HomeMy WebLinkAboutSDP202000028 Correspondence 2020-06-05 (7)ALBEMAR,LE
COUNTY I VIRGINIA
Is this a new submission or a re -submission?
r New Submission r Re -submission
The Community Development Department (CDD) now accepts the digital submission of development applications
through a new web -based form.This feature is being implemented in an effort to provide a user-friendly method to submit
and resubmit multiple development applications. Please click the New Submission button above to see the list of
available applications.
To guide you through the digital submission process, we have provided Submittal Instructions on how to use this
Submission Form and some General Submission Guidelines. Please review both of these documents before making your
submission.
Submittal Instructions
General Submission Guidelines
If you have questions about the correct submission method for your project, please email us at
cddsubmittal@albemarle.org or call us at (434) 296-5832.
You have selected re -submission. If necessary, you will need to complete the appropriate PDF application form(s).
• For Road Plan re -submissions, an application and fee are required and can be found here.
• For Water Protection Ordinance re -submissions, an application and fee are required and can be found here.
• For Special Use Permit re -submissions, an application can be found here. A Fee will apply for all submittals after the
first free re -submittal.
• For Zoning Map Amendment re -submissions, an application can be found here. A Fee will apply for all submittals after
the first free re -submittal.
• For all other applications (SDP, SUB, CLE, etc.) there is no application or fee required to submit.
Once you have finished filling out any required application, save it to a location on your computer.
Please enter your project's application number in the field provided below, once completed, tab to the next field. The
application number you entered will reference the project's application number in Albemarle County Community
Development Department's development tracking system. Once referenced, the Project Name and Project Type fields will
be auto -populated. Please confirm the information referenced in these fields is correct. After confirmation, please enter
your name and email address for contact purposes and attach any associated files for resubmittal through the File
Upload button.
Submission Fees are determined by application type and are listed within each application.
Full Name*
Ex: John DDe
Keane Rucker
Email*
Ex: johndoe@grrail.com
keane@shimp-engineering.com
Phone Number*
Ex:434-973-9999
434-299-9843
Application Number*
Ex:SDF201800005
SDP202000028
(R-efix +4 digit year + 5 digit nurrber
Is this an LOR?*
r Yes
Project Name
(I\b entry needed)
Proffit Rd Townhomes North - Final - DIGITAL
Project Type
(I\b entry needed)
SDP
File Upload
Only FDF and TIFF filetypes accepted
SDP2020-28 Planning Response Letter.pdf
SDP2020-28 Bldg. Inspections Response Letter.pdf
SDP2020-28 Engineering Response Letter.pdf
SDP2020-28 Fire Rescue Response Letter.pdf
SDP2020-28 GIS Response Letter.pdf
SDP2020-28 ACSA Response Letter.pdf
SDP2020-28 ACSA Data Sheets.pdf
SDP2020-28 Final SDP Sub.2 (6-3-20).pdf
Nt3xirrumsize per file: 701VB
fJ No
86.97KB
64.69KB
62.92KB
57.81 KB
59.37KB
64.24KB
33.25KB
13.87MB