Loading...
HomeMy WebLinkAboutSDP202000031 Review Comments Final Site Plan and Comps. 2020-06-03 (2)Phone (434) 296-5832 Project: Plan preparer: Owner or rep.: Plan received date: (Rev. 1) Date of comments: (Rev. 1) Reviewer: Project Coordinator: COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Site Plan review Boys and Girls Club, Northside — Final Site Plan Craig Kotarski, PE, Timmons Group — 608 Preston Ave, Suite 200, Charlottesville, VA 22903 [craig.kotarski(iDtimmons.com ] Boys and Girls Club, 1000 Cherry Ave., Charlottesville, VA 22903 [ jpierceLbeclubva.org ] 26 Mar 2020 8 May 2020 20 Apr 2020 3 Jun 2020 John Anderson Tori Kanellopoulos Fax (434) 972-4126 SDP2020-00031 (Also, see SDP2020-00011. Initial site plan comments below are basis of Engineering review comments for the Final site plan.) If text grayscale, comment is addressed. Follow-up at items 11, 14, 16, 47, only. .PDF preview prior to re -submittal is welcome. * Engineering deems Initial Site Plan detail adequate for approval of the ISP. For Final Site Plan Approval: 1. VSMP /WPO plan approval is required prior to Final Site Plan approval. WP0202000005 is under review. Note: Applicant made critical slopes waiver request; based on information submitted, including Applicant email, 2/27/2020 4:05 PM, Engineering supports critical slopes waiver request. (FSP) Persists. April 20, 2020 9:41 AM email (A�plicant): `...asked Megan to pull it from the 4/15 BOS agenda, as we knew it would increase based on this latest set of plans. Once you've been able to review and give your support, we will update and get it back to the County as quickly as possible.' Also, email to Applicant, April 20, 2020 1:09 PM. (Rev. 1) FSP revision, None. Engineering will comment on revised WPO Plan, 4-Jun, if possible. Albemarle board approved critical slopes waiver request on 6/3/20 (consent agenda item). 2. Stream buffers exist on parcel. Requirements listed at Ch. 17, Article VI, Stream Buffers, apply. C1.1 3. Flush curb detail indicates —10" base. Please confirm depth of base and identify base material (asphalt, asphalt type; stone, stone type). 4. Similarly, VDOT Std. CG-3 /CG-2 details indicate —10" base, each typ. section. Identify base material and depth of each layer if base is a mixed stone /asphalt composite. 5. C1.2: Include VDOT SL-1 detail (safety slab). 6. C2.0: Show and label stream buffers. C4.0: 7. This plan sheet appears twice; please label 2°d occurrence C4.3. 8. Revise CG-2 to CG-6 along south side of heavy-duty asphalt access, S side of building. Gutter is required to convey drive aisle /access /parking area storm runoff. Curb alone is insufficient. (18-4.12.15.g.) 9. Label Jouett MS main building, to orient project. Engineering Review Comments Page 2 of 4 10. Label Ivy Creek School main building. C4.1 11. Since proposed 8' (Max. ht.) retaining wall N of main parking area supports infrastructure (parking), sealed geotechnical retaining wall plans are required prior to FSP approval. Please ref. retaining wall checklist for plan reviewers (Attached). (FSP, Rev. 1) Persists. Applicant response (3/23/20; 5/5/20): 'Acknowledged. Sealed retaining wall plans will be submitted with future submission.' 12. Label typical narrowest width dimension of 19 proposed curvilinear parking spaces. 13. Provide bollard at double -doors opening to 5' sidewalk and flush mount curb on south side of building to protect occupants exiting blindly to sidewalk without visibility east, of approaching vehicles. Place left of door, on exiting. Recommend bollards both right and left. At a minimum, provide bollard to left on exiting. 14. Provide evidence of coordination and approval from ACSA concerning design approval of sanitary sewer pump station connecting via 6" new force main to Ex. pump station alongside Jouett Middle School. (FS) Persists. Applicant: `Sanitary sewer pump station and force main plans have been submitted to ACSA with this submission. See Sheets C8.0-C8.3.' (Rev. 1) Applicant is coordinating sanitary utility plan with ACSA. Applicant response: `Sanitary sewer pump station and force main plans were once again submitted to ACSA with this submission.' As follow-up: Engineering reminds to coordinate pump station plans, reliability classification form /VDH review, as needed. Please ensure pump station /2" FM design receive VDH approval. 15. Consider sequence and pedestrian safety needed during force main construction. Provide narrative and details to protect visitors to Jouett MS (parents, teachers, students, etc.). (FSP) Addressed. Applicant: `Sequencing and safety will be at the forefront of construction. Force main construction adjacent to Jouett will most likely take place during the summer, when parents, teachers, and students are not present. Additional notes have been provided on Sheets C8.0-C8.3.' 16. (C4.1, C5.0, C5.2): Label proposed storm lines downstream of 70-1f and 700-1f x 96" DIA CMP underground detention systems public drainage easements. Provide easement plat, showing SWM facility, facility access, and public drainage easements. Public drainage easement must extend to a natural drainage feature, or to the property line. (FSP) Persists. Applicant: `...An easement plat will be provided with a future submission.' 17. For both detention systems, provide overland relief to protect improvements against flooding, and critical slopes against erosion in event of weir plate obstruction. Design overland relief to convey 10-yr event. Assume complete bypass of systems, should one or both become non -operational. (FSP) Addressed. Applicant `SWM1 would overflow to structure 202 if the weir plate was obstructed. In this case, the overflow drainage would make its way south and end up in Ditch C, which would then convey it to SWM2. If the weir plate in SWM2 became obstructed as well, the drainage would overflow to structure 402. This structure is more than 1' below the adjacent building FFE, so no impact to the building is anticipated. Ultimately, this drainage would overtop the curb and sheet flow south down the slope. Due to the proposed grading, this overflow drainage would not channelize. While it is important to consider all possible outcomes, it is very unlikely that this situation would occur; Boys & Girls Club will enter into a Stormwater Maintenance Agreement with the County to ensure that the underground detention systems are maintained and monitored so that the weir plates never become fully obstructed. For this reason, and those listed above, we believe adequate protection is provide d for both site improvements and critical slopes.' 18. C4.1, C5.0, C5.1: Revise CG-2 to CG-6 at all locations where storm runoff collects against a curb. CG-2 alone is insufficient. (18-4.12.15.g.) 19. Recommend revise parking drive aisle grade slightly, provide DI at pipe 209 intersection with CG-6 (rev. CG-2) in front of N side of building. Proposed grade requires exact construction to bend drive aisle runoff between contours 543 and Str. 206. A more reliable design (a recommendation) is to direct runoff to a new DI at pipe 209 (rev. CG-2 to CG-6 between Str. 234 and new DI, then CG-2 after new DI); then, after new DI, provide grade directing runoff to Str. 206. Water flowing across a paved surface tends to travel straight. A likely better long-term drainage design that more nearly meets expectations for pavement /drainage performance is to collect runoff traveling west at a new DI, then collect runoff traveling north in parking aisle /areas N of the building. Collection of concentrated flow at main entrance to facility avoids Engineering Review Comments Page 3 of 4 ice which is likely consequence of sheet flow over this distance, west then north, if proposed pavement grade is constructed. At entrance to the building, pipe 209 is immediately below, and for slight expense, a DI may greatly reduce risk to patrons, including children unaware of risk or hazard of black ice in winter. (FSP) Addressed. Applicant: `Ditch F has been added to ensure that additional drainage does not make its way to the drive aisle directly in front of the building. Additionally, CG-6 has been added to the entirety of the eastern internal parking island to more effectively convey the water coming down the sloped drive aisle to structure 206. As a result of these improvements, we do not believe an additional structure is needed in front of the building.' C4.1, C4.2 20. Label underground detention systems. If Mfr. system, include name of Mfr. in plan or profile view. (If Mfr. system, for VSMP/WPO plan, include recommended installation guidelines, maintenance, and periodic inspection guidelines.) (FSP) Persists only at WPO202000005. (SWMP review item 6, follow-up: Technical installation notes provided. Please furnish periodic inspection and Lane mfr.-recommended maintenance procedures on the [WPO] plans). 21. For VSMP and final site plan, ensure manway entries to underground facilities permit visual check of weirs without entry. Manways should provide check of SWM facility operation, especially weirs. Do not place SWM facility manways in a designated parking or loading space. 22. Add FM (force main) size descriptor (6" DIA). 23. Ensure Nyloplast ® pipes and risers are identified and labeled. Provide Nyloplast typical construction installation and periodic maintenance and inspection guidelines. 24. Provide drainage calculations (LD-229, LD-204) for all storm pipes and inlets. (FSP) Addressed —See 4/20/20 WPO2020-00005 submittal Design Calculations & Narrative booklet, rev. April 17, 2020, p. 4-7. 25. Provide, show, label basketball court fencing. 26. C4.3: Label loading area/s, if any. C5.0 27. Revise proposed contours, consistent with grading required to install Ditch B. 28. C5.0, C5.2, proposed 2:1 slopes on critical slopes do not, for the moment, appear to include reverse slope benches. Ensure contours and labels guide construction of reverse slope benches. (FSP) Persists. Transfer fill slope benching detail from WPO202000005, C5.2, to final site plan, C5.2. (Rev. 1) Addressed. 29. Provide EC-3, pipe or concrete channel section at proposed 90-degree change in direction of runoff proposed for Ditch D. 30. (C5.0, C5.1, C5.2): Provide guardrail WDOT GR-1) with typ. details along south side of heavy-duty asphalt access located on south side of building. Although CG-2 is proposed, proposed grading is an unrecoverable slope. Guardrail is required. (FSP) Partially addressed. As follow-up: Provide VDOT GR- 4-2 detail on the plans. (Rev. 1) Addressed. 31. C5.2: Revise aisle grade on south side of building between contour elevations 534 and 516 to concentrate flow against CG-6 curb (revise CG-2 to CG-6) for reasons of practicality and safety stated elsewhere. Proposed grade assumes sheet flow over 18-ft vertical interval when effort should be made to eliminate runoff from this drive aisle (place against curb) rather than design to spread runoff across entire width of the drive aisle. 32. C5.0, C5.2: Label proposed slopes (3:1, 2:1) south and west of building. Slopes steeper than 2:1 are impermissible. 33. Engineering recommendation to approve waiver to impact critical slopes (south and west of building) requires design incorporate construction standards at 18-30.7.5, including reverse slope benches. (FSP) Persists. Also, item 28, above. Transfer WPO202000005, C5.21 fill slope benching detail to FSP, C5.2. (Rev. 1) Addressed. 34. Increase separation between pipe 303 and back face of retaining wall, especially at NW end of wall; see ifnage [image removed with FSP comments]. 35. Provide and define ditches /channels formed by proposed /existing contours N of playfield, and elsewhere (blue arrows, images below [image removed]). Note presence of critical slopes immediately downslope of many locations. Engineering Review Comments Page 4 of 4 C5.1, C5.2 36. Provide channel design for ditches formed by existing /proposed grade. Ref. images, b ,,. [images removed]. (FSP) Addressed. Applicant: `Grading has been revised to limit channelization of water where proposed grade meets existing grade. In the case shown below (Sheet C5.2), an existing channel exists in this area. Proposed grading mimics existing grade to the largest extent practical, while reducing channelization in the proposed condition.' 37. Show full extent of proposed grade, south of SE corner of basketball court. Grade =? C5.4 38. 18-4.12.19.b. (Drainage Plan checklist, drainage item 7): Revise contours to prevent storm runoff running through dumpster enclosure. Recommend direct pad to drain to a surface stone (French) drain to right of pad, then exit surface drain via curb cut to drive aisle surface. Minimize contamination of stormwater runoff due to contact with solid waste. 39. Consider highlight section downslope runoff without, in most cases, defined grade to intercept runoff prior to curb, or sidewalk. Provide capture /conveyance in locations with 7', 10' or 15' vertical interval leading to sidewalk, curb, basketball court, or heavy-duty concrete. 40. Provide curb or hardscape edging between earth slopes and heavy-duty concrete east of main building (image, above). C7.0, C7.1 41. Recommend plan note emphasize compaction requirements beneath pipes or MHs entirely in fill section; prior VDOT specification would be appropriate. (Str. 402, 404, 501, RD3, nearly all Str. 412 — SWM2A) CONTRACTOR SHALL PLACE FILL UNDER INLET(S) AT 95% COMPACTION & EMBANKMENT MATERIAL SHALL CONSIST PREDOMINANTLY OF SOIL AND BE PLACED IN SUCCESSIVE UNIFORM LAYERS NOT MORE THAN 8' IN THICKNESS BEFORE COMPACTION IN ACCORDANCE WITH VDOT 2007 ROAD AND BRIDGE SPECIFICATION 303.04. AFTER T VERTICAL PLACEMENT OF FILL, CONTRACTOR SHALL EXCAVATE RECENTLY LAID FILL AND INSTALL COMPACTED VDOT STD. 21A STONE IN AN 8'x8' O.C. COMPACTED 21A AREA CENTERED ON THE INLET(S). CONTRACTOR SHALL REPEAT THIS OPERATION UNTIL AN 8'x8' O.C. 21A STONE BASE IN INSTALLED BETWEEN THE EXISTING GROUND AND THE PROPOSED INLET(S) BASE IN EFFORTS TO REDUCE THE RISK OF SETTLING, CONTRACTOR SHALL PROVIDE VDOT WITH COMPACTION RESULTS PRIOR TO ROAD ACCEPTANCE. 42. Include safety slab label in storm profiles for MH ht. >12-ft. Str. 102, 108, for example. 43. Recommend VDOT anchoring of storm pipe that approaches 16% grade. Conservative design, care, and precautionary measures for storm pipe installed at steep grade on critical slopes are appropriate. VDOT drainage manual, p. 9-37 (FSP) Addressed. Applicant: `The proposed outfall pipe layout has been revised so that the slope does not exceed 4-1-OA [15%] at any point. As a result, VDOT anchoring is not required.' 44. SWM1 — Str 100: Label reverse slope bench. (FSP) Comment revised to request ditches be labeled in storm profiles. Reverse (fill slope) benching does not intersect storm lines, so will not appear in storm profiles. (Rev. 1) Addressed. 45. Label SWM1 and SWM2 in plan view (C5.0). 46. Show /label riprap in profile at outfall Str. 100. 47. New: Please provide whips (canopy tree) planting plan /see Engr. email to Applicant, 6/3/2020 3:02 PM. Please feel free to call if any questions: 434.296-5832-0069. Thank you SDP2020-00031 Boys and Girls Club FSP 060320revl