Loading...
HomeMy WebLinkAboutSUB202000021 Application 2020-06-24APPLICATION FOR ROAD PLAN APPROVAL FEES ROAD PLANS FOR PROPOSED SUBDIVISION *If public and private streets are proposed, pay the higher of the two fees (private street) 8 copies of the road plan are required for all submittals Public Street Fees Private Street Fees ❑ For each review of a submitted plan, including re- ❑ Authorization of one or more private streets within views of revisions after plan approval = $269 + $100 Fire a subdivision filed separately from a subdivision appli- Rescue Fee cation = $720 ❑ For each review of a submitted plan, including re- views of revisions after plan approval = $430 + $100 Fire Rescue Fee VARIATIONS OR EXCEPTIONS BEFORE APPROVAL OF A PRELIMINARY PLAT ❑ Variation to or exception from street interconnection requirements = $581 ❑ Variation to or exception from one or more street standards = $581 ❑ Variation to or exception from curb and/or gutter requirements = $581 AFTER PRELIMINARY PLAT APPROVAL AND BEFORE FINAL SUBDIVISION PLAT APPROVAL m Variation to or exception from any requirement of Chapter 14 for which a variation to or exception from is au- thorized after approval of a preliminary plat and before approval of a final plat=$892.00. Attach written justifica- tion AFTER FINAL PLAT APPROVAL ❑ Variation to or exception from any requirement of Chapter 14 for which a variation to or exception from is au- thorized after approval of a final plat = $892.00. Attach written justification SURETY/BONDING If required to construct a street, the subdivider shall pay to the county a fee equal to the cost of the inspection of the con- struction of any such street. These fees shall be paid prior to completion of all necessary inspections and shall be deemed a part of the cost of construction of the street for purposes of section 14-435(B). The bond process and forms can be found at the document center under bonds. After a plan is approved, a bond estimate request form must be submitted to the Community Development office with the required fee. The owner signatures will be verified for each parcel affected, and estimates will be prepared by the engineering reviewer. A bond amount will be pro- vided to the owner. Bond agreements will be prepared by the county, and when properly completed by the owner, will be reviewed and signed by the County Attorney and County Engineer. Please allow a few weeks for this process.