Loading...
HomeMy WebLinkAboutWPO202000027 Review Comments WPO VSMP 2020-06-09COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: ELDON FARM RESIDENCE - VSMP - DIGITAL Project file number: WPO202000027 Plan preparer: Shimp Engineering P.C. [Justin@shimp-engineering.com] Owner or rep.: Eldon Farm, LLC Troy Wade [troy@jamisondaviscompany.com] Shelter Associates [JD@shelterltd.com] [laina@shelterltd. com] Plan received date: 12 May 2020 Date of comments: 09 June 2020 Reviewers: Emily Cox County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. SWPPP not provided. A registration statement was provided, but no SWPPP. Here is a template: http://www.albemarle.org/upload/images/forms center/departm ents/Community Development/forms/Engineering and WPO Forms/ Stormwater Pollution Prevention Plan SWPPP template.-odf B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. PPP not provided. Please ensure a plan is provided and all items in County Code section 17-404 are addressed. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. SWM plan was not provided. How will water quality and water quantity requirements be met? Please provide VRRM spreadsheet, drainage areas, and all applicable requirements. 2. Level spreaders were shown, but no calculations were provided. 3. A SWM maintenance agreement will be necessary before plan approval. Engineering Review Comments Page 2 of 3 D. Erosion and Sediment Control Plan (ESOP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESOP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Silt fence in such short lengths on the southwestern end of the site does not seem effective. 2. Please provide a construction entrance with a wash rack and the appropriate detail from page 8 of the design standards manual: http://www.albemarle.org/upload/images/forms center/departm ents/community development/forms/design standards manual/Al bemarle County Design Standards Manual 2014-12-02.pdf 3. Ensure there are sufficient perimeter controls. Specifically, Phase 1, on the NW end — culvert and pavement removal do not appear to be covered. 4. The culvert between ST 1 and ST 3 needs to have outlet protection. Where is it draining to, ST1 or ST3? 5. Please label contours for ST 3. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and Engineering Review Comments Page 3 of 3 the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hiq2://www.albemarle.ora/deptforms.ap?department=cdengLypo