HomeMy WebLinkAboutWPO202000031 Bond Estimates 2020-06-18 (2)Project Name: VESCP Plan for Byers Fill Site
WPO file M WP02020-00031
TMP(s): 04700-00-00-001CO3 04600-00-00-033HO
Date Estimate Completed: 06/18/20
Erosion and Sediment Control Bond Estimate
Item Item
Number
1
z
3
4
5
9
10
11
12
13
14
15
16
17
18
19
zo
21
50
51
52
53
54
55
56
57
58
59
6o
61
62
63
64
65
stablization (PS, TS)
silt fence (SF)
safety fence (SAF)
diversion (DID, FD, RWD)
temporary slope drain (TSD)
Sediment Trap #1
earthwork for trap/basin
silt fence inlet protection (IP)
stone inlet protection (IP)
outlet protection (OP)-Trap#1
outlet protection (OP)-Trap#2
outlet protection (OP)
channel (SCC, matted)
check dam
construction entrance (CE)
wash rack
paved construction entrance
rip -rap, placed
pipe length
-ft
i
height of dam at toe
ft
height of fill at faceoft
ft
length of damft
top width
(area above transition
0 sf
(total width of dam)
16 ft
(height below transitio
8 ft
(area below transition
0 sf
(total fill volume)
0.0 cy
length of spillway
of spillway
Mftftwidth
No. Unit
Unit Cost
(installed
1.0 acres
$5,000.00
70.0 ft
$5.00
0.0 ft
$5.00
140.0 ft
$13.00
pipe diameter JIML 0in
i�
$0.00
cut at high side
cut at face
length of cut
width of cut
(area below transitii
(total width of cut)
(depth below transit
(area above transiti
(total fill volume)
(TOAL CY estimate
(spillway stone tons
ft
ft
ft
ft
203 sf
59 ft
8ft
172 sf
1486.1 cy
1486 cy
14.5 tons
length r 01ft width ft
length 0 ft width ft
length 0 ft width ft
length 195 ft width ft
depth in channel 0 ft channel width oft
depth
width
survey and layout (price per 0.1 mi.) acres
mobilization
Temporary Access road
WP0202000031 VESCP Byers Fill Site _ESC_bond _est_061820
-ft length Oft
(tons) 0 tons
traps and basins -
11
0
00
11
1
$13.00
$50.00
$100.00
$200.00
$0.00
$0.00
$0.00
$0.00
$2,500.00
$2,000.00
$3,500.00
$60.00
Cost
$4,950.00
$350.00
$0.00
$1,820.00
$0.00
$19,318.00
$725.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,521.00
$0.00
$0.00
$2,000.00
$3,500.00
$0.00
$995.00
$2,500.00
cost sum
$37,679.00
contingency
$3,767.90
Total
$41,450
6/18/2020