Loading...
HomeMy WebLinkAboutWPO201800027 Bond Estimates 2020-06-24Project Name : Martha Jefferson Hospital Apartments VSMP Plan (Amendment #1 to WP0201800027) WPO file number: WP0201800027 TMP(s): 07800-00-00-020M6, 07800-00-00-020M5 Date Estimate Completed: 06-24-20, CE, ckd.JA A1b.Coo6zazo Erosion and Sediment Control Bond Estimate Item Item Number 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DID, FD, RWD) temporary slope drain (TSD) Sediment Basin #1 earthwork for Sediment Basin #1 structures for Sediment Basin#1 Sediment Basin #2 earthwork for trap/basin structures for basin pipe length 1111OL 0 ft height of dam at toe height of fill at faceOft ft length of damft top width ft (area above transition; 48 sf (total width of dam) 36 ft (height below transitioi 15 ft (area below transition) 45 sf (total fill volume) 964.4 cy length spillway width off spillway _ft ft riser height 8.757ft riser diameter 48 in barrel length 101 ft barrel diameter _Ain height of dam at toe height of fill at faceOft ft length of damft top width ft (area above transition; 28 sf (total width of dam) 12 ft (height below transitioi 4 ft (area below transition) 8 sf (total fill volume) 253.3 cy length spillway width off spillway _ft ft riser heightF48in ft riser diameter barrel length ft barrel diameterin pipe diameter lft&__O in ■ cut at high side cut at faceOft ft length of cutft width of cutft (area below transitic 364 sf (total width of cut) 80 ft (depth below transit 7 ft (area above transitic 231 sf (total fill volume) 4848.1 cy (TOAL CY estimate 5170 cy (spillway stone tons 264.5 tons (riser unit price) $150.00 base plate orfdn - (barrel unit price) $65.00 barrel collars baffle length WRft cut at high side ft cut at faceOft ft length of cutft width of cut (area below transitic 372 sf (total width of cut) 78 ft (depth below transit 2 ft (area above transitic 74 sf (total fill volume) 3303.7 cy (TOAL CY estimate 3388 cy (spillway stone tons 63.3 tons (riser unit price) $150.00 base plate or fdn - (barrel unit price) $50.00 barrel collars - No. Unit Unit Cost Cost (installed) In acres $5,000.00 $86,000.00 4340.0 ft $5.00 $21,700.00 1320.0 ft $5.00 $6,600.00 2850 ft $13.00 $37,050.00 $0.00 $0.00 $13.00 $67,210.00 $50.00 $13,225.00 $1, 312.50 $200.00 $200 $6,565.00 $200.00 $400 $50.00 $5,500 $13.00 $44,044.00 $50.00 $3,165.00 $1, 800.00 $200.00 $200 $9,500.00 $200.00 $400 6/24/2020 Project Name : Martha Jefferson Hospital Apartments VSMP Plan (Amendment #1 to WP0201800027) WPO file number: WP0201800027 TMP(s): 07800-00-00-020M6, 07800-00-00-020M5 Date Estimate Completed: 06-24-20, CE, &d. JA, Atb.CO. 062420 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 46 baffle length 100 ft $50.00 $5,000 47 Sediment Trap #1 48 earthwork for trap/basin 49 height of dam at toe 4 ft cut at high side 12 ft 50 height of fill at face 1 ft cut at face loft 51 52 length of dam top width 85 ft ft length of cut width of cut 150 ft "ft 53 ove transition' 7 sf glow transitic 300 sf 54 (total width of dam) 8 ft (total width of cut) 54 ft 55 (height below transitioi 3 ft (depth below transit 2 ft 56 (area below transition) 3 sf (area above transitic 50 sf 57 (total fill volume) 31.5 cy (total fill volume) 1944.4 cy 58 length of spillway 8 ft or (TOAL CY estimate 1955 cy $13.00 $25,415.00 59 width of spillway 8 ft (spillway stone tons 3.7 tons $50.00 $185.00 60 structures for basin 61 riser height or 0 ft 62 riser diameter 0 in (riser unit price) $0.00 $0.00 63 barrel length 0 ft base plate or fdn $200.00 $0 64 barrel diameter 0 in $0.00 $0.00 65 barrel collars $200.00 $0 66 baffle length =ft $50.00 $0 67 68 silt fence inlet protection (IP) $100.00 $100.00 69 stone inlet protection (IP) $200.00 $9,000.00 70 outlet protection (OP)-Trap#1 length 28 ft width loft $1,260.00 $2,520.00 71 outlet protection (OP)-Basin#1 length 18 ft width 12 ft $972.00 $1,944.00 72 outlet protection (OP)-Basin#2 length 18 ft width 15 ft $1,215.00 $2,430.00 73 outlet protection (OP) length 12 ft width 6 ft $324.00 $648.00 74 channel (SCC, matted) length 0 ft width 0 ft $0.00 75 check dam depth in channel 2 ft channel width 4 ft $180.00 $180.00 76 construction entrance (CE) $2,500.00 $2,500.00 77 wash rack $2,000.00 $2,000.00 78 paved construction entrance $3,500.00 $3,500.00 79 rip -rap, placed depth 0 ft length 0.0 ft 80 width 0.0 $60.00 $0.00 81 82 survey and layout (price per 0.1 mi.) acres 12.77 traps and basins 3 $7,885.00 83 mobilization $2,500.00 84 Temporary Access road - CRS access road $35,000.00 85 Temporary Culvert $2,500.00 cost sum $408,178.50 contingency $40,817.85 WP0201900027 MJH Apts Amend 1 WPO ESC bond Estim 062420-CE Total $449,000 6/24/2020