HomeMy WebLinkAboutSDP202000013 Correspondence 2020-06-03COLLINS ENGINEERING 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ?434.293.3719 PH 434.293.2813 FX www.collins-engineering.com June 2, 2020 Mariah Gleason County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Foothill Crossing Phase V — SDP2020-00013 Dear Mariah: Thank you for your comments dated May 20, 2020. Revised plans are hereby submitted incorporating the following changes in response to the items in your letter: Planniniz: 1. Comment previously addressed. 2. Comment previously addressed. 3. The comments have been addressed as followed: a. As discussed on 5/28/20, the pedestrian pathway loop has been created through the neighborhood, satisfying this comment and concern. b. As indicated by Charles Rapp, this comment has been addressed. c. As indicated by Charles Rapp, this comment has been addressed. 4. The comments have been addressed as followed: a. Comment previously addressed. b. As discussed in the email, the 0.897 acres is the active recreation area and stream buffer area. The notations have been updated to illustrate the math. c. Comment previously addressed. d. Comment previously addressed. e. The plant legend has been updated and additional trees added to ensure the tree canopy coverage is provided on the project. f. See comment response e. g. Comment previously addressed. 5. The comments have been addressed as followed: a. The existing right of way has been updated to match the easement plat currently under review, and the deed book and page number has been updated to match the easement plat under review on sheet 2 and sheet 5. b. Comment previously addressed. c. Bollards have moved the termination of the existing right of way as requested. This is shown and labeled on sheet 5, and noted under the detail on sheet 3. d. This note about tying into the Glenbrook Development has been removed, as requested. e. A notation for the DB PG has been added to the label of the emergency access and pedestrian easement. Once the subdivision plat is recorded, this information will be added to the site plan prior to approval. 6. A notation for the DB PG has been added to the label for the wall maintenance easement. Once the subdivision plat is recorded, this information will be added to the site plan prior to approval. This information has also been shared with RGA to add to their easement plat/subdivision plat. 7. It appears that the exception request should be on the PC consent agenda on June 10n 8. Comment previously addressed. 9. Comment previously addressed. 10. I am not sure what the purpose of this is, but we have added a dashed line between the sunroom or patio and the rest of the house, as requested. 11. Comment previously addressed. 12. Comment previously addressed. 13. Comment previously addressed. 14. Comment previously addressed. 15. The comments have been addressed as followed: a. The notation for the DB—PG has been added to the label for the emergency access easement. b. It appears that the exception request should be on the PC consent agenda on June 16th c. The notation for the DB—PG has been added to the label for the drainage easements. 16. The owner information has been updated on the cover sheet and sheet 2. 17. A central mailbox has been added and labeled on sheet 3. En in�g: 1. Acknowledged. WPO is under review for approval. 2. Acknowledged, the road plans have been resubmitted for approval. ACSA: 1. Acknowledged. The plans are ready for approval, once the Eastern Avenue utilities are dedicated. VDOT: 1. The SSAR is under review for acceptance. 2. The landscaping note has been added to the notes on the landscaping sheet, Sheet 11, as requested. Please contact me if you have any questions or require any further information. Sincerely, Scott Collins, PE