HomeMy WebLinkAboutWPO201900068 Review Comments WPO VSMP 2020-06-25COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP Permit Plan Review
Project title:
Red Hill Elementary School — VSMP
Project file number:
WP02019-00068
Plan preparer:
Jonathan Showalter, Timmons Group f onathan.showalterC&timmons.com]
608 Preston Ave., Suite 200 / Charlottesville, VA 22903
Owner or rep.:
Albemarle County School Board (Joe Letteri)
Plan received date:
26 Nov 2019 — Digital
(Rev. 1)
6 Feb 2020 —Digital
(Rev. 2)
24 Jun 2020 — Digital
Date of comments:
13 Dec 2019
(Rev. 1)
26 Mar 2020
(Rev. 2)
25 Jun 2020, Approved
Reviewer:
John Anderson
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any
VSMP permit by issuing a project approval or denial. This project is approved.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain
(1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. This SWPPP is approved.
1. Section 1, Registration Statement /Sec. V.C.: Check `No,' unless land disturbance has commenced. (Rev.
1) Addressed.
2. Section 1, Registration Statement /Pg. 4: Sign /Date. (Rev. 1) Comment persists. Applicant response:
`The registration statement will be signed by the contractor as soon as one has been chosen.' (Rev. 2)
Addressed. Adam J. Yates (Virtexco Corp)
3. Section 6.A. /Exhibit (p. 21-22, .PDF): Indicate initial location of rain gauge. (Rev. 1) Addressed.
4. Section 6.A. /Exhibit (p. 21-22, .PDF): Revise LOD: SWPPP Exhibit + SWM /ESC inserts + VSMP /WPO
Plan. 0.94 Ac. as shown is unrealistic, and includes isolated areas without connection to CE, or material
storage /laydown (unless access is through Ex. building). Assume areas crossed with equipment during
construction are disturbed by virtue of compaction or end -of -project typical need to till /amend soil, clear
debris, restore, or install temporary /permanent stabilization. nor isolated areas of proposeLOD, image,
bed. Image removed with Rev. 1 comments. Again, disturbance will likely exceed proposed limits as a
practical matter. Engineering questions need for limiting LOD < 1 Ac. There is no appreciable delay when
applying for a DEQ VPDES VAR10 permit, and no additional requirements since LOD >10,000 SF in
Albemarle triggers VSMP requirements identical with requirements that apply to projects with LOD > 1
Ac. (Rev. 1) Addressed. Applicant response: `LOD has been revised and is now connected throughout the
site.' Rev. LOD z1.39 Ac.
5. Section 6.A. /Exhibit (p. 21-22, .PDF): Indicate initial location of temporary solvent /chemical storage
(temporary material storage trailer). (Rev. 1) Addressed.
6. Section 7, Impaired Waters: Revise proposed enhanced inspection frequency (item (2)) consistent with
VAR10, Part H G 2. a. (2.) (Ref. pg. 13 /VAR10). (Rev. 1) Addressed.
7. Section 7: Furnish missing (TMDL /impaired) data for North Fork Hardware River, since designated for
enhanced inspection. (Rev. 1) Addressed.
8. Section 9, Signed Certification: Sign — date. (Rev. 1) Comment persists. Note: Albemarle cannot register
this project with DEQ, or schedule a preconstruction meeting until the project is registered with DEQ.
Applicant response: `Section 9 will be completed when a contractor has been selected.' (Rev. 2)
Engineering Review Comments
Page 2 of 4
Addressed. AdobeSign digital signature provided (Tyler Gifford, 6/24/2020 12:20 PM email); hard copy to
follow 29-Jun.
9. Section 12: Revise proposed enhanced inspection frequency (item (2)). Also, item 6., above. (Rev. 1)
Addressed.
10. Sec. 1, Registration Statement, p.2, Sec. IV, E -MS4: Leave blank since project does not discharge to
Albemarle County MS4. See County GIS /Map Themes (Layer) /Utilities /Water-Wastewater-Stormwater
/Albemarle County MS4 boundary. Red Hill is well outside /south of Albemarle County MS4 boundary.
(Rev. 1) Addressed.
11. Revise SWPPP title to include reference to WPO201900068. (Rev. 1) Addressed.
B. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This
plan is approved pending purchase of 0.50 lb. phosphorus nutrient credits. (Rev. 2) Nutrient credits
purchased 18-Jun 2020. Ref. county RMS /CV document system.
1. Revise title to: Red Hill Elementary School Additions and Renovations VMSP WPO201900068.
Please QC: do not submit plan titled Site Plan, or Site Plan Amendment as a VSMP /WPO Plan.
(Rev. 1) Addressed.
2. C2.0: Revise to show TMP 08700-00-00-060BO (Thomas Brendt) since design proposes to release
runoff to a LS, then a slope leading to this property, rather than a defined channel. Show
residence at 3947 Red Hill School Road. Show property boundaries consistent with GIS. Label
TMP # 08700-00-00-060130. (County GIS image, below; image removed with Rev. 1 comments.)
(Rev. 1) Withdrawn. Applicant response: `The LS location has been revised to direct stormwater
into the existing roadside ditch. See Sheet C5.0'
3. C6.0: Water quality calculations /surplus removal: Plan proposes to utilize 0.44 lb. surplus phosphorus
from Scottsville Elementary School Addition project (0.44 lb. of 0.44 lb. total); plan also proposes to use
0.06 of 0.15 lb. surplus phosphorus from Woodbrook Elementary School project to meet Red Hill projects
0.50 lb. TP Load Reduction requirement. This works only if Woodbrook and Scottsville Elementary are
located in the same HUC or upstream HUC (see, below; Images removed with Rev. 1 comments), and
Woodbrook and Scottsville schools are not in the same HUC or upstream HUC. Revise WQ compliance
plan. (Ref. images /link, below. Also: Scottsville - WP0201900051; Woodbrook - WP0201600074):
(Rev. 1) Addressed. Applicant response: `Stormwater quality calculations have been revised. Ownership
to purchase nutrient credits to satisfy quality requirements.' Note: plan requires phosphorus nutrient credit
(purchase): 0.50 lb. (C6.0)
9VAC25-870-69A. /Offsite Compliance Options (5.): `5. When an operator has additional properties
available within the same HUC or upstream HUC that the land -disturbing activity directly
discharges to or within the same watershed as determined by the VSMP authority, offsite
stormwater management facilities on those properties may be utilized to meet the required
phosphorus nutrient reductions from the land -disturbing activity.'
9VAC25-870-10 /Definitions: "'Hydrologic Unit Code" or "HUC" means a watershed unit
established in the most recent version of Virginia's 6th Order National Watershed Boundary
Dataset unless specifically identified as another order.'
Link NA 6' order HUC Map:
https://www.deg.vir ig nia.gov/Portals/0/DEQ/Water/WaterQualityAssessments/IntegratedReport/2016/mapsNA
NWBD_v4.pdf --- Red Hill Elementary, HUC JM46
Soottsvil e Eleffie t.,.. , U14C rr,rnn Image removed with Rev. 1 comments.
64' order HUG Map Q 44 6 rr 44 n ro n4); image n beye - Image removed with Rev. 1 comments.
w,.,.,ab,.eek Elementary, B14C jR09 - Image removed with Rev. 1 comments.
C5.0:
4. Post -developed runoff may not release to undefined channel so close to a neighboring residential property.
Revise design. (Rev. 1) Addressed. Applicant response: `Post -developed run-off has been redesigned to
outflow to existing channel parallel with road.'
5. Str. 100 /outfall: Evaluate effect of existing impervious runoff on existing channel along Red Hill School
Engineering Review Comments
Page 3 of 4
Road. Evaluate 10-year event, whether Ex. roadside ditch has adequate capacity, and whether ditch flow
bypasses driveway entrance to 3947 Red Hill School Road to reach tributary to South Branch. (Rev. 1)
Addressed. Applicant response: `The existing ditch has been analyzed for the 10-year event. See detail
"Road Side Ditch Calculation" on Sheet C6.0.'
6. LS in this location is problematic. Ref. 9VAC25-870-66.D., which cautions against downslope effects.
Also, item 4., above. LS releases to featureless slope toward 3947 Red Hill School Road (Brendt property).
(Rev. 1) Addressed. Applicant response: `The LS has been relocated to prevent downslope effects to 3947
Red Hill School Road property.'
9VAC25-870-66.D.
7. C5.2, C6.0: Consider effect of relocated (impervious) modular trailers on post -developed ground cover.
Analyze trailer DA (C5.2). Show trailer leader line outfalls. Adjust post -redeveloped ground cover (C6.0).
(Rev. 1) Addressed. Applicant response: `Per change in direction, ownership will provide one (1) trailer to
be located over the existing asphalt pavement. Trailer is temporary and will not cause disturbance to the
asphalt surface.'
8. C7.0: Provide Std. VDOT MH with STR206-STR200 profile. Nyloplast® does not meet Drainage Plan
checklist, ACDSM, or VDOT drainage manual guidance. Nyloplast is appropriate only for yard grates, or
limited conveyance over limited distance. Use Std. VDOT MH Str. with 12" RCP storm pipe. (Rev. 1)
Addressed. Applicant response: `Nyloplast basins have been changed to VDOT standard structures as
requested.'
9. C7.0: Str 218 — 214: Revise 4" storm line to 6" Min. (Rev. 1) Addressed. Applicant response: `Storm has
been re -designed. All storm line is a minimum 6".'
10. Remove sheet E0.4, Site Plan Photometrics. (Rev. 1) Addressed.
C. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan
is approved.
1. C3.1: Include ACDSM paved construction entrance detail. (Rev. 1) Addressed.
2. C3.2, C3.3: Revise LOD. Also, SWPPP comment, item 4., above (Rev. 1) Addressed.
C3.3, C3.4: Label mulched areas, trails, etc. (blue arrows, below; image removed with Rev. 1 comments).
Confirm whether trails or play areas are to be constructed on existing grade, with no disturbance,
whatsoever (i.e. outside LOD). Label circular features shown below. (Rev. 1) Addressed.
C3.2:
4. Label ST floor dimensions. (Rev. 1) Addressed.
5. Provide break in SF at ST stone weir (outfall). (Rev. 1) Addressed.
6. Revise CE label to PCE (paved construction entrance). (Rev. 1) Not addressed. (Rev. 2) Addressed.
7. Revise ST L:W ratio to more nearly resemble (VESCH Std. & Spec. 3.13) 2.1 length -width ratio. (Rev. 1)
Addressed.
8. C3.3: Provide labels to identify five circular areas material surface type. Show proposed grading for level
circular areas, if areas are to be level. If grading is required, revise LOD /VaRRM.xls. Also, see SWPPP
item 4., ESCP item 3., above. (Rev. 1) Addressed.
9. C3.2, C3.3: Show PS, MU for five circular area, within areas of land disturbance, or grading. (Rev. 1)
Addressed.
10. C5: Show grading required to level pads for relocated modular trailers, an activity included with this
project (Note Ex. contours: 723, 722, 721). Revise LOD. (Rev. 1) Addressed. Applicant response: `Per
change in direction, ownership will provide one (1) trailer to be located over the existing asphalt pavement.
Trailer is temporary and will not cause disturbance to the asphalt surface.'
11. C6.0 Riprap channel detail: It is unclear whether this detail defines C3.3 ESC feature, or permanent feature.
Please clarify. (Rev. 1) Partially addressed. Applicant response: `The riprap channel detail located on
C6.0 will be a permanent feature.' As follow-up: Please revise detail caption, C6.0, to include descriptor
permanent. (Rev. 2) Addressed.
Engineering Review Comments
Page 4 of 4
D. Pollution Prevention Plan (PPP)—SWPPP, Sec. A, items 3, 4, 5, above. (Rev. 1) Addressed.
The PPP content requirements can be found in County Code section 17-404; PPP is approved.
Please submit 4 print copies of now -approved WPO plan and 2 print copies of the SWPPP for stamped approval
(files /distribution to Virtexco /ESC inspector). Please ensure each copy of the SWPPP includes 11" X 17" ESC
plan, SWM plan, and PPP exhibit inserts. Submit at CDD lobby under cover (to my attention) that reads: `Not for
review, for stamped approval.' CDD lobby, ham: M, W, F, 8:30-4pm, limited to reduce risk to the public during
the covid-19 pandemic.
Process:
Since LOD > 1 Ac., county staff will need to enter project information in a DEQ database for state application
processing. DEQ will review the application information based on local VSMP authority approval. At this time, the
DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done
electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to
pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the
county (CDD /Engineering).
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicant
will need to complete the request for a pre -construction conference form. The form identifies the contractor and
responsible land disturber, and the fee remaining to be paid NA, for Red Hill Elementary, a county project). This
will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County
inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading
permit will be issued by the County so that work may begin.
County forms can be found on the county website forms center under engineering;
hLtp://www.albemarle.orp-/dotfonns.asp?department=cdengno
WPO201900068 Red Hill Elementary VSMP 062520rev2.doc