HomeMy WebLinkAboutWPO202000031 Bond Estimates 2020-06-18Project Name: VESCP Plan for Byers Fill Site
WPO file M 1AP02020-00031
TMP(s): 04700-00-00-001CO, 04600-00-00-033HO
Date Estimate Completed: 06/18/20
Erosion and Sediment Control Bond Estimate
Item
Item
Number
1
stablization (PS, TS)
2
silt fence (SF)
3
safety fence (SAF)
4
diversion (DID, FD, RWD)
5
temporary slope drain (TSD)
pipe length
%ft
9
Sediment Trap #1
10
earthwork for trap/basin
11
height of dam at toe
8 ft
12
height of fill at face
0 ft
13
length of dam
87 ft
14
top width
I ft
15
(area above transition
0 sf
16
(total width of dam)
16 ft
17
(height below transitio
8 ft
18
(area below transition;
0 sf
19
(total fill volume)
0.0 cy
20
length of spillway -ft
21
width of spillway
ft
22
structures for basin
23
riser height
O I ft
24
riser diameter
0 in
25
barrel length
0 ft
26
barrel diameter
0 in
27
28
50 silt fence inlet protection (IP)
51 stone inlet protection (IP)
52 outlet protection (OP)-Trap#1 length
pipe diameter �O in
cut at high side ft
(riser unit price) $0.00
base plate or fdn
(barrel unit price) $0.00
-
barrel collars
baffle length ft
cut at face
ft
length of cut
ft
oft
width of cut
(area below transitic
203 sf
(total width of cut)
59
-ft width -ft
No. Unit
Unit Cost
Cost
(installed)
1.07acres
$5,000.00
$4,950.00
70.0 ft
$5.00
$350.00
0.0 ft
$5.00
$0.00
140.0 ft
$13.00
$1,820.00
$0.00
$0.00
$13.00 $19,318.00
$50.00 $725.00
$0.00
$200.00
$0
$0.00
$200.00
$0
$50.00
$0
$100.00
$0.00
■
$200.00
$0.00
$0.00
$0.00
6/18/2020