Loading...
HomeMy WebLinkAboutSUB202000021 Review Comments Road Plan and Comps. 2020-06-09COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage Plan Review Project title: Foothill Crossing Phase V Project file number: SUB202000021 Plan preparer: Collins Engineering [scott@collins-engineering.com] Owner or rep.: Riverbend Development, Inc. [alan@riverbenddev.com] Plan received date: 3 February 2020 (Rev. 1) 21 April 2020 Date of comments: 6 April 2020 (Rev. 1) 9 June 2020 Reviewers: Matt Wentland Scott, We have reviewed the plans and have the following comments: Engineering 1. The WPO submittal will need to be approved prior to road plan approval. (Rev. 1) The WPO is currently under review. 2. Label all drainage easements as public or private. (Rev. 1) Comment not addressed. 3. Show the overland relief path for Inlet 12 in case it becomes clogged or overwhelmed. (Rev. 1) Comment not addressed. 4. Show and label removable bollards at both ends of the emergency access road. (Rev. 1) Comment partially addressed. The Foothill Crossing II cul-de-sac is not yet approved or built. The bollards on that side should be shown where the access road connects to a bonded and constructed road in Foothill Crossing IIGlenbrook. Revision 1 comments 5. It should be made clear that the emergency access road is part of and to be built with the construction of this subdivision and that it will be constructed up to a point where it meets a road in Foothill Crossing IUGlenbrook that is approved, bonded and constructed. Planning — Mariah Gleason Comments are attached to this email. Fire Rescue and E911 had no objection and VDOT comments will be forwarded when received. The project is currently under review with ACSA. File: SUB202000021 Foothill Crossing Phase V Review Comments rev 06-09-20.doc