HomeMy WebLinkAboutSUB202000021 Correspondence 2020-06-24 (2)ALBEMAR,LE
COUNTY I VIRGINIA
Is this a new submission or a re -submission?
r New Submission r Re -submission
The Community Development Department (CDD) now accepts the digital submission of development applications
through a new web -based form.This feature is being implemented in an effort to provide a user-friendly method to submit
and resubmit multiple development applications. Please click the New Submission button above to see the list of
available applications.
To guide you through the digital submission process, we have provided Submittal Instructions on how to use this
Submission Form and some General Submission Guidelines. Please review both of these documents before making your
submission.
Submittal Instructions
General Submission Guidelines
If you have questions about the correct submission method for your project, please email us at
cddsubmittal@albemarle.org or call us at (434) 296-5832.
You have selected re -submission. If necessary, you will need to complete the appropriate PDF application form(s).
• For Road Plan re -submissions, an application and fee are required and can be found here.
• For Water Protection Ordinance re -submissions, an application and fee are required and can be found here.
• For Special Use Permit re -submissions, an application can be found here. A Fee will apply for all submittals after the
first free re -submittal.
• For Zoning Map Amendment re -submissions, an application can be found here. A Fee will apply for all submittals after
the first free re -submittal.
• For all other applications (SDP, SUB, CLE, etc.) there is no application or fee required to submit.
Once you have finished filling out any required application, save it to a location on your computer.
Please enter your project's application number in the field provided below, once completed, tab to the next field. The
application number you entered will reference the project's application number in Albemarle County Community
Development Department's development tracking system. Once referenced, the Project Name and Project Type fields will
be auto -populated. Please confirm the information referenced in these fields is correct. After confirmation, please enter
your name and email address for contact purposes and attach any associated files for resubmittal through the File
Upload button.
Submission Fees are determined by application type and are listed within each application.
Full Name*
Ex: John DDe
Scott Collins
Email*
Ex: johndoe@gnrail.com
scott@collins-engineering.com
Phone Number*
Ex:434-973-9999
434-293-3719
Application Number*
Ex:SDF-201800005
SUB202000021
(Prefix +4 digit year + 5 digit number
Is this an LOR?*
r Yes
Project Name
(I\b entry needed)
Foothill Crossing Phase V - Final Road Plan - Electronic
Project Type
(I b entry needed)
SUB
File Upload
Only FDF and TIFF filetypes accepted
fJ No
Foothill Crossing Phase V Final Road Plan -3rd Submission 6-18-
27.03MB
20.pdf
Foothill Crossing Phase V Response Letter - 3rd Submission June 18
167.4KB
2020.pdf
Nbxinumsize per file: 701VB