Loading...
HomeMy WebLinkAboutSDP202000036 Calculations 2020-06-04WATER DATA SHEET Date 4 June 2020 (1) Project Name Belvedere Phase 5A (2) Project Location Belvedere Subdivision, Albemarle County (3) Consultants Roudabush, Gale and Associates (4) Sources South Rivanna Reservoir (5) Design Population 24 SFD, 38 SFA x 270 = 11,610 gpd (6) Hydraulic Capacity T.B.D (7) Pipe Material D.I.P (8) Pipe Diameter (Inches) Length (Feet) 4" 6" 8" 1519 10" 12" (9) Fire Hydrant Assemblies 2 (10) Valves: (A) Gate 6 (B) Air Relief (11) Fittings: (A) Cross (B) Tee 2 (C) 900 Ell (D) 45' Bend (E) 22'/20 Bend (F) Reducer (G) Blow -off Assemblies 1 (Number) (Number) (Number) (Number) (Number) (Number) (Number) (Number) (Number) (Number) (12) Minimum pressure at critical water meter TBD Authority Provide: Booster Station Storage Reservoir A-1 (20 psi required) SEWER DATA SHEET Date 4 June 2020 (1) Project Name Belvedere Phase 5A (2) Project Location Belvedere Subdivision, Albemarle County (3) Consultants Roudabush, Gale and Associates (4) Waste Treatment Facility Moores Creek AWRRF (5) Design Population 270 gpd x 43 = 11,610 gpd (Number) (6) Connections 43 RESIDENTIAL (Number) (7) Industrial Waste N/A (8) Pipe Material D.I.P and SDR 26 (9) Pipe Diameter (Inches) Length (Feet) 6" 8" 1312 10" 12" 15" 18" 21" 24" TOTAL FEET 1312 (10) Manholes: (A) Standard 10 (B) Drop (A) Siphons & Pump Stations (B) Force Main (Size -Length) . Authority Provide: Drainage Basin Sub Drainage Basin A-2 (Number) (Number) (Number) (Feet)