Loading...
HomeMy WebLinkAboutWPO202000031 Bond Estimates 2020-06-18Project Name: VESCP Plan for Byers Fill Site WPO file M 1AP02020-00031 TMP(s): 04700-00-00-001CO, 04600-00-00-033HO Date Estimate Completed: 06/18/20 Erosion and Sediment Control Bond Estimate Item Item Number 1 stablization (PS, TS) 2 silt fence (SF) 3 safety fence (SAF) 4 diversion (DID, FD, RWD) 5 temporary slope drain (TSD) pipe length %ft 9 Sediment Trap #1 10 earthwork for trap/basin 11 height of dam at toe 8 ft 12 height of fill at face 0 ft 13 length of dam 87 ft 14 top width I ft 15 (area above transition 0 sf 16 (total width of dam) 16 ft 17 (height below transitio 8 ft 18 (area below transition; 0 sf 19 (total fill volume) 0.0 cy 20 length of spillway -ft 21 width of spillway ft 22 structures for basin 23 riser height O I ft 24 riser diameter 0 in 25 barrel length 0 ft 26 barrel diameter 0 in 27 28 50 silt fence inlet protection (IP) 51 stone inlet protection (IP) 52 outlet protection (OP)-Trap#1 length pipe diameter �O in cut at high side ft (riser unit price) $0.00 base plate or fdn (barrel unit price) $0.00 - barrel collars baffle length ft cut at face ft length of cut ft oft width of cut (area below transitic 203 sf (total width of cut) 59 -ft width -ft No. Unit Unit Cost Cost (installed) 1.07acres $5,000.00 $4,950.00 70.0 ft $5.00 $350.00 0.0 ft $5.00 $0.00 140.0 ft $13.00 $1,820.00 $0.00 $0.00 $13.00 $19,318.00 $50.00 $725.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 $100.00 $0.00 ■ $200.00 $0.00 $0.00 $0.00 6/18/2020