HomeMy WebLinkAboutSUB201700074 Study 2020-04-20underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Letter of Transmittal
April 20, 2020
Mr. John Anderson, PE, Civil Engineer II
Community Development Dept.
County of Albemarle, Virginia
401 McIntire Road
Charlottesville, VA 22902-2702
Subject: Documentation Regarding Earthwork and Pavement Observation and
Testing Services, Hollymead Towncenter Block VI, Albemarle County,
Virginia (Underhill Engineering Project No. 18023)
(Albemarle County RE: SUB2017-00074)
Dear Mr. Anderson:
Underhill Engineering, LLC (Underhill) is pleased to present this transmittal consisting of documentation
regarding Earthwork and Pavement Observation and Testing services. This transmittal includes reports
submitted June 29, 2018, November 28, 2018, February 14, 2019, April 1, 2019, two reports dated July
31, 2019, and February 5, 2020, summarizing the services provided. This information is provided as
requested by our client, Mr. Katurah Roell, copied here.
Underhill has endeavored to complete the services identified herein in a manner consistent with that
level of care and skill ordinarily exercised by members of the profession currently practicing in the same
locality and under similar conditions as this project. No other representation, express or implied, is
included or intended, and no warranty or guarantee is included or intended in this report.
Sincerely,
UNDERHILL ENGINEERING, LLC
�rL—� E
i i 'MP
Elliot J. White, EIT, PMP
Staff Engineer I
O. Chris opher Webster, PE
Principal
���Eptil,Tff OF
yy�� y-r��pi �yy��pp Gs��
O 0. CHRISTOPIOR
U WESSM y
Lic. No. 019910
�yo
�"f ssfonrAt� -hA
T: 434.771. 0234
1001 E. Market Street, Suite 100, Charlottesville, VA 22902
underhillengineering.com
Hollymead Towncenter Block VI
Albemarle County, Virginia
Exhibits:
1. Concrete Compression Test, November 20, 2018 (1 page)
2. Subgrade Observation and Field Density Testing, June 29, 2018 (18 pages)
3. Soil Laboratory Testing, November 28, 2018 (15 pages)
4. Subgrade Observation and Field Density Testing, February 14, 2019 (25 pages)
5. Subgrade Observation and Field Density Testing, April 1, 2019 (12 pages)
6. Soil Laboratory Testing, July 31, 2019 (12 pages)
7. Subgrade Observation and Field Density Testing, July 31, 2019 (20 pages)
8. Asphalt Observation, February 5, 2020 (1 page)
cc: Mr. Katurah Roell- Town Properties, LLC
Project 18023 / April 20, 2020 2 Underhill Engineering, LLC
Schnabel
E N G I N E E R I N G
Concrete Test Report
DATE OF REPORT: 11/20/2018
Page 1 of 1
PROJECT: Underhill Eng 18023 Hollymead
PROJECT NUMBER: 15643010 T60
CLIENT: Underhill Engineering
BLDG. PERMIT NO.:
SET NO.: 1
SAMPLING DATA
DATE SAMPLED: 10/23/2018 TIME SAMPLED:
REQUIRED DESIGN STRENGTH (psi):
SAMPLED BY: Susan Ray
MIX DESIGNATION:
NUMBER OF CYLINDERS MOLDED: 5
SUPPLIER:
DATE CYLINDERS RECEIVED: 10/24/2018
TIME BATCHED:
TRANSPORTED BY: Susan Ray
TIME FINISHED:
TRUCK NUMBER:
SIZE OF LOAD (cy):
TICKET NUMBER:
WATER ADDED ON SITE (gallons):
TYPE OF OBSERVATION:
ADDITIVE QUANTITY:
SAMPLES PLACED IN CURING BOX?: No
QUANTITY PLACED (cy):
WEATHER CONDITIONS:
TESTING INSTRUCTIONS: 1 @ 7,3 @ 28, 1 @ Hold
LOCATION OF CONCRETE PLACED:
PROPERTIES OF FRESH CONCRETE
MIX DATA / SPECIFICATIONS
AIR TEMPERATURE (°F):
MIX DESIGN STRENGTH (psi):
CONCRETE TEMPERATURE (ASTM C 1064) ff):
CONCRETE TEMPERATURE (ASTM C 1064) ff):
SLUMP/SPREAD (ASTM C 143/C 1611) (in.):
SLUMP/SPREAD (ASTM C 143/C 1611) (in.):
POST ADDITIVE SLUMP (ASTM C 143) (in.):
POST ADDITIVE SLUMP (ASTM C 143) (in.):
AIR CONTENT (ASTM C 231 or C 173) (%):
AIR CONTENT (ASTM C 231 or C 173) (%):
COMPRESSION TEST RESULTS
SPECIMEN
TEST
AGE
DIAMETER
AREA
FAIL
MAXIMUM
COMPRESSIVE
CURE
CYLINDER UNIT
NUMBER
DATE
(DAYS)
(INCHES)
(SQ.IN.)
TYPE
LOAD (LBS)
STRENGTH (PSI)
TYPE
WEIGHT
(PCF)
1 -1
10/30/2018
7
4.00
12.57
2
37,100
2950
L
142.3
1-2
11/20/2018
28
4.00
12.57
3
48,240
3840
L
143.1
1-3
11/20/2018
28
4.00
12.57
2
45,680
3630
L
142.2
1-4
11/20/2018
28
4.00
12.57
2
47,990
3820
L
143.6
1-5
Hold
4.00
12.57
L
142.5
Average 28 Day Strength:
3,760 psi
REMARKS:
ProlectDistribution SCHNABEL ENGINEERING
Chris Webster - Underhill Engineering
Susan Ray - Underhill Engineering
Noland Silman, P.E.
480 Four Seasons Drive
Charlottesville, Virginia / 22901
T/ (434) 975-3200 F/ (434) 975-3233
Types of failure according to ASTM C 39. Curing Methods: L = Lab Cure; F = Field Cure; N/A = Not Applicable.
Cylinders tested in accordance with ASTM C 39 and ASTM C 1231. Cylinders molded and concrete sampled in accordance with ASTM C 31 and C 172
when sampled by Schnabel personnel. Air content test was performed by ASTM C 231 unless otherwise noted in the Remarks section.
The unit weight of the cylinders has been calculated in the laboratory, for information purposes only, and assumes that the sample is exactly 6" x 12" or
4" x 8", unless otherwise noted.
Test results relate only to the items observed and tested as referenced above.
Field and laboratory testing is in accordance with the approved project documents unless otherwise noted in the Remarks section.
This report shall not be reproduced without the prior written approval of Schnabel Engineering.
underhilI ENGINEERING
geotechnical I geothermal I geoconstruction
June 29, 2018
Mr. Katurah Roell
Town Properties, LLC
3215 Barracks Hill
Charlottesville, VA 22901
Subject: Report No. 1, Earthwork Observation and Testing Services, Hollymead
Towncenter Block VI, Albemarle County, Virginia (Underhill Engineering
Project No. 18023.00)
Dear Mr. Roell:
Underhill Engineering, LLC (Underhill) is pleased to present our Report No. 1, summarizing Underhill's
earthwork observation and testing services for the project. This report summarizing Underhill's services
relating to observation of subgrades to receive compacted structural fill, and observation and testing of
compacted structural fill for the new townhomes. These services are provided in accordance with
Underhill's Service Agreement with you dated March 1, 2016, and your authorization of April 5, 2018.
This report summarizes services provided from April 30 through June 20, 2018.
Our services as reported herein included the following tasks:
■ Observations of subgrades to receive compacted structural fill after removal of the limited
topsoil and unsuitable existing fill soils. Evaluation of subgrades included observations of
proofrolling of the stripped subgrades by the Contractor using a loaded dump truck,
observations of test pits / test strips, and probing with a Geostick Penetrometer at selected
locations.
■ Retrieval of bulk samples for soil laboratory testing.
■ Observation and testing of compacted structural fill placement. Observation of fill placement
included the following tasks:
o Evaluation of proposed fill materials for suitability,
o Measurement of lift thickness at selected locations, and
o Observations of compaction methods employed by the Contractor. Compaction testing
included field density tests to compare to the laboratory maximum dry density and
optimum moisture content.
Field density testing of utility backfill including the following tasks:
o Evaluation of proposed backfill materials for suitability.
o Periodic observations of compaction methods employed by the Contractor.
o Periodic field density testing.
The following services were not included: observation of erosion and sediment control methods,
surveying for line and grade, environmental services, or other services not specifically identified above.
T: 434.531.2565
327 W. Main Street, Suite 2, Charlottesville, VA 22903
underhillengineering.com
Observation of Subgrades
Underhill's Engineer observed subgrades to receive compacted structural fill for building support on
April 30, 2018. Underhill's Engineer observed subgrade response during proofrolling by a loaded dump
truck as conducted by the Contractor. Subgrades were also evaluated by probing with a Geostick
Penetrometer including in shallow test pits as excavated by the contractor in areas where proofrolling
revealed unsuitable soils. The approximate area of subgrades observed is indicated in Exhibit A (Figure
1). Subgrades were considered suitable to receive compacted structural fill, except for one area where
soft existing fill soils were encountered.
The area of unsuitable soils consisted of soft existing fill, containing concentrations of burnt roots and
other organic matter. This area was located generally parallel to Grand Forks Boulevard and was
approximately 100 feet long and 30 feet wide with an average depth of 3.5 feet. The approximate area
of undercut is indicated in Exhibit A (Figure 1). Based on our rough measurements using a tape measure
assisted by the contractor, we estimated the total undercut to be approximately 389 CY.
Field Density Testing
Compacted structural fill placed for building Lots 27 through 42 and utility backfill were tested for
relative compaction on May 2 through June 20, 2018. Compacted structural fill typically consisted of
fine to coarse silty sand, contains mica and some rock fragments, as represented by the bulk Proctor
sample tested by Underhill's subconsultant laboratory. During period visits to the site, lifts were noted
to be placed in typical 6 to 8-inch, loose lifts, compacted using a vibratory sheepsfoot roller and
vibratory smooth drum roller.
Underhill also provided periodic (spot) field density testing of utility backfill. During period visits to the
site, lifts were noted to be placed in typical 4 to 6-inch, loose lifts. The contractor used a remote -
controlled sheepsfoot roller to compact sewer line trench backfill. Spot field density testing is provided
to aid the contractor in evaluating whether backfill placed and tested at the locations indicated meet the
required compaction. Note that spot field density testing does not relieve the contractor from meeting
the compacted backfill requirements as indicated in the project documents.
Compaction testing of lifts was completed using non-nuclear test methods, correlated using nuclear test
methods. A summary of Field Density Test Results is included as Exhibit B (13 sheets). The approximate
field density test locations are indicated in Exhibit C (Figure 2). Field density testing indicated
compaction to at least 95 percent of the maximum dry density as evaluated by the laboratory Standard
Proctor tests.
Underhill has endeavored to complete the services identified herein in a manner consistent with that
level of care and skill ordinarily exercised by members of the profession currently practicing in the same
locality and under similar conditions as this project. No other representation, express or implied, is
included or intended, and no warranty or guarantee is included or intended in this report.
Project 18023.00 / June 29, 2018 2 Underhill Engineering, LLC
Thank you for the opportunity to provide our services. If you have any questions or require additional
information, please do not hesitate to contact the undersigned.
Sincerely,
UNDERHILL ENGINEERING, LLC
EALTH p"
Susan E. Ray, EIT, GIT L
Staff Geotechnical Engineer
p O. CHRISTOV11FA
U W f?SS'fT�t
Lic. No. 019910
O. Christ pher Webster, PE .a
Principal �0
4TIONAL G
00►0**w
Exhibits:
Exhibit A: Subgrade Observation Plan, Figure 1
Exhibit B: Field Density Test Summary (13 sheets)
Exhibit C: Field Density Test Location Plan, Figure 2
cc: Gregg O'Donnell — Stanley Martin Homes
Project 18023.00 / June 29, 2018 3 Underhill Engineering, LLC
_eµ
:ma
DITCH 1 �
'I
l '
TO SNT2 :/•
§
FACNTY 2
/
CONSTRUCT PADS FOR LOTS /
27-31 ONLY AFTER REMOVAL
OF ST-2. SEE CONSTRUCTION
SEQUENCE EP-4
L F(o�1.RJ
1-^ 7 A?ef6v,-A4A4e Are< a`s � siSrA ze
/%,.
EROSION AND SEDIMENT
CONTROL LEGEND
®® 0
a® at rou Q 0
® IF) 0
®® 0
o�o©
o®oo
F9 8 O
DITCH
a
TO SNTA -..
FA
FACILITY x ,
a'--- RELOCATE CONSTRUCTION
m
Q
ENTRANCE TO LAUREL PARK
LANE DURING PHASE 4
Z
'•
� �
Y
W
;
2 0
�&
boa
m
--E—P
5
5
icsam
�m
EE mwe/n
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
05/02/18
Field Density Summary
Lab Reference:
Optimum Moisture (%):
Maximum Dry Density:
95% of Maximum Dry Densityl
5
15.6
113.1
107.4
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
1
05/02/18
587
5
137.3
19.3
115.1
113.1
102%
17S
724174
4223658
Passed
2
05/02/18
587.5
5
131.9
17.8
112.0
113.1
99%
17S
724178
4223648
Passed
3
05/02/18
587
5
135.6
18.7
114.2
113.1
100+%
17S
724177
4223625
Passed
4
05/02/18
587.5
5
132.6
17.8
112.6
113.1
100+%
17S
724185
4223592
Passed
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
C.Webster/S. Ray
05/07/18
Field Density Summary
Lab Reference:
Optimum Moisture (%):
Maximum Dry Density:
95% of Maximum Dry Densityl
5
15.6
113.1
107.4
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
5
05/07/18
593.5
5
128.7
17.1
109.9
113.1
97%
17S
724175
4223664
Passed
6
05/07/18
594
5
125.7
15.2
109.1
1 113.1
96%
17S
724176
4223645
Passed
7
05/07/18
596.5
5
138.5
19.5
115.9
1 113.1
100+%
17S
724178
4223619
Passed
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
05/08/18
Field Density Summary
Lab Reference:
Optimum Moisture (%):
Maximum Dry Density:
95% of Maximum Dry Densityl
5
15.6
113.1
107.4
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
8
05/08/18
597
5
141.2
20.3
117.4
113.1
104%
17S
724188
4223616
Passed
9
05/08/18
596
5
142.3
20.6
118.0
113.1
104%
17S
724179
4223629
Passed
10
05/08/18
595
5
144.9
21.2
119.6
113.1
100+%
17S
724181
4223649
Passed
11
05/08/18
594
5
145.0
21.2
119.6
113.1
100+%
17S
724176
4223657
Passed
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
05/25/18
Field Density Summary
Lab Reference:
Optimum Moisture (%):
Maximum Dry Density:
95% of Maximum Dry Densityl
5
15.6
113.1
107.4
Test
Number
Date Tested
Elevation
(ft)
Lab
Reference
Wet Density
(PCF)
Moisture
Content (%)
Dry Density
(PCF)
Maximum
Dry Density
(PCF)
Percent
Compaction
(%)
Grid Zone
Easting
Northing
Results
12
05/25/18
587
5
132.8
17.9
112.6
113.1
100%
17S
724192
4223685
Passed
13
05/25/18
588
5
135.1
18.6
113.9
113.1
101 %
17S
724186
4223692
Passed
14
05/25/18
585.5
5
138.3
19.4
115.8
113.1
100+%
17S
724191
4223695
Passed
15
05/25/18
589.5
5
141.5
20.5
117.4
113.1
100+%
17S
724186
4223692
Passed
16
05/25/18
587.5
5
147.0
21.7
120.8
113.1
107%
17S
724192
4223682
Passed
17
05/25/18
588
5
140.1
19.9
116.8
113.1
103%
17S
724188
4223696
Passed
18
05/25/18
589.5
5
137.0
18.9
115.2
113.1
100+%
17S
724189
4223685
Passed
19
05/25/18
589.5
5
142.7
20.6
118.3
113.1
100+%
17S
724188
4223694
Passed
20
05/26/18
592
5
139.3
19.8
116.3
113.1
100+%
17S
724190
4223680
Passed
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
06/05/18
Field Density Summary
Lab Reference:
Optimum Moisture (%):
Maximum Dry Density:
95% of Maximum Dry Densityl
3564
5
16.2
15.6
111.7
113.1
106.1
107.4
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
21
06/05/18
597
3564
128.3
16.6
110.0
111.7
99%
17S
724183
4223603
Passed
22
06/05/18
597
3564
129.3
17.0
110.5
111.7
100+%
17S
724184
4223601
Passed
23
06/05/18
596
5
131.9
17.4
112.4
113.1
99%
17S
724187
4223613
Passed
24
06/05/18
596
5
127.3
16.1
109.6
113.1
100+%
17S
724180
4223617
Passed
25
06/05/18
597
3564
131.2
17.5
111.7
111.7
100+%
17S
724179
4223610
Passed
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
06/06/18
Field Density Summary
Lab Reference:
Optimum Moisture (%):
Maximum Dry Density:
95% of Maximum Dry Densityl
S-1
5
17.3
15.6
107.3
113.1
101.9
107.4
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
26
06/06/18
600.5
5
134.6
18.9
113.2
113.1
100%
17S
724215
4223571
Passed
27
06/06/18
600.5
5
139.8
19.7
116.8
113.1
100+%
17S
724212
4223575
Passed
28
06/06/18
601.5
S-1
117.1
11.7
104.8
107.3
98%
17S
724217
4223573
Passed
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
06/07/18
Field Density Summary
Lab Reference:
Optimum Moisture (%):
Maximum Dry Density:
95% of Maximum Dry Densityl
3564
5
16.2
15.6
111.7
113.1
106.1
107.4
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
29
06/07/18
602
5
136.6
18.7
115.1
113.1
102%
17S
724233
4223568
Passed
30
06/07/18
603
3564
132.0
17.5
112.3
111.7
1001%
17S
724235
1 4223564
1 Passed
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
06/08/18
Field Density Summary
Lab Reference:
Optimum Moisture (%):
Maximum Dry Density:
95% of Maximum Dry Densityl
5
15.6
113.1
107.4
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
31
06/08/18
590
5
140.7
20.0
117.3
113.1
104%
17S
724191
4223672
Passed
32
06/08/18
591
5
140.8
20.0
117.3
113.1
100,%
17S
724195
1 4223676
1 Passed
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
06/14/18
Field Density Summary
Lab Reference:
Optimum Moisture (%):
Maximum Dry Density:
95% of Maximum Dry Densityl
5
15.6
113.1
107.4
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
33
06/14/18
600
5
142.6
20.4
118.4
113.1
105%
17S
724217
4223577
Passed
34
06/14/18
600.5
5
142.5
20.5
118.3
113.1
100+%
17S
724217
4223576
Passed
35
06/14/18
122.4
14.8
106.6
0.0
#DIV/0!
17S
724213
4223567
Passed
36
06/14/18
126.7
15.8
109.4
0.0
100+%
17S
724216
4223566
Passed
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
06/15/18
Field Density Summary
Lab Reference:
Optimum Moisture (%):
Maximum Dry Density:
95% of Maximum Dry Densityl
5
15.6
113.1
107.4
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
37
06/15/18
600.5
5
136.3
18.9
114.6
113.1
101 %
17S
724216
4223581
Passed
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
06/18/18
Field Density Summary
Lab Reference:
Optimum Moisture (%):
Maximum Dry Density:
95% of Maximum Dry Densityl
5
15.6
113.1
107.4
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
38
06/18/18
589
5
143.9
20.9
119.0
113.1
105%
17S
724189
4223669
Passed
39
06/18/18
1 588
5
145.7
21.3
1 120.1
1 113.1
106%
17S
724197
1 4223659
1 Passed
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
06/19/18
Field Density Summary
Lab Reference:
Optimum Moisture (%):
Maximum Dry Density:
95% of Maximum Dry Densityl
5
15.6
113.1
107.4
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
40
06/19/18
590
5
133.3
18.2
112.8
113.1
100%
17S
724192
4223665
Passed
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
06/20/18
Field Density Summary
Lab Reference:
Optimum Moisture (%):
Maximum Dry Density:
95% of Maximum Dry Densityl
5
15.6
113.1
107.4
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
41
06/20/18
598
5
135.3
18.7
114.0
113.1
101%
17S
724209
4223586
Passed
42
06/20/18
1 598.5
5
1 138.2
19.5
115.6
113.1
102%
17S
724213
1 4223587
1 Passed
®®o®®Fil® p
0
�5
0000000 =;
0
y�0
e� \y tir •T �' dad �+ L' ¢, rib R.� @ Y _
Ns X� P% 5p IS
e _
I _
YEETINO STREET
61' W Ik R/V
- ----
N
_97
n xg
n
a @ V.... 5PORYWA'U M11"EIfENT P
EYARLV7 FOR Nevlmoxs a ��
b HOLLYMEAO TOWNCENTEE BLOCK C6 �a° w E e^an��
CT1 a nm8ut0 oISNCf. AIBLE COUNW. VA
�:
tilutllON k SEOdENT CONTROL PIAN PN.1.9E U �j?>
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
November 28, 2018
Mr. Katurah Roell
Town Properties, LLC
325 Barracks Hill
Charlottesville, VA 22901
Subject: California Bearing Ratio (CBR) Testing, Hollymead Towncenter Block VI,
Albemarle County, Virginia (Underhill Engineering Project No. 18023)
Dear Mr. Roell:
Underhill Engineering, LLC (Underhill) is pleased to present this report, summarizing the results of
California Bearing Ratio (CBR) testing for the above stated project. These services are provided in
accordance with Underhill's Services Agreement with you dated March 1, 2016, and your authorization
of April 5, 2018.
Laboratory Test Results
Three bulk samples were retrieved by Underhill from on site for soil laboratory testing. The
approximate sample locations are shown in Figure 1. Soil laboratory testing assigned by Underhill
consisted of the following:
■ Three gradation tests (ASTM D422).
■ Three Standard Proctor tests (ASTM D698).
■ Three California Bearing Ratio tests (VTM-8).
A summary of the soil laboratory test results, gradation curves, moisture -density relationships, and CBR
test curves follow the text of this report. CBR tests results varied from 19.3 to 22.9 with 0.1 to 0.5
percent swell. Underhill understands that a design CBR value of 10 was considered for the design
pavement section. The as -tested CBR values exceed this design value.
Underhill has endeavored to complete the services identified herein in a manner consistent with that
level of care and skill ordinarily exercised by members of the profession currently practicing in the same
locality and under similar conditions as this project. No other representation, express or implied, is
included or intended, and no warranty or guarantee is included or intended in this report.
T: 434.531.2565
327 W. Main Street, Suite 2, Charlottesville, VA 22903
underhillengineering.com
Thank you for the opportunity to provide our services. If you have any questions or require additional
information, please do not hesitate to contact us.
Sincerely,
UNDERHILL ENGINEERING, LLC
Susan E. Ray, EIT, GIT
Staff Geotechnical Engineer
O. Chris opher Webster, PE
Principal
Figure 1: Location Plan
Exhibit A:
Soil Laboratory Test Results
Project 18023 / November 28, 2018 2 Underhill Engineering, LLC
w
Scale: No scale
APPROXIMATE SAMPLE LOCATION
Note: Base drawing provided by Dominion Engineering
FIGURE 1: LOCATION PLAN
Project 18023
Hollymead Block VI
Charlottesville, Virginia
underhill ENGINEERING
geotechnical I geodesign I geoconstruction
Soil Laboratory Test Results
Summary of Soil Laboratory Tests (1 sheet)
Gradation Curves (3 sheets)
Atterberg Limits (1 sheet)
Moisture -Density Relationships (3 sheets)
CBR curves (3 sheets)
Project 18023 / November 28, 2018 i Underhill Engineering, LLC
Summary of Soil Laboratory Tests
Sample No.
S-4
S-5
S-6
Sample Type
BULK
BULK
BULK
Description,
SILTY SAND (SM)
SILTY SAND (SM)
SILTY SAND (SM)
Symbol USCS
(A-2-7)
(A-2-6)
(A-7-5)
Passing No. 200
Sieve
33.2
34.2
39.6
• Passing No. 40
Sieve
54.7
59.5
65.5
• Passing No. 4
Sieve
83.6
92.2
88.2
Max. Dry Density
(pcf)
120.6
112.6
114.4
Optimum
Moisture Content
12.2
14.5
14.8
N
CBR Value
19.3
21.1
22.9
(soaked)
Swell (%)
0.1
0.3
0.5
Testing provided by Underhill's subconsultant laboratory, Schnabel Engineering
Project 18023 / November 28, 2018 ii Underhill Engineering, LLC
U.S. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER
R 4 4 2 1 a 1 zid 1/2z/Q 3 d 6 00 1d16 )n 30 do 50 �r, 1001an200
100
95
90
85
80
75
70
65
x
2 60
w
>- 55
m
ry
w 50
Z
LL
z 45
w
of 40
w
a
35
30
25
20
15
10
5
0
100 10 1 0.1
GRAIN SIZE IN MILLIMETERS
0.01 0.001
COBBLES
GRAVEL
SAND
SILT OR CLAY
coarse fine
coarse medium fine
0
N Specimen Sample Description LL PL PI Cc Cu
W
a • 4 0.0 ft SILTY SAND (SM, A-2-7), fine to coarse grained sand, contains43 29 14
w crushed stone and rock fragments, reddish brown
W
Q Test Method D100 D60 D30 D10 %Gravel %Sand %Silt %Clay
0
III
ASTM D422 64 0.669 -- -- 16.4 50.4 33.2
Percent Finer
Sieve Size
No. 200
No. 100
No. 60
No.40
No. 20
No. 10
No. 4
3/8"
3/4"
1"
1.5"
2.5"
Finer
33.2
41.5
48.3
54.7
62.8
74.6
83.6
87.4
91.8
93.6
97.0
100.0
Tested By Tested Date
MP/RG
Sch
E N G
Reviewed By
IDS
nabel
N E E R I N G
GRADATION CURVE
Project: Hollymead Block VI
Underhill Engineering 18023
Albemarle County, VA
Contract: 15643010 Testing Lab: RICH
U.S. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER
n i i/9 4 R in iR in ZZn inn )An
100
95
90
85
80
75
70
65
x
2 60
w
>- 55
m
ry
w 50
Z
LL
z 45
w
of 40
w
a
35
30
25
20
15
10
5
0
AW 5
100 10 1 0.1
GRAIN SIZE IN MILLIMETERS
0.01 0.001
COBBLES
GRAVEL
SAND
SILT OR CLAY
coarse fine
coarse medium fine
Specimen Sample Description LL PL PI Cc Cu
SILTY SAND (SM, A-2-6), fine to coarse grained sand, contains
0.0 ft rock fragments, crushed stone and mica, reddish brown 38 28 10
Test Method D100 D60 D30 D10 %Gravel %Sand %Silt %Clay
ASTM D422 38.1 0.444 -- -- 7.8 58.0 34.2
Percent Finer
Sieve Size
No. 200
No. 100
No. 60
No.40
No. 20
No. 10
No. 4
3/8"
3/4"
1"
1.5"
Finer
34.2
44.6
52.6
59.5
67.5
79.9
92.2
94.7
97.6
98.3
100.0
Tested By Tested Date
MP/RG
Sch
E N G
Reviewed By
IDS
nabel
N E E R I N G
GRADATION CURVE
Project: Hollymead Block VI
Underhill Engineering 18023
Albemarle County, VA
Contract: 15643010 Testing Lab: RICH
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS I HYDROMETER
100
95
90
85
80
75
70
65
2 60
w
>- 55
m
Z 50
LL
Z 45
w
ry 40
w
o_
35
30
25
20
15
10
5
0
3W 6
100 10 1 0.1
GRAIN SIZE IN MILLIMETERS
0.01 0.001
COBBLES
GRAVEL
SAND
SILT OR CLAY
coarse fine
coarse medium fine
Specimen Sample Description LL PL PI Cc Cu
SILTY SAND WITH GRAVEL (SM, A-7-5), fine to coarse grained
0.0 ft sand, contains crushed stone and rock fragments, reddish 42 29 13
rown
Test Method D100 D60 D30 D10 %Gravel %Sand %Silt :E'/.Clay
ASTM D422 38.1 0.28 -- -- 11.8 48.6 39.6
Percent Finer
Sieve Size
No. 200
No. 100
No. 60
No.40
No. 20
No. 10
No. 4
3/8"
3/4"
1"
1.5"
Finer
39.6
50.2
58.5
65.5
72.5
81.3
88.2
92.4
97.2
99.0
100.0
Tested By Tested Date Reviewed By
IMP /RG IDS
Schnabet
E N G I N E E R I N G
GRADATION CURVE
Project: Hollymead Block VI
Underhill Engineering 18023
Albemarle County, VA
Contract: 15643010 Testing Lab: RICH
80
CL
CH
60
x
w
0
z
40
Q
a
20
A
m
CL-ML ML MH
0
0 20 40 60 80 100
LIQUID LIMIT
PLOTTED DATA REPRESENTS SOIL PASSING NO. 40 SIEVE
Specimen
LL
PL
PI
Fines
Testing
Lab
Description
4 0.0 ft
43
29
14
33
RICH
SILTY SAND (SM, A-2-7), fine to coarse grained sand,
contains crushed stone and rock fragments, reddish brown
5 0.0 ft
38
28
10
34
RICH
SILTY SAND (SM, A-2-6), fine to coarse grained sand,
contains rock fragments, crushed stone and mica, reddish
6 0.0 ft
42
29
13
40
RICH
f SAND WITH GRAVEL (SM, A-7-5), fine to coarse
grained sand, contains crushed stone and rock fragments,
reddish rown
Schnabel
E N G I N E E R I N G
ATTERBERG LIMITS
Project: Hollymead Block VI
Underhill Engineering 18023
Albemarle County, VA
Contract: 15643010
117.0
116.0
115.0
114.0
113.0
109.0
108.0
107.0
106.0
105.0
9
\
\
\
\
\
\
\
\
\
\
\
\
\
11 13 15 17 19
WATER CONTENT, %
Sample Description:
SILTY SAND (SM, A-2-7), fine to coarse
grained sand, contains crushed stone and
rock fragments, reddish brown
Sample Source:
4, 0.0 ft
Test Methods:
VTM1
Oversize Fraction Sieve Size: No 4
Percent Oversized Retained: 16.4%
Liquid Limit (LL):
43
Plasticity Index (PI):
14
% Retained #4 Sieve:
16.4
% Passing # 200 Sieve: 33.2
Schnabel
E N G I N E E R I N G
Assumed Specific Gravity:
Uncorrected Max. Dry Density (pcf):
Uncorrected Opt. Moisture (%):
21
2.65
114.4
14.2
Corrected Max. Dry Density (pcf): 120.6
Corrected Opt. Moisture (%): 12.2
Comments:
Date: 10-23-18 Reviewed By: DS
MOISTURE DENSITY RELATIONSHIP
Project: Hollymead Block VI
Underhill Engineering 18023
Albemarle County, VA
Contract: 15643010 Testing Lab: RICH
117.0
116.0
115.0
114.0
113.0
109.0
108.0
107.0
106.0
105.0
8
\
\
\
\
\
\
\
\
10 12 14 16 18
WATER CONTENT, %
Sample Description: SILTY SAND (SM, A-2-6), fine to coarse Assumed Specific Gravity:
grained sand, contains rock fragments, Max. Dry Density (pcf):
crushed stone and mica, reddish brown
Opt. Moisture (%):
Sample Source: 5, 0.0 ft
Test Methods: VTM1
Liquid Limit (LL): 38
Plasticity Index (PI): 10
% Retained #4 Sieve: 7.8
% Passing # 200 Sieve: 34.2
Schnabel
E N G I N E E R I N G
Comments:
20
2.62
112.6
14.5
Date: 10-23-18 Reviewed By: DS
MOISTURE DENSITY RELATIONSHIP
Project: Hollymead Block VI
Underhill Engineering 18023
Albemarle County, VA
Contract: 15643010 Testing Lab: RICH
113.0
112.0
111.0
110.0
109.0
-108.0
Q
105.0
104.0
103.0
102.0
101.0
10
\
\
\
\
\
\
\
\
\
\
\
12 14 16 18 20
WATER CONTENT, %
Sample Description: SILTY SAND WITH GRAVEL (SM, A-7-5),
fine to coarse grained sand, contains
crushed stone and rock fragments, reddish
brown
Sample Source: 6, 0.0 ft
Test Methods: VTM1
Oversize Fraction Sieve Size: No 4
Percent Oversized Retained: 11.8%
Liquid Limit (LL): 42
Plasticity Index (PI): 13
% Retained #4 Sieve: 11.8
% Passing # 200 Sieve: 39.6
Schnabel
E N G I N E E R I N G
Assumed Specific Gravity:
Uncorrected Max. Dry Density (pcf):
Uncorrected Opt. Moisture (%):
22
2.68
109.8
16.5
Corrected Max. Dry Density (pcf): 114.4
Corrected Opt. Moisture (%): 14.8
Comments:
Date: 10-23-18 Reviewed By: DS
MOISTURE DENSITY RELATIONSHIP
Project: Hollymead Block VI
Underhill Engineering 18023
Albemarle County, VA
Contract: 15643010 Testing Lab: RICH
640
AO
600
560
520
480
440
.N
400
Q
0
360
CO
Z
0
320
w
280
240
200
160
120
80
40
0
1 1 1
1 1 1
0.10 6.20 6.30 6.40
PENETRATION (INCHES)
0.50
Sample Description: SILTY SAND (SM, A-2-7), fine to coarse
grained sand, contains crushed stone and
rock fragments, reddish brown
Sample Source: 4
Sample Depth: 0.0 ft
Test Method: VTM-8
Dry Density Before Soaking (pcf):
Dry Density After Soaking (pcf):
Maximum Dry Density (pcf):
Moisture Content Before Soaking (%):
Moisture Content After Soaking (Avg) (%):
Moisture Content Top Inch After Soak (%):
Optimum Moisture Content (%):
118.4
118.3
114.4
12.2
13.7
15.5
14.2
Liquid Limit (LL): 43
Plasticity Index (PI): 14
% Retained #4 Sieve: 16.4
% Passing # 200 Sieve: 33.2
CBR: 19.3, Soaked
Surcharge (psf):
Swell (%):
50
0.1
112
Schnabel
E N G I N E E R I N G
CALIFORNIA BEARING RATIO TEST
Project: Hollymead Block VI
Underhill Engineering 18023
Albemarle County, VA
Contract: 15643010 Testing Lab: RICH
640
600
560
520
480
440
.N
400
Q
0
360
Z
0
320
w
280
240
200
160
120
80
40
0
0.10 0.20 0.30 6.46
PENETRATION (INCHES)
0.50
Sample Description: SILTY SAND (SM, A-2-6), fine to coarse
grained sand, contains rock fragments,
crushed stone and mica, reddish brown
Sample Source: 5
Sample Depth: 0.0 ft
Test Method: VTM-8
Dry Density Before Soaking (pcf):
Dry Density After Soaking (pcf):
Maximum Dry Density (pcf):
Moisture Content Before Soaking (%):
Moisture Content After Soaking (Avg) (%):
Moisture Content Top Inch After Soak (%):
Optimum Moisture Content (%):
112.6
112.3
112.E
13.0
15.9
17.5
14.5
Liquid Limit (LL): 38
Plasticity Index (PI): 10
% Retained #4 Sieve: 7.8
% Passing # 200 Sieve: 34.2
CBR: 21.1, Soaked
Surcharge (psf):
Swell (%):
50
0.3
112
Schnabel
E N G I N E E R I N G
CALIFORNIA BEARING RATIO TEST
Project: Hollymead Block VI
Underhill Engineering 18023
Albemarle County, VA
Contract: 15643010 Testing Lab: RICH
640
600
560
520
480
440
.N
400
Q
0
360
Z
0
320
w
280
240
200
160
120
80
40
0
0.10 0.20 0.30 6.46
PENETRATION (INCHES)
0.50
Sample Description: SILTY SAND WITH GRAVEL (SM, A-7-5),
fine to coarse grained sand, contains
crushed stone and rock fragments, reddish
brown
Sample Source: 6
Sample Depth: 0.0 ft
Test Method: VTM-8
Dry Density Before Soaking (pcf):
Dry Density After Soaking (pcf):
Maximum Dry Density (pcf):
Moisture Content Before Soaking (%):
Moisture Content After Soaking (Avg) (%):
Moisture Content Top Inch After Soak (%):
Optimum Moisture Content (%):
112.4
111.9
109.8
14.7
17.3
19.1
16.5
Liquid Limit (LL): 42
Plasticity Index (PI): 13
% Retained #4 Sieve: 11.8
% Passing # 200 Sieve: 39.6
CBR: 22.9, Soaked
Surcharge (psf):
Swell (%):
50
0.5
112
Schnabel
E N G I N E E R I N G
CALIFORNIA BEARING RATIO TEST
Project: Hollymead Block VI
Underhill Engineering 18023
Albemarle County, VA
Contract: 15643010 Testing Lab: RICH
underhilI ENGINEERING
geotechnical I geodesign 1 geoconstruction
February 14, 2019
Mr. Katurah Roell
Town Properties, LLC
3215 Barracks Hill
Charlottesville, VA 22901
Subject: Report No. 2, Earthwork Observation and Testing Services, Hollymead
Towncenter Block VI, Albemarle County, Virginia (Underhill Engineering
Project No. 18023)
Dear Mr. Roell:
Underhill Engineering, LLC (Underhill) is pleased to present our Report No. 2, summarizing Underhill's
earthwork observation and testing services for the project. This report summarizes Underhill's services
relating to observation of subgrades to receive compacted structural fill, and observation and testing of
compacted structural fill for the new townhomes. These services are provided in accordance with
Underhill's Service Agreement with you dated March 1, 2016, and your authorization of April 5, 2018.
This report summarizes services provided from June 29, 2018 through February 8, 2019.
Underhill's services as reported herein included the following tasks:
Observations of subgrades to receive compacted structural fill after removal of the limited
topsoil and unsuitable existing fill soils. Evaluation of subgrades included observations of
proofrolling of the stripped subgrades by the Contractor using a loaded dump truck,
observations of test pits / test strips, and probing with a Geostick Penetrometer at selected
locations.
Retrieval of bulk samples for soil laboratory testing.
Observation and testing of compacted structural fill placement. Observation of fill placement
included the following tasks:
o Evaluation of proposed fill materials for suitability,
o Measurement of lift thickness at selected locations, and
o Observations of compaction methods employed by the Contractor. Compaction testing
included field density tests to compare to the laboratory maximum dry density and
optimum moisture content.
Field density testing of utility backfill including the following tasks:
o Evaluation of proposed backfill materials for suitability.
o Periodic observations of compaction methods employed by the Contractor.
o Periodic field density testing.
The following services were not included: observation of erosion and sediment control methods,
surveying for line and grade, environmental services, or other services not specifically identified above.
T: 434.531.2565
327 W. Main Street, Suite 2, Charlottesville, VA 22903
underhillengineering.com
Observation of Subgrades
Underhill's Engineer observed subgrades to receive compacted base course material for road support on
November 19, 2018. Underhill's Engineer observed subgrade response during proofrolling by a loaded
dump truck as conducted by the Contractor. Subgrades were also evaluated by probing with a Geostick
Penetrometer. The approximate area of subgrades observed is indicated in Exhibit A (Figure 1).
Subgrades were considered suitable to receive compacted dense -graded aggregate base course material
(VDOT No. 21A).
Underhill's Engineer observed subgrades to receive compacted structural fill for building support on
Building Pad 20 on January 9 and 10, 2019. Underhill's Engineer observed subgrade response during
proofrolling by a loaded dump truck as conducted by the Contractor. Subgrades were also evaluated by
probing with a Geostick Penetrometer. The approximate area of subgrades observed is indicated in
Exhibit A (Figure 2). Subgrades were considered suitable to receive compacted structural fill.
Underhill's Engineer observed undercut subgrades at the temporary construction pond area in Lots 27,
28, 29, and 30 to receive compacted structural fill for building support on February 4, 2019. Underhill's
Engineer evaluated subgrades by probing with a Geostick Penetrometer. The approximate area of
subgrades observed is indicated in Exhibit A (Figure 3). Subgrades were considered suitable to receive
compacted structural fill.
Underhill's Engineer observed subgrades to receive compacted structural fill for building support on
Building Pads 27 through 31 on February 4, 2019. Underhill's Engineer observed subgrade response
during proofrolling by a loaded dump truck as conducted by the Contractor. Subgrades were also
evaluated by probing with a Geostick Penetrometer. The approximate area of subgrades observed is
indicated in Exhibit A (Figure 4). Subgrades in Exhibit A, Figure 5, were not considered suitable to
receive compacted structural fill and were undercut by the Contractor. The area of unsuitable soils
consisted of soft existing fill, likely due to inadequate drainage. Underhill recommended and observed
the undercut of the unsuitable soils to expose the underlying competent subgrades. This area was
located generally perpendicular to Grand Forks Boulevard and was about 20 feet long and 12 feet wide
with an average depth of 3.5 feet. Based on Underhill's rough measurements using a tape measure
assisted by the Contractor, the estimated total undercut was about 31 CY.
Field Density Testing
Utility backfill was tested for relative compaction on June 29 through August 28, 2018. Compacted
structural fill typically consisted of silty sand, containing mica and rock fragments, as represented by the
bulk Proctor sample tested by Underhill's subconsultant laboratory, Schnabel Engineering. During
periodic visits to the site, the material was noted to be placed in typical 6 to 8-inch, loose lifts,
compacted using a remote -controlled sheepsfoot roller. Note that spot field density testing does not
relieve the Contractor from meeting the compacted backfill requirements as indicated in the project
documents.
Compacted structural fill placed for Building Lots 20, 29, 30, and 31 were tested for relative compaction
on November 19, 2018 through February 8, 2019. Compacted structural fill typically consisted of silty
sand, containing mica and rock fragments, as represented by the bulk Proctor sample. During periodic
visits to the site, the material was noted to be placed in typical 6 to 8-inch, loose lifts, compacted using a
vibratory sheepsfoot roller.
Project 18023 / February 14, 2019 2 Underhill Engineering, LLC
Compaction testing of lifts was completed using non-nuclear test methods, correlated using nuclear test
methods for the dates of June 29, 2018 to January 10, 2019. Nuclear test methods were used on
February 4 and 8, 2019. A summary of Field Density Test Results is included as Exhibit B (18 sheets).
Field density testing indicated compaction to at least 95 percent of the maximum dry density as
evaluated by the laboratory Standard Proctor tests.
Underhill has endeavored to complete the services identified herein in a manner consistent with that
level of care and skill ordinarily exercised by members of the profession currently practicing in the same
locality and under similar conditions as this project. No other representation, express or implied, is
included or intended, and no warranty or guarantee is included or intended in this report.
Thank you for the opportunity to provide our services. If you have any questions or require additional
information, please do not hesitate to contact the undersigned.
Sincerely,
UNDERHILL ENGINEERING, LLC
�gv, LTn CIF
Susan E. Ray, EIT, GIT L
Staff Geotechnical Engineer
O O. CHRISTOPIMR
U Wf?95'IF.R y
Lie. No.019910
O. Christ pher Webster, PE
Principal �0
4ONAT
0fow
Exhibits:
Exhibit A: Subgrade Observation Plan, Figures 1-5
Exhibit B: Field Density Test Summary (18 sheets)
cc: Gregg O'Donnell — Stanley Martin Homes
Project 18023 / February 14, 2019 3 Underhill Engineering, LLC
®SU�IRADES CNcEC�ED
dN u�tAI18
EY,Wb1TA, F`iGUZE
n•♦oN
i m DITCH 1 E
x•
DITCH I I --— — ,-
TO Sm
/' � , a P � U OA i I ♦ DN
J a
*r
FACILITY 2
b� •\� � �pi ws ♦1 li A
CONSTRUCT PADS FOR LOTS
27-31 ONLY AFTER REMOVAL
OF ST-2. SEE CONSTRUCTION /` ,` �,e t h n•,O P,
SEQUENCE EP-4 s.
% ' `,� •� ; tea` % I 1 m � c
y j I o
RELOCATE CONSTRUCTION w 8
ENTRANCE TO LAUREL PARK o z
LANE DURING PHASE 11 3 U �q $
EROSION AND SEDIMENT'
CONTROL LEGEND
TO Sm
FACILITY 2 o cm
®�O® ter, as �p m H
�- S1 EP5
ffSL*,GQRDE5 Oe)SGT;VEO
oN I iq - IIIojiq ExN�e)ITa I GU2E 2
a•ws
a
rI DI;
fS'�[
DITCH 1
/� \ � ' gyp•
K.
1t +^[.
/� `• �/� \
I
a
TO SMM 8 W w o ri
S
FACILITY 2
CONSTRUCT PADS FOR LOTS
�Fp_
m !
.'
.I
27-31 ONLY AFTER REMOVAL
4
__
5•
OF ST-2. SEE CONSTNUCTION
SEQUENCE 61-4
RELOCATE CONSTRUCTION
ENTRANCE TO LAUREL PARK
a $
i
LANE DURING PHASE A
w
10
EROSQNAND SEDWENT
CONTROL LEGEND
j
S
®O O O FACIUTY 2
�a
® oV,
EP5
®® o F--1
ti soeI GZNOE5 o�seq-veo
ON 2I41 i9
ExME1TA1 GIGw?.E 3
m.um
DiTCil1
I
I
w ax:sS
�
Y�•� �
i
DITCH I
'�
..ter �•
.�.
F' I __ `9
Ilk
Ir
TO SNM
6
E
CONSTRUCT PADS FOR LOTS
v °
j•
27-31 ONLY AFTER REMOVAL
OF ST-z SEE CONSTRUCTION
/• 4
•
\ �.
�,
`. \
•.-O
1
SEQUENCE EP-A
.;�
/
..
a o
- -
-
p
n
r•
°. iD • _
_
_
-
/ l
/ o
�m
RELOCATE CONSTRUCTION
ENTRANCE TO LAUREL PARK
z
LANE DURING PHASE II
w
EROSION ANGEND ENf
\
a
CONTROL LEGEND
®® ®
TO SNY
FAULTY 2•
\ / *
S�'�
9\
®®off
EP5
o..� wyaenx
S06GIZRDES OeSEvZVeo
" ON 2141(9
EXNIgITA, �)GURE H
a as;`Sr
t'CE�
DITCH 1 �fi 'I - '� ow
_ \\ • � � �' n t_ wn:i»� � awo�Ks it
All
y ;
X,TO Sm
FACILITY 2
CONSTRUCT PADS FOR LOTS / 4� \ u 1
27-31 ONLY AFTER REMOVAL §, \ '� '•
OF ST-2 SEE CONSIR1ICTION ,/ < • +' � . - w-O v I
SEOUENCE EP-4�40
Q .
RELOCATE CONSTRUCTION x. 8
ENTRANCE TO LAUREL PARK Q
LANE DURING PHASE 11EROSION AND
CONTROL IEGENDRAEM ��• !/',' /� \ \ m
/ z
®O TO Sxe1
FACIUTY 2
® ® oRE
EP5
® o o
as .ARn,
LluNSvi-tAaLE S�3G6LAaE5
OgsepveD oN 2I4119
FYWb3 -►-A,
q.la W
"m
s. e!
DITCH 1
o w
DITCH 1
> `N as
lift,
TO SIN �`++ j �'r >E
FACILITY 2
-
_
CONSTRUCT PADS FOR LOTS
27-31 ONLY AFTER REMOVAL
OF ST-2. SEE CONSTRUCTION
i9*
SEQUENCE EP-4
J
RELOCATE CONSTRUCTION
ENTRANCE TO LAUREL PARK
a S
LANE DURING PHASE II
3
3
/' ✓ \
ri
rU�
a rq
o
EROSION AND SEDIMENT
CONTROL LEGEND
® �
TO SNM .
F /// X.
® ar rar ®O
FACIUTY 2FWl
o
owl
a «� o
o
W
o",< Nmlre
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
06/29/18
Field Density Summary
Lab Reference: S-5
Optimum Moisture (%): 15.6
Maximum Dry Density: 113.1
95% of Maximum Dry Density 107.4
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
41
06/29/18
592.5
S-5
143.4
20.8
118.7
113.1
100+%
17S
724192
4223653
Passed
42
06/29/18
598.5
S-5
142.0
20.4
117.9
113.1
100+%
17S
724193
4223654
Passed
43
06/29/18
589
S-5
139.1
19.6
116.3
113.1
100+%
17S
724195
4223650
Passed
44
06/29/18
589
S-5
143.5
20.8
118.8
113.1
100+%
17S
724195
4223648
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
07/02/18
Field Density Summary
Lab Reference: S-5
Optimum Moisture (%): 15.6
Maximum Dry Density: 113.1
95% of Maximum Dry Density: 107.4
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
45
7/2/2018
591.5
S-5
130.6
15.4
113.2
113.1
100+%
17S
724195
4223638
Passed
underhill ENGINEERING
geotechnicaf I geodesign I geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
07/03/18
Field Density Summary
Lab Reference: S-5
Optimum Moisture (%): 15.6
Maximum Dry Density: 113.1
95% of Maximum Dry Density: 107.4
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
46
7/3/2018
590
S-5
130.3
17.1
111.3
113.1
98.4%
17S
724200
4223634
Passed
47
7/3/2018
1 592
1 S-5
1 133.2
1 17.9
113.0
1 113.1
1 99.9%
1 17S
1 724195
1 4223627
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
07/10/18
Field Density Summary
Lab Reference: S-5
Optimum Moisture (%): 15.6
Maximum Dry Density: 113.1
95% of Maximum Dry Density: 107.4
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
48
7/10/2018
591.5
S-5
137.6
19.2
115.4
113.1
100+%
17S
724201
4223617
Passed
49
7/10/2018
1 592
1 S-5
1 136.2
1 18.7
114.7
1 113.1
1 100+%
1 17S
1 724199
1 4223613
Passed
underhill ENGINEERING
geotechnical I geodesign i geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
07/13/18
Field Density Summary
Lab Reference: S-3
Optimum Moisture (%): 11.8
Maximum Dry Density: 121.7
95% of Maximum Dry Density: 115.6
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
50
7/13/2018
593.5
S-3
140.8
19.9
117.4
121.7
96.5%
17S
724200
4223604
Passed
51
7/13/2018
1 594
1 S-3
1 138.4
1 19.3
116.0
1 121.7
1 95.3%
1 17S
1 724203
1 4223612
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
07/17/18
Field Density Summary
Lab Reference: S-3
Optimum Moisture (%): 11.8
Maximum Dry Density: 121.7
95% of Maximum Dry Density: 115.6
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
52
7/17/2018
594.5
S-3
140.3
20.1
116.8
121.7
96.0%
17S
724213
4223596
Passed
underhill ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
07/19/18
Field Density Summary
Lab Reference:
Optimum Moisture (%):
Maximum Dry Density:
95% of Maximum Dry Density:
S-5
S-3
15.6
11.8
113.1
121.7
107.4
115.6
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
53
7/19/2018
597.5
S-3
139.0
19.5
116.3
121.7
95.6%
17S
724202
4223597
Passed
54
7/19/2018
597
S-3
143.6
21.5
118.2
121.7
97.1 %
17S
724202
4223602
Passed
55
7/19/2018
597.5
S-5
133.0
17.8
112.9
113.1
99.8%
17S
724210
4228603
Passed
56
7/19/2018
600.5
S-5
133.7
19.1
112.3
113.1
99.3%
17S
724222
4223502
Passed
underhill ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
08/07/18
Field Density Summary
Lab Reference: S-3
Optimum Moisture (%): 11.8
Maximum Dry Density: 121.7
95% of Maximum Dry Density: 115.6
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
57
8/7/2018
594.5
S-3
139.2
18.2
117.8
121.7
96.8%
17S
724202
4223599
Passed
58
1 8/7/2018
594.5
S-3
139.5
19.6
116.6
121.7
95.8%
17S
724206
4223591
Passed
59
8/7/2018
595
S-3
138.5
18.6
116.8
121.7
96.0%
17S
724204
1 4223601
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
08/08/18
Field Density Summary
Lab Reference: S-3
Optimum Moisture (%): 11.8
Maximum Dry Density: 121.7
95% of Maximum Dry Density: 115.6
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
60
8/8/2018
596.5
S-3
142.8
20.7
118.3
121.7
97.2%
17S
724200
4223614
Passed
61
8/8/2018
1 596.5
1 S-3
1 139.9
1 20.0
116.E
1 121.7
1 95.8%
1 17S
1 724198
1 4223623
Passed
underhill ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
08/10/18
Field Density Summary
Lab Reference: S-3
Optimum Moisture (%): 11.8
Maximum Dry Density: 121.7
95% of Maximum Dry Density: 115.6
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
62
8/10/2018
596.5
S-3
138.6
19.5
116.0
121.7
95.3%
17S
724196
4223637
Passed
63
8/10/2018
1 591.5
1 S-3
1 140.8
1 20.1
117.2
1 121.7
1 96.3%
1 17S
1 724195
1 4223648
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
08/14/18
Field Density Summary
Lab Reference: S-3
Optimum Moisture (%): 11.8
Maximum Dry Density: 121.7
95% of Maximum Dry Density: 115.6
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
64
8/14/2018
589
S-3
139.0
19.6
116.2
121.7
95.5%
17S
724193
4223683
Passed
underhilI ENGINEERING
geotechnical I geodesign 1 geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
08/28/18
Field Density Summary
Lab Reference: S-3
Optimum Moisture (%): 11.8
Maximum Dry Density: 121.7
95% of Maximum Dry Density: 115.6
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
65
8/28/2018
590
S-3
136.2
17.9
115.5
121.7
94.9%
17S
724190
4223693
Passed
66
8/28/2018
1 590
1 S-3
1 141.0
1 19.4
118.1
1 121.7
1 97.0%
1 17S
1 724188
1 4223679
Passed
underhill ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
11/19/18
Field Density Summary
Lab Reference: S-6
Optimum Moisture (%): 7.9
Maximum Dry Density: 145.9
95% of Maximum Dry Density: 138.6
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
67
11/19/2018
599
S-6
164.3
17.3
140.1
145.9
96.0%
17S
724206
4223582
Passed
68
1 11/19/2018
598.5
S-6
160.8
16.1
138.5
145.9
94.9%
17S
724207
4223602
Passed
69
11/19/2018
597
S-6
160.8
16.0
138.6
145.9
95.0%
17S
724201
4223613
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
01 /09/19
Field Density Summary
Lab Reference:
Optimum Moisture (%):
Maximum Dry Density:
95% of Maximum Dry Density:
S-6
S-3
7.9
11.8
145.9
121.7
138.6
115.6
Test
Number
Date Tested
Elevation
(ft)
Lab
Reference
Wet Density
(PCF)
Moisture
Content (%)
Dry Density
(PCF)
Maximum
Dry Density
(PCF)
Percent
Compaction
(%)
Grid Zone
Easting
Northing
Results
72
1/9/2019
592
S-6
167.8
18.5
141.6
145.9
97.1%
17S
724191
4223682
Passed
73
1/9/2019
592
S-6
166.0
17.7
141.0
145.9
96.7%
17S
724192
4223697
Passed
74
1/9/2019
601.5
S-3
189.5
23.7
153.2
145.9
100+%
17S
724222
4223604
Passed
75
1/9/2019
600.5
S-3
175.1
20.0
145.9
145.9
100+%
17S
724216
4223612
Passed
76
1/9/2019
602.5
S-3
179.9
21.5
148.1
145.9
100+%
17S
724218
4223607
Passed
77
1/9/2019
602
S-3
172.5
19.4
144.5
145.9
99.0%
1 17S
1 724218
1 4223613
1 Passed
underhill ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
01/10/19
Field Density Summary
Lab Reference: S-3
Optimum Moisture (%): 11.8
Maximum Dry Density: 121.7
95% of Maximum Dry Density: 115.6
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
78
1/10/2019
603
S-3
148.7
20.4
123.5
121.7
100+%
17S
724222
4223607
Passed
79
1/10/2019
1 603.5
1 S-3
1 144.7
1 19.1
121.5
1 121.7
1 99.8%
1 17S
1 724218
1 4223616
Passed
underhill ENGINEERING
geotechnical I geodesign 1 geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
02/04/19
Field Density Summary
Lab Reference: S-5
Optimum Moisture (%): 15.6
Maximum Dry Density: 113.1
95% of Maximum Dry Density: 107.4
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
80
2/4/2019
586.5
S-5
142.0
25.8
112.9
113.1
99.8%
17S
724168
4223687
Passed
81
1 2/4/2019
586
S-5
144.6
27.9
113.1
113.1
100.0%
17S
724167
4223692
Passed
82
1 2/4/2019
588.5
S-5
132.5
24.0
106.9
113.1
94.5%
17S
724170
4223679
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
02/08/19
Field Density Summary
Lab Reference: P-1
Optimum Moisture (%): 13
Maximum Dry Density: 102.7
95% of Maximum Dry Density: 97.6
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
82
2/8/2019
590.5
P-1
124.0
28.3
96.6
102.7
94.1%
17S
724168
4223687
Passed
83
2/8/2019
592
P-1
124.6
27.9
97.4
102.7
94.9%
17S
724167
4223692
Passed
underhilI ENGINEERING
geotechnical I geodesign 1 geoconstruction
April 1, 2019
Mr. Katurah Roell
Town Properties, LLC
3215 Barracks Hill
Charlottesville, VA 22901
Subject: Report No. 3, Earthwork Observation and Testing Services, Hollymead
Towncenter Block VI, Albemarle County, Virginia (Underhill Engineering
Project No. 18023)
Dear Mr. Roell:
Underhill Engineering, LLC (Underhill) is pleased to present our Report No. 3, summarizing Underhill's
earthwork observation and testing services for the project. This report summarizes Underhill's services
relating to observation of subgrades to receive compacted structural fill, and observation and testing of
compacted structural fill for the new townhomes. These services are provided in accordance with
Underhill's Service Agreement with you dated March 1, 2016, and your authorization of April 5, 2018.
This report summarizes services provided from March 28 to April 1, 2019.
Underhill's services as reported herein included the following tasks:
Observations of subgrades to receive compacted structural fill after removal of the limited
topsoil and unsuitable existing fill soils. Evaluation of subgrades included observations of
proofrolling of the stripped subgrades by the Contractor using a loaded dump truck,
observations of test pits / test strips, and probing with a Geostick Penetrometer at selected
locations.
Observation and testing of compacted structural fill placement. Observation of fill placement
included the following tasks:
o Evaluation of proposed fill materials for suitability,
o Measurement of lift thickness at selected locations, and
o Observations of compaction methods employed by the Contractor. Compaction testing
included field density tests to compare to the laboratory maximum dry density and
optimum moisture content.
Field density testing of utility backfill including the following tasks:
o Evaluation of proposed backfill materials for suitability.
o Periodic observations of compaction methods employed by the Contractor.
o Periodic field density testing.
The following services were not included: observation of erosion and sediment control methods,
surveying for line and grade, environmental services, or other services not specifically identified above.
T: 434.531.2565
327 W. Main Street, Suite 2, Charlottesville, VA 22903
underhillengineering.com
Observation of Subgrades
Underhill's Engineer observed subgrades to receive compacted structural fill for building support on
Building Pad 26 on March 28 and 29, 2019. Underhill's Engineer observed subgrade conditions using a
Geostick Penetrometer (GP). The approximate area of subgrades observed is indicated in Exhibit A
(Figure 1). The northeastern and southwestern corners of the undercut, shown in Exhibit A (Figure 2),
were not considered suitable to receive structural fill and were undercut an additional 1.5 feet by the
contractor. After the additional undercut, subgrades were considered suitable to receive compacted
structural fill.
Underhill's Engineer observed subgrades to receive compacted structural fill for building support on
Building Pad 25 on March 29, 2019. Underhill's Engineer observed subgrade conditions using a Geostick
Penetrometer (GP). The approximate area of subgrades observed is indicated in Exhibit A (Figure 3).
Subgrades were considered suitable to receive compacted structural fill.
Underhill's Engineer observed subgrades to receive compacted structural fill for building support on
Building Pad 20 on March 29, 2019. Underhill's Engineer observed subgrade conditions using a Geostick
Penetrometer (GP). The approximate area of subgrades observed is indicated in Exhibit A (Figure 4).
Subgrades were considered suitable to receive compacted structural fill.
Underhill's Engineer observed the cuts to grade for building support on Building Pads 24 to 20 on April 1,
2019. Underhill's Engineer observed the response of the grade conditions during proofrolling using an
empty Volvo A30 haul truck. The approximate area of subgrades observed is indicated in Exhibit A
(Figure 5). Subgrades observed were considered suitable for the Contractor to proceed with the
foundation and floor slab construction.
Underhill's Engineer observed subgrades to receive compacted structural fill for building support on
Building Pad 19 on April 1, 2019. Underhill's Engineer observed subgrade conditions using a Geostick
Penetrometer (GP). The approximate area of subgrades observed is indicated in Exhibit A (Figure 6).
Subgrades were considered suitable to receive compacted structural fill.
Field Density Testin
Compacted structural fill placed for Building Lots 26, 25, 20, and 19 were tested for relative compaction
on March 28 through April 1, 2019. Compacted structural fill typically consisted of silty sand (SM) and
silt (ML) with sand, containing mica and rock fragments, as represented by the bulk Proctor samples.
During periodic visits to the site, the material was noted to be placed in typical 6 to 8-inch, loose lifts,
compacted using a vibratory sheepsfoot roller.
Compaction testing of lifts was completed using non-nuclear test methods. A summary of Field Density
Test Results is included as Exhibit B (3 sheets). Field density testing indicated compaction to at least 95
percent of the maximum dry density as evaluated by the laboratory Standard Proctor tests.
Underhill has endeavored to complete the services identified herein in a manner consistent with that
level of care and skill ordinarily exercised by members of the profession currently practicing in the same
locality and under similar conditions as this project. No other representation, express or implied, is
included or intended, and no warranty or guarantee is included or intended in this report.
Project 18023 / April 1, 2019 2 Underhill Engineering, LLC
Thank you for the opportunity to provide our services. If you have any questions or require additional
information, please do not hesitate to contact the undersigned.
Sincerely,
UNDERHILL ENGINEERING, LLC
Susan E. Ray, EIT, GIT
Staff Geotechnical Engineer
OiChriYstpler Webster, PE
Principal
Exhibits:
H O�
O L
O o. CHRISTOPHER
U W EBSTPR
Lic. No. 019910
A
oNAL �
0
'ssfG
ar .aA
Exhibit A: Subgrade Observation Plan, Figures 1 through 6
Exhibit B: Field Density Test Summary (3 sheets)
cc: Gregg O'Donnell — Stanley Martin Homes
Project 18023 / April 1, 2019 3 Underhill Engineering, LLC
5u6G"IDES Obsc-MCO
U on1 317% - 3)29l1ci
ExE4%(6rr A, FIGUQE 1_
DITCH I
r t.
\ � v mI � � �-Yt.Sb 11r1 • .� / - \` \T `�Ci� a �r w ,l .g� ," ;' •. � ,11
kill I
RIC
TO So , I m S
a�
FACILITY 2
e i
jby I
CONSTRUCTPADS FOR LOTS `♦y \ c, i
i
Or ST 2. ONLY AFTER REMOVAL
OF
ST-2 SEE CONSTRUCTION � • ♦ c \.. e•,® �r
SEQUENCE EP-4
\
m
/ \ �' - • RELOCATE CONSTRUCTION $
ENTRANCE To LAUREL PARK p..
,p LANE DURING PHASE II $
EROSION AND SEQUENT
/c
CONTROL LEGEND
®®©� TO sxN .� \" SYo
® a�ma Qs O FACILITY 2 �.�''' €
Rip EP5
W9 m1ai 0 F-7 �
p6�p
e`c aA/li
uN )uITA?2>-E 6vbG9-A0E5
065E9WED WE,) 3)7—'9(19
rXU%0.rrA F'Ir.OMP-7_
DITCH 1
- 1
0 c
Mj�!•
DITCH 1
,
-' ' _. �
v
F � !
��
�` \ � �.
�� p,. �"'
_
3
vim•
ae e
Y
•`
TO S1MA
FACILITY
2 `�
•
'\ `
8�
s
J
v
sw
I
Q }
CONSTRUCT PADS FOR LOTS
4op�y
ONLY AFTER REMOVAL OF ST
OF 5T-2. SEE CONSTRUCTION
/ <a \ .�
s'
°"`�
I
€
SEQUENCE EP-4
a.
\ J Y
r' e
+m.
-
a
RELOCATE CONSTRUCTION
ENTRANCE TO LAUREL PARK
8
LANE DURING PHASE II
w
g
o
EROSION AND SEDIMENT
4j• / `i� �
ISE
_
CONTROL LEGEND��/
®®O
� TO SWM
® aT rtx¢ Q
O FACILITY 2
c-
I
g
�EP5
�a o
❑N ®Q
O
\�'.
p
rxRYJm
® dm mnmL 0
O
�
ax mnem
��-► tw6G9,ADES n6seRueD
one 31-Lgln
a
DITCH I 1�
A
CONSTRUCT PADS FOR LOTS —
27-31 ONLY AFTER REHOVAL
OF ST-1 SEE CONSTRUCTION
SEQUENCE EP-4
EX4tb,T A, FiGuQE
� I
1
'1
' I
RELOCATE CONSTRUCTION
ENTRANCE TO LAUREL PARK
LANE DURING PHASE It
j
V v
� V
C F
Uy $
} G
�'pa Eg
worn�num
EP5
DITCH I
17 t)v6GL4,0Es b6seRve-Q
otl 3�Z9�Ig
CONSTRUCT PADS FOR LOTS-
27-31 ONLY AFTER REMOVAL
OF ST-2. SEE CONSTRUCTION
SEQUENCE EP-4
.c .
E3:m�L''7
,mom -moo
Rmoo
ExNigrT A, FIGURE 4
C�
"iti
eN')
can
if L
1 �1
1 �
ATE CONSTRUCTION
NCE TO LAUREL PARK
DURING PHASE N
F-1FINAL Ga.AC>E PRc)oFR.oLL
065evl\)I;D bN Li l l h 1
EX4�IP�1T F� FI CCU 2E 5
a 1c.S;
I
faE��
DITCH I
D
El
IN
h
8:
TO sm
FACILITY 2
e
CONSTRUCT PADS FOR LOTS /
`4'
{� a.
of
♦
1
ONLY AFTE R RELOVAL
j @ • 4e cy.
- _
r�
OF Sr-2 SEE CONS7RUCTNIN
OF ST
SEQUENCE EP-4
e
o. O
f ",`
' ,\ •
_
RELOCATE CONSTRUCTION
W
ENTRANCE TO LAUREL PARK
e z
LANE DURING PHASE II
.9
EROSION AND SEDNIEENT
CONTROL LEGEND
,
a roses
®O�
®O FACILITY 2
®®o®
EP5
®®oo
® wn m.sn 8 F+
ne ml.A.
a5u8G9,4,0E5 n6seRuco
orJ Lil)lll)
d � N
DITCH I
T S'�
1 � _
� g
TO Sm �• ` �
FACUTY Z
e \
O
CONSTRUCT PADS FOR LOTS
27-31 ONLY AFTER REMOVAL
OF ST-2 SEE CONSTRUCTION' e c
SEOUENCE EP-4
i
EROSION AND SEDWENT
'� %•' `' \
CONTROL LEGEND
®®O�
TOsm
ar raa s
®OOO
FACUtt 2
® o
F) �ibrr A, FIGLJ(-�
— i RELOCATE CONSTRUCTION
ENTRANCE TO LAUREL PARR
LANE DURING PHASE II
t;A j
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
03/28/19
Field Density Summary
Lab Reference:
S-3
Optimum Moisture (%):
11.8
Maximum Dry Density:
121.7
95% of Maximum Dry Density:
115.6
Test
Number
Date Tested
Elevation
(ft)
Lab
Reference
Wet Density
(PCF)
Moisture
Content (%)
Dry Density
(PCF)
Maximum
Dry Density
(PCF)
Percent
Compaction
(%)
Grid Zone
Easting
Northing
Results
84
3/28/2019
590
S-3
148.6
23.1
120.7
121.7
99.2%
17S
724207
4223683
Passed
85
3/28/2019
590
S-3
138.9
20.1
115.7
121.7
95.0%
17S
724211
4223679
Passed
86
3/28/2019
591
S-3
156.0
25.0
124.8
121.7
100+%
17S
724209
4223679
Passed
87
3/28/2019
592
S-3
152.8
24.2
123.0
121.7
100+%
17S
724207
4223679
Passed
88
3/28/2019
592.5
S-3
147.7
23.0
120.1
121.7
98.7%
17S
724210
4223675
Passed
89
3/28/2019
593.5
S-3
149.0
23.2
120.9
121.7
99.4%
17S
724213
4223677
Passed
90
3/28/2019
594
S-3
148.4
23.0
120.7
121.7
1 99.1 %
17S
724210
1 4223679
1 Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
03/29/19
Field Density Summary
Lab Reference:
S-3
Optimum Moisture (%):
11.8
Maximum Dry Density:
121.7
95% of Maximum Dry Density:
115.6
Test
Number
Date Tested
Elevation
(ft)
Lab
Reference
Wet Density
(PCF)
Moisture
Content (%)
Dry Density
(PCF)
Maximum
Dry Density
(PCF)
Percent
Compaction
(%)
Grid Zone
Easting
Northing
Results
91
3/29/2019
593.5
S-3
157.7
26.7
124.5
121.7
100+%
17S
724209
4223681
Passed
92
3/29/2019
594.5
S-3
151.9
24.0
122.5
121.7
100+%
17S
724209
4223669
Passed
93
3/29/2019
594
S-3
150.1
23.7
121.3
121.7
99.7%
17S
724203
4223672
Passed
94
3/29/2019
603.5
S-3
152.4
24.2
122.7
121.7
100+%
17S
724218
4223610
Passed
95
3/29/2019
604
S-3
151.2
23.8
122.1
121.7
100+%
17S
724226
4223610
Passed
96
3/29/2019
605
S-3
164.1
29.1
127.1
121.7
100+%
17S
724220
4223609
Passed
97
3/29/2019
605
S-3
163.9
28.3
127.7
121.7
1 100+%
17S
724226
1 4223606
1 Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name:
Project Number:
Rep:
Date:
Hollymead Block VI
Albemarle County, VA
18023
S. Ray
04/01 /19
Field Density Summary
Lab Reference:
S-3
Optimum Moisture (%):
11.8
Maximum Dry Density:
121.7
95% of Maximum Dry Density:
115.6
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
98
4/1/2019
606
S-3
155.4
25.5
123.8
121.7
100+%
17S
724226
4223619
Passed
99
4/1/2019
1 606
1 S-3
1 169.3
1 30.6
129.E
1 121.7
1 100+%
1 17S
724236
1 4223607
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
July 31, 2019
Mr. Katurah Roell
Town Properties, LLC
325 Barracks Hill
Charlottesville, VA 22901
Subject: California Bearing Ratio (CBR) Testing, Hollymead Towncenter Block VI,
Albemarle County, Virginia (Underhill Engineering Project No. 18023)
Dear Mr. Roell:
Underhill Engineering, LLC (Underhill) is pleased to present this report, summarizing the results of the
second set of California Bearing Ratio (CBR) testing for the project. These services are provided in
accordance with Underhill's Services Agreement with you dated March 1, 2016, and your authorization
of April 5, 2018.
Laboratory Test Results
Two bulk samples were retrieved by Underhill from on site for soil laboratory testing. The approximate
sample locations are shown in Figure 1. Soil laboratory testing assigned by Underhill consisted of the
following:
■ Two gradation tests (ASTM D422),
■ Two Atterberg Limits tests (ASTM D4318),
■ Two Standard Proctor tests (ASTM D698),
■ Two California Bearing Ratio tests (VTM-8).
A summary of the soil laboratory test results, gradation curves, moisture -density relationships, and CBR
test curves follow the text of this report. CBR tests results values were 20.1 with 0.1 to 0.2 percent
swell. Underhill understands that a design CBR value of 10 was considered for the design pavement
section. The as -tested CBR values exceed this design value.
Underhill has endeavored to complete the services identified herein in a manner consistent with that
level of care and skill ordinarily exercised by members of the profession currently practicing in the same
locality and under similar conditions as this project. No other representation, express or implied, is
included or intended, and no warranty or guarantee is included or intended in this report.
T: 434.531.2565
327 W. Main Street, Suite 2, Charlottesville, VA 22903
underhillengineering.com
Thank you for the opportunity to provide our services. If you have any questions or require additional
information, please do not hesitate to contact us.
Sincerely,
UNDERHILL ENGINEERING, LLC
Susan E. Ray, EIT, GIT
Staff Geotechnical Engineer
O. Chris opher Webster, PE
Principal
Figure 1: Location Plan
Exhibit A:
Soil Laboratory Test Results
Project 18023 / July 31, 2019 2 Underhill Engineering, LLC
w
Scale: No scale
APPROXIMATE SAMPLE LOCATION
Note: Base drawing provided by Dominion Engineering
FIGURE 1: LOCATION PLAN
Project 18023
Hollymead Block VI
Charlottesville, Virginia
underhill ENGINEERING
geotechnical I geodesign I geoconstruction
Soil Laboratory Test Results
Summary of Soil Laboratory Tests (1 sheet)
Gradation Curves (2 sheets)
Atterberg Limits (1 sheet)
Moisture -Density Relationships (2 sheets)
CBR curves (2 sheets)
Project 18023 / July 31, 2019 i Underhill Engineering, LLC
Summary of Soil Laboratory Tests
Sample No.
S-4
S-5
S-6
Sample Type
BULK
BULK
BULK
Description,
SILTY SAND (SM)
SILTY SAND (SM)
SILTY SAND (SM)
Symbol USCS
(A-2-7)
(A-2-6)
(A-7-5)
Passing No. 200
Sieve
33.2
34.2
39.6
• Passing No. 40
Sieve
54.7
59.5
65.5
• Passing No. 4
Sieve
83.6
92.2
88.2
Max. Dry Density
(pcf)
120.6
112.6
114.4
Optimum
Moisture Content
12.2
14.5
14.8
N
CBR Value
19.3
21.1
22.9
(soaked)
Swell (%)
0.1
0.3
0.5
Testing provided by Underhill's subconsultant laboratory, Schnabel Engineering
Project 18023 / July 31, 2019 ii Underhill Engineering, LLC
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS I HYDROMETER
A 9 i i/9 '2 R in iR 'Qn Gn inn )nn
100
95
90
85
80
75
70
65
x
2 60
W
>- 55
m
ry
W 50
Z
LL
Z 45
W
of 40
W
a
35
30
25
20
15
10
5
0
100 10 1 0.1
GRAIN SIZE IN MILLIMETERS
0.01 0.001
COBBLES
GRAVEL
SAND
SILT OR CLAY
coarse fine
coarse medium fine
Specimen
Sample 7
Test Method
ASTM D422
Sample Description LL PL PI Cc CU
SILTY SAND (SM, A-2-5), fine to coarse grained sand, contains 42 40 2
crushed stone, orangish brown
D100 D60 D30 D10 %Gravel %Sand %Silt I %Clay
64 0.59 0.103 -- 5.9 69.2 24.9
Percent Finer
Sieve Size
No. 200
No. 100
No. 60
No.40
No. 20
No. 10
No. 4
3/8"
3/4"
1"
1.5"
2.5"
% Finer
24.9
36.2
45.4
54.6
66.0
84.2
94.1
95.8
98.3
98.8
99.5
100.0
Tested By Tested Date
RG
Sch
E N G
Reviewed By
DS
nabel
N E E R I N G
GRADATION CURVE
Project: Hollymeade Block 6-18023
Testing for Underhill Engineering
Contract: 19C43001 Testing Lab: RICH
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS I HYDROMETER
A 9 i i/9 '2 R in iR 'Qn Gn inn )nn
100
95
90
85
80
75
70
65
x
2 60
W
>- 55
m
ry
W 50
Z
LL
Z 45
W
of 40
W
a
35
30
25
20
15
10
5
0
100 10 1 0.1
GRAIN SIZE IN MILLIMETERS
0.01 0.001
COBBLES
GRAVEL
SAND
SILT OR CLAY
coarse fine
coarse medium fine
Specimen
Sample 8
Test Method
ASTM D422
Sample Description LL PL PI Cc CU
SILTY SAND (SM, A-7-5), fine to coarse grained sand, contains 66 47 19
crushed stone, reddish brown
D100 D60 D30 D10 %Gravel %Sand %Silt I %Clay
38.1 0.25 -- -- 4.3 47.7 48.0
Percent Finer
Sieve Size
No. 200
No. 100
No. 60
No.40
No. 20
No. 10
No. 4
3/8"
3/4"
1"
1.5"
% Finer
48.0
55.0
60.0
65.1
72.2
82.1
95.7
96.6
97.4
98.1
100.0
Tested By Tested Date
RG
Sch
E N G
Reviewed By
DS
nabel
N E E R I N G
GRADATION CURVE
Project: Hollymeade Block 6-18023
Testing for Underhill Engineering
Contract: 19C43001 Testing Lab: RICH
80
CL
CH
60
x
w
0
z
40
a
a
20
CL-ML ML MH
0
0 20 40 60 80 100
LIQUID LIMIT
PLOTTED DATA REPRESENTS SOIL PASSING NO. 40 SIEVE
Specimen
LL
PL
PI
Fines
Testing
Description
Sample 7
p
42
40
2
25
RICH
SILTY SAND (SM, A-2-5), fine to coarse grained sand,
contains crushed stone, orangish brown
Sample 8
p
66
47
19
48
RICH
SILTY SAND (SM, A-7-5), fine to coarse grained sand,
contains crushed stone, reddish brown
Schnabel
0a E N G I N E E R I N G
ATTERBERG LIMITS
Project: Hollymeade Block 6-18023
Testing for Underhill Engineering
Contract: 19C43001
106.0
105.0
104.0
103.0
102.0
w
U
Q
> 101.0
z
w
>-100.0
99.0
98.0
97.0
96.0
95.0
14
16 18 20 22 24
WATER CONTENT, %
Sample Description: SILTY SAND (SM, A-2-5), fine to coarse Assumed Specific Gravity:
grained sand, contains crushed stone, Max. Dry Density (pcf):
orangish brown
Opt. Moisture (%):
Sample Source: Sample 7
Test Methods: VTM1
Liquid Limit (LL): 42
Plasticity Index (PI): 2
% Retained #4 Sieve: 5.9
% Passing # 200 Sieve: 24.9
Schnabel
E N G I N E E R I N G
Comments:
2.61
101.8
19.5
Date: 7-09-19 Reviewed By: DS
MOISTURE DENSITY RELATIONSHIP
Project: Hollymeade Block 6-18023
Testing for Underhill Engineering
Contract: 19C43001 Testing Lab: RICH
92.0
91.0
90.0
89.0
88.0
w
U
Q
> 87.0
H
Z
w
>- 86.0
85.0
84.0
83.0
82.0
81.0
25
\
\
\
\
\
\
\
27 29 31 33 35
WATER CONTENT, %
Sample Description: SILTY SAND (SM, A-7-5), fine to coarse Assumed Specific Gravity:
grained sand, contains crushed stone, Max. Dry Density (pcf):
reddish brown
Opt. Moisture (%):
Sample Source: Sample 8
Test Methods: VTM1
Liquid Limit (LL): 66
Plasticity Index (PI): 19
% Retained #4 Sieve: 4.3
% Passing # 200 Sieve: 48.0
Schnabel
E N G I N E E R I N G
Comments:
2.63
88.5
30.6
Date: 7-09-19 Reviewed By: DS
MOISTURE DENSITY RELATIONSHIP
Project: Hollymeade Block 6-18023
Testing for Underhill Engineering
Contract: 19C43001 Testing Lab: RICH
400
360
320
280
.N
Q
Z
0
240
a
o
U)
w
200
160
120
80
40
0.1 0.2 0.3 0.4
PENETRATION (INCHES)
0.5
Sample Description: SILTY SAND (SM, A-2-5), fine to coarse
grained sand, contains crushed stone,
orangish brown
Sample Source: Sample 7
Sample Depth:
Test Method: VTM-8
Dry Density Before Soaking (pcf):
Dry Density After Soaking (pcf):
Maximum Dry Density (pcf):
Moisture Content Before Soaking (%):
Moisture Content After Soaking (Avg) (%):
Moisture Content Top Inch After Soak (%):
Optimum Moisture Content (%):
103.4
103.3
101.8
18.4
20.7
21.4
19.5
Liquid Limit (LL): 42
Plasticity Index (PI): 2
% Retained #4 Sieve: 5.9
% Passing # 200 Sieve: 24.9
CBR: 20.1, Soaked
Surcharge (psf):
Swell (%):
50
0.2
112
Schnabel
E N G I N E E R I N G
CALIFORNIA BEARING RATIO TEST
Project: Hollymeade Block 6-18023
Testing for Underhill Engineering
1 Contract: 19C43001 Testing Lab: RICH
400
360
320
280
.N
Q
Z
0
240
a
o
U)
w
200
160
120
80
40
0.1 0.2 0.3 0.4
PENETRATION (INCHES)
0.5
Sample Description: SILTY SAND (SM, A-7-5), fine to coarse
grained sand, contains crushed stone,
reddish brown
Sample Source: Sample 8
Sample Depth:
Test Method: VTM-8
Dry Density Before Soaking (pcf):
Dry Density After Soaking (pcf):
Maximum Dry Density (pcf):
Moisture Content Before Soaking (%):
Moisture Content After Soaking (Avg) (%):
Moisture Content Top Inch After Soak (%):
Optimum Moisture Content (%):
90.1
90.0
88.5
29.3
32.2
34.8
30.6
Liquid Limit (LL): 66
Plasticity Index (PI): 19
% Retained #4 Sieve: 4.3
% Passing # 200 Sieve: 48.0
CBR: 20.1, Soaked
Surcharge (psf): 50
Swell (%): 0.1
112
Schnabel
E N G I N E E R I N G
CALIFORNIA BEARING RATIO TEST
Project: Hollymeade Block 6-18023
Testing for Underhill Engineering
1 Contract: 19C43001 Testing Lab: RICH
underhilI ENGINEERING
geotechnical I geodesign 1 geoconstruction
July 31, 2019
Mr. Katurah Roell
Town Properties, LLC
3215 Barracks Hill
Charlottesville, VA 22901
Subject: Report No. 4, Lots 1 to 18, Earthwork Observation and Testing Services,
Hollymead Towncenter Block VI, Albemarle County, Virginia (Underhill
Engineering Project No. 18023)
Dear Mr. Roell:
Underhill Engineering, LLC (Underhill) is pleased to present our Report No. 4, summarizing Underhill's
earthwork observation and testing services for lots 1 through 18 at the Hollymead Towncenter. This
report summarizes Underhill's services relating to observation of subgrades to receive compacted
structural fill, and observation and testing of compacted structural fill for the new townhomes. These
services are provided in accordance with Underhill's Service Agreement with you dated March 1, 2016,
and your authorization of April 5, 2018. This report summarizes services provided from April 2 to May
28, 2019.
Underhill's services as reported herein included the following tasks:
Observations of subgrades to receive compacted structural fill after removal of the limited
topsoil and unsuitable existing fill soils. Evaluation of subgrades included observations of
proofrolling of the stripped subgrades by the Contractor using a loaded dump truck,
observations of test pits / test strips, and probing with a Geostick Penetrometer at selected
locations.
Observation and testing of compacted structural fill placement. Observation of fill placement
included the following tasks:
o Evaluation of proposed fill materials for suitability,
o Measurement of lift thickness at selected locations, and
o Observations of compaction methods employed by the Contractor. Compaction testing
included field density tests to compare to the laboratory maximum dry density and
optimum moisture content.
o Measuring the depth of 21A placed on roadways.
Field density testing of utility backfill including the following tasks:
o Evaluation of proposed backfill materials for suitability.
o Periodic observations of compaction methods employed by the Contractor.
o Periodic field density testing.
Observation of asphalt placement.
The following services were not included: observation of erosion and sediment control methods,
surveying for line and grade, environmental services, or other services not specifically identified above.
T: 434.531.2565
327 W. Main Street, Suite 2, Charlottesville, VA 22903
underhillengineering.com
Observation of Subgrades
Underhill's Engineer observed final subgrades on Building Pad 17 through 20 on April 2, 2019.
Underhill's Engineer observed subgrade conditions by proofrolling, using a loaded dump truck. The
approximate area of subgrades observed is indicated in Exhibit A (Figure 1). The western portions of lots
18 and 19, shown in Exhibit A (Figure 2), were not considered suitable to receive structural fill and were
undercut an additional 3 feet by the contractor. After the additional undercut, subgrades were
considered suitable to receive compacted structural fill.
Underhill's Engineer observed subgrades to receive compacted structural fill for building support on
Building Pad 12 through 14 on April 17, 2019. Underhill's Engineer observed subgrade conditions by
digging a test pit and using a Geostick Penetrometer (GP). The approximate area of subgrades observed
is indicated in Exhibit A (Figure 3). Portions of lots 12 through 14, shown in Exhibit A (Figure 4), were not
considered suitable to receive structural fill and were undercut an additional 0.5 to 3 feet by the
contractor. After the additional undercut, subgrades were considered suitable to receive compacted
structural fill.
Underhill's Engineer observed subgrade undercut to receive compacted structural fill for building
support on Building Pad 10 and 11 on April 22, 2019. Underhill's Engineer observed subgrade conditions
by using a Geostick Penetrometer (GP). The approximate area of subgrades observed is indicated in
Exhibit A (Figure 5). Subgrades were considered suitable to receive compacted structural fill.
Underhill's Engineer observed the final subgrades on Building Pads 1 to 19 on April 24, 2019. Underhill's
Engineer observed the response of the grade conditions during proofrolling using an empty Volvo A30
haul truck. The approximate area of subgrades observed is indicated in Exhibit A (Figure 6). Subgrades
observed were considered suitable for the Contractor to proceed with the foundation and floor slab
construction.
Field Densitv Testin
Compacted structural fill placed for Building Lots 10 through 18 were tested for relative compaction
between April 2 and April 22, 2019. Compacted structural fill typically consisted of silty sand (SM)
containing mica and rock fragments, as represented by the bulk Proctor samples. During periodic visits
to the site, the material was noted to be placed in typical 6 to 8-inch, loose lifts, compacted using a
vibratory sheepsfoot roller.
Compacted structural backfill for the sanitary sewer and accompanying laterals was placed and tested
for relative compaction between April 29 and May 14, 2019. Compacted structural fill typically
consisted of silty sand (SM) containing mica and rock fragments, as represented by the bulk Proctor
samples. During periodic visits to the site, the material was noted to be placed in typical 6 to 8-inch,
loose lifts, compacted using a vibratory sheepsfoot trench roller.
Compacted structural backfill for the water line and accompanying laterals was placed and tested for
relative compaction on May 24, 2019. Compacted structural fill typically consisted of silty sand (SM)
containing mica and rock fragments, as represented by the bulk Proctor samples. During periodic visits
to the site, the material was noted to be placed in typical 6 to 8-inch, loose lifts, compacted using a
vibratory sheepsfoot trench roller.
Project 18023 / July 31, 2019 2 Underhill Engineering, LLC
Compaction testing of lifts was completed using non-nuclear test methods. A summary of Field Density
Test Results is included as Exhibit B (11 sheets). Field density testing indicated compaction to at least 95
percent of the maximum dry density as evaluated by the laboratory Standard Proctor tests.
Stone and Asphalt Observation
21A stone was placed on the road leading to lots 1 through 20 in preparation for asphalt and Underhill
recorded the aggregate base course thickness at multiple locations in shallow test pits made by the
contractor on July 9, 2019. The aggregate base course thickness was found to vary from 9 to in excess of
11 inches, exceeding the design section.
Asphalt was placed on July 11, 2019. Underhill measured the thickness of the intermediate asphaltic
concrete layer at several locations. The thickness of the intermediate section was measured at two
inches.
Concrete testing of site concrete was also performed and is included under a separate cover.
Underhill has endeavored to complete the services identified herein in a manner consistent with that
level of care and skill ordinarily exercised by members of the profession currently practicing in the same
locality and under similar conditions as this project. No other representation, express or implied, is
included or intended, and no warranty or guarantee is included or intended in this report.
Thank you for the opportunity to provide our services. If you have any questions or require additional
information, please do not hesitate to contact the undersigned.
Sincerely,
UNDERHILL ENGINEERING, LLC
J/ — P 40#44
EALTH p�
Susan E. Ray, EIT, GIT L
Staff Geotechnical Engineer
p O. CHRISTOPI R
V Wf?85iF.ft
Lie. No. 019910
O. Christ pher Webster, PE Ya
Principal �0
�ss�o�va� mow'
Exhibits:
Exhibit A: Subgrade Observation Plan, Figures 1 through 6
Exhibit B: Field Density Test Summary (11 sheets)
cc: Gregg O'Donnell — Stanley Martin Homes
Project 18023 / July 31, 2019 3 Underhill Engineering, LLC
bl(-Zlh NO
nun lugK0,
lg, i
nun lugK0,
lg, i
6
nun �Wo
11119. I �+r�-- "�!`1�' y��n •y ������ ,Yr III
nn�
blf211, No 090-68s90 j—�
SaOb�99ns ���V1ioSNn �J
�ry
�ji�ii���'��� ■■ -
��IIN s�,,
IX
Fes" ,-�1�"1 � ��j°�►'�"�' `�::�;,
J. .
blILlIh NO
ogn163s90 s9oa'6`J9nS 0
LVm✓ao a.P
7 CLJ \\
�mmwuame /
o yy
�wv f
-
.w
m. r -10
NO
� L
fmi
as
aan
0g0'63s90
S�a`d��47ns ���'d1inSNn
«Y
X) 9 O�wiY
9ds
m
W
u
d
D
•gyp
��8
'��
`
` /
�,
��..,
>�
_
! d `\\_/�
w
l
Y
y
n.mu x yew
..uX
-
%!3 -ZI CIL1--/I- -MCal Xa
hIj22[h NO
03 (\Z 3S90 S',30 a'bcD47nc,
a
9dS
/ \
J�
nonra..xaw
i
FE
Y
r
�
I
a
•
/
bb
87"
I
WI
4 \
m I
_a
I
� •
3i..3
9
9?1091 _-j �v -Li 9li'1X9 b1IN2lh NO
09 0713S470 590V,6`J47oS
9?1091 _-j �v -Li 9li'1X9 b1IN2lh NO
09 0713S470 590V,6`J47oS
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
04/02/19
Field Density Summary
Lab Reference:
S-3
Optimum Moisture (%):
11.8
Maximum Dry Density:
121.7
95% of Maximum Dry Density:
115.6
Test
Number
Date Tested
Elevation
(ft)
Lab
Reference
Wet Density
(PCF)
Moisture
Content (%)
Dry Density
(PCF)
Maximum
Dry Density
(PCF)
Percent
Compaction
(%)
Grid Zone
Easting
Northing
Results
100
4/2/2019
606.5
S-3
157.5
26.0
125.0
121.7
100+%
17S
724231
4223614
Passed
101
4/2/2019
606.5
S-3
154.9
25.1
123.8
121.7
100+%
17S
724223
4223617
Passed
102
4/2/2019
605.5
S-3
158.0
26.8
124.6
121.7
100+%
17S
724222
4223610
Passed
103
4/2/2019
605.5
S-3
151.0
23.8
122.0
121.7
100+%
17S
724223
4223623
Passed
104
4/2/2019
606.5
S-3
157.7
26.3
124.9
121.7
100+%
17S
724223
4223621
Passed
105
4/2/2019
607.5
S-3
156.6
25.9
124.4
121.7
100+%
17S
724226
4223621
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
04/16/19
Field Density Summary
Lab Reference:
S-3
Optimum Moisture (%):
11.8
Maximum Dry Density:
121.7
95% of Maximum Dry Density:
115.6
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
106
4/16/2019
608.5
S-3
150.0
24.2
120.8
121.7
99.2%
17S
724241
4223638
Passed
107
4/16/2019
609
S-3
142.0
23.3
115.2
121.7
94.6%
17S
724240
4223630
Passed
108
4/16/2019
609
S-3
157.1
26.1
124.6
121.7
100+%
17S
724243
4223639
Passed
109
4/16/2019
609.5
S-3
152.9
26.1
121.3
121.7
99.6%
17S
724236
4223634
Passed
110
4/16/2019
609
S-3
162.7
27.9
127.2
121.7
100+%
17S
724241
4223640
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
04/18/19
Field Density Summary
Lab Reference:
S-3
Optimum Moisture (%):
11.8
Maximum Dry Density:
121.7
95% of Maximum Dry Density:
115.6
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
111
4/18/2019
610.5
S-3
179.1
32.4
135.3
121.7
100+%
17S
724256
4223650
Passed
112
4/18/2019
610.5
S-3
157.4
26.4
124.5
121.7
100+%
17S
724253
4223645
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
04/22/19
Field Density Summary
Lab Reference:
S-3
Optimum Moisture (%):
11.8
Maximum Dry Density:
121.7
95% of Maximum Dry Density:
115.6
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
113
4/22/2019
608
S-3
153.5
24.5
123.3
121.7
100+%
17S
724279
4223626
Passed
114
4/22/2019
609.5
S-3
151.3
24.2
121.8
121.7
100+%
17S
724276
4223627
Passed
115
4/22/2019
612
S-3
161.8
28.7
125.7
121.7
100+%
17S
724277
1 4223625
1 Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
04/29/19
Field Density Summary
Lab Reference:
S-3
Optimum Moisture (%):
11.8
Maximum Dry Density:
121.7
95% of Maximum Dry Density:
115.6
Test
Number
Date Tested
Elevation
(ft)
Lab
Reference
Wet Density
(PCF)
Moisture
Content (%)
Dry Density
(PCF)
Maximum
Dry Density
(PCF)
Percent
Compaction
(%)
Grid Zone
Easting
Northing
Results
116
4/29/2019
599
S-3
147.1
22.7
119.9
121.7
98.5%
17S
724228
4223590
Passed
117
4/29/2019
599.5
S-3
151.9
24.0
122.5
121.7
100+%
17S
724231
4223591
Passed
118
4/29/2019
600
S-3
155.9
25.2
124.5
121.7
100+%
17S
724231
4223597
Passed
119
4/29/2019
601.5
S-3
149.6
23.4
121.2
121.7
99.6%
17S
724231
4223590
Passed
120
4/29/2019
600.5
S-3
143.3
22.0
117.5
121.7
96.5%
17S
724229
4223594
Passed
121
4/29/2019
602
S-3
146.5
22.6
119.5
121.7
98.2%
17S
724234
4223600
Passed
122
4/29/2019
602
S-3
149.6
23.4
121.2
121.7
99.6%
17S
724235
4223600
Passed
123
4/29/2019
603
S-3
149.3
23.6
120.8
121.7
99.3%
17S
724235
4223594
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
05/01 /19
Field Density Summary
Lab Reference:
S-3
Optimum Moisture (%):
11.8
Maximum Dry Density:
121.7
95% of Maximum Dry Density:
115.6
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
124
5/1/2019
600
S-3
155.5
25.0
124.4
121.7
100+%
17S
724237
4223604
Passed
125
5/1/2019
600.5
S-3
152.2
24.0
122.7
121.7
100+%
17S
724239
4223601
Passed
126
5/1/2019
600
S-3
155.9
25.7
124.0
121.7
100+%
17S
724237
4223605
Passed
127
5/1/2019
601.5
S-3
146.8
22.9
119.4
121.7
98.1%
17S
724236
4223604
Passed
128
5/1/2019
601.5
S-3
155.3
24.9
124.3
121.7
100+%
17S
724242
4223607
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
05/02/19
Field Density Summary
Lab Reference:
S-3
Optimum Moisture (%):
11.8
Maximum Dry Density:
121.7
95% of Maximum Dry Density:
115.6
Test
Number
Date Tested
Elevation
(ft)
Lab
Reference
Wet Density
(PCF)
Moisture
Content (%)
Dry Density
(PCF)
Maximum
Dry Density
(PCF)
Percent
Compaction
(%)
Grid Zone
Easting
Northing
Results
129
5/2/2019
604.5
S-3
149.3
23.3
121.1
121.7
99.5%
17S
724240
4223610
Passed
130
5/2/2019
604.5
S-3
161.6
27.1
127.1
121.7
100+%
17S
724239
4223603
Passed
131
5/2/2019
603.5
S-3
152.9
24.4
122.9
121.7
100+%
17S
724246
4223614
Passed
132
5/2/2019
604
S-3
145.6
22.4
119.0
121.7
97.7%
17S
724248
4223612
Passed
133
5/2/2019
605.5
S-3
151.2
24.0
121.9
121.7
100+%
17S
724244
4223614
Passed
134
5/2/2019
605
S-3
159.3
27.4
125.0
121.7
100+%
17S
724244
4223614
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
05/06/19
Field Density Summary
Lab Reference:
S-3
Optimum Moisture (%):
11.8
Maximum Dry Density:
121.7
95% of Maximum Dry Density:
115.6
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
135
5/6/2019
606.5
S-3
148.4
23.1
120.6
121.7
99.1%
17S
724257
4223622
Passed
136
5/6/2019
606
S-3
147.0
22.7
119.8
121.7
98.4%
17S
724253
4223618
Passed
137
5/6/2019
607
S-3
148.7
23.1
120.8
121.7
99.3%
17S
724255
4223626
Passed
138
5/6/2019
606.5
S-3
149.8
24.1
120.7
121.7
99.2%
17S
724253
4223621
Passed
139
5/6/2019
607.5
S-3
159.5
27.3
125.3
121.7
100+%
17S
724251
4223624
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
05/07/19
Field Density Summary
Lab Reference:
S-3
Optimum Moisture (%):
11.8
Maximum Dry Density:
121.7
95% of Maximum Dry Density:
115.6
Maximum
Maximum
Percent
Test
Elevation
Lab
Wet Density
Moisture
Dry Density
Date Tested
Dry Density
Compaction
Grid Zone
Easting
Northing
Results
Number
(ft)
Reference
(PCF)
Content (%)
(PCF)
(PCF)
(%)
140
5/7/2019
607.5
S-3
164.4
29.1
127.3
121.7
100+%
17S
724263
4223633
Passed
141
5/7/2019
608
S-3
156.0
25.6
124.2
121.7
100+%
17S
724261
4223628
Passed
142
1 5/7/2019
1 609
1 S-3
1 153.5
1 24.9
122.9
1 121.7
1 100+%
1 17S
1 724263
1 4223633
1 Passed
143
5/7/2019
1 609.5
1 S-3
1 155.0
1 25.2
123.8
1 121.7
1 100+%
1 17S
1 724259
1 4223630
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
05/14/19
Field Density Summary
Lab Reference:
S-3
Optimum Moisture (%):
11.8
Maximum Dry Density:
121.7
95% of Maximum Dry Density:
115.6
Test
Number
Date Tested
Elevation
(ft)
Lab
Reference
Wet Density
(PCF)
Moisture
Content (%)
Dry Density
(PCF)
Maximum
Dry Density
(PCF)
Percent
Compaction
(%)
Grid Zone
Easting
Northing
Results
144
5/14/2019
597.5
S-3
152.0
24.0
122.6
121.7
100+%
17S
721228
4223590
Passed
145
5/14/2019
597.5
S-3
152.0
24.1
122.5
121.7
100+%
17S
724232
4223691
Passed
146
5/14/2019
596.5
S-3
154.9
24.8
124.1
121.7
100+%
17S
724225
4223590
Passed
147
5/14/2019
599.5
S-3
152.1
24.1
122.6
121.7
100+%
17S
724228
4223590
Passed
148
5/14/2019
598
S-3
158.2
25.6
126.0
121.7
100+%
17S
724223
4223584
Passed
149
5/14/2019
600
S-3
161.3
27.0
127.0
121.7
100+%
17S
724225
4223589
Passed
150
1 5/14/2019
1 600
1 S-3
1 166.1
1 29.1
128.7
1 121.7
1 100+%
1 17S
1 724226
1 4223590
1 Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
Project Name: Hollymead Block VI
Albemarle County, VA
Project Number:
Rep:
Date:
18023
S. Ray
05/24/19
Field Density Summary
Lab Reference:
S-3
Optimum Moisture (%):
11.8
Maximum Dry Density:
121.7
95% of Maximum Dry Density:
115.6
Test
Number
Date Tested
Elevation
(ft)
Lab
Reference
Wet Density
(PCF)
Moisture
Content (%)
Dry Density
(PCF)
Maximum
Dry Density
(PCF)
Percent
Compaction
(%)
Grid Zone
Easting
Northing
Results
151
5/24/2019
600.5
S-3
152.4
25.9
121.0
121.7
99.5%
17S
724220
4223583
Passed
152
5/24/2019
603
S-3
149.0
25.5
118.7
121.7
97.6%
17S
724237
4223597
Passed
153
5/24/2019
604
S-3
164.9
30.8
126.1
121.7
100+%
17S
724243
4223606
Passed
154
5/24/2019
606.5
S-3
152.5
26.4
120.6
121.7
99.1%
17S
724256
4223618
Passed
155
5/24/2019
608
S-3
161.3
29.5
124.6
121.7
100+%
17S
724263
4223628
Passed
156
5/24/2019
610
S-3
152.7
24.4
122.7
121.7
100+%
17S
724264
4223632
Passed
157
5/24/2019
606
S-3
172.6
31.7
131.1
121.7
100+%
17S
724249
4223612
Passed
158
5/24/2019
603
S-3
153.2
25.3
122.3
121.7
100+%
17S
724231
4223592
Passed
underhilI ENGINEERING
geotechnical I geodesign I geoconstruction
1001 East Market Street Suite 100, Charlottesville, VA 22903
(434) 771-0234
FIELD REPORT
Project Number 18023
Date
February 5, 2020
Weather
45°, light rain
Arrive On -Site
11:20 AM
Leave Site
12:15 PM
Mileage
17
Summary of Services Performed (field test data, locations, elevations, and depths are estimate) & Individuals Contacted
Underhill's Staff Engineer, Elliot White, EIT, PMP, was on site at the Hollymead Town Center Block VI, as
requested, to observe the ashpalt operation on Bushwood Alley.
Virginia Asphalt Service was onseen laying and rolling asphalt on Bushwood Alley. Asphalt thickness was
measured behind the paver at three locations, the observed measurements met the minimum thickness of 1.5
inches. Asphalt depth was also checked by measuring curb height, which also met the minimum asphalt
thickness of 1.5 inches.
LIMITATIONS: The Underhill Engineering, LLC field representative is present on site solely to observe the field activit
of the contractor identified and to keep our client informed of the progress and quality of the work. The reporting
results by the Underhill Engineering, LLC field representative does not relieve the contractor from complying with
contract documents. Underhill Engineering, LLC does not have the authority to direct the contractor's work. A
information provided by the Underhill Engineering, LLC field representative is intended solely to advise the contract
of the technical requirements of the plans and specifications and/or design concept. The contractor is sol,
responsible for its means, methods, sequences, procedures, construction site safety, quality of work, and adherence
the contract documents.
REVIEWED BY