Loading...
HomeMy WebLinkAboutWPO201700021 Bond Bond Inspection 2019-07-18 Date Received: q 1 Fee Paid � A 1 , Received by: '� a Intake: Fonrard anarement Analyst 't® 87/ `1ACrIW% G BOND INSPECTION REQUEST APPROVEC AN # WPO 2017-00021 PROJECT Nr VSMP for Free State Run (As listed on the approved plan) This is to request ;pection e performed by the County. Where fees are assessed,a fee is required for each inspection. I k the in oections requested. VSMP/ :rosion Control,Stormwater Management and/or Mitigation per Water ►, on Ordinance section 17-207 & 208 $250 ❑ Subdivisioi roads,drainage, etc.)per Subdivision Ordinance section 14-435 and 14-438; $269 ❑ Water& Sewer per Subdivision Ordinance section 14-435 $269 ❑ Site Development Performance bond(Incomplete Site Work& Landscape Maintenance) $301 TOTAL FEES $250 Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville, VA 22902,Attention: Management Analyst-Phone 434-296-5832; Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings, inspection reports,and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures. A minimum 20%of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded incomplete site work,a request for reduction should only be made once all site work is complete. The revised estimate should be sent to; EMAIL: OdonnellGP@stanleymartin.com OR REGULAR MAIL ADDRESS: 404 People Place, Suite 303 Charlottesville, VA 22911 Si ature of Owner/Developer Jeremy W. Swink 7/18/2019 Print Name Date Revised 7/152014,7/20/2015. 11/32015