FOR DATE BY IS NOT TO FULL SCALE a �e �1 r cc U) J 0 U Z U g U a) U) It O_ J U OU J — j Z U_ U g U m, } om U g N d O <,•) O N N cM N J CD � N N Lo Lu M Q O � 0 = J LL d C_ R W — W 6" PW . , 1 tiNNz —m r�...a ENGINEERING BUILDING FFE = 366.20 0 (D 3 35a gS,she ss 1 3g5 A ss 3" SS al FIRE HYDRANT WITH 6" TS&V DC2 w w "b ENGINEERING C BUILDING E 0 45° VERTICAL BEND, TRANSITION TO BELOW GRADE PIPING CLEANOUT 0260200 REPAIR WOODEN RAMP, / LANDING, AND CANOPY / SANITARY SEWrn 4" SS PVC SCHE WYE CONNECT AND CLEANOUI 343 GRINDER PUMP / 341 — 340 / W _ ; W \ 1Lo 1 10 PLAN SCALE: 1" = 10' W 3E W Eel v„ n W WALL MOUNTED LIGHTING FIXTURE, TYP 0 6� NOTES: 1. LOCATION OF 4" SS LINE APPROXIMATE, NOT FROM SURVEY. CONTRACTOR SHALL DETERMINE EXACT LOCATION AND ELEVATION IN FIELD. N 2. PROPOSED 4" SS SHALL HAVE A MINIMUM SLOPE OF 1/8" PER FOOT. 3. EXACT LOCATION OF WATER AND SEWER CONNECTION TO BE DETERMINED IN FIELD. ALL ABOVE GROUND WATER PIPING MUST BE HEAT TRACED. 4. LOCATION OF 1" PW LINE APPROXIMATE, NOT FROM SURVEY. CONTRACTOR SHALL DETERMINE EXACT LOCATION AND ELEVATION IN FIELD. IF A ° CONFLICT EXISTS, 1" PW SHALL BE RE-ROUTED O TO AVOID BUILDING PIERS. W W -- -- w 00 � o \ M - / u WATER METER, PROTECT DURING CONSTRUCTION 360 LIGHT POLE, TYP 363 v —358 - VALVES, PROTECT DURING CONSTRUCTION PRV AND RPZ FOR TRAILER WATER SERVICE, 360 PROPOSED CONNECTION SHALL BE LOCATED DOWN STREAM OF STRUCTURE 355 TEE CONNECTION TO WATER SERVICE 3S8\ 3 1" PW, COPPER PIPE TRAILER CONNECTION, SEE NOTE 3 3SS\ 350 -_ 353\ 8 NEW TREE LINE, TYP c 3S0 345 INTERNAL PROPERTY LINE 348___ 10 5 0 10, SCALE: 1" = 10' PROJECT ENGINEER: B. EDWARDS � � x `` 2 620.05.21 09:00:13-04 � PRELIMINARY DRAWING • .. L. MICHAEL DO NOT USE FOR SANTOWASSO CONSTRUCTION : Lac. No.045376 Ar �W �"s' SIONAL �� Hazen_ HAZEN AND SAWYER 4011 WESTCHASE BLVD, SUITE 500 RALEIGH, NC 27607 RIVANNA WATER &SEWER AUTHORITY CHARLOTTESVI LLE, VI RG I N IA SITEWORK CIVIL UTILITY PLAN DATE: MAY 2020 DESIGNED BY: A. MARCH HAZEN NO.: 31442-002 DRAWN BY: A. MARCH CONTRACT NO.: 01 MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY ENGINEERING BUILDING ADDITION CHECKED BY: B. EDWARDS DRAWING NUMBER: C104 IF THIS BAR DOES NOT 0 1/2" 1" MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE 1 REGULATORY REVIEW 05/2020 LMS REV ISSUED FOR DATE BY ANOTES: d Lo 0 N 0 N O N Lo J 0 U z U U Q U) Lo O J U U � U j z U U � U m} im N d o �. o4 N � �o co O J N Qp of N N v w M Q o� 4io J ii a 0 -� LANDSCAPING LEGEND Al 0 D DWARF ENGLISH BOX WOOD H BURFORD HOLLY t_>j 0 RED MAPLE \�J S.. 3g0 355, 352/ 350� r. ENGINEERING BUILDING 0 M o EX TREE 1 SEE LANDSCAPING LEGEND WALL -MOUNTING LIGHTING FIXTURE, SEE ELEC DWGS C 33' co U 360 — 358 35 350 — — 348 45 EX TREE 2 4" CALIPER 32— ! 0��- SHRUB PLANTING SCHEDULE SCIENTIFIC MATURE PLANT CONTAINER HEIGHT AT TYPE 1� QTY COMMON NAME SPACING NAME SIZE SIZE INSTALLATION SHRUB 4 BUXUS SEMPERVIRENS DWARF ENGLISH 3'-15' 3 GAL 18" 5' "SUFFRUTICOSA" BOXWOOD SHRUB 4 IIEX COMUTA "BURFORDII" BURFORD HOLLY T-15' 3 GAL 18" 5' TREE PLANTING SCHEDULE SCIENTIFIC MATURE PLANT CALIPER AT TYPE QTY COMMON NAME NAME SIZE INSTALLATION MED. SHADE TREE 2 ACER RUBRUM & CVS. RED MAPLE 40' - 50' 2.5" CALIPER PROJECT ENGINEER: B. EDWARDS H 0.05.21 09:00:37-04 PRELIMINARY DRAWING L. MICHAEL DO NOT USE FOR SANTOWASSO CONSTRUCTION Lic. No.045376 Ar �� 1 IONAL ��� DESIGNED BY: A. MARCH DRAWN BY: A. MARCH CHECKED BY: B. EDWARDS IF THr ME SIURER DO EN DRAWING NOT0 1/2 1 IS NOT TO FULL SCALE REGULATORY REVIEW 05/2020 LMS ISSUED FOR DATE BY ----— — — — — — — --- -- SEE LANDSCAPING LEGEND W� LIGHTPOLE, TYP NEW TREELINE EX TREE 3 8.5" CALIPER o — PLAN SCALE: 1" = 10' ROOT CROWN TO BE AT FINISH GRADE OR 1-2" ABOVE GRADE FINISH GRADE H n aze HAZEN AND SAWYER 4011 WESTCHASE BLVD, SUITE 500 RALEIGH, NC 27607 43' L /\ V V I V 1 1 1 V I ROOTBALL EX TREE 4 4" CALIPER C 345\ 353 �360 35g \ 363 1. ALL SITE PLANTINGS OF TREES AND SHRUBS SHALL BE ALLOWED TO REACH, AND MAINTAINED AT, MATURE HEIGHT; THE TOPPING OF TREES IS PROHIBITED. SHRUBS AND TREES SHALL BE PRUNED MINIMALLY AND ONLY TO SUPPORT THE OVERALL HEALTH OF THE PLANT. 0 NOTES: 1. DIG PLANTING HOLE AT LEAST 2X THE WIDTH OF THE ROOT BALL OR CONTAINER. 2. SCARIFY SUBGRADE AND SIDES OF PLANTINGS HOLE WHEN PLANTING IN CLAY SOIL. 3. SET THE TOP OF THE ROOT BALL LEVEL WITH THE SOIL SURFACE, OR 1-2" ABOVE IF THE SOIL IS PRONE TO SETTLING. TEED 4. IF B&B PLANT, REMOVE BURLAP FROM AT LEAST THE TOP 12 INCHES OF THE Z OF MULCH ROOT BALL, WITHOUT DISTURBING THE ROOT BALL. REMOVAL ALL CORD FROM THE TRUNK. REMOVE BURLAP AND WIRE BASKET FROM THE ROOT BALL. OR BROKEN 5. BACK FILL THE PLANTING HOLE WITH EXCAVATED NATIVE SOIL, BROKEN UP AIL MIN 12" DEEP OR TILLED. WATER TO REMOVE AIR POCKETS. DO NOT ADD AMENDMENTS. 6. PLACE MULCH ON THE SURFACE TO A (SETTLED) DEPTH OF 1 TO 3 INCHES. SHRUB PLANTING DETAIL DETAIL 1 SCALE: NTS C105 RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINIA MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY ENGINEERING BUILDING ADDITION c r6, c9 SEE LANDSCAPING LEGEND EX TREE 5 CLUSTER OF TREES 10 5 0 10, SCALE: 1" = 10' DATE: MAY 2020 SITEWORK HAZEN NO.: 31442-002 CIVIL CONTRACT NO.: 0 LANDSCAPING PLAN DRAWING NUMBER: C105 r. M�M DEQ Virginia Runoff Reduction Method Re -Development Compliance Spreadsheet - Version 3.0 BMP Design Specifications List: 2013 Draft Stds & Specs Site Summary Project Title: RWSA Engineering Building Addition Date: NA I Total Rainfall (in): 43 Total Disturbed Acreage: 0.43 Site Land Cover Summary Pre-ReDevelopment Land Cover (acres) A soils B Soils C Soils D Soils Totals %of Total Forest/Open (acres) 0.00 0.00 0.00 0.00 0.00 0 Managed Turf (acres) 0.10 0.24 0.00 0.00 0.34 79 Impervious Cover (acres) 0.07 0.02 0.00 0.00 0.09 21 0.43 100 Pnst-RpDpvpinnmpnt Land rnvpr larrpsl A soils B Soils C Soils D Soils Totals %of Total Forest/Open (acres) 0.00 0.00 0.00 0.00 0.00 0 Managed Turf (acres) 0.06 0.18 0.00 0.00 0.24 56 Impervious Cover (acres) 0.11 0.08 0.00 0.00 0.19 44 0.43 100 Site Tv and Land Cover Nutrient Loads Final Post -Development Post- Post- Adjusted Pre- (Post-ReDevelopment ReDevelopment Development ReDevelopment Impervious) & New ) P (New Impervious) Site Rv 0.52 0.40 0.95 0.40 Treatment Volume (ft3) 819 474 345 474 TP Load Lb/yr) 1 0.51 1 0.30 1 0.22 0.30 Total TP Load Reduction Required (lb/yr) 0.21 0.03 0.18 Final Post -Development Load (Post-ReDevelopment & New Impervious) Pre- ReDevelopment TN Load Lb/yr) 3.68 2.42 Site Compliance Summary Maximum % Reduction Required Below 10% Pre-ReDevelopment Load Total Runoff Volume Reduction (ft3) 0 Total TP Load Reduction Achieved Lb/yr) 0.00 Total TN Load Reduction Achieved (lb/yr) 0.00 Remaining Post Development TP Load 0.51 Lb/yr) Remaining TP Load Reduction (lb/yr) Required 0.21 ---------------------------------------- Drainage Area Summary Pre- ReDevelopment FinalPost-Development Post-ReDevelopmentTP TP Load per acre TP Load per acre Load per acre (Ib/acre/yr) (Ib/acre/yr) lb/acre r 0.90 1.20 0.90 D.A. A D.A. B D.A. C D.A. D D.A. E Total Forest/Open (acres) 0.00 0.00 0.00 0.00 0.00 0.00 Managed Turf (acres) 0.24 0.00 0.00 0.00 0.00 0.24 Impervious Cover (acres) 0.19 0.00 0.00 0.00 0.00 0.19 Total Area (acres) 0.43 0.00 0.00 0.00 0.00 0.43 Drainage Area Compliance Summary D.A. A D.A. B D.A. C D.A. D D.A. E Total TP Load Reduced (lb/yr) 0.00 0.00 0.00 0.00 0.00 0.00 TN Load Reduced (lb/yr) 0.00 0.00 0.00 0.00 0.00 0.00 Runoff Volume and CN Calculations 1-year storm 2-year storm 10-year storm Target Rainfall Event (in) 1 3.03 3.66 5.54 Drainage Areas RV & CN Drainage Area A Drainage Area B Drainage Area C Drainage Area D Drainage Area E CN 74 0 0 0 0 RR (ft) 0 0 0 0 0 1-year return period RV wo RR (ws-in) 0.93 0.00 0.00 0.00 0.00 RV w RR (ws-in) 0.93 0.00 0.00 0.00 0.00 CN adjusted 74 0 0 0 0 2-year return period RV wo RR (ws-in) 1.35 0.00 0.00 0.00 0.00 RV w RR (ws-in) 1.35 0.00 0.00 0.00 0.00 CN adjusted 74 0 0 0 0 10-year return period RV wo RR (ws-in) 2.80 0.00 0.00 0.00 0.00 RV w RR (ws-in) 2.80 0.00 0.00 0.00 0.00 CN adjusted 74 0 0 0 0 1 1 REGULATORY REVIEW 1 05/2020 1 LMS REV I ISSUED FOR I DATE I BY PROJECT ENGINEER: B. EDWARDS DESIGNED BY: A. MARCH 20.05.21 09:01:11-04' . DRAWN BY: A. MARCH PRELIMINARY DRAWING L. MICHAEL DO NOT USE FOR SANTOWASSO CHECKED BY: B. EDWARDS CONSTRUCTION Lic, No.045376 IF THIS BAR DOES NOT 0 1/2" 1" MEASURE 1"THEN DRAWING �SI0NAL '�� IS NOT TO FULL SCALE CoRmHoLoTm Chesapeake Bay Nutrient Land Trust, LLC. January 29, 2020 Rivanna Water & Sewer Authority ATTN: Scott Schiller, PE 695 Moores Creek Lane Charlottesville, VA 22902 RE: CBNLT / Oak Grove - Nutrient Credit Availability "Tomorrow's Natural Resources Today" Project Reference: Moores Creek Advanced Water RRF Engineering Building Addition, Charlottesville Attention: Mr. Schiller: This letter is to confirm the availability of authorized Nutrient Credits sufficient to meet your project requirements at our Oak Grove nutrient facility, which is registered with the Virginia Department of Environmental Quality (DEQ). These Nutrient Credits are generated and managed under the terms of the Oak Grove Nutrient Reduction Implementation Plan dated May 11, 2017 which was authorized by the DEQ on August 31, 2017. The Oak Grove project has been authorized to provide Nutrient Credits for use in the James River watershed. These Credits are transferable to those entities regulated under DEQ's Stormwater Management Program in accordance with VA Code § 62.1-44.15:35. Currently our Oak Grove facility has 8.80 pounds of Phosphorus Credits available. If we can provide further assistance please feel free to contact our office. Sincerely, Chesapeake Bay Nutrient Land Trust, LLC By Its Manager EarthSource Solutions, Inc. Scottk ReeaL Scott A. Reed Vice President Chesapeake Bay Nutrient Land Trust, LLC. • 5735 S. Laburnum Avenue • Richmond, VA 23231 • P: 804.222.5114 • www.cbnit.com Hazen HAZEN AND SAWYER 4011 WESTCHASE BLVD, SUITE 500 RALEIGH, NC 27607 RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINIA MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY ENGINEERING BUILDING ADDITION SITEWORK CIVIL STORMWATER CALCULATIONS DATE: MAY 2020 HAZEN NO.: 31442-002 CONTRACT NO.: 0 DRAWING NUMBER: C106 O PEAK FLOW CALCULATIONS FROM LIMITS OF DISTURBANCE PRE -DEVELOPMENT m a) as U) J 0 U Z U g U tu a) U) rl- O_ J U OU J - j Z U_ U g U ml o m U g N d O Lo 9 N N CM O J N QCD � N N Lu M Q 0 = J LL d 1 .n co i oral e v � 1 ENGINEERING-e BUILDING a 355 353 350 348 � 36� 345 355 342 35`Zo 340 36 3�a 33� 3q5 335 3�3 334 341 340 \ 332 x 339 366f � 365 ��"` 3 42363on 358 353 3S3 3.Sn LIMITS OF DISTURBANCE, TYP -fo �3 4S �34 3 9 PRE -DEVELOPMENT SCALE: 1" = 20' �L o CONTRACTOR LAYDOWN AREA f. i COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.07 6.9 B 98 0.02 2.0 LAWN A 39 0.10 3.9 B 61 0.24 14.6 TOTALS 0.4 27 COMPOSITE CN 71 TIME OF CONCENTRATION, t, (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF, Q PEAK FLOW (CFS) 2 10 3.66 5.54 1.17 2.54 0.8 1.7 POST -DEVELOPMENT 1 v: COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.11 10.8 B 98 0.08 7.8 LAWN A 39 0.06 2.3 B 61 0.18 11.0 TOTALS 0.4 32 COMPOSITE CNI 80 TIME OF CONCENTRATION, t, (HOURS) �O LEGEND IMPERVIOUS AREA OPEN SPACE STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF, Q PEAK FLOW (CFS) 2 10 3.66 5.54 1.76 3.37 1.2 2.3 PEAK FLOW CALCULATIONS FROM CURB CUT DRAINAGE AREA (POST -DEVELOPMENT) DRAINAGE THROUGH CURB CUT 0=CIA C 0.95 i I N/HR 6.62 A ACRES 0.15 Q CFS 0.94 ALOE; o 0 0 0 DRAINAGE BOUNDARY = 0.15 AC I I I / --- - - 1--------------- -- - - 061 ••••• 6� 6j cA J 00 • o e o 0 CURB CUT _ _ _ - - - o DRAINAGE AREA = 1 \\ CONTRACTOR Q10-YR PEAK= 0.94 CFS "' LAYDOWN AREA c+M e �� 1 1 oi 0 1 1 1 1 363 1 ENGINEERING ENGINEERING BUILDING BUILDING 36� 338 1 1 1 355 RIPRAP OUTLET PROTECTION 1 353 1 350 0 3S3 348 3.4n LIMITS OF DISTURBANCE, TYP 1 60 345 1 1 1 O 1 1 365 . 42 34S o 1 36 �� 340 343 LEGEND 3 33 339 \ 1 3�6 335 33? 1 1 1 3�3 334 1 1 1 1 IMPERVIOUS AREA 1 1 1 341 332 x 1 340 \ x OPEN SPACE 339 0 20 10 0 20' I I I SCALE: 1" = 20' POST -DEVELOPMENT SCALE: 1" = 20' PROJECT ENGINEER: B. EDWARDS li RIVANNA WATER &SEWER AUTHORITY DATE: MAY 2020 DESIGNED BY: A. MARCH 0.05.21 09:01:31-04' CHARLOTTESVI LLE� VI RG I N IA HAZEN NO.: 31442-002 2 PRELIMINARY DRAWING o L. MICHAELSITEWORK 01 DRAWN BY: A. MARCH DO NOT USE FOR o SANTOWASSO CIVIL CONTRACT NO.: CHECKED BY: B. EDWARDS CONSTRUCTION Lic. No.045376 - MOORES CREEK ADVANCED WATER RESOURCE STORMWATER CALCULATIONS DRAWING �W HAZEN AND SAWYER NUMBER: Ar IF THIS BAR DOES NOT 0 1/2" ill �"s' 4011 WESTCHASE BLVD, SUITE 500 RECOVERY FACILITY 1 REGULATORY REVIEW 05/2020 LMS MEASURE 1" THEN DRAWING SIONAL �� RALEIGH, NC 27607 ENGINEERING BUILDING ADDITION C107 REV ISSUED FOR DATE BY IS NOT TO FULL SCALE EMBEDMENT, TYP (SEE NOTE 1) a ti m 0 N 0 N N U) J 0 U Z U U T Q U) U J ❑ O J - Z U U U m} ❑ �m U 7; CD d � o d N `r o � N co o J N Q o of N N LO V L M Q o� o J L a 48' MAX SPACING BETWEEN 112" EXHAN61UN JUIN I MA I L REQUIRED WHEN WALK ABUTS RIGID STRUCTURES TYPICAL CONTRACTION JOINT VARIES, SEE PLAN T FOR WIDTH WHEN WIDTH OF SIDEWALK, PAD, ETC EXCEEDS 6', LONGITUDINAL CONTRACTION JOINTS SHALL BE PLACED AS REQUIRED TYPICAL CONCRETE WALKWAY 0245000 BACK OF CURB 12" 2'-6" FINISHED MIN GRADE 6" _ CONCRETE CURB AND GUTTER 3" R f 1 1/2" 00 0o Do 0 Do i I(0:) ASPHALT PAVEMENT - SLOPE NOTES: 1. CONTRACTION JOINTS SHALL BE PLACED AT 10 FOOT INTERVALS, OR 15 FOOT INTERVALS WHEN A MACHINE IS USED TO PLACE THE CURB. 2. EXPANSION JOINTS SHALL BE PLACED AT 90 FOOT INTERVALS AND ADJACENT TO ALL RIGID OBJECTS. CURB AND GUTTER 0242000 VARIES VARIES - SEE SITE PLAN 4'-0" EQUAL 12" SLOPE AT 1/4:12 MIN 2" ASPHALT TYP SURFACE COURSE 3.5" ASPHALT BASE COURSE CL EQUAL _ SLOPE AT 1/4:12 TACK COAT 4'-0" 12:1 s: 1 or 3:� 3. CUT SECTION \/�A/��� /\.��� FILL SECTION NOTE: 8" AGGREGATE BASE COURSE THE 2" ASPHALT CONCRETE SURFACE COURSE AND THE TYPE I SEPARATOR GEOTEXTILE TACK COAT SHALL NOT BE PLACED UNTIL COMPLETION COMPACTED SUB -GRADE OF ALL OTHER WORK IN CONTRACT. 1 1 REGULATORY REVIEW REV ISSUED FOR TYPICAL ROADWAY SECTION 0251000 PROJECT ENGINEER. - DESIGNED BY: DRAWN BY: CHECKED BY: IF THIS BAR DOES NOT 05/2020 LMS MEASURE 1" THEN DRAWING DATE BY IS NOT TO FULL SCALE CUT BACK EXIST SURFACE COURS! 6" MIN FROM BAS EXIST SU COURSE TACK CO NEW ASPHALT PAVEMENT SEE 0251000 CUT BACK EXIST BASE COURSE 12" MIN >URFACE " MIN T 3ASE 1.5" MIN BASE COURSE CA10I DMOC BOURSE TYPICAL PAVEMENT JUNCTION 0251301 Note: Sign shall have white lettering on a blue background. Ref. Sec. 7-0802.4 I Rev. 1-00, 2011 12" 2„ DMV PERMIT 299 REQUIRED ::� 3/4" 2„ 1 1/2" 24" 1 /2„ 1 1/2" PENALTY 11/2" $tOO-500 FINE �3/4" 1 1/2" TOW -AWAY ZONE � 3/4" 1 1/2" 2„ ACCESSIBLE PARKING SIGNS Note: Sign shall have white lettering on a blue background. 7" Ref. Sec. 7-0802.4 I Rev. 1-00, 2011 Reprint 12" VAN ACCESSIBLE 1 1/4" 1 3/4" 1" 1 3/4" 1 1/4" VAN ACCESSIBLE PARKING SIGNS VAN ACCESSIBLE PARKING SIGNS DETAIL 1 SCALE: N.T.S. DC1 PLATE NO. STD. NO. 32A-7 PLATE NO. I STD. NO. 32B—"7 ADHERE CAP UNIT TO TOP UNIT W/ CONCRETE ADHESIVE AS SPECIFIED BY THE MASONRY WALL SUPPLIER 3/4" SET, TYP 8" HIGH MODULAR CONCRET FACING UNITS /J I I /J I GEOGRID REINFORCEMENT (SEE NOTE 1 AND SPECIFICATION I I I _ @1 _ SECTION 13800 - GEOGRID) I 1 1 T FINISHED GRADE (VARIES) (SEE NOTE 3) IMPERVIOUS FILL, MIN 12" THICK TOTAL WALL HEIGHT 12" MIN THICK AASHTO VARIES -4 # 57 STONED AINAGE FILL a (V FINISHED GRAD IMPORTED SELECT GRANULAR BACKFILL (SEE NOTE 2) i MIN 18" 6"0 PERFORATED DRAINAGE PIPE SLOPE AASHTO # 57 OR CLASS B (1/8" PER FT) TO DRAIN SURROUNDED CONCRETE LEVELING PAD 2 0„ WITH AASHTO NO. 57 STONE. OUTLET 6" THICK x 2'-0" WIDE, CONT. IL PIPE EVERY 25 FT OF WALL LENGTH NOTES: FILTER GEOTEXTILE 1. GEOGRID REINFORCEMENT MATERIAL AND EMBEDMENT LENGTH TO BE ESTABLISHED BY PROFESSIONAL ENGINEER REGISTERED IN THE COMMONWEALTH OF VIRGINIA BASED UPON CURRENT AND PROJECTED LOADINGS AND PROPER DRAINAGE. MINIMUM GEOGRID LENGTH TO BE 0.75 TIMES THE MAXIMUM WALL HEIGHT AND TO BE UNIFORM FOR ALL LAYERS. 2. WALL BACKFILL MATERIAL USED IN DESIGN SHALL BE ON -SITE MATERIAL OR MATERIAL MATCHING WALL DESIGN PARAMETERS SHALL BE SUPPLIED BY CONTRACTOR AT NO ADDITIONAL COST. IT SHOULD BE ASSUMED BACKFILL MATERIAL IS NOT AVAILABLE ON SITE. SEE SPECIFICATION SECTION 13100 - MSE RETAINING WALLS FOR BACKFILL SPECIFICATIONS. 3. PROVIDE POSITIVE DRAINAGE AWAY FROM BACK OF WALL. 4. INCLUDE SUBGRADE LOADING FOR PARKING AREA WHERE APPLICABLE. DESIGN TO ACCOMODATE H-20 LOADING AS MINIMUM. RETAINING WALL DETAIL 3 SCALE: N.T.S. DC1 GENERAL NOTES: 1. DETECTABLE WARNING TO BE PRE -FORMED PLASTIC \ INSERT WITH SLIP RESISTANT SURFACE COVERING THE FULL WIDTH OF THE RAMP FLOOR BY 2 FOOT 12:1 MAX. IN LENGTH IN THE DIRECTION OF TRAVEL. 5' MIN. TYPE B 2. THE DETECTABLE WARNING SHALL BE PROVIDED BY TRUNCATED DOMES. TRUNCATED DOMES TO BE PARALLEL STAMPED IN TOP SURFACE. THE COLOR OF THE DETECTABLE WARNING SECTION SHALL BE YELLOW.3. SLOPING SLOPING SIDES OF CURB RAMP MAY BE POURED " ' �m--'�- -L� I 12/- MONOLITHICALLY WITH RAMP FLOOR OR BY USING 12:1 MAX. PERMISSIBLE CONSTRUCTION JOINT WITH REQUIRED 5' MIN BARS. � \ 2' IN. * , AT 2" HIGHER THANTYPE 4. IF RAMP FLOOR IS PRECAST, HOLES MUST BE C EDGE OF PAVEMENT PROVIDED FOR DOWEL BARS SO THAT ADJOINING AT**, SAME AS TOP OF FLARED SIDES CAN BE CAST IN PLACE AFTER PARALLEL & PERPENDICULAR CURB PLACEMENT OF PRECAST RAMP FLOOR. PRECAST CONCRETE SHALL BE CLASS A-4. 50%-65% OF BASE DIAMETER TOP DIAMETER 5. REQUIRED BARS ARE TO BE NO. 5 X 8" PLACED 1' + 0 CENTER TO CENTER ALONG BOTH SIDES OF THE VAR. WIDTH0 IWill BASE DIAMETER RAMP FLOOR, MID -DEPTH OF RAMP FLOOR. SIDEWALK OR 2", MINIMUM CONCRETE COVER 1 1/2". SIDEWALK SPACE TRUNCATED DOME 6. RAMPS MAY BE PLACED ON RADIAL OR TANGENTIAL - - - �H-= 3' MIN DETAIL SECTIONS PROVIDED THAT THE CURB OPENING IS 1.6"-2.4" PLACED WITHIN THE LIMITS OF THE CROSSWALK AND THAT THE AT THE THE *VAR. 4' MIN. C-C SLOPE CONNECTION OF CURB OPENING IS PERPENDICULAR TO THE CURB. 0000000000 °°°°°°°°°°°°°°°°°°° �� * TREATMENT WHERE 1.6 „ -2.4 0000000000000000000 0000000000000000000 °°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°°°°°°°° N 7. TYPICAL CONCRETE SIDEWALK IS 4 THICK. WHEN °°°°°°°°°°°°°°°°°°° THE RAMP IS PLACED IN THE CURB RETURN RADIUS WIDTH OF SIDEWALK C-C °°°°°°°°°°°°°°°°°°° 000000000000000000° IT SHALL BE 7" THICK. OR SIDEWALK SPACE 0.65" MIN. °°VARI000000ABLE 0MIN°° — IS LESS THAN 7'-4" �� PAY LIMITS 8. WHEN CURB RAMPS ARE USED IN CONJUNCTION CG-12 DETECTABLE WARNING WITH A SHARED USE PATH, THE MINIMUM WIDTH SHALL BE THE WIDTH OF THE SHARED USE PATH. CURB RAMP DETAIL B. EDWARDS H RIVANNA WATER & SEWER AUTHORITY A. MARCH 20.05.2109:01:55-04W-' CHARLOTTESVILLE, VIRGINIA PRELIMINARY DRAWING L. MICHAEL A. MARCH DO NOT USE FOR SANTOWASSO Hazen B. EDWARDS CONSTRUCTION Lac. No.05376 �w HAZEN AND SAWYER MOORES CREEK ADVANCED WATER RESOURCE 0 1/2" 1" \� 4011 WESTCHASE BLVD, SUITE 500 RECOVERY FACILITY S10NAL � RALEIGH, NC 27607 ENGINEERING BUILDING ADDITION DETECTABLE WARNING SURFCE DETAIL Z SCALE: N.T.S. DC1 DATE: STANDARD DETAILS HAZEN NO.: CIVIL CONTRACT NO.: CIVIL DETAILS - SHEET 1 DRAWING NUMBER: MAY 2020 31442-002 01 DC1 d 0 N O N 0 N 0 N Lo U) J 0 U z U U T Q U) N U ❑ 0 J — Z U 0 � U m} ❑ lm N d o � N � O co O J N Qp � N N Lo �w M Q o� 4i0 ii a 3d 0 ih A PIPE OUTLET CONDITIONS q 0% - TYPE II SEPARATOR GEOTEXTILE KEY IN 6"-9"; RECOMMENDED FOR ENTIRE PERIMETER SECTION A -A 0243300 CTCCI POST _N WIRE FABRIC NING SIGN SIDE VIEW 3'-4" PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL *SEE SITE PLAN MIN 10 GAUGE LINE WIRES U u 4 RAISED HEXAGONAL HEAD THREADED PLUG CLEANOUT 0260200 8'-0" MAX VARIABLE AS DIRECTED BY THE ENGINEER TREE PROTECTION AREA DO NOT ENTER CONCRETE PAD, SEE 0264005 FINISH GRADE PVC RISER LOCATE LOCATE CLEAR OF OBSTRUCTIONS WYE OR 45' BEND =IIIII=IIIII IIIIIIIIII-IIIII=11111 11111—IIIII=IIIII=IIIII-IIIII-IIIII=IIIII-IIIII-IIIII=IIIII=IIIII=IIIII-IIIII=IIIII=IIIII IIIIIII IIIII IIIII WARNING AND BARRIER FENCE. IIIII SEE SPECIFICATION 31 10 00 IIIII IIIII IIIII IIIII IIIII 'illl 'illl NOTE: FOR TREE PROTECTION ONLY FRONT VIEW NOTES: t 1. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF TREE PROTECTION AREA MATERIAL. M 2. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE, AND SPACED d AS DETAILED. 3. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' M DO NOT ENTER ON CENTER THEREAFTER. t 4. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. 5. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 6. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. WARNING SIGN DETAIL TREE PROTECTION FENCE DETAIL 2 SCALE: N.T.S. DC2 PROJECT ENGINEER: B. EDWARDS DESIGNED BY: A. MARCH PRELIMINARY DRAWING DRAWN BY: A. MARCH DO NOT USE FOR CHECKED BY: B. EDWARDS CONSTRUCTION IF THIS BAR DOES NOT 0 1/2" 1" 1 REGULATORY REVIEW 05/2020 LMS MEASURE 1" THEN DRAWING REV ISSUED FOR DATE By IS NOT TO FULL SCALE AL eH r ti r^ 20.05.21 09:02:17-04j o L. MICHAEL r. SANTOWASSO Lic. No.045376 �&ONAL E��� PLASTIC OR WIRE TIES MIN 12 1/2 GAUGE INTERMEDIATE WIRES, TYP GRADE CONSTRUCTION OF A SILT FENCE SF (WITHOUT WIRE SUPPORT) 1. SET THE STAKES. 2. EXCAVATE A 4"x4" TRENCH UPSLOPE ALONG THE LINE OF STAKES 6'MAX FILL SLOPE SECTION--, SOIL STABILIZATION MATS SHOULD BE INSTALLED VERTICALLY Q� 5 NOTE: SLOPE SURFACE DOWNSLOPE FOR BEST RESULTS. Q Q SHALL BE SMOOTH AND FREE OF Q ROCKS, LUMPS OF FLOW DIRT, GRASS AND (/ Q STICKS. MAT SHALL BE PLACED FLAT 4' A Q ON SURFACE FOR 3. STAPLE FILTER MATERIAL TO STAKES 4. BACKFILL AND COMPACT / PROPER SOIL 0 CONTACT. AND EXTEND IT INTO THE TRENCH. THE EXCAVATED SOIL. Q �Q ^� Sv �4' 2, I— � Q �IIIIIIIIIIII I II- 1, � DIRT SHALL BE TAMPERED PRIOR TO LAYING TOP -I LAP OVER FLOW X, TOE BERM \\/ SHEET FLOW INSTALLATION MAINTAIN SLOPE ANGLE TRENCH INTO BERM AND (PERSPECTIVE VIEW) PROGRESS DOWNSLOPE SLOPE LINING (WET SLOPE TREATMENT POLYPROPELYENE NON -WOVEN SLOPE LINING TOP CUT SLOPE (DRY SLOPE) (NEEDLE PUNCHED) III11— II'Il OSN TREATMENT - 2 GEOTEXTILE FILTER I,II F\USER ,4E SOVRCF ERi CLOTH (BEHIND 4' PB R �P TREATMENT - 2) I -I i. O_E IF SOIL =��� BOTTOM OF FILL SLOPE _�i V iPBL! BOTTOM OF CUT SLOPE BOTTOM OF CUT SLOPE SOURCE: VDOT ROAD AND BRIDGE STANDARDS DETAIL 1 SCALE: N.T.S. DC2 I I GUARD RAIL SHALL BE I I IN ACCORDANCE WITH I I VDOT STANDARD I I I I I I I I L — J L _ J GALVANIZED STEEL GUARD RAIL 0244503 HAZEN AND SAWYER 4011 WESTCHASE BLVD, SUITE 500 RALEIGH, NC 27607 - OR SHOULDER BREAK POINT PLATE: 3.36-5 RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINIA MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY ENGINEERING BUILDING ADDITION POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) 0227000 NOTE: HYDRANT MUST BE EQUIPPED WITH CHARLOTTES- VILLE THREADS WHICH IS THE LOCAL STANDARD. 1 LENGTH OF BRANCH VARIES 6' MIN (270') 2' TO 10' 18"-22" 7 CU. FT. VALVE BOX #68 STONE-1 NOTE 1. SURROUND WEEP HOLES WITH GRAVEL AND KEEP FREE OF CONCRETE. 2. MAINTAIN A 3 1/2' MIN. COVER FROM THE MAIN TO THE FIRE HYDRANT ( INCLUDING DITCHES ) 3. FINISHED GRADE SHALL SLOPE AWAY FROM THE FIRE HYDRANT AND VALVE BOX. 4. THE GATE VALVE IS ALLOWED IN SHOULDER OR BEHIND THE DITCH. IT IS NOT ALLOWED IN THE DITCH. 5. FIRE HYDRANTS SHALL BE INSTALLED AT LOCATIONS WHERE WEEP HOLES ARE ABOVE THE PREVAILING GROUNDWATER ELEVATION. IF REQUIRED TO BE IN WET AREAS, THE WEEP HOLES SHALL BE PLUGGED AND THE HYDRANT SHALL BE PUMPED DRY. TYPICAL FIRE HYDRANT ASSEMBLY DETAIL N.T.S. FIG. W-4 DETAIL 3 SCALE: N.T.S. DC2 DATE: HAZEN NO.: STANDARD DETAILS CIVIL CONTRACT NO.: CIVIL DETAILS - SHEET 2 DRAWING NUMBER: MAY 2020 31442-002 01 DC2