Loading...
HomeMy WebLinkAboutWPO202000031 Bond Estimates 2020-06-24Project Name: VESCP Plan for Byers Fill Site WPO file M WP02020-00031 TMP(s): 04700-00-00-001CO3 04600-00-00-033HO Date Estimate Completed: 06/11/20, K.Rucker - chk. JA 06/12/20 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 stablization (PS, TS) acres $5,000.00 $4,950.00 2 silt fence (SF) ft $5.00 $5.00 3 safety fence (SAF) ft $5.00 $0.00 4 diversion (DID, FD, RWD) _ ft $13.00 $13.00 5 temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in $0.00 $0.00 9 Sediment Trap #1 10 earthwork for trap/basin 11 height of dam at toe 4 ft cut at high side 12 ft 12 height of fill at face 3 ft cut at face 1 ft 13 length of dam llllllllllllllllll�ft length of cut -ft 14 top width 4 ft width of cut 15 ft 15 (aru- _ jove transition 30 sf (area below transiti( 17 sf 16 (total width of dam) 8 ft (total width of cut) 41 ft 17 (height below transitio 1 ft (depth below transit 11 ft 18 (area below transition; 3 sf (area above transifi 104.5 sf 19 (total fill volume) 0.0 cy (total fill volume) 0.0 cy 20 length of spillway �ft (TOAL CY estimate 0 cy $13.00 $0.00 21 width of spillway ft (spillway stone tons 0 tons $50.00 $0.00 22 structures for basin 23 riser height ft 24 riser diameter in (riser unit price) $0.00 $0.00 25 barrel length ft base plate or fdn $200.00 $0 26 barrel diameter 4A in (barrel unit price) $0.00 $0.00 27 barrel collars $200.00 $0 28 baffle length Wft $50.00 $0 50 silt fence inlet protection (IP) 0 $100,00 $0.00 51 stone inlet protection (IP) 0 $200.00 $0.00 52 outlet protection (OP)-Trap#1 length 0 ft width -ft 0 $0.00 $0.00 6/16/2020