HomeMy WebLinkAboutSP202000012 Special Use Permit Checklist 2020-06-15SPECIAL USE PERMIT CHECKLIST for
PREAPP202000041 Tier III PWSF/ TMP 05400-00-00-072AO
J
f jRGIN�A
CPP
Name or initials of
staff filling out form
Project Name /Tax Map Parcel Number
After the mandatory pre -application meeting, county staff will mark this checklist appropriately so
that it is clear to the applicant the information from Section 33.4 (c) that must be submitted with
the official application
Required for
application?
(County Staff)
X
Provided with
application
(Applicant)
X
SECTION 33.4(c)
YES
NO
❑
A narrative of the project proposal, including its public need or benefit;
X❑
❑
❑X
A narrative of the proposed project's consistency with the comprehensive plan,
including the land use plan and the master plan for the applicable development area;
❑X
❑
❑X
A narrative of the proposed project's impacts on public facilities and public
infrastructure.
M❑
M
A narrative of the proposed project's impacts on environmental features.
ElM
❑
A narrative of the proffers proposed to address impacts from the proposed project.
❑X
❑
❑X
One or more maps showing the proposed project's regional context and existing natural
and manmade physical conditions;
❑
A conceptual plan showing, as applicable:
71
❑
1) the street network, including circulation within the project and connections to
existing and proposed or planned streets within and outside of the project;
❑X
❑
2) typical cross -sections to show proportions, scale and streetscape/cross-
sections/circulation;
❑
❑
3) the general location of pedestrian and bicycle facilities;
❑
4) building envelopes;
Z❑
5) parking envelopes;
❑
❑
6) public spaces and amenities;
❑
Z
7) areas to be designated as conservation and/or preservation areas;
SPECIAL USE PERMIT CHECKLIST 04/2013 Page 1 of 2
❑
8) conceptual stormwater detention facility locations;
F❑
9) conceptual grading;
[-I
[-)—C]
Other special studies or documentation, if applicable, and any other information
identified as necessary by the county on the pre -application comment form.
1) See attachment C, Preliminary review comments related to the pre application concept
plan.
2) all items required by Section 5.1.40
Please note: There are additional submittal requirements outlined on the official application for a Special Use Permit.
Read and Sign
I hereby state that, to the best of my knowledge, the official application submitted contains all information marked on
this checklist as required for application.
Signature of person completing this checklist
Nathan Holland
Print Name
6/10/2020
Date
(757) 305-8420
Daytime phone number of Signatory
SPECIAL USE PERMIT CHECKLIST 04/2013 Page 2 of 2