Loading...
HomeMy WebLinkAboutWPO201700021 Application 2017-02-21 1?1 , AlbemarleJty llVA 4.0 401 McIntire Road Charlottesville,VA22902-4° �' l ' Planning Application Voice:(434)296-5832 Fax:(434)972-4 PARCEL / OWNER INFORMATION TMP 06200-00-00-00800 Owner(s): FREE STATE PARTNERS LLC Application # WP0201704021 PROPERTY INFORMATION Legal Description I ACREAGE Magisterial Dist. Rio Land Use Primary Forest Current AFD i Not in A/F District 11 Current Zoning Primary R4 Residential [APPLICATION INFORMATION Street Address Entered Judy Martini Application Type Water Protection Ordinances n. L J 2/22/2017 Project Free State Run - VSMP Received Date 02/21/17 Received Date Final Submittal Date 03/02/17 Total Fees 13 Closing File Date Submittal Date Final Total Paid 13 Revision Number Comments Legal Ad SUB APPLICATION(s) Type Sub Application Comment Stormwater Management/BMP Plan 03/02/17 Erosion and Sediment Control Plan 03/02/17 APPLICANT / CONTACT INFORMATION ContactType Name Address CityState Zip Phone PhareCe Owner/Applicant FREE STATE PARTNERS LLC PO BOX 645 CHARLOTTESVILL 22902 Primary Contact JUSTIN SHIMP 201 E. MAIN ST., STE. M CHARLOTTESVILL 22902 4342275140 • Signature of Contractor or Authorized Agent Date ^I11� Virginia Stormwater Management Program (VSMP) a�- ;_ai Application for Albemarle County Project Name: Frcc S.LTe. (The name should be the same as it appears on plans) Is this an amendment to an approved plan? Yes ❑ No Is this a revision or resubmission for review? Yes 0 No Gil. County File Number : tft miff.41 (to be provided by the County for new applications) The following are required elements of new applications[from code section 17-401]. For revisions or amendments,please indicate which items are being amended Signatures must be provided for any submission. 0 A. Signature of the Property Owner for each parcel: (Required with every submission or revision, NOT TO BE SIGNED BY AN AGENT OR CONSULTANT) By signing this application as the owner,I hereby certify that all requirements of these plans and permits will be complied with,and I have the authority to authorize the land disturbing activities and development on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure compliance with the approved plans and permits. -ram Met GZ PC,JL SPA.C. . :, w. / 2/: � Tax Map&Parcel Print Name of Property Owner Signa ./ of Owner Date Tax Map&Parcel Print Name of Property Owner Si. ature of Owner Date Tax Map&Parcel Print Name of Property Owner Signature of Owner Date Tax Map&Parcel Print Name of Property Owner Signature of Owner Date Contact Information for the Owner(s)to receive correspondence: Print Name .4.i Address Zoo Cuss St SA),Q City C crk,ok-kkob s% State \IPt Zip ? g02 Daytime Phone(51A) 3O\ S` Y E-mail �w�nk. s gk'*.••Vl..r,wv4�• 7/1/l4_ Revised. 7/1f1/14 Paoe 1 nf2 ❑ B. All Fees [Code section 17-208] For new or modified plans; Total acres proposed to be disturbed Acres to be Total Fee Fee Due with this Fee with Transfer or disturbed Application modification of permit Less than 1 $290 $145 $20 1 and less than 5 $2,700 C$1,350 $200 5 and less than 10 $3,400 $1,700 $250 10 and less than 50 $4,500 $2,250 $300 50 and less than $6,100 $3,050 $450 100 100 and more $9,600 $4,800 $700 For(minor)amendments to an approved plan;$200 per review Variances;$150 Mitigation Plan;$150 ❑ C. Registration Statement on the official DEQ form. ❑ D. Erosion and Sediment Control Plan satisfying the requirements of code section 17-402. ❑ E. Stormwater Management Plan satisfying the requirements of code section 17-403. ❑ F. Pollution Prevention Plan satisfying the requirements of code section 17-404. ❑ G. Stormwater Pollution Prevention Plan satisfying the requirements of code section 17-405. ❑ H. Mitigation Plan satisfying the requirements of code section 17-406 for any proposed disturbance of stream buffers. ❑ I. Requested Variations or Exceptions as provided in code sections 17-407 and 408. ❑ J. Construction Record Drawings (as-builts) for any existing facilities in the proposal satisfying the requirements of code section 17-422. Provide 2 copies of allplans and any supporting documents. Professional seals must have original signatures. Additional information if not provided on plans and documents: Name of a Contact Person for correspondence(usually the plan preparer,consultant or agent) Print Name �13,3,,s 9,;,,,.__ ..o Address 2,o\ S NAut• ��- S,#ta. t' City ak.."t te;1/46, . State ‘W' Zip 22 2- Daytime Phone MP%) 2Z4-. S MO E-mail JJya.,.. 7� 51a11•0_ 42.11•1.4A-A.N3 , Gs•-- *When applications and plans are reviewed,but not approved,and a response to comments is not received within 6 months from the date of county comments,the application will be deemed withdrawn. Applications without valid owner's signatures will not be considered valid. FOR OFFICE USE ONLY WPO# Fee Amount$ Date Paid a.4.1_117 By who? J 9jI 00 Receipt# 10%463 Ck#_1+19&)Q By://7 7/1/id Ravicpii•7/if/let n.no^) ..r1 Albemarle County tori Courity WPO WPO Application Process ' `4- application and fee LI $1,700 (sample fee for site between 5-10 acres, totals $3,650) co late ess chLL k (10 days) i pl n co ents (2-4 weeks) • :ions (*) ('; Time for applicant revisions is --0-- pl Co ' en (2-4 weeks) highly variable. This averages 3 plC w zs: Ions (*) revision cycles. Waivers, modification, exceptions, and board approvals --•0-.i pl n co en (2-4 weeks) = extend time significantly.) i =n rev ions (*) p n ap? oval (2-4 weeks) stormWpnagement maintenance agreement ' and recording fee$17 Any pro-rated fees ---- for regional facilities p rcel c eck w/easements bond�eq est need to be paid here (allow 2 weeks) and fee $250 Si! C - erifications 16+ + • _ _ (allow 2 weeks) b• d a unt estimated (allow 1 week) b• d ag -ment prepared b• Id po =d —4,.- sulety prtvided b.. d agr ement completed DE registration review DE regi ation (1 week) c• ai .rney approval pa silt 1 DEQ fee (allow 1 week) $952 c• lliti •ineer approval DE .1 ceofGCP receipt of DEQ General , ( 3 days) Construction Permit (allow 1 week) pre-co structi n meeting request and permit fee $748 pre o str ction meeting •- ---.-^-1 actions required by applicant grad ermit issued This sample timeline is for Water Protection 0 OS start work Ordinanceapplications only. Site Plans, actions required Subdivision Plats, Street Plans,Zoning Map by county Amendmnets, Special Use Permits, and other plans and processes which may affect reviews, 1 2014 approvals, or permits are not shown. July