Loading...
HomeMy WebLinkAboutSUB202000064 Review Comments Final Plat 2020-06-05 (3)County of Albemarle Department of Community Development Memorandum To: Tori Kanellopoulos From: Emily Cox Date: 05 June 2020 Subject: Spring Hill Village — Final Subdivision Plat (SUB202000064) The final subdivision plat for Spring Hill Village has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. SUB201900158 must be approved and either built or bonded before this plat can be approved. 2. Please designate public vs. private storm easements. Easement needs to be public if it collects any water from public right-of-way or if is part of the SWM facility. 3. Please label SWM facility easement around all SWM facilities. The plat says there is a hatching, but it is not evident. 4. Two deeds are necessary: SWM facility easement deed and public drainage easement deed. They must be approved by the county attorney. Please provide them in word document form (with tracking changes on), or if requested, the county can draft the deeds. The templates are provided (attached to this comment letter). Please let us know how you would like to proceed. 5. Based on ZMA20200006(not currently approved), there appears to be a need for a sidewalk/travelway easement along Route 20. As currently shown, the pedestrian path is not completely in the right-of-way. 6. If any retaining walls cross property lines, they must be in an easement and have a maintenance agreement.