HomeMy WebLinkAboutWPO201800092 Review Comments WPO VSMP 2020-05-27Emily Cox
From: Emily Cox
Sent: Wednesday, May 27, 2020 3:26 PM
To: Scott Collins
Cc: Matthew Wentland
Subject: RE: Planning Application Review for WP0201800092 FootHill Crossing Phase Vl.
Scott — See below in red. Let me know if you have any questions.
Emily Cox, PE
Civil Engineer II
(4341 296-5832 Ext. 3565
401 McIntire Rd.
Charlottesville, VA 22902
www.albemarle.ore
From: Scott Collins <scott@collins-engineering.com>
Sent: Friday, May 15, 2020 9:29 AM
To: Emily Cox <ecox2@albemarle.org>
Cc: Matthew Wentland <mwentland@albemarle.org>
Subject: RE: Planning Application Review for WP0201800092 FootHill Crossing Phase VI.
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Emily -
We are wrapping up the comments for Foothills Crossing Phase VI, and I have a couple of clarifications to make sure we
have all the remaining comments addressed:
1. Comment #3 under SWPP: The VSMP#3 plan under WP02017-0020 was approved on 6/18/18. This plan
includes the disturbed area associated with the access road across the creek. Attached is the county link to the
approved plans. A land disturbance permit was issued and work was performed in the field under this permit.
https://Ifweb.abemarle.org/WebLink/DocView.aspx?id=987260&page=1&dbid=3. Let me know if this
information satisfies this comment, or if there is something else you need.
Please show us where the emergency access road is shown on these plans and included in the SWIM calculations (sheet #
or just circle it). It is not evident to us. We need to know where the impervious area was accounted for in SWM.
2. Comment #5 under Stormwater management Plan —The full easement is shown on sheet 5 in the upper right
hand corner of the submitted plans. Also, from the plans and from the exhibit that I provided this week to you
can Dan, you can see that the easement will ultimately be vacated and will end at the future location of the
Road ROW as the next section ties this into the development. Is there anything else that is needed to address
this comment.
Comment addressed. As long as there is an easement encompassing what is necessary. However this will be checked on
your final submission for approval stamps. Ensure the easement is clearly shown.
Comments #15 and #16 under Stormwater management Plan — See attached pdfs. I have labeled the WPO
buffer on sheet 6 and noted the impacts associated with the public utilities on the plan. I also cut on the
sanitary sewer so you can see the impacts associated with this public utility. I don't think the impacts from the
public utilities count toward the overall buffer impacts, nor does the primitive trail, so I think the plan shows all
the impacts and mitigation for the impacts. Can you confirm this for me, thanks!
Comments 15 and 16 addressed.
4. Comment #19 — on sheet 8 of the submitted plans in the lower right hand corner, it labels the outfall as Class II
riprap lining the existing stream and stretching 20' upstream and downstream from the culvert. Let me know if
that is acceptable.
Length, width, depth of rip -rap should be specified.
5. Comment #20 —let me know if the information that I provided in comment #1 response also addresses the
concerns in Comment #20.
Please highlight in approved and current plans where this impervious area for emergency access is accounted for.
6. Comment #21—the location of the future dedication has been provided to Dan, and I will follow-up with him to
make sure it is acceptable.
Comment addressed.
Thanks again for the help on this Emily!
Scott
From: Emily Cox <ecox2@albemarle.org>
Sent: Friday, April 24, 2020 3:24 PM
To: Scott Collins <scott@collins-engineering.com>
Cc: Alan Taylor <alan@riverbenddev.com>; Matthew Wentland <mwentland@albemarle.org>
Subject: Planning Application Review for WPO201800092 FootHill Crossing Phase VI.
Scott -
Let me know if you have any questions. Have a good weekend!
The Review for the following application has been completed:
Application Number = WPO201800092
Reviewer = Emily Cox
Review Status = Requested Changes
Completed Date = 04/24/2020
This email was sent from County View Production.