Loading...
HomeMy WebLinkAboutWPO201900068 VSMP - SWPPP 2020-06-24COUNTY OF ALBEMARLE Department of Community Development o J 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Tel. (434) 296-5832 9 Fax (434) 972-4126 Stormwater Pollution Prevention Plan (SWPPP) For Construction Activities At: Project Name: Red Hill Elementary School Additions and Renovations WPO #201900068 Address: 3901 Red Hill School Road North Garden, VA 22959 Prepared by: Timmons Group 608 Preston Avenue, Suite 200 Charlottesville, VA 22903 434.295.8317 Prepared for: Albemarle County School Board 401 McIntire Road Charlottesville, VA 22902 Contact: Mr. Joseph P. Letteri 434-975-9340 SWPPP Preparation Date: November 25, 2019 Revised: June 24, 2020 APPROVED by the Albemarle County Community Development Department Date 06/25/2020 File WP0201900068 (This document is to be made publicly available according to 9VAC25-880-70, Part II, section D) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County CONTENTS: (from Albemarle County Code Sec. 17-405) 1. Registration statement 2. Notice of general permit coverage 3. Nature of activity 4. Erosion and Sediment Control Plan. 5. Stormwater Management Plan 6. Pollution Prevention Plan. 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. 8. Qualified personnel 9. Signed Certification 10. Delegation of authority. 11. General permit copy 12. Inspection logs Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 1. Registration statement (Provide a signed completed copy of the DEQ registration statement) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR OFFICE USE ONLY GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM ID Number: _ CONSTRUCTION ACTIVITIES (VAR10) Technical Criteria: 1113 ❑ IIC ❑ REGISTRATION STATEMENT 2019 NEW ISSUANCE Z MODIFICATION WITH ACREAGE INCREASE ❑ Existing Permit Coverage Number (if applicable, VAR10####): Section I. Operator/Permittee Information. RE -ISSUANCE ❑ MODIFICATION WITHOUT ACREAGE INCREASE ❑ A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have operational control over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must sign the certification in Section VI. (per Part III. K. of the VAR10 Permit). Construction Activity Operator Name: VIRTEXCO CORPORATION Contact person: Rick Truslow Address: 977 Norfolk Square City, State, Zip Code: Norfolk, VA 23502 Phone Number: 804-641-4378 Primary Email: rtruslow@virtexco.com CC Email: tgifford(�i)_albemarle.org ; jletteri(a�k12albemarle.org B. Billing Information (leave blank if same as the Operator identified in Section I. A. above). This entity will receive Annual Permit Maintenance and Permit Modification Fee invoices (if applicable). Name: Contact Person: Address: City, State Zip Code: Phone Number: Primary Email: CC Email: C. May we transmit correspondence electronically? You must choose YES and include a valid email in order to pay by credit card and to receive your permit coverage approval letter via email: YES 0 NO ❑ Rev 04/2019 PAGE 1 17 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 Section II. Construction Activity Location Information. Project site information. A. Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land disturbance, construction entrances and all water bodies receiving stormwater discharges from the site. B. Construction Activity Name: Red Hill Elementary School Gym Addition and Renovation Address: 3901 Red Hill School Road City and/or County and Zip Code: North Garden, Virginia, 22959 Latitude and Longitude (6-digit, decimal degrees format): 37.964521,-78.635301 C. Construction Activity Entrance Location (description, street address and/or latitude/longitude in decimal degrees): 37.964521,-78.635301 Section III. Offsite Support Activity Location Information. List all offsite support activities to be included under this permit registration. Enter additional areas on a separate page. Offsite areas not included on this registration may need to obtain coverage under a separate VPDES permit. A. Offsite Activity Name: Address: City and/or County and Zip Code: Latitude and Longitude (6-digit, decimal degrees format): B. Offsite Activity Entrance Location (description, street address and/or latitude/longitude in decimal degrees): Section IV. Site Information. A. Acreage totals for all land -disturbing activities to be included under this permit coverage. Report to the nearest one -hundredth of an acre. Total land area of development (including the entire area to be disturbed as approved in the Stormwater 1.20 Management Plan): Primary estimated area to be disturbed (portions with 1.20 Erosion and Sediment Control Plan approval only): Offsite estimated area to be disturbed (if applicable): N/A C. Property Owner Status: B. Estimated Project Dates (M M/D D/YYYY) Start date: 09/2020 Completion date: 08/2021 FEDERAL ❑ STATE ❑ PUBLIC 0 PRIVATE ❑ D. Nature of the Construction Activity Description (i.e. commercial, industrial, residential, agricultural, environmental): School Addition and Associated Sitework E. Municipal Separate Storm Sewer System (MS4) name (if discharging to a MS4): N/A Rev 04/2019 PAGE 2 17 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 F. Is this construction activity part of a common plan of development or sale? YES ❑ NO 0 G. 61" Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Attach a separate list if needed. HUC RECEIVING WATERBODY(S) 020802031201 Section V. Other Information. North Fork Hardware River A. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting the Registration Statement. By signing the Registration Statement, the operator is certifying that the SWPPP has been prepared. B. Has an Erosion and Sediment Control Plan been submitted to the VESCP Authority for review? YES 0 NO ❑ Erosion and Sediment Control Plan Approval Date (for estimated area to be disturbed).: C. Has land disturbance has commenced? YES ❑ NO W D. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity Form. AS&S Entity Name (if different from the Operator identified in Section II. A.): SEE THE FOLLOWING PAGE FOR SIGNATURE AND CERTIFICATION REQUIREMENTS AND INFORMATION Rev 04/2019 PAGE 3 17 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 Section VI. Certification. A person representing the operator as identified in Section I. A. and meeting the requirements of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that operator is defined in 9VAC25-870-10 as follows: "Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater associated with a large or small construction activity, operator means any person associated with a construction project that meets either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system. 9VAC25-880-70. Part III. K. Signatory Requirements. Registration Statement. All Registration Statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations, the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where auth ority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name: Signature (signed in ink): Date: 6/18/2020 Section VII. Submittal Instructions. Submit this form to the Virginia Stormwater Management Program (VSMP) Authority. If the locality is the VSMP Authority, please send your Registration Statement submittal directly to the locality; do NOT send this form to DEQ. A list of local VSMP Authorities is available here: VSMP Authorities. If DEQ is the VSMP Authority, please send to: Department of Environmental Quality Office of Stormwater Management Suite 1400 PO Box 1105 Richmond VA 23218 constructionep@deg.virginia.eov If the locality is the VSMP Authority, please send to: fhe Local VSMP Authority (insert address below Community Development Dept. 401 McIntire Road North Wing Charlottesville, VA 22902 Rev 04/2019 PAGE 4 17 Section 2. Notice of general permit coverage (This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.) (Provide a copy of the DEQ coverage letter when obtained) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 3. Nature of activity (Provide a detailed narrative of the construction activities. Include or reference a construction schedule and sequence. Include any phasing.) This project includes the construction of a building addition, parking lot, sidewalk, associated utilities, and site work. The limits of disturbance are 1.20 acres. These improvements are being made within the property boundary. The property is bounded by Residential Properties and VA-760 Red Hill School Road to the north, residential properties to the east, west and south side. All construction shall take place in accordance with the Erosion and Sediment Control Sequence of Installation on plan sheet C3.0. Estimated construction dates are as indicated on the Registration Statement. 0 Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 4. Erosion and Sediment Control Plan. (Provide a reduced, 11x17 copy of the latest Erosion and Sediment Control Plan. Do not reference only.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County EROSION AND SEDIMENT CONTROL NARRATIVE: PROJECT DESCRIPTION THIS PROJECT INCLUDES THE CONSTRUCTION OF A GYMNASIUM ADDITION, SITE IMPORVEMENTS, AND ASSOCIATED UTILITIES & LANDSCAPING. LIMITS OF CLEARING AND GRADING ARE 1.20 ACRES. ADJACENT PROPERTY THE PROPERTY IS BOUNDED BY RED HILL SCHOOL ROAD TO THE NORTH, A FARM TO THE EAST, AND WOODED PARCELS TO THE SOUTH AND WEST OWNED BY ALBEMARLE COUNTY SCHOOLS. EXISTING SUE CONDITIONS THE EXISTING SUE IS RED HILL ELEMENTARY SCHOOL. OFF SITE AREAS NO OFFSITE AREAS WILL BE DISTURBED. ANY OFF -SITE LAND -DISTURBING ACTIVITY ASSOCIATED WITH THE PROJECT SHALL HAVE AN APPROVED ESC PLAN. CRITICAL EROSION AREAS EARLY ESTABLISHMENTAND PROPER MAINTENANCE OF PERIMETER CONTROLS WILL PROVIDE SEDIMENTATION CONTROL. ALL SLOPES STEEPER THAN 3:1 SHALL BE STABILIZED WITH BLANKET MATTING. EROSION AND SEDIMENT CONTROL MEASURES UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE CURRENT ADDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. THE MINIMUM STANDARDS OF THE VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE BY LOCAL AUTHORITIES HAVING JURISDICTION. STORMWATER RUNOFF CONSIDERATIONS STORMWATER QUALITY WILL BE TREATED THROUGH THE PURCHASE OF OFFSITE CREDITS. STORMWATER QUANTITY WILL BE HANDLED THROUGH LEVEL SPREADERS RETURNING CONCENTRATED FLOW TO SHEET FLOW AS NECESSARY. STRUCTURAL PRACTICES: 1. TEMPORARY CONSTRUCTION ENTRANCE- 3.02 ATEMPORARY CONSTRUCTION ENTRANCE SHALL BE PROVIDED AT THE LOCATION INDICATED ON THE PLANS. IT IS IMPERATIVE THAT THIS MEASURE BE MAINTAINED THROUGHOUT CONSTRUCTION. US PURPOSE 15 TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. 2. SILT FENCE BARRIER -3.05 SILT FENCE SEDIMENT BARRIERS SHALL L BE INSTALLED DOWNSLOPE OF AREAS WITH MINIMAL GRADES TO FILTER SEDIMENT -LADEN RUNOFF FROM SHEET FLOW AS INDICATED. ITS PURPOSE IS TO INTERCEPT SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS AND PREVENT SEDIMENT FROM LEAVING THE SITE. 3. STORM DRAIN INLET PROTECTION -3.07 STONE FILTERS SHALL BE PLACED AT THE INLLT OF ALL DRAINAGE STRUCTURES AS INDICATED ON PLANS. ITS PURPOSE 15 TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAINAGE SYSTEM PRIOR TO PERMANENT STABIUZATION. C CULVERTINET PROTECTION -3.08 A SEDIMENT FILTER LOCATED AT THE INLET TO A CULVERT TO PREVENT SEDIMENT FROM ENTERING THE SYSTEM PRIOR TO PERMANENT STABILIZATION. 5. DIVERSION DIKE - 3.09, 3.11 & 3.12 A TEMPORARY RIDGE OF COMPACTED SOIL TO DIVERT WATER FROM A CERTAIN AREA. 6. SEDIMENT TRAP -3A3 A TEMPORARY BARRIER OR DAM WITH A CONTROLLED STORMWATER RELEASE TO DETAIN SEDIMENIAADEN RUNOFF FROM DISTURBED AREAS IN'WET' AND'DRY' STORAGE LONG ENOUGH FOR THE MAJORITY OF SEDIMENT TO SETTLE OUT. 6.1. MAINTENANCE OF SEDIMENT TRAP -INSPECT TRAP EMBANKMENT WEEKLYTO ENSURE IT 15 STRUCTURALLY SOUND AND HAS NOT BEEN DAMAGED DURING CONSTRUCTION ACTIVITIES. THE TRAP SHALL BE CHECKED AFTER EVERY RAINFALL EVENT. ONCE THE SEDIMENT HAS REACHED THE DESIGNATED CLEANOUT LEVEL IT SHALL BE REMOVED AND PROPERLY DISPOSED OF. 7. OUTLET PROTECTION - 3.18 STRUCTURALLY LINED APRONS OR OTHER ACCEPTABLE ENERGY DISSIPATING DEVICES PLACED AT THE OUTLETS OF PIPES OR PAVED CHANNEL SECTIONS. 8. DUST CONTROL -3.39 DUST CONTROL IS TO BE USED THROUGH THE SITE IN AREAS SUBJECT TO SURFACE AND AIR MOVEMENT. VEGETATIVE PRACTICES: 1. TOPSOIL (TEMPORARY STOCKPILE) - 3.30 TOPSOIL SHALL BE STRIPPED FROM AREAS TO BE GRADED AND STOCKPILED FOR LATER SPREADING. STOCKPILE LOCATIONS SHALL BE LOCATED ONSUE AND SHALL BE STABILIZED WITH TEMPORARY SILT FENCE AND VEGETATION. 2. TEMPORARY SEEDING - 3.31 ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 30 DAYS SHALL BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. SELECTION OF THE SEED MIXTURE SHALL DEPEND ON THE TIME OF YEAR IT IS APPLIED. 3. PERMANENT SEEDING -3.32 FOLLOWING GRADING ACUVITIES, ESTABLISH PERENNIAL VEGETATIVE COVER BY PLANTING SEED TO REDUCE EROSION, STABILIZE DISTURBED AREAS, AND ENHANCE NATURAL BEAU . 4. SOIL STABILIZATON BLANKETS & MATTING - 3.36 A PROTECTIVE COVERING BLANKET OR SOIL STABILIZATION MAT SHALLBE INSTALLED ON PREPARED PLANTING AREAS OF CHANNELS TO PROTECT AND PROMOTE VEGETATION ESTABLISHMENT AND REINFORCE ESTABLISHED TURF. MANAGEMENT STRATEGIES 1. PROVIDE SEDIMENT TRAPPING MEASURES AS FIRST STEP IN GRADING, SEED AND MULCH IMMEDIATELY FOLLOWING INSTALLATION. 2. PROVIDE TEMPORARY SEEDING OR OTHER STABILIZATION IMMEDIATELY AFTER GRADING. 3. ISOLATE TRENCHING FOR UITLTIIES AND DRAINAGE FROM DOWNSTREAM CONVEYANCES IN ORDER TO MINIMIZE PERIMETER CONTROLS. 4. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED UNTIL THEY ARE NO LONGER REQUIRED TO COMPLY WITH THE CONTRACT DOCUMENTS OR STATE LAW. PERMANENT STABILIZATION ALL NON -PAVED AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING FINISHED GRADING. SEEDING SHALL BE IN ACCORDANCE WITH STD. & SPEC. 3.32, PERMANENT SEEDING. SEED TYPE SHALL BE AS SPECIFIED FOR "MINIMUM CARE LAWNS" AND 'GENERAL SLOPES" IN THE HANDBOOK FOR SLOPES LESS THAN 3:1. FOR SLOPES GREATER THAN 3:1, SEED TYPE SHALL BE AS SPECIFIED FOR 'LOW MAINTENANCE SLOPES' IN TABLE 3.32-D OF THE HANDBOOK. MR MULCH (STRAW OR FIBER) SHALL BE USED ON ALL SEEDED SURFACES. IN ALL SEEDING OPERATIONS SEED, FERTILIZER AND UME SHALL BE APPLIED PRIOR TO MULCHING. SEQUENCE OF INSTALLATION PHASE 1 (SEE SHEET ED 1. A PRE -CONSTRUCTION MEETING IS REQUIRED WITH ALBEMARLE COUNTY E&S INSPECTOR, CONTRACTOR, OWNER, AND ENGINEER. THIS MEETING SHALL TAKE PLACE ON -SITE. CLEARING LIMITS MUST BE FLAGGED PRIOR TO THE MEETING WITH ONE (1) WEEK OF NOTICE. 2. INSTALL CONSTRUCTION ENTRANCE, CULVERT INLET PROTECTION AND SILT FENCE, EXCAVATED SEDIMENTTRAP, AND IN DIKES. 3. AFTER ALL EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE, SITE WORK CAN BEGIN. 4. ROUGH GRADE PROJECT AREA. 5. SEED ALL DENUDED AREAS PER VESCH STANDARDS. PHASE 11(SEE SHEET C3.3) 1. INSTALL ADDITIONAL INLET PROTECTION WHERE SHOWN ON THE PHASE 11 EROSION AND SEDIMENT CONTROL PLAN AS THE STORM SYSTEM IS CONSTRUCTED AND BECOMES OPERATIONAL. 2. FINE GRADE PROJECT AREA. APPLY PERMANENT SOIL STABILIZATION TO THESE AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS ACHIEVED. 3. ALL STORMWATER PIPING & STRUCTURES, INCLUDING DETENTION FACILITIES SHALL BE INSPECTED FOR SILTSEDIMEW. IF PRESENT SILT/SEDIMENT SHALL BE CLEANED OUT FOR THE SYSTEM TO THE SATISFACTION THEE&SINSPECTOR. 4. APPLY PERMANENN T SOILL STABILIZATION STABILIZATION TO THESE AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS ACHIEVED. SILT FENCE BELOW SEDEMENT TRAP MUST BE MAINTAINED THROUGH GRADING AND ONCE ALL CONTRIBUTING 4. ONCE ALL CONTRIBUTING DRAINAGE AREAS TO SEDIMENT TRAP HAVE BEEN STABILIZED TRAP CAN BE REMOVED AND GRADED TO RIVAL GRADE. 5. ONCE CONSTRUCTION A COMPLETE AND ALL CONTRIBUTING AREAS ARE STABILIZED, EROSION CONTROL MEASURES CAN BE REMOVED UPON APPROVAL FROM THE E&S INSPECTOR. MINIMUM STANDARDS: AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED BY A DISTRICT OR LOCALITY MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS: MS-1. PERMANENT ORTEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE ATE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. MS-2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROIFCTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENITONALLYTRANSPORTED FROM THE PROJECTSITE. MS-3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. MS-4. SEDIMENT TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. MS-5. STABILTZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. MS-6. SEDIMENT TRAPS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP. A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENTTRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. MS-7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABIUZING MEASURES UNTIL THE PROBLEM IS CORRECTED. MS.8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR HILL SLOPES UNE55 CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. MS-9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. MS-10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR GTHERWISE TREATED TO REMOVE SEDIMENT. MS-11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. MS-12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. MS-13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBIE MATERIAL SHALL BE PROVIDED. MS-14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. MS-15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE 15 COMPLETED. MS-I6. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 UNEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWAMPLNG OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT ROWING STREAMS OR OFIETTE PROPERTY. D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACIED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E. RESTABILIZAITON SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. MS-17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. MS-18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENTAND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. MS-19.PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SUES SHALL BE PROTECTED FROM SEDIMENT DEPOSUION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE STANDARDS AND CRITERIA LISTED IN SECTION 19 OF VIRGINIA ADMINISTRATIVE CODE 9VAC25-840-40 MINIMUM STANDARDS. CONTRACTOR SHALL PROVIDE ALL INFORMATION REQUIRED FOR CONSTRUCTION RECORD DRAWINGS: Fe COUNTY OFALBEMARLB IIeC".,.m., of Commrwty DeveloPaean Construction Record Drawings (As -built) for VSMP The following is a list of information required on construction record drawings for stormwater facilities (reference Water Protection Ordinance 17-422). It is preferable that the construction record drawing be prepared by someone other than the designer. Please do not provide design drawings as construction record drawings. A. A signed and dated professional seal of the prepares engineer or surveyor. B. The name and address of the firm and individual preparing the drawings on the title sheet C. The constructed location ofall items associated with each facility, and the iaspscnon records W verify proper dimrnsions, materials and installation. The items include, but are not limited W the following: 1. Inspection Records and phmogn phs fan pipe trenches and balding, including anderdreins. 2. Video Pipe Inspection for any pipes which are not accessible or viewable. 3. Updated t-ocation with geo-coordinates of all facilities. 4. Verified Drainage Ares maps for the drainage area treated, and for drainage to the facilities. 5. Current physkal and Wpographie survey for all earthen structures. Ponds should include a survey of the pond bottom. Surveys should verify pond volumes are per design. Corrections may be required for alterations fi an the design. 6. Plants, location and type. 7. Plans and profiles for all culverts, Pipes, Risers, Wdm end Drainage StrucWres - Display the installed type of drainage sureares, wl-oh ipe in, wehs, materials, inlets or end undrunt(s), inlet and outlet protection, alignment and invent elevations compared to design. S. Computations: For significant deviations from design, provide sealed computations verifying that the as -built condition is equivalent or better than design. 9. Ditch Lines - Display the constructed location of all ditch lines and channels, including typical sections and linings. 10. Easements - Show all platted easements with dead book refereaces labeled. Facilities and drainage must be within platted easements. Provide copies of recorded documenrs. I1. Guardrail, fences or other safety provi®ons - Display the wean icled location of all safety provisions; fences, guardrail, including the type, length and applied end treatmenrs, compared W design. 12. Material layers-bioflter media, sane layers, sand layers, keyways and cores must be verified As to mntermI types and depths. Include inspetion reports, boring or test pit reports and materials certifications. Biofilrer media must be an approved state is. 13. Access roads- show location of access roads, surface treatment, drainage, etc, as applicable. 14. Compaction reports are required toverify fill compaction m in deals. 15. Manufacturers certifications for proprietary ERVEI certifying proper installation and functioning. GENERAL EROSION AND SEDIMENT CONTROL NOTES: ES-1: UNLESS OTHERWISE INDICATED, CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE LATEST EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS MR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. ES-2: THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY WILL MAKE A CONTINUING REVIEW AND EVALUATION OF THE METHODS AND EFFECTIVENESS OF THE EROSION CONTROL PLAN. ES-3: PLACE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP INCLEARING, GRADING, OR LAND DISTURBANCE, ES-4: MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN ON THE SITE AT ALL TIMES. ES-5: PRIORTO COMMENCING LAND -DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFFSITE BORROW OR WASTE AREA), SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE ARCHUECT/ENGINEER AND THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY FOR REVIEW AND ACCEPTANCE, ES-6: PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARYTO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE RESPONSIBLE LAND DISTURBER. (MODIFIED NOTE) ES-7: ALL DISTURBED AREAS SHALL BRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALLTIMES DARING LAND -DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT. ES-8: DURING DEWATERING OPERATIONS, PUMP WATER INTO AN APPROVED FILTERING DEVICE. ES-9: INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. MAKE ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFIECTIVE S OF THE EROSION CONTROL DEVICES IMMEDIATELY. BOILS INFORMATION 19C-MINNIEVILLE LOAM,15 TO 25 PERCENT SLOPES. 60 TO 120 INCHES TO RESTRICTIVE FEATURES, WELL DRAINED, HYDROLOGIC SOIL GROUP: B 418 -YADKIN LOAM,2 TO PERCENT SLOPES. MORE THAN 80 INCHES TO RESTRICTIVE FEATURES, WELL DRAINED, HYDROLOGIC SOIL GROUP: B 88-UDORTHENTS, 2 TO 25 PERCENT SLOPES. MORE THAN 80 INCHES TO RESTRICTIVE FEATURES, HYDROLOGIC SOIL GROUP: D TABLE 3.31-B ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS "QUICK REFERENCE FOR ALL REGIONS' PLANTING DATES SPECIES RATE fLBSIACREI SEPT.1-FEB. 15 50/50MIXOF ANNUAL RYEGRASS (LOLIUM MULTIFLORUM) 8 5 100 CEREAL(WINTER) RYE (SECALE CEREALE) FEB. 16-APR. 30 ANNUAL RYEGRASS 60100 (LOLIUM MULTI-FLORUM) MAY 1 -AUG. 31 GERMAN MILLET SO (SETARIA ITALICA) TS 3.31 POR TARY SEEDING PLANT MATERIALS No S ale TABLE I.S. SITE SPECIFIC SEEDING MIXTURES FORAPPALACHIANIMOUNTAIN AREA TOTAL LBS. PER ACRE MINIMUM CARE LAWN COMMERCIAL OR RESIDENTIAL 200-250 LBS, KENTUCKY 31 OR TURF -TYPE TALL FESCUE -1. IMPROVED PERENNIALRYEGRASS' 0-10% KENTUCKY BLUEGRASS 0-10% HIGH -MAINTENANCE LAWN MINIMUM OF THREE (3) UP TO FIVE (5) VARIETIES OF BLUEGRASS FROM APPROVED LIST FOR USE IN VIRGINIA. 125 LBS. GENERAL SLOPE 13:1 OR LESS) KENTUCKY 31 FESCUE in LBS. RED TOP GRASS 2 LBS. SEASONAL NURSE CROP" 20 LBS. IN US. LOW -MAINTENANCE SLOPE (STEEPER THAN 3:1) HENTUCKY 31 FESCUE 108LB6. RED TOP GRASS 2 LBS. SEASONAL NURSE CROP" 20 LBS. CROWNVETCH "' 20 L. IN US. ' PERENNIAL RYEGRASS WILL GERMINATE FASTER AND AT LOWER SOIL TEMPERATURES THAN FESCUE, THEREBY PROVIDING COVER AND EROSION RESISTANCE FOR SEEDBED. " USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES AS STATED BELOW: MARCH, APRIL THROUGH MAY 15TH......... ANNUAL RYE MAY 16TH THROUGH AUGUST 1STH......................... FOXTAIL MILLET AU GUST I6TH THROUGH SEPTEMBER, OCTOBER.... ANNUALRYE NOVEMBER THROUGH FEBRUARY................................. WINTER RYE IF FLATPEA IS USED, INCREASE TO 30 LBSJACRE. ALL LEGUME SEED MUST BE PROPERLY INOCULATED. WEEPING LLVEGRASS MAY ALSO BE INCLUDED IN ANY SLOPE OR LOW -MAINTENANCE MIXTURE DURING PS WARMER SEEDING PERIODS; ADD 10-20 LBSJACRE IN MIXES. 3.32 PERMANENT SEEDING MIX FOR PIEDMONT AREA No Scale U W 2 re Q ' O� LU <„ W It N w`a O �o r = 3o r•1 06 L~rd N 0 Z Q I1J O � N EL WI N - ¢O X LLI cm 100 z O J 0 = Q = O � U W �. fA J CIJ c O Cl) Z S LU ~ O U) J w U J 3 Lu CL LU 0 Lu tr LLf Lu m ¢ J cn to ¢ M EROSION & SEDIMENT CONTROL NOTES & DETAILS C3.0 A PROFILEb 4.n. 2 w nc.,a_GPI_ HnsL ac,.Ess o mrv. , 21 [RA GV rv_ Ecretss � ` mA aivc n vlcrL PUN SECTION A —A A,wm,nw xnla IR, of t Wcb uulvl be aL�ragM xiX� a Xmwmwl 1 mcb bahocA sblXoffvaM1'e wWPbve n wnall bone xiW a WawNn of I � mcbes fog adxpM,e nul prnslve, Wnsh wMer matit 6e canied aw.n'LmH XIe mINUltt to nl npprovnl senN,a sntion .W snlo�inv sbaX Le lnnwrtnl fiom m! u nv NaWs. clIW�IIe.��r xn,ntom.e. PAVED WASH RACK PIPE OUTLET CONDITIONS R � II •R� 4 Le SECTION A FILTER KEY IN 6"-8": RECOMMENDED CLOTH FOR ENTIRE PERIMETER *&A PLAIN VIM 0%� T SECTIONAlFILTER KEYIN 6"-8"; RECOMMENDED CLOTH FOR ENTIRE PERIMETER NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION BASKET, OR CONCRETE. 2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED USING PLATES 3.16-3 ANO 3.184. 3. d =1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHES. ❑ E7 E] E] CJEl E] E] El STANDARD ORANGE VINYL OR PLASTIC CONSTRUCTION FENCE ATTACHED TO POSTS (PRE -WEATHERED WOOD, GALVANIZED STEEL, IRON OR THICK PVC PLASTIC), AT LEAST 40' ABOVE FINISH GRADE WITH SPAN BETWEEN POSTS NO GREATER THAN E ON CENTER. EVERY NINTH POST SHALL CONTAIN A WARNING SIGN THAT CLEARLY IDENTIFIES THE FENCE AS A TREE PROTECTION FENCE. ONO SCALE TREE PROTECTION raga — (—.) (13) 0. Wumes imle ores, IF s, -elRaion PU ea (s0awlume(cr) e.\ ]10.5 a 589 712 — 470 MrsiaMM 113 14]9 4] 8 stoage r ylireE(cy)(6]'DA) 462 om dstore wtlr(fl) 712.GO sWmge P—at Nis elevaXon(cy) 470 --coarse.ggregaS-11 W MOOT SD. M35] of A5 e olwet storage sales 2:1 gW (8 50 stoage: d"ti) botlaX of trey Halation (fl) N,ft 710.5 stoae yired Icy) (67'DA) b trey dm s tarew 7130 p.dm eb. (It) ]14 storage PwWed't tfiis eble8on (cy) 1 478 I^P ndW of m (fl) � a 5 TYPICAL ORIENTATION OF VESCH TREATMENT - 1 SOIL (STABILIZATION SHALLOW BLANKET) SLOPE ON SHALLOW SLOPES, STRIPS NETTING PROTECTIVE COVERINGS MAY BE APPLIED ACROSS THE SLOPE. WHERETHEREISABERMATTHE BERM TOP OF THE SLOPE, BRING THE MATERIAL OVER THE BERM AND STEEP ANCHOR IT BEHIND THE BERM. SLOPE 4 ON STEEP SLOPES, APPLY PROTECTIVE COVERING PARALLEL TO THE DIRECTION OF FLOW AND ANCHOR SECURELY. BRING MATERIAL DOWN TO A LEVEL AREA BEFORE 4 TERMINATING THE INSTALLATION. TURN THE F. 12. DITCH FLOW END UNDER4"ANDSTAPLE AT 12"INTERVALS. IN DITCHES, APPLY PROTECTIVE COVERING PARALLEL TO THE DIRECTION OF FLOW. USE CHECK SLOTS AS REQUIRED. AVOID JOINING MATERIAL IN THE CENTER OF THE DITCH IF AT ALL POSSIBLE. RLD� (NGLIDPnGNALIEW aM SIDE ELEVATION w E EXISTING GaOUN r ry iLMI 2 AMT U a vOOT pt COMBE AOGBEG4TE e �SD,MENi—L M ,A (aJ ETS:XFUL OF IrvcRDnON VIEW PLAN G DEVICE ^ ? MIn N HLTEa G.OTH SECTION A -A Ml J Qy W —NSPACE RENFORCED1ETE SECTIONB-B 3.36-1 CE ,`02 3 O O STONE CONSTRUCTION ENTRANCE TYPICAL VESCH TREATMENT - 1 (SOIL STABILIZATION BLANKET) INSTALLATION CRITERIA Og• SLOT NS APPROTEOXIMATELY 208 STAPLES REQUIRED dd�p PER 100 SQ. YES. OF MATERIAL ROLL. OF ANCHOR SLOTS, SLOTS & CHECK SLOTS TO BE BURIED 6' TO 12'. < '044 S SO N o RMINAL FOLD SJ—MESH WILL HAND ONL,MIN.(— owT) ) LIEU OF EDGTAPLED LAPE) ZK M S EEPER H rv4,3 I LHE— i:TcIz 0 —VAR.—VAR— 2' O PFIaMLr E PFIR.1 2" r p 2" SILT FENCE CULVERT INLET PROTECTION O ENDWALL TOE OF TEMPORARY SEDIMENT TRAP FILL CULVER TOE OF SILT FlLL TEMPORARY RIGHT-OF-WAY DIVERSIONS FENCE STANCEISE'MINIMUM pW IDIF FLOW IS TOWARD EMBANKMENT VGOT i21A 16' STg1E MIN- "OPTIONAL STONE COMBINATION 1I 0' I 1.5' I I2S FLOW— MINIMUM TYPICAL GRAVEL STRUCTURE CLASS I OT..011,i05..ER#STCOARSE#FLOW AGGREGATE TO REPLACE SILT FENCE INRIPRAP HORSESHOE" WHEN HIGH VELOCITY OF IS EXPECTED 3.11-1 CIP TEMPORARY RIGHT-OF-WAY DIVERSION rvo scale CULVERT INLET PROTECTION No Gale mo m L_J GRAVEL CURB INLET SEDIMENT FILTER RDNDFR�FLTSR WAR SED GONCRETE CMBeaFr GaAVEI SHALL 9E V WTNs, p35T GN 5 cGMSEAGGaEGATE ERNST CONSERVATION SEEDS RIGHT-OF-WAY NON-NATIVE WOODS MIX- ERNMX-132 BOTANICAL NAME COMMON NAME PRICEA-B 30.00% FESTUCA RUBRA CREEPING RED FESCUE 1.50 20.00% LOLIUMPERENNE, PERENNIAL RYEGRASS. 1.85 'FASTBALL RGL' 'FASTBALL RGL' (TURF TYPE) 20.00% PHLEUMPRATENSE, TIMOTHY.'CLIMAX' 1.20 'CLIMAX' 12.00% TRIFOLIUMHYBRIDUM ALSIKE CLOVER 3.25 10.00% AGROSTIS PERENNANS, AUTUMN BENTGRASS, 14.00 ALBANYPINEBUSH- ALBANYPINE BUSH - NYECOTYPE NY ECOTYPE 8.00% AGROSTISALSA REDTOP 8.00 lo.% MIX PRICI-B BULK: $3.61 SEEDING RATE: 4060 LB PER ACRE WOODLAND OPENINGS THE SHADE -TOLERANT GRASSES AND CLOVER ARE GOOD FOR WOODLAND OPENINGS AND PARTIALLY SHADED SITES. MIX FORMULATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE DEPENDING ON THE AVAILABILITY OF EXISTING AND NEW PRODUCTS. WHILE THE FORMULA MY CHANGE, THE GUIDING PHILOSOPHY AND FUNCTION OF THE MIX WILL NOT. SLOPE STABILIZATION SEED MIX ,. sET THE sr -dam ALoNGTNF UNF FsrAN_ �oPE �IW4 Is a II FLOW 3.08-1 SHEET FLOW INSTALLATION (PER6PECTIVE VIEW) (P FB A USF POINTSORAINAGEWAV (FRONT INSTALLATION 3.05-2 ELEVATION) O SILT FENCE (W/O WIRE SUPPORT) 612412020 W O2S Li N c Z Q Lu O � V 04 - QO W cm m Z U) O J 0 0 U: N J c 0 O Z S LU ~ O 3 J w U-i J 3 Lu 2 w w _ CL Lu LLf ~ Lu m ¢ J O to Q M EROSION & SEDIMENT CONTROL NOTES & DETAILS C3.1 EROSION CONTROL LEGEND APPROX. LOCATION OF 4" / I II •�.�-� LIMOS OF CLEARING AND GRADING - DT WATERLINE V COMPILED PROPERTY PID: OBJB0-00-00-01200 • DRAINAGE DIVIDEM MCLAUGHLWLIVING TRUST I -11 AREA DDE 30'PRESCRIPTIVE VOOT ZONE: HSI w -R. 0W EASEMENT 0 )SAC FENCE 3.01 PAVED CONSTRUCOON ENRUNCE 3.02 PID: 087BO-00-00-0f000 SF SILT FFNCE 3.05 MCLAUGHLIN LIVING m ` 1 p TRUSTC/ODANIEL H ry 1 10 -- I 1 y TIP .MET PROTECTION 3.07 U Z MCLAUGHLIN A TERESEN SOIL TNPE:'/ / >o �-� l MCuuGHUN N ^ ^ toy 1 ,11q SF - _ _ SAF -��ac=_��1°\ 1,1 1 ` ` Z09EAC 1 oo �� DIVERSION oIKE 3.09 -•�-�-r/ ,/ ,/ O,�F 91,1 �72 !____tea 12"RCPW16HW max;`_ 1 K / ' ' - 4' 3,11 TP � ', 11 115 \� APPROX LOCATIONOF4" m m >_L U / - _ _�`� 119 \ D.l. WATERLINEsrcx O / �' I , / TS DC 1`� RED ,3.13 / y�i ' / >' '/ ✓ ,SEDIMENT TRAP \ / / ` SF 1 y ry1' H/LL SCH L` K' 0.6 AC DRAINAGE EA 1 (RO OOL OURET RtOTECOON 3.18 N o / �� �Y / / k /' /' / / , , �' �' , �i' /'.�/ /'.- '-1 ' ;1.- •''' �,�'i- �-, '- �.-/S`-TO- NE W-,E�IRT-OTQ-aTOORR,AGG-_E TROEP-OG E PROVOIRE4DR�A9P4=.8 I TS TEMPORARY SEEDIMG 3.31 Kb OOTOTAL SP 'PI\WERVVJ" rrn Lu I PERMANEx B®B G RO.W EASEMENT _VALVE (3J P$ 3.32 v 1 w U MULCHING 3.35 F� � /COMPILED PROPERlYLiN�F F_OPDFDAM=TH 4" �' , - - , , - - ' i3OS / i `°Ari�'a :::EP.;•: 1 12 _ �jt ,e _\-_� - O TP TREE moT[tilOx f[xw 3.38 OFtF'/--- 3o w OM 68.1'i ry \\ T ` p v�i 6 i \ 'ii2 __�J•- DC MST CONTROL 3.39 ✓ ' r' / , �� // r TP i _ .' >T X oHP, 724 . -.. - 725 / \ / coccwo°° G CONSTRUDTION VEHICLE r - 30 _ �rvgv 3 BM II �I AREASSTEEPERTNAA3:ITOSE 3.31 PARKING ALONG TEMPORARVf ♦ RW SSEPS / U, �K - -- 4 _1� `--'---- -' STABILIZED WOH STAB -ON �' / ,'�'P1P�08JOP40-00-WOAO� r GRAVEL ROAO.r �E"`+ - - 726 - ^ _ _ _ _ - _ - _ _ - BLANKET OFALBEMARI,E < ��P.'�} \ RI ' SCHOOL BOARD Y Mp8lpUpil` OV,\"°� '� 2a�-- _ - - - - y � /' - 7/ ' "NRGINIA EROSION AND SEDIMENT CONTROL MINDBOOK" SPECIFlCAOON NUMBER ' ZONE: HS>T25-/ I TO Al- WITS OF DISTURBANCE= L� O l' ` HEO HILL ELEM. SCHOOL'" D . 508, PG 503 T 2.6Bac l t �, I ��� * off' M Ts Dc pw L s �\ �` /\ 1:L AC. I 1�r� ` ,° oRP �A55µoD E FLAGPOLE ,r.wlw_ / SF ' / SAF DD try^ ti N,0 �"- S C'c - 6'S 4 3 °OcwOOGlz1 f l 5111 ASPHALT SAF / ITDTAL LIMI BOF of ' 0" W SAF p/ 1ryO to80000 _ I 2HC SP DISTURBANCE=1.0 AC. 1n q / i60� + i' r' �° GIfS' ACES 0"p TEMPO RV GRAVEL .0/1 1� CONSTRU TION PATH FOR SITE ' TOTAL LIMITS OF DISTURBANCEF,� /r �W' / 1.20 C. / (' p BENCH CANOPY VCRMGW.I.&aTnTtSrA> ACC,S.G VEL TO BE REMOVED �� C°° UPON COMP ETION 6F /"\\r �ry GRAVEL \� corvc. ABANDONED /PIII� �14.�� 1:s Na D102046SOT C�aNSTRUCTI jjJJ AM��BHALL BE rp/ \/ ^ rSOIL TYPE:m CONC (CAPPED)FUEL f0 N24%I020 'kEPLACED W13H jOP SOILAND ' / AF I - '\\ CONC CG / a PERMANENTSE y 416 ---� �"'3JoxwLD p/ r�O X� o°°R ` \ F 4"X4'STEEL oo I SY+Nc p I PROTECTSEPTIC, ,SEPTIC E-rn fe COLUMN$(iY6J 4 COVERS COVERS/OO 190 I Pro: oeJoa9B-o6-aslr% / p/ ry° SAF I �C`OUNTYOFALBEly1ARLE / 1 I _ I HILL EL BOARD ' r BRICK L / "RED HILL ELEM SCHOOL" / / + IO //0 ' ` ICANOIjY BRICK WALL ILA\ / OB. 504 PO. 343 / 4b5AC ra wuBC OEG / 'TOTALLIMITS&DISTURBANCE/ / '' O , B"(WI�NEE WALL 4 ON GONG. PA06 ' FE'OOOR I ( 4Q ' I \ Z , 4'(Hl(TYP) - cr£tw-i°eL D_ ( 1\ W r r / PROTECT SEPTIC, , COVERS / COY k ! �I 1<l I' I r r L r O 3) 3FM000A R IOBL.OGOf+ I r METAL - i�" l Q I SOINLETW/GRATE ti N ' ^ STAIRS -\ MAFPLE 4 I TOP=728.35' ICJ N 725 = "IDEDS E➢UiPMENT F = lfe' d / / INV OUT=)21.35'12`ROP (SW) M : 1 r r , F -ns.v' ExcLasuaE _ _ _ _ _ _ J - I / / N e fH7 vEf Co00.a c, \\ / - 729 - Cl C-) I ` IFw-,°O° Fz,= -' / 1ti0 LSA r c O Lu I 3 N SAMITARYDF JUNCT'•O r+ia 3FFEW c I 1 N Q BLAGGED BYOO1fERS (TY 0 , , ' E 11DBt. 000w FFE i�6 I I 'I I /l / CM ' ^ - " '' Lt SD INLET W/GRATE V ,-4�� TOP=JT3.16' / A Q \ .,wl °GOB T 619 =eln Y _ INVD = =7Z.' 1' IRCP(NE) `/ m �1•t2ap' I • _ S' - - I r I � INV OUT= J20.64' 15"RCP (SW) �= l I 3�T GCB I I' I I I 3'( �DGo6 c°°rrwarl O �y Q I e �r�DGGB- z5,ae'� c°s° G. '^" -726- - i 0�0 \ 1 fe rtwFtE ° I� ^ BLOCK N;4[ 4 1h9 3OMH C Z 0' k LI YPE>\ wE(PovB ® _ ' �b'(M , / TOP=)25 )s' f// J p - INV,N-W 16'8"PVC (NWf /� G 0 Q \ rn E E x / Uqg g G sµ / NV IN )20. i 16"RCP (NE) 0 InFlAYxWGE �vI 1 SF I �/� II INVOUJ=12001'15"RCP (SEJ = U O ` .OWf�oR CINDERBLEVEL ILITY 1 /yHOOL.`/// �I TOTAL,ILIMITS OF -.P1s "REDHIL ELEMENTARY DISTfJRB727 1.20 I`, y 1 OTA LIMIT OF\ I - \ 1.20 �C. II IY DIS AN E_ G 0 � I I SAF \ ` 9 fOx8 1 I1 TOTAL LIMIT90F y \ V/ Z \ ny/OBL.OGOx _ _ DISTURBANCE= 4 33 5 - ' N .2 0 AC. \ WATER -I'll -LED - I I I+�IW PID: 08700-00-00-06400 = U 2N°OEO. TBEBF 1 I _ I` ' F FOR _ �� BARRICADEIBY, 'J26-__I_ I Il 0 V� WWWW G�uv° = 2r / ✓AMESF EPOVIELHSI , JR U >+1 CONTRACTOR \ (�` I ZONE'HSf � w V ARK/NG SPACES I \ l l ->1B _ 08. 2246, PG, 461 J �J,J SAF F 'El>nO°z: 3F( nO°. ..� s I Z 0 10 TILER OBE \ \ II r/ ELQ \ \ \ 1 1 �r \ - - SHED YTLu T MP / OVI D BV WNER ; 'I Lu \ \ \ \ \\I ` o CHAINLINK F CE 'HJ II _ L�LJ ~ w \ \=18" C 1J"A, PROJECT NO: .380 ` NOVE NO25, 3019 I �Occ SARRIC�ADE (BY y' REVISIONS CONTRACTOR)_ 3 I ( SOMH DATE DESCRIPTION lNVIN=)19.38'15"RCP (NWJ 1 14 PARKING SPACES / / 4&20 COUNTYCOMMENTS \ \ 1 1 \ I \gyp\\ I 12! ' INVOUT=718.28'15"RCP(SEf 62420 COUNTYCOMMENTS \ B1PVG \ \ \ \ \ 7 • _ _ _ _ - 711 90l_NLINKFENCE'6yH) BASKE ALL 1 1 1 1 1 1 1 1 1 \ >]S GOAL) �PRESERVEO - - - _ HED EP 12 \ 1 _ _ _ T 1 1 _ \ 1 11 1 11 `- _ _ _ _ _ �x - CRITICAL SLOPES \ \ I _ - - ]>9 - _ _ - - _ _ --X (TYPICAL) - SHED l SO CURB INLET m \ \ I 1 _ \ 1 0 c___ ]18- _ --�� INV OUT=J18.2515G (S) EROSION &SEDIMENT TOP J22.26' 44 �T y MP E 2 SCALE 1"=20' CONTROL PLAN - PHASE I D zD• ao• C3.2 _ _ .LOCATION OF4" 0., WATERLINE I I EROSION CONTROL LEGEND 1 D.l. = v COMPILED PROPERTY / PID: 7B0-0-00f200 MCLAUGHLINLIVING TRUST I I LIMITSOFCNGADGRAI LINE ZONEHSf •ommommom• DRAINAGE DIVIDE I30'PRESCRIPTIVE VBOT R.O W. EASEMENT 0.72AC VDOTCLASSAI \ ` I CHANNEL RIPRAP I Pt_ SOIL AREA DIVIDE OUTLET PROTECTION. __ 1 �_ i WIDTH I=3.]5' I SAF �9AF— SAFETY FENCE 3.01 BROWPIS - TON"H'\ 1 3 11D _ _ WIDTH 2=6• _ 1 T I � I SPREADER 2fi WIDTIDT HL' --`- 313 LENGTH 18' I PCE PAVED CONBiRUCTION ENIMN� 3.0] �L pOWNSTREAM GIPOF WUSH - jy+ I' 12 B DEPTH=18' PMCLA GHLINLIVING POF ALL - �\ 1 �' MCLAUGHLINLIVING m TEL I - 1 p _ TRUSTC/O OANIELH 1 (/ `\ /�N ' // TOP �FWALLELEV;T11.3R101 1 Og" -_ I� .," y \ MCLAUGHAUGHLIRESEN '1 6F —16 — SILTFENCF 3.05 V Q W IL C 55E DETAIL/ON SHEET CB'0 1 1V��� OI r' C , 1 MCLAUGHLIN S TYP y Ly 1°6 r - SF 3AF I 1^ 1 ZONE: HS> P ® INIET PROTERION 3.0] 0 09f AC > /\ DIV... DIKE D.PL TION OF 4" WATERLINERl— OF WAY D-RSiIX1011(E 3.11 �m / / / / / / \~ \]��' / ✓ / / 1^11. IP ` SF BEOIMENT T— 3.13 .725 _ \\ I OP OURET Pa02CTlOx 3.18 w LL U < ,PRESCRIPTIVE VDOT� lM1'W iER I v N r Lu OHP� T6 TEMPORARY SEEDING 3.31 / ^ m w D RO.W EASEMENT VALVE (3+ c + w a F CO \` PERMAHFM SE®ING CIP �L, 3.32 / COMPILED PROPERlYLiN�F TP - PS GF O .PCE O ¢ / � .', � • - � � � , - -' � � ' ' - � • i9 Age � A` MU MULCHING 3.35 w TaEE vaoTECnox FExrf 3.38 ` via i _ BM +1`1J p, PS MU IP HP.ONTROL 724 / / so OAKS soaew000 s ` 3 DC WSi C3.39 , I . I ' I I / 08]00-9b.060A0/ 1 I / l \ 126 - - - �K _ _ BM AREAS STEEVE. — 3:1 TO BE 3.36 r 1 ._ „ A�w �\_ fIOUNTY OFALBEMARI,E I l STABILIZED WRH STABILIUTON r / ' SCHOOL BOARD / I I']2, p4lluc- - - -' w ` BLANKET ZONEHSI l 725 -' / a ' r' \\ TO AL LIMITS OF e ot>G'wooD O lI WE r D 508, PG. 503 PS 7 T •'VI0.GINIA EROSION AND SEDIMENT CONTROL HANDBOOK" SPECIFlCATION NUMBER s /y DISTURBANCE=1.20AC. ./ / / FLAGPOLE I I I I ' 6 e @ 6AF / TTOTAL LIMITS OF URBe / EG tR�B / A lrovl I 2NC SPACES DISTANCE=120 AC. IIAn / //ryp0 ' 1 Y / TOTAL LIMITS OF DISTURBANCF� I / O�_/W�l 1.20 AC. PS 1ry(' ` CANOPY ^ V�ALGW ]&aiAUSrU9 y / corvc ABANDONED / I.s Na D1020i8$OT 14'GATE / 1CONC CG I SOIL CONC (CAPPED) / ':F06/24/I020�ePV" / B3TONAL EEO ,FF[Jiz ` PS F 4"X4"STEEL / O - .fe• I COLUMNtS{TT6J I / / PROTECT SEPTIC/ SEPTIC MU / COVERS/ COVERS/ ,COUNTYOFILL EALBEI]fARLE r PS / L BOARD i'STEPPED "RED HILL LEM SCHOOL"h, ` I ICANOgY BRICK WALL IIA\ DE, 504 PG 343 y ^ ✓ / / / / ,a PL DE / TOTAL LIMITS6F DISTURBANCE= / ''r P9 / c / 'r ' ,'�uj ' PROTECT SEPTIC COVE!}8 / COVEIRS / Qy ' / O y� 3�JzoB SE;Daz. CCOIt / I METAL 1B" ` I _ - 7ze• 1\ STAIRS -� MAPLE SD INLETW/GRATE ti CIA TOP=726.35' oa Lf'A N EpU/PMENT F N I / I I / o / INVOUT=722.35'12"RCP(SW) A P8 F s.v ENCLOSURE 0 M > II II E,SAL �DOOrz rr / / 729 F.z,°°°R \ •_ rr °9aovsY 3� I �� N SAMJUITARYDF —6 s iOOaa I'FV °Opp 11 CM CM ' 11 BLAGGED BYOTT.. (TY ' ' E liDEt. o00w 2V. CB / *k v I� SD INLET W/GRATE TOP=lT3.16' / A Q / \ OU S. - zszs F ' �Ilt2a.2p' l' INVOUT=]20.64' f5"RCP(SW) LL F- ll F 1M1 N 40 / l Q I a//J0008 � s•(JDOCB � IGII WA TOTAL LIMkTSO I N X]ss za e'[E)Oer_DCOB �r-rG-n3zr_ rvc DI6TUR CE= I / O O 28 - \YPE MaE Fh�� ® n sona M"iM cKMUL I'/ ioP�725]9' LLIN m p INVIN=12016'B"PVC (NWf O o \ rn E E mil/ Uqg Q G s\ / NV IN ]201T 16"RCP NEJ G o a ul vl ^ SF CINDER BLOCKFACILITY Ii 1INV OUJ=72001'15"RCP (SE) = V o TOTALLIMITS OF �F'E I�tRO01s REDHILL ELEMENTARY 11 L DISTURBANCE= - 1 II/ scHooL^ I, Y �l �R I N J 1.20P0 ." ` h1y i � N } o � 3 DOD6 � o � o . I \ ` ^ ••-mom /i TOTAL LIMIT60F \ \ I/ Z 1�1 SAF PSI F - / DISTURBANCE= / W (� -'; _'II/// N.20AC. TEMPORARYTRAILER W PID: OB]00-OP00-06400 za°DEc. iB�E \ II .` ' IaAY D s _` TO BE PROVIOEO BY ]26 I I I/ �' JAMES F POWELL, JR J Ci O J 1 OWNERSHIP I ZONE: HSf w �US. 2246, PG. 46f Lu P6 SHED , I: I, \ I ' AQLu a Q w CHAINLINK F CE �' HJ ll O _ _ I/ T � w _ x I H m o \ `18"PItiC �1 ` \ CONC. CONC. _ _ / I I Ll { \ ! W \ I /NV=jfa'Y M ArsEa \ p O _ \\ 11 __ __ __ 724-___ T'Zb�• TPPROJECT NO: W3801 % DATE: NOVEMBER 25,2019 _ REVISIONS 10P=]24.21' DATE DESCRIPTION INVlN=l19.36'f5"RCP (NW) 2-620 COUNTYCOMMENTS INVOUT=71S28'15-RCP(SEf 4-8-ZO COUNTY COMMENTS \ \ try 62420 COUNTYGOMMENTS 81PVC \ / \ =712er f� \ \ I \ 7 ��x�`_ \ •____ _ EP. CURB CON. / l 111 KE YEoSERVEo U 110 GOAL ___ CHNL/NK-- R-__ _ _ SE ____--__- __-__-TICAL SLOPES BL�KPCAL) Sy I T SO CURB LET m TOP=J22.26' �- g �, — -- --- n6--- --- _ -- - -- KDciREE INV OUT=718.25'15"GMP(SE) EROSION & SEDIMENT - SCALE 1"=20' CONTROL PLAN - PHASE II - - D zD• ao• C3.3 Section 5. Stormwater Management Plan (Provide a reduced I Ix17 copy of the latest stormwater management plan. Do not reference only.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County S APPROX. LOCATIONOF4" D.l WATERLINE COMPILED PROPERTY LINE PID:OB7B0-00-0 1200 MCLAUGHLINLIVING TRUST 30'PRESCRIPTIVE MOT ZONE'HSf _R.O.W EASEMENT 072AC I BRO\ CHAT \ 1 1\\>�` \1 s0 --- EXISTING ROADSIDE I Dun OWIfSTONE LEOE 1DITCH A WIDI / DT SPREADER 25 WIDTH; - --`� 5 1 111 " _-JSEESHEETC6.OFORDETAIL) r LEIN( 1 pOWNSTREAM GIEADE FLUSH -- _ - `jya M'ITH y0P OF/ L. 1' - - - - — - I 1� p - DEM TOP WALL EL117111.39\0--__�a�_ SEE DETAILON SHEET 11.1 1 11 - 203 - _- - 1 9y � 6� y y� % / ' `Vy 10 OCT T2 /PlD]08J00-00-00-060AOI i POUNTYOFALBEMARI,E I �' 2U / SCHOOL BOARD ll I z6NEHSI 1 / ,'G�} 212 _ 125 ' i OR'08, PO 603 / oY'P S•i2 ' ^ I �' - 14 li ROOF DRAIN 3 ,/ \ ''tt� CONNECTION yY 21T 216 E ROOF DRAIN PROM ADD j O I / \\ / F ADDITION TDB TORM PIPE 223 CLEANOUT (TYP.) ROOF DRAIN CONNEC110D1 ^ 1 1 1 m y 1 ROOF DRAIN \ / 1/ P 1 ,..5, .3 ` CONNECTION CLEA f(p 1F / n4�,DBL.4�R COVERS/OO / / I / / Pro oBJoa-aaoo-6s1do° / (4 1 / dE �°O°R I( dOUNTYOFALBEI ARLE / 1 SCHOOL BOARD REFER TO MEP PLAN "REDHILLELEMSCHOOL" / ' / ry FOR DRAINAGE AND 08. 504 PG. 343 �y N SANITARY SEWER / 4F5AC i^� INSIDE COURTYARD AND UNDER BUILDING ScPflC / ry� T Dolt CgVERS '' F F= - / -o�/ 3rooaR FFE iT5 4 1 A F I 3�)�°COR SB 1 SAMITARYDF. JUNCTION BOX sFE izi 1 HLAGGED BYOTt ERS (TYP) F ' E ;°et. 000w F 1 � I i \ = T5z3 rFEiI]�n 1 I F E-�ns.zo 1 I n FFE-/v2o F1W108[��Oft F� �B a _ \ 1 0 1 IIEVEL .1� �. CINDER BLOCKFACILITY 1 \l ` I = "S.,"REDHILL ELEMENTARY SCHOOL• 1 ;, I\ s E °aow 1 IUGi l I ISHED\ \ I \ X \ BIPV( \ \ \ \ `-71282' \ \ \\ T'—x— _ \\ •-___ - 81 PRESERVED -]f _ — - x�--x- CRITICAL SLOPES__.''. 9 _ _ ` _ - - \ —.Tx (TYPICAL) c/) NOTES: 1. i UNLESSOTHERWISE SPECIFIED. ALL FOUNDATIONTIONDRAINS SHALL BE 4' PERFORATED PVC PIPE. FOUNDATION DRAINS SHALL TIE TO CLASS At THE NEAREST STORMWgTER CONVEYANCE PIPE NSTONE I ACCORDINGLY. JEL R TEC 2. ALL ROOF 2.5- OU OF THEAV BUILDING MUM AND : I PROTECTION. I INVERT MINIMUM OUTOFTHEBUILDING AND DRAIN 1 = 3.75' AT A MINIMUM 1 %SLOPE TO THEIR TIE IN POINT 12=8' 'I AND MINIMUM 2'OF COVER. 'H 18- PID:LAUGHL0 LIVING0 =18' TRUST CHOW LIVING m TRUST C/O DANIEL H MCLAUG ERESE N I M L LAUGHIN ZONE HSI ONE: 091 ACC I ) APPROX LOCATION OF 4" D.l. WATERLINE � T 12"RCP J25 ' - \ J w U INV=]22 ]3• / \ W ) --- ONP'/PRESCRIPTIVEN59TER y� U RUN, EASEMENT VALVE' PD {cn 1Y COUNTYOFALSEM�RLE BOARDZ SCHOOL BOARD ¢ o ,O .AS1 O u� w 1 - Oe]116. PG. z—z55 JREGRADE CHANNEL TO BE 1 DEEP WITH 3.1 s I S��SSIIDE SLOPE PROVIDE TIT DEPTH OF VDOT _ _ #� / 726 _ W' DNNOHANDARD CLAGEANGEOOTEXTILEE FABRIC P _ _- RECESS,yfyppVFLOW FINISHED GRAD (SEE RIPRAP CHANNEL9ETAIL SHEET) CONTRACTOR TO RE -GRADE ALONG EDGE I OF ASPHALT, CREATING SHOULDER DRAINING DOWN TO RIPRAP CHANNEL I %/ I SS n I I l Ou IJ �ETBACM - ry NYP) 2HC SPACES _ � - •' / I �• Y�"�OF FOUNDATION PVC TOTIE TO I FOUNDATION DRAIN. '" I \ c>w�ucw/.xarnurJri 1- GATE Ls 12 12020S0T CG h ^ I - -� � - 727' ' _ _ _ _ _ ONAL 4"X4"STEEL COLUMNtS{IT `) lk II "STEPPED /' BRICKWALL 1 I �/ x \ p W METAL II Q I ° SDINLET W/GRATE Lo N STAIRS ' 4 TOP=J26.35' {o N a / / 1 / / INv our=Jzz.35.1z•RCP (sw) N N 04 c SDINLETWLGRATE q* TOP=J23.16' ' ^ m 0 INV IN = 720.95' 12"RCP (NE) �5� I waLL G I r INVOUT=720.64'15"RCP (SW) LL fa"BLOCH (1 cq 00 728 W N m Z IL 1—DESWAL[ 3OMH TOP= ]25. ]9' V //� i G� O INV IN=72016'8"PVC (NW) /� O O I INVIN=]201T 15"RCP (NE) \� O C O / INVOUT=J2001'15'RCP(SE'l = U 0 fC� p727 (I IIt o 0 \'726 -- I PID: 06700-OP0 100 W F MESF POco) JAWELL, JR J V 0 0 J ONE HSI OBZ2246, PG, 461 \ I 1% d Q W F W W -- �/ 2. I w am 1 / / PM CTNO: N3801 -LOW ER MAN NMBER 25, 2019 �B€FLUSH WIOVE OLET DATE : TH 3I I / /'Ry' SOMH REVISIONS DATE DESCRIPTION GROUND 101J24.21' — COUNTYCOMMENTS INV 1N=719.36' f5"RCP (NW) \ I / INVOUT=]19.28'15•RCP(SE) 4-&20 COUNTYCOMMENTS / 1ryb I 8-2420 COUNTY COMMENTS --723 �: 22 BLOCK m gHEO SDCURS Tm OP= 22.26' INV OUT=718.25' 15•CMP(SE) GRADING AND DRAINAGE T/ ,"=2o' PLAN SCALE D zD• ao• C5.0 S APPROX. LOCATIONOF4" ' -_ - 1 \ I D.l WATERLINE I I COMPILED PROPERTY LINE PID: �00-0a0 20 TRUST MCL4UGHLlGHLINNLIVING TRUST I II 30'PRESCRIPTIVE MOT ZONE 'HSI R.O.W. EASEMENT 0.72AC i PIO:087Ba0000 INLIVI \` - - MCLAUGNG I 1 d TRUSTC/o ,0DANVIOANIELH MCL4UGHGRESEN MCLAUHL NE HSIN - -� /10y \_-� MATCH EXISTMATCH MIST. 091 AC / / 1 T ai APPROX LOCATIONOF4" y9y I y910 I.. \ ' i' .' / r / i6 _----- _ - r I �' ' �^-� ` `DWATERLINE / BC%/ A / GT ) - _ l - 122' MATCH EXIST. r -INV=l20 �C>6BE\� 12"R57P --)3' PRESCRIPTIVE VOOT�- HW]ERI - N ROW. EASEMENTVALVE l3J PID:.7B-0-0-1- oN ` COUNTYOFALSEMARLE UGTC 724.06 - \EP - t SCHOOL BOARD TC ]23.11 / / COT4PlLED PROPERIYL7N� , , -' , , / TC 1.6 qT / - EP 723.15-- ZONE RS1 EP 72411 22 _ .])AC 724 711 pp ]21.]5 )2 TC ] " ]24.]5 - - - I I 1 _ _ �'P1D�.100-9 -00 O60A01 1 r l �_ D 726 - i OUNTY OFALBEMA f/RI,E I I / ry ]25. `]25.941 TC T23.5] ]2 eLm'. SCHOOL BOARD l I ]25.11 ZI / /r 'r \\ EP 723.30 ONE HSI BS 72432 i D TS ]258255- EXIST. T 12 Q I I 2.6B AC / �'P n / PFE 725]\ .94 /� 2540 �C / / I / I� P� I•n 725\2�.40 25.94 /25.N 3725.73 / / 6 1 726.94 ]25.8] _84 _ ' Y SETBACM I K . FFG725. / 727.2� - 2HcsAP rI CES I l Y / 4B 725.83 FF�72]28 ` 2 14'GATE CorVc CO ^, I FFE T25.94 r - - _ � - 727 . EP 725.83 So)aaze0006 I r P / / Lr r r�OO 3]000a 4"X4"STEEL COLUMNtS{ITP`) lk / MAINTAIN 2%C OS6 ] r'COVElElTRS/O \ I / i13 SLOPE IN_X AGkOSS O GRADE ]28.93 HAR9SCAPE (4 ) / FFE iUooa �02 130 xI l PID: 0670 00-06100 1ry0 172692� GRADE 727.22 ,C`OUNTYOFALBEI/1ARLE,„ / 1 SCHOOL BOFRO / "REDHILLELEMSCHOOL" BRICKWALL OB. ^ry 727 W MATCH EXIST. GRADE / 455AC 1 BELOW WINDOW MAINTAIN 2%dCROS9 / SLOPEIMAY.(ACROSS / ' F / a I / HA4Q I 1` ROSCAPE %\ i24.97 0�3gVER 1 E I �.. oaore I I METAL r I ¢ I I k' SD INLETW/ORATE 3 ^ STAIRS 4 TOP=128.35 INVOUT=722.35'12-RCP(SW) 724.98 F 5.2.1 /-----729 11 10 MAINTAIN 2%CROSS SLOPE (MAX.) ACROSS I - e Dec. Doors e'M'I oe�. 000R I HARDSCAPEI`` .G >w Y(WIDOEA SANITARYDF JUNCTIONBOX. ery✓'000: FJoaOR BLAGGED BYOTt ERS (TYF) 722.94 N i� �' FF[ia5.21 rbw ,1F(iZooR a ii ' I r / SDINLETWCGRATE TOP=723.16' sFry / 121 I I F -2a2o ` -�'� IeL wALL O I Y INV OUT= 720.64' 15"RCP(SW) n FFELv2o 728 FlW108[�OB FFE-B f ® II 1y05�OGKWN'[ SOMH ToP=72S 79' \ \ INV IN=. iT 15 RCP (NE) \ I 0r . 1BLOCKFACILITY p Uqg I / r INVOUT2001'15'RCP SEJ E�"LEVEL - 1974 "REDHILL ELEMENTARY ' 718.SCHOOL' 1 95 l - 727 I 17 I FFE 721.93 721.53 / U 3 \ \ \ I 721.83 l' \' 726 PID: OB]00-Oa00-06d00 I\ I JAMES F 719.20 , JR I / \ I ZONE HSI 46, PG, OB. 2246, PG. 461 il8 96 / / ro ' ��' e - e E 000R 'FE n 25 ( - I 719.49 s \ MATCH EXIST. ( MATCH EXIST. I 2 I \ `18 P1Y 1 I I 719.23 `� \ I ]22.61 MATCH EXIST. B/ / \ \ 722.33j26 \ \ 1 MATCH EXIST. ff a719.26 SDMH INV-I9.36' f5"RCP(NW) INV OUT- 719.28'15-RCP(BE) I BIPVC ,--723 I I \ 7F ��x� _ \ •____ _ EP `. CURB / ��� I \ I \• ��x `_�x� 721, 81 - PRESERVED - - - >75 _ _ _ _ _ _ _ _ _ ]f9 _ _ _ _ _ _ xt �x _ _ ` CRITICAL SLOPES BLOCKY - _ _ _ _ _ �tx (TYPICAL) - SHED _ _ _ _ _ TOP-=722.SOCURS126 ET � I _--»8-____ _, - --_-��� INVOUT=7f62515C ( ) x � MP SE SCALE 1"=20' o 20• ao• W, �i W) 0) oa Lo N Q N a c W C N GCD C) C14 - O x W w m Z O p Q 46 C O < _ v U T 0 N O co o _ W co J wvU) 0 C3 W M W W uA amo � co GRADING SPOT SHOTS PLAN C5.1 Cl) APPROX. LOCATIONOF4" COMPILED PROPERTY LINE PID: 06780-W-I�0120 MCLAUGHLINLIVING TRUST X RESCRIPTIVE R OPW EASEMENMOT T ZONE HSI LU H72AC ID PID, 08713a601000 MCLA INLIVING 0 TRUSTC,0DANIEL H MCLAUGHLIN & TERESE N MCLAUGHLIN ZONE HSI 0,91AC 200 APPROX. LOCATIONOF4� D.I. WATERLINE /47 A0 01 100 ­0 Lu _j 12"R�P 725 JNV_ Lu b '#?Q.,W, EASEMENT VtVE 'llj PID. COUNTY OFALEEMA LE Gr SCHOOL BOARD 12 COMPILED P�Opg&n* % ZONE RSI OB, 7EB. PG 4S7 A 24 - - - - - - - - - - - - '1710�08700-"XOAOI ♦♦- - - - - - - - - - - - - - - /POUNTYOFALBEMAR�E Z SCHOOL BOARD METAL SIGN ZONE: Sl "RED HILL ELEM, SCHOOL 216 FLAGPOLE - - - - - - - - 218 0.90 223 090 0.02' 0 4B CANOPY 4P 0.32 ABANDONED 0� CONC, 'DIP M 4612412020 '1'c IN 4"X4'STEEL COLUMNS{ITP`) T IElk CDIEReI 71S O(, IS, 191 dGUNTYOFALBE��ARLE SCHOOL BOA "'CANOPY - V STEPPED "REDHILLELEMSCHOOc WALL OB. 504 Pe 4�5AC Lu SEPflC I try Z-V ,/ o ­)_._ I " METAL SDIKETWIGRATE oa r._ cm FVaERS STAIR, TOP=726� cm INVOUT=72235'1Z-RCP(SW) ­T C3 7� > 'o, c? Lu 14 CN "W11�/ CD SANITARYDF. JUkCTIONBOX. FFE2= 04 ALAGGEDBYOTt\IERS(TYF) SIM SDINLET-0. TE TOP=723.16- INVOUT- 64'15-RCPSW) cq 11Z,21 ff, (HLI 0 0 Lu co 00, AW USECIDM' co - , P_.5711 0 WV IV=72016'8-PVC(NW) ILEVEL OINVIN=T0171YRCP(NE) C0 IV "I' �001'15'RCP(SEI = = 0 3(MDEOR CINDER BLOCKFACILITY 4 0 —SCHOOL� ELEMENTARYL727 lT U) WCIII 0 I.. o S_ c) LLI PID, 06700-0a0�10 r; C) U) xw__ '726 - AMES 1 10— H-1,21 . . . .. ZONE PG,I HS461 _j Lu ­D, CIS. 2246, LEGEND: FE 0- SHED LLI T I/Y u L CHAINLINK Ej'(Hl I, \__�REA� LLI Lu IN V'S;'p. W, I cl) :r cl) PROJECT NOi N3801 DATE:NOVE.EE­,.IS REVISIONS TOP=�421' DATEDES-111ON 1NVlN=7I936'I5"RCPWW) 2-0 COUNTY WMM NTS INVOUT-719.28'15-RCP(SE) 4­ COMI COUNTY N COMMENTS MENTS BjPV -712 kl -723 T�, 7�1 --- ChANIINKFENCE� 120 ------- PICA �CRTIPI.C.AL)SLOPES 84 --"9 AL SO CURB INLET ----- TOP- 7222T ­718 ------- INV OUT� 718�25'15- CMP (BE) SCACE 1-M STORMWATER SUMMARY 2D 4D PLAN C5.2 — — — — ROADSIDE DITCH A ROADSIDE DITCH A I i S01FD1STuf(BM'�cE'�MITSO,,DJSTU CE'' i ..'/� ,,,- i_, "_ _� �, / ��> _- , •'•ice'.'_- i_, - -� �, - LIMNS OF DISTU o/ / �� .'�r,%'i' ! �1V /' \` ', / �— LIMITS OF DISTURBANCE il','' rp/ ,'� r /Y/ ,' I ,' � / g A I ��\ ® � �_ _ ---, � �Ir � il�,'; -'� '/,/�s // ,' I r � / 5� ! 7► � � �-- _ --- 40"' II -90 A a I �I ; / LIMITS OF DISTURBANCE vv \ � LIMITS OF DISTURBANCE i p�' _ 17, `— ---------------- _ j � _�_ PRE -DEVELOPED CONDITION '�I'I'� �, I. o a0• eo' i _�_ POST -DEVELOPED CONDITION nslWate.OuYlH •LEVEL SPREADER TIMBER LENGTH (L)CALCULATIONS rnmPliencal Srte lMormaoon ""°'.,m.'P°-" t. WATER QUANTITY: DRAINAGE AREAS FROM C5.2 6' 3�•I ....®.., LEVEL SPREADER: I w...,.nvw�.Irt+O Q(10)FOR PIPE 201=2.00 CFS (SEE CALC BOOK FOR Irw.•w...ene. o.IM. Poet-0eveloPmem vmlen Rreaunemvol.me ane Iuaasl � ® •'� ""a'^ raM�p ti + IN THE DEVELOPED CONDITION THE RUNOFF FROM THE DISTURBED AREA WILL FLOW OFF ASSHEET FLOW. LEVEL SPREADERSMEHT FLOW. T IS POINTSRATED DISCHARGE TO RETURN RUNOFF TO SHEET FLOW. THIS PROJECT FULFILLS THE REQUIREMENTS OF SECTION 9VAC25-9T0-SS SECTION D. CALCULATIONS) LFX 2.00 CFS =26.00' 6. - ^• L= 13 LF x 2.00 CFS INFLOW (10-YR STORM EVENT USED)=13 � .m...... ^I� .tea ,• _.,. W MAINTENANCENOTE: INSPECTIONS SHALL TAKE PLACE +•a"~^ n y „ r+"+'""'mow'° ANNUALLY, IDEALLY DURING THE NON -GROWING SEASON. .` SEDIMENTS SHOULD BE CLEANED OUT OF THE LEVEL SPREADER FOREBAYS ANO FLOW SPUTTERS. ••-+a•T+•a WATER QUALITY CALCULATIONS: SUMMARY FROM RUNOFF REDUCTION SPREADSHEET FOR REDEVELOPMENT (SEE CALC. BOOK): MOOT STD. CLASS Al .... .... BROWNSTONE RIPRAP . VDOT STD. CLASS Al DI STUBBED AREA: 0.92 ACRES 6'X12'CONC CURB BROWNSTONE RIPRAP CURB LEVELale SPREADER DETAIL No S DRAINAGE AREATO DITCH A=0.W AC C=0.55 BOTTOM OF CURB LINE OR PIPE TC=6MIN BOTTOM OF CHANNEL 0.5' OUTFALL I(2)=4.941NMR Q(2)=D.55(O.60K4.94)=I-CBS CHANNEL I.O' GRADE OF DEEP. I(10)=6.541WHR Q(10)= 0.55(0.60)(6.54)=2.16 CFS DEEP s - - - .. w PRE -DEVELOPMENT LAND COVER: B SOILS: 0.16 AC WOODS 0.5] AC TURF 0.19 AC IMPERVIOUS POST -DEVELOPMENT LAND COVER: BSOILS : 0.48 AC TURF Dd4 AC IMPERVIOUS SURROUNDING SLOPE ST R M FIL TO IMPEDE STORM FLOW TO OPENING 4' V(2)=3.T9 FTIS (ALLOWABLE VELOCITY 2:1 MAX SLOPE 2:1 MAX SLOPE D(10)=0.45' I�2 B' s _— a ""-' a •.,.._a• REQUIRED REMOVAL: 0.50 LBSIYR' PF 'STORMWATER QUALITY TREATMENT REQUIREMENTS TO BE MET THROUGH THE I PURCHASE OF NUTRIENT CREDITS. 2 KEY IN 6"-9" FOR ENTIRE PERIMETER 16" VDOT STD. CLASS Al 18 ? 1.0' BROWNSTONE RIPRAP CHANNEL SECTION RECESSED INTO GROUND GRASS LINED DITCH MIRAFI 140N FILTER n = 0.045; S = 12.2% FABRIC OR EQUIVALENT DITCH A -ROAD SIDE SCC PERMANENT RIPRAP CHANNEL DETAIL ROAD SIDE DITCH CALCULATION No Scale No Scale A o x v _,,.r �• JJ I.s i4a 0402046S0T �ONAL O Lu 1.0 0) oa Lo N Q N a c W C N GCD N LLO� W �., COz in o OJ p Q C O 0 _ U 0 N O coo _ W c� J Lou 0 _ 0 G C3 Lu Lu W W a Im � co 'SECT NO: 59990t fE: NOVEMBER 25, 2019 REVISIONS ATE DESCRIPTION 620 COUNttCOMMENTS &20 COUNTY COMMENTS �420 COUNtt COMMENTS STORMWATER MANAGEMENT PLAN C6.0 102: MI STA 10-35.42 TOP ]21.84 INV IN 718.58 (103) NVOUT ]18.48 (101) ES-1 for 15 inch Pipe 104: DI-2136 ft Throat STA 10+5].85 STA 00 10+00. TOP 719.36 TOP ]24.00 �111: INV IN ]1].92 (101) INV OUT 719.32 (103) ]30 ]30 PROPOSED ]25 GRADE ]25 \ EXISTING GRADE ]20___j ]20 103 � 1 3'OF 2." 10 ]15 RCP 16"R % F ]15 VDOTSTD. CLASS All RIPRAP. SEE PU ]10 q SHEET C5.0 ]10 ]OS ]OS 222 MH-2 STA 10.21.67 216:6"Cleenout TOP 720.40 216: 6"G1ee.- STA 10+19.14 INV IN ]1585 (211) STA 10+0].30 TOP 725.89 TOP 725.66 INV IN 721.98(216) INV IN ]15.24 (223.) INV OUT 715.13(221) INV IN 12.34(21]) INV OUT 721.98(213) 226:6"Cleenout INV OUT ]22.34 (215) STA 1-0.00 212: 6"Cleenout TOP 125.02 STA 10+56.02 INV IN ]22.]1 (22]) 218:6"Cleenout TOP ]25.10 INV IN]20.23(213) INV OUT 119.46 (225) STA 10+00.00� INV OUT 720.13 (211) STA 10+18.2] TOP 126.00 [U4*8"Cleenout TOP ]24.46 INV IN ]22.81 (219) INV IN ]18.60 (225) INV OUT 722.41 (21]) INV OUT ]18.44 (223) 204: DI-36 6 ' " STA 10+00.0 TOP ]20.02 730 INV OUT ]15. 1(203) 730 202: 114 STA 1 +33.12 TOP 1].03 725 INVI 712.85(221) 725 INVO ]11.4](201 PROPOSE GRADE 200: S-1 for 12 inch ipe 720 STA1 TOP +41.13 12.23 720 INVI 711.07 (21) ]15 ]15 ?p3 ]r A'0 F Op% EXI G TING DE ]10 ]10 201 8.0 12"HOFEPE LEVEL SPREADER @ 5.00% ]OS ]OS ]35 ]35 ]30 ]30 PR POSED G E EXISTING 725 GRADE 725 ]20 ]0OF 20] .21] 21 715 6"HDP®100% 11F8O 6 FGF I 3 213 3 .88' OF 6'HDPE 4..% ]10 ]10 22: MH-2 TA 10+21.67 OP ]20.40 IN ]15.85 (2 1) ]35 1 VIN]15.24(23.) ]35 2: MH-2 730 TA 10+33.12 730 ROPOSED NV IN 112.85( 1) RADE NV IN ]13.94 ( 3) NV OUT 711.4 (201) ]25 ]25 720 EXISTIN GRADE 720 ]p s 6+ TOF \ 715 B ] 715 i$4.s0 F 41 � OF 0 �0 ]10 9t50 10+00 11+00 9+50 10+00 11+00 12+00 9+50 10+00 11+00 12+00 9+50 10+00 11+00 12+00 12+50 STR104-STR100 PROFILE STR204-STR200 PROFILE STR218-STR222 PROFILE STR226-STR202 PROFILE HORIZ SCALE: 1"=50' HORIZ SCALE: 1"=50' HORIZ SCALE: 1"=50' HORIZ SCALE: 1"=50' VERT SCALE: 1"=5 VERT SCALE: 1"=5 VERT SCALE: 1"=5 VERT SCALE: 1"=5 612412020 ca N Q N � a c W C N G Geq a# 0 N EE LL1 N m z cl) pJ o Q o 0 Q0 2 t Ix d �U)_j O cn o _ LL I c� J wvu) J �w� 2 0 0 M w W LLI a m o r 4 rn STORMWATER PROFILES C7.0 Section 6. Pollution Prevention Plan. (reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4) A. Plan showing pollution activities and prevention practices (Provide a reduced I Ix17 copy of a site plan on which all of the following activity locations are clearly marked. Keep this plan up-to-date with ongoing site changes and inspections.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County C. Sources of Pollutants continued. Common activities and minimum control and prevention practices Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures Follow Erosion and Sediment Control Clearing, grading, excavating, and un- Land disturbance area Plan. Dispose of clearing debris at stabilized areas acceptable disposal sites. Seed and mulch, or sod within 7 days of land clearing Cover storm drain inlets and use drip pans Paving operations Roads and driveways and absorbent/oil dry for all paving machines to limit leaks ands ills Concrete washout shall occur in area Direct concrete wash water into a leak - Concrete washout and adjacent to the construction entrance as proof container or leak -proof settling basin cement waste designated on the Pollution Prevention that is designed so that no overflows can Plan. occur Enclose or cover material storage areas. Mix paint indoors in a containment area or Structure construction, stucco, Structures in a flat unpaved area. Prevent the painting, and cleaning discharge of soaps, solvents, detergents and wash water, paint, form release oils and curing com ounds. Dewatering if necessary when Water shall be filtered, settled or similarly Dewatering operations converting culvert inlet protection treated prior to discharge as shown on shown on plans plan. Designated areas for material delivery and Material delivery and storage Adjacent to construction entrance and storage. Placed near construction construction trailer. entrances, away from waterways and drainage paths Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures Material use during building process Building areas Follow manufacturer's instructions. MSDS's attached. Waste collection area will not receive a substantial amount of runoff from upland areas and does not drain directly to a waterway. Containers have lids covered before periods of rain, or are in a covered Solid waste disposal As provided by contractor area. Scheduled collection to prevent overfilling. MATERIALS NOT TO BE BURIED ON -SITE Convenient and well -maintained portable sanitary facilities will be provided, and Sanitary waste Current locations shown on plan located away from waterways or inlets. Such facilities shall be regularly maintained. Apply fertilizers in accordance with Landscaping operations Landscape areas shown on plan manufacturer's recommendations and not during rainfall events To be treated in a sediment basin or better Wash area is located at the construction control as specified on plan. Minimize Wash Waters entrance. Adjacent diversion dike will the discharge of pollutants from divert wash water to sediment trap. e ui ment and vehicle washing Vehicle and equipment washing Designated areas and details shown on Provide containment and filtering for all plan wash waters per the plan Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials present on the site to precipitation and to stormwater. (Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges.) D. Non-stormwater discharges Discharge Pollutants or Pollutant Constituents Location on Site Dust control water Sediment As shown on plan Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Discharge Pollutants or Pollutant Location on Site Constituents E. Persons responsible for pollution prevention practices (Provide the names and contact information for all persons responsible for prevention practices as listed above.) Mr. Rick Truslow VIRTEXCO Corporation Norfolk, VA 23502 804.641.4378 F. Response and reporting practices Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures as follows. Respond to all spills, leaks and discharges as follows; Materials and equipment necessary for oil or chemical spill cleanup will be kept in the temporary material storage trailer onsite. Equipment will include, but not be limited to, brooms, dust pans, mops, rags, gloves, goggles, kitty litter, sand, saw dust, and plastic and metal trash containers. All oil or other chemical spills will be cleaned up immediately upon discovery. Identify and stop source of discharge. Use absorptive materials to soak up as much chemical as possible. Place all contaminated material in trash containers for disposal. Report all spills, leaks and discharges as follows; (Provide detailed response and reporting practices according to 9VAC25-880-70, Part II, section A.4.e.) Reports will be made to the following: Virginia Department of Emergency Management Emergency Operations Center (EOC) Phone: (800) 468-8892 Spills large enough to reach the storm sewers will be reported to the National Response Center at 1-800-424-8802. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Cl) EROSION CONTROL LEGEND APPROX LOCATION OF LIMITS �\ ITS OF CLEARING AND GRADING WATERLINE D.I. COMPILED PROPERTY LINE / PID: JB0-00-00-01200 • ■ �DRAINAGE DIVIDE_ \ OB MCLAUGHLINLIVING TRUST I SOIL AREA DIVIDE 30'PRESCRIPTIVE VOOT ZONE: HSf w - -R.O.W. EASEMENT 0. )2AC SAFEn FENCE 3 1 vAveO consrnurnon ENIIUNCE D2 1� SF 51Lr FENCE .05 PID: 08JB0-00-00-0f000 m \� MCLAUGHLINLIVING O ��—ate / 01 100 9- 1 p -- TRUST C/O DANIEL H 11 (/ n 1 , 10 MCLAUGHLIN& TERESE N 1 C/yI 7�/ C /��_� MCLAUGHLIN O ® INIFT P0.0TEGTIOx .0] Z S016 ) PE;' / 00 / TEMPO BY MATERIAL - = 1 -1n - '--H— / .1 tt11!� 1 1Y SF _ - _ _ SAF -��`- 1 ( ZONE: HS1 DD OIVERSIOX DIKE 3.09 0: / YJV DA Oy STORAGE TRAILER 112 - \ 091AC 0' 1 1 / �/ !_'a �` f2"RCP W/61HW N;`- > 101'1 ' / ' ' Mpg _ INV=J(9.f0' / / �`�_MGM OF WAY DNERSION DIXE 3.11 ¢ TP 1 / 115 iR1`a� 1 9 '� o `• APPROX WATEROCETION OF 4" / 47 m TS DC CON6TRUCTION -'�` _-- I ST SFninFNl mAv 3.13 / I / ,' -RAINGUAGE 1ti ' R / �• '� ' , I 1 ' TRAILER �_ ED H/ _/(`_ / . SEDI ENT TRAP \ SF LL BC L _ - I W OBDACDRAT AGEAREA ' ' ,bUMP'TER' /OGr ______ �,- R` 1` /RO C�L ROgp - -_-`�` ��O OP OUTLET PROTECDON 3.18 T—STORAGEREOGIRED: 2AC, ' \ "' �E) _ I xx TOTAL ST(2RAGE PROVIDED�94.8 CY'/ WORTARMM(XING i DD A` --_D wLL O , - TOP OF TRAP= 514 SF STATION _ _13RL/P J25 - TEMFORARV SEEDING 3.31 U �Ifh�. _ .STONE WEIR--�_a _ _ _ --NV`< / _ K� 6 / - _ 'PRESCRIPT? VODT'� __ IAIER y U / / �� -' -' _ 114 ::::f::.::;�::::::::.... _ max__ x- ONY RO.W EASEMENT VALVE l3� PS PERMANENT SEEDING 3.32 12 3.35 rc < O Qo COMPILEb PROPERI'FLTN�F F_OPDFDAM_=Y14" � ST 1 / G+L'1'','♦ � > �_ � O �'$ w tt ', _ __—_e `_�-� _ O Tp -FENCE FENCE 3.36 � N w w ON, OF 68 i \ `oA _ off i' _ �'� 3O 0 na f ' 10.1' \ - ■ \ ns= -_�� - \ T / DC DUST CONTROL 3.39 oHP L _ - JP6 - �� a-oOGwoOO _- / CONSTRUCTION VEHICLE \ ,' CONCRETE WASHOUT FOR X _ - 724- %J,{ RW P5 m DEDICATED CONCRETE � 5 _ —\ �` �BEh55IIS4FB_➢liN3' P KING ALONG TEMPORARYr ♦ TE ' __ STPBIUZED WIM STABIU]ATION �,'P1D�08J00-00-00-060A0/ i GRAVEL ROAD.r 1 ♦ EN _ TRUCK WASHOUT CO T26 _ _ _ _ _ _ _ _ _ _ _ _ _ _ \ _ 6UJNKET �� , • / ,' PDUNTYOFALBEMARI,E I ` ♦ \�E J�5 TEMPORARY-' .' 9� , _ - _ _ - -cn - /I m SCHOOL BOARD ll �F OB 00 V,\N TOILETS , 2 _ _ _ G:1 a W� "'NRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK" SPCflR ON NUMBER I. ZDNE: HS! 1 r y a Ns", �' � � a I 725 ' T07AL L...TS OF DISTURBANCE = TL / WL°, ...-- -... _.... __.... _- ,' DR MS,, PG. 503 �I t ' ♦� ' G TS DC prER W/ � \� / ` 1'.i(O AC. O // / z.6RAc ♦ \ \�E �, ER WAIWI �` / ■■ •m I / ♦♦♦� ` , �I omN'^°ssµoD ' �_ y FLAGPOLE /z•.IwP ABOVE GROUND FUEL CONTAINE,_ R /Itl/I y 3 / SF ' ♦ / WITH IMPERMEABLE HENW MIL ♦ �ucP` P LINER. VOLUME SUFFICIENT TO ` / AF / 16 1^ r ♦�♦ MPS 5�vA CONTAIN STORED FUELEDID VOLUME t 10%(GASEISEL) r �/ DP,P / Eg1 try ASPHALT / iTOTAL LIMN 2HC SP ' Ar DISTURBANCE=1.0 /'^' ACES fe^PINE r/ Oy.P TEMPO RY GRAVEL F�/ CONSTRU TION PATH FOR SITE / TOTAL LIMITS OF D16TURB,A20 AC. / EN 6� BENCH CANOPY - // ACCESS.G VEL TO BE REMOVED // O� URN COMP ETION 6F 1ry GRAVEL \� corvc. ABANDONED C�BNN COMPI jJON OF LLBE °� (SOIL TYPE:m FUELPUMP ZPLACED W It TOP SOIL AND / J� �r _ AF .I - CpA'C CG CONc (CAPPED) PERMANENT 6E DING. y d v+ - 4 B727 , -- / / / '' ♦ ' \ \ /j c�IOetaOOOB 3 /DOEJ000a `... ■ F 4"X4"STEEL PROTECTSEPTIC/ ,SEPTIERS/ C O / COVERS C, VSAF / 1 ,COUNTYOFALBEf/1ARLE / 1 / SCHOOL BOARD z ('STEPPED `\ "RED HILL ELEM SCHOOL"�0!�_� ICANOIjY BRICK WALL / OR RN, PG 343 ^ ' Imo•~ 415AC v4 OOu� aE� / TOTAL LIMITS OF DISTURBANCE= / '' i� D/ / ' Fes_/°O°R ♦�,��• r I co..,c, \ I I c�'i y / I // II4x \ \ i 2D`Ac I / , B"(OKNEE ALL ) U ,' ONCONC. PAD6 ' FFE /DOOR ' !/�`�2\\ 4'(H)(TYP) F: (r�DBtID— PROTECTSE ' \ w,7 - ' 3EP/!IC / �/ .ao COVE!}S / COVERS k I x O�� / �CaV( E/E=n5? FE lost. DOOR I I METAL OINLETW/GRATE ' MAPLE / 4e I I z STAIRS T OP=7' uiPMEry1� EpT ^W U` / � I / / INV OUT=UT=22.d5'f2"ROP (6W) / 729 1 ` I ` eoe2 DooR e'0✓It-�000rs cD,vc \N ryO LSA-24 x(n) DR� \ / 1P I SAMITAR` UNCTjON 1�! I DooB � � � �vs � I BLAGGED BYOTt\IERS (TY O ,' E ;Oet ODOR - I �I I / =faz8 Tryv)OOORii ' SDINLETW/GRATE a 3.16' WVIN= '019OooB^ I - _ INVIN=J20.95'12"RCP (NE) 101, INVOUT=7z0.64'f5"RCP(5W) l � F��za°OTo Pa 21DooR FHI= oq oB 728- � R >�' o ocK Matt ` \YPE re A E h�� ® II M i 3 / TOVH 25 s J9' NVlN=J2016'8"PVC (NW) INVIN=J201T 15"RCP (NE) 1 ^ SF INVOUT=J2001'15"RCP (SE) \ I ` ..�`�a�-[H,BLOCKFACILY HENARY TA'LIMITS OF SCHOOLSPAC� 7�1_llT ST RB1 NCDI6TURBAN411 =20�C. VL TOTALUMITSOF / 120AC AF DISTURBANCE FFE-TieOId1.2ACLi 726 I2C -1 ( II PJID: OJ0-000-0L6, 0J R0 3J2BARRICADE iRE� / AME SF CONTRACTOR) ZONE'HSf sAF "SDB. 2246, PG 461 T MPO YT . ILER OBE \ \ I II Ilk 11 ov1 D BY WNER 3 �I CHAINLINK FE CE •Hl �l — — I / _ 121 I \ B vb M 1 �I ` \ �_ coNc. CONc. \ INV=IJ13.3 126 11 WATER -FILLED \ L 41 �uoc CONTFACI`ORY 3 I SOMH CONTRACTORr _ _ INV �119.36' 15"RCP (NW) 1 I \ II 14 PARKING SPACES INVOUT=719.28'15"RCP(SE) 1 8(PVC -723-' - of tllll \ \ 7 �x� _ \ • _ _ _ _ - - EP CURB CON . / I 711- B4SKElIALL GOAL) T (TYIPTICAL SLOPES 119 _ _ _ _ _ ICAL) SBL SO CURB .INLE T TOP J2226' INVOUT=]18.2515CMP(SE) SCALE 1"=20' D 2D• ao• 'e) 02 o N Q N ; Q G W S N CD it 0 CV EE O LL! w coz in o —1 G Q C O 0 Q? N CM wo o _ LL! t; wv J W G W M W W I- co � U) POLLUTION PREVENTION PLAN - PHASE I Cl� _ APPROX. LOCATION OF4" I EROSION CONTROL LEGEND ( 1 COMPILED PROPERTYLINE P1D: 087B0-00-OM1200 K� N� UNITS OF CLEARING AND GRADING _ _ �\ �'� - MCLAUGHLINLIVING TRUST 30'PRESCRIPTIVE VOOT ZONE HSI •ommommomm DRAINAGE DIVIDE w R.O W. EASEMENT 072 AC VDOTCLASSAI \ 1 `CHANNEL RIPRAP I SOIL AREA DMDE \ I _a\ �\ , ABOVE GROUND FUEL CONTAINER OUTLET PROTECTION. \ - WITH IMPERMEABLE HFA MIL WIDTH I=3.76 I SAF —SAE— SAFET'FENCE 3.01 \� ` 110 LINER. VOLUME SUFFICIENT TO WIDTH 2=S BROWIf6TON�LEVE -� CONTAIN STORED FUELED LENGTH , , I 2S SPREADER WIDTH' - a i I \ VOLUME. PCE PAVED CONST.-. ENTBAN. 3.02 I I I 1 V 0%(GASIDEISEL) DEPTH PlD'08JBP00-00-0f000 _ I DOWNSTREAM GRADE BUSH __ ` I I MCLAUGHLINLIVING m i ' hYITH P OF, L. ' _ / i i i T'O -__ -- 1 p '-_ TRUST C/O DANIELH 1 n / ' TOP,dF WALELLEV p ]11.39�01 1 �i� ea=\ I t\ I 1 6F �� iE SILT FENCE 3.05 MCLAUGHLINS TERESEN I `< SEE DETAIL/ON MCLAUGHLIN 1O6 - SF - ' 1 ZONE HSi P v® INIfT PROTECTION 3.0] L2 _ 091 AC oiVEPSIox oIXE 3.09 p 9 / 69�\ i �,\ / 1CP 10K i / BM \i ^ D.PI. ROX LOCETIONOF4" 69 i6�' 6gh y90 \ /- '� / l 510 WD �� RIGHT OFWAY DIVERSION DIKE 3.11 O OP L SF `j 1 ` /R /C( — J I ST SEOIMFM TRAP 3.13 Lu T � _ D 318P�RO.WDON 12 PESAF SCRIPTI ...... TEMO V VE EASEMENTV+UMPSTER ONCRETEWASHOUTFOR PUNAxExTSEEDING 3.32 TRUCKWHOUT I~_000Y: MU O NULCNING 3.35 TREE PROTECTION fENCE 3.38 na � TP BM •IR 'moo " PS MU ,oHP.724 / / — 725— socaw000 _sl ' s o DUST CONTROL 3.39 7 126- s�o_- a'' •OBM AREAS STEEPRHB336 POLINOMARIE ABIRD WN STABILIZATION BOARD -- _ _ _ IRANT 6E ]25 "RE 603 PS IUCION 7 = 'VI0.GINIA EROSION AND SEDIMENT OMROL HAN0SRCFlG10NUMBERTRAp7URBANCE1.20AC, 2.8BAC LER TEMPORARY TOILETS I ts.wv / I ''a F FLAGPOLE II / oYF �'/ MORTAR MIXING \ I 0 3 \/ STATION \ / I V / / SAF / �c�, 1b 1� 1 19 / i \ / "k I 1 / ITDTAL LIMITS OF N / a f EG / !0 2HC SplU 1e / '2s DI6TURRBANCE=IRO AC. Y1 p0 1^ i TOTAL LIMITS OF DI6TURBANCF,= PS A CANOPY 1.20 C. ABANDONED / O ` FUEL PUMP L 14'GATE (CAPPED) / _ i 0', L eft / I iOO I ,'0yl cppe ` P6 F 4"X4'STEEL Lp /SYMc O I {�=R1.18' ' COL UMN$fT96) / ✓ / PROTECT SEPTIC' ,SEPTIC v ` MU COVERS i C, VERS/ PTO: OBJ00-0400-O6f010 �OUNTYOFALBE ARLE _ / r / HILLEL MSCH / z PS 1 a v i'STEPPED / "RED HILL ELEM SCHOOL" / / 011CANOOY BRICK WALL / GB. 504, EG. 343 / ryy �� ✓ 1 _ I 7 / 411AC 10 ouBiEOEc• / 'TOTAL LIMITS-CJF DISTURBANCE'= / PS 3M'IOoaB I��cbryG \ `_l oal p 0 I I \ / ' _ slooOR ( Q // 4000 L i',•„ F ]P2i FIOBLXOOOR ___ / U / PROTECT 6EPTIC' i LLI SEPI//llC f Suie/2 Z /I�/ COVERS` / CQ✓ERR / QY ! kl/i Li a) 3F(wJ 000A sE; .�B I METAL 16 Q / SD INLET W/GRATE �[ N �� /VY, ^ STAIRS L MAkLE 4 TOP=126.35' VV F/ ErvCLOSURE F ^ INV OUT=72235'12"RCP(SW) N n PS I _729--1- / / __ _ i I OII - - - I 1 I ffE i FFE nsz 000R a M9 ���000rs cc, O LSA I I / � W I I I I\ � � ♦ F , � ���/ SAMITARYDF. I ' �7zEzs zFFFEErzi �ppB G (V FGGEDBYOT ERS(TYPSD-ET—RTE TOPN=726' z pcp8 F � I I Y WVOUT=7.95'12"RCP (NE) `/ m F = a.m -5i leto wa1! G I I INV OUT=JT064'15"RCP(SYK n I Fa��=oza0.z0o8 Fryv/BL o0o8 3WSH OO5�cx TOTAL LI0MfSOI _I A_ CE= LL Q 0F )ss DI6TUR28 to taaFtE ^®h�� ® II 1.20AC. "ALfCK w4[ 3OMH W 0 m Z_ XRs - I F I'/ TOPN, l20-16'B"PVC (NWJ co \ al rnl ^ b1 SF 1 LEVEL �l URB �VG sly O ^ / xgvrvousE\� / INVIN=7281T 15"RCP (NE) O Q 4FE f�� CINDER BLOCKFACILITY j / I/ INVOUT=72001'15"RCP (SE) It U Ix TOTAL LIMIT60F = 1814 "REDHILLELEMENTA11 DISTURBANCE= - SCHOOL' / l�L 1 y / - '72] I (/� J 1.2Dpa `F IItiS it ` G I I I N \ I 11 SAFE pg ` ` n FOVIOc08 TOTAL LIMITSOF \ \ U ; I/ V% Z 2 DISTURBANCE r / W V z4�oAc rBr'E I _ ' U 000R N.2OAC. /! TEMPORARY TRAILER '\726 W PlD'OB700-00-00-06400 O (n r = szr OWNERSHIPTO BE / Ili- JAMEZONE' HSI L, JR J lU U J I J I OB. 2246, PG, 461 JLu J O PS / Y I I+E� d Q G CHAINLINK FE CE 'MI OT _ _ 3 III lk N� F m Lu \ IINV I aHEa I _ OT I / PROJECT NO: NOVE fe'O CTFEE mil,. _ DATE NOVEMBER 242019 ` \ E REVISIONS SDMH T0P-12421' DATE DESCRIPTION INVIN=719.3615"RCP(NWf 2-620 COUNttCOMMENTB INVOUT=719.28'15-RCP(SE) 4-8-20 COUNTY COMMENTS 8-2420 COUNttCOMMENTS \ BjPVC 721 _ _ _ CHAINL/NKFENCE6yH/ _ o _ J2p _ �� x� - _ GOAL (Tyl) J PREBERVEO _ _ _ _ CRITICAL SLOPES BL T s� 1 _ _ - - ]f9 - _ - - - _ _ , x� (TYPICAL) SO CURB INLET m oL - -'- -- _ _ _ x_ - TOP=722.26' � ']f8 -- _ \ ---__—-- it feoEcr2Ee INV OUT=11825'15'CMP(SE) POLLUTION PREVENTION �X----- xTPLAN-PHASE II ' - - - - SCALE 1"=20' o zo• ao• PPP-2 G. Pollution Prevention Awareness (Describe training and procedures to provide awareness and compliance for all measures in this document; waste management, wash waters, prevention measures, etc.) The registered land disturber shall oversee all construction activities to implement and maintain pollution prevention measures. As such training and procedures shall be provided by contractor for each worker on site before they begin land disturbing activities. Training on implementation of erosion and sediment control devices/procedures must be provided by registered land disturber each time a new E&SC procedure is constructed. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. This site discharges to impaired waters as detailed on the following sheets. Enhanced inspection frequency is required as outlined below: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 24 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections as authorized in Part II G 2 d shall not be allowed. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Bacteria Total Maximum Daily Load Development for North Fork Hardware River and Hardware River Submitted by: Virginia Department of Environmental Quality Virginia Department of Conservation and Recreation Prepared by: Department of Biological Systems Engineering, Virginia Tech CENTER for WATERSHED STUDIES at VIRGINIA TECH July 2007 Revised: October 2015 VT-BSE Document No. 2015-0005 Project Personnel Virginia Tech, Department of Biological Systems Engineering Brian Benham, Associate Professor and Extension Specialist: Project Director Kevin Brannan, Research Associate Sang Min Kim, Research Associate Maria Ball, Research Associate Karen Kline, Research Scientist Virginia Department of Environmental Quality Nesha McRae, NPS TMDL Coordinator, Valley Regional Office Tara Sieber, TMDL Coordinator, Valley Regional Office Don Kain, Water Quality Monitoring and Assessments Manager, Valley Regional Office Craig Lott, TMDL Coordinator, Watershed Programs, Central Office For additional information, please contact: Virginia Department of Environmental Quality Valley Regional Office, Harrisonburg: Tara Sieber, (540) 574-7870 Water Quality Assessment Office, Richmond: Craig Lott, (804) 698-4240 Executive Summary Background The Hardware River watershed lies within both Albemarle and Fluvanna Counties and the North Fork Hardware River flows entirely within Albemarle County. The Hardware River and the North Fork Hardware River both have bacteria impairments. The Hardware River is a tributary to the Middle James River (USGS Hydrologic Unit Code 02080203, Middle James - Buffalo), which flows into the Chesapeake Bay at Hampton Roads harbor in southeast Virginia. The North Fork Hardware River is a tributary to Hardware River. Hardware River has been on the 303(d) impaired waters list since 2002; the North Fork Hardware River has been listed since 2006, and both were most recently listed in the 2006 303(d) Report on Impaired Waters (VADEQ, 2006). Water quality samples collected in the impaired reaches during the 2004 Assessment Period yielded impaired results as shown in Table ES. 1. The interim instantaneous freshwater water quality standard for fecal coliform specifies that fecal coliform concentration in the stream water should not exceed 400 colony forming units (cfu) per 100 mL; the instantaneous standard for Escherichia coli specifies that the E. coli concentration should not exceed 235 cfu/100 mL. Due to the frequency of water quality violations at the stations listed in Table ES. 1, Hardware River and the North Fork Hardware River remained on Virginia's 2004 303(d) list of impaired water bodies for fecal coliform. These impaired segments have been assessed as not supporting the Clean Water Act's Primary Contact Recreational Use Goal. Table ES.1. Bacteria standard exceedances during the 2006 assessment period (2000- 2004). Station ID Stream Exceedances of Interim Fecal Coliform Standard 2-HNF008.28 North Fork Hardware River 2 of 9 (22%) 2-HRD011.57 Hardware River 9 of 36 (25%) This document describes the Total Maximum Daily Loads (TMDLs) for bacteria that were developed for the Hardware and North Fork Hardware watersheds in order to remedy the bacteria water quality impairments. The TMDLs were developed for the new water quality standard for bacteria, which states that the calendar -month geometric mean concentration of E. coli shall not exceed 126 cfu/100 mL, and that no single sample can exceed a concentration of 235 cfu/100mL. A glossary of terms used in the development of these TMDLs is listed in Appendix A. Sources of Bacteria There are three point sources permitted to discharge bacteria into the Hardware River; two of these are located on the South Branch of the North Fork Hardware River and one on an unnamed tributary to the South Fork Hardware River. The majority of the bacteria load, however, originates from nonpoint sources. Nonpoint sources of bacteria are often agricultural and include land - applied animal waste and manure deposited on pastures by livestock. A significant bacteria load comes from cattle and wildlife directly depositing feces in streams. Wildlife also contribute to bacteria loadings on all land uses, in accordance with the habitat range for each species. Non-agricultural nonpoint sources of bacteria loadings include straight pipes, failing septic systems, and pet waste. The bacteria load produced in different locations (e.g., confinement, pasture, forest) was estimated on a monthly basis to account for seasonal variability in wildlife behavior and livestock production and practices. Livestock management and production factors, such as the fraction of time cattle spend in confinement, pastures, or streams; the amount of manure storage; and spreading schedules for manure application, were also considered on a monthly basis. These sources of bacteria can be summarized in two ways. First, Table ES. 2 summarizes the bacteria produced in each location (stream, cropland, pasture, residential, and forest). Land -deposited sources of bacteria then undergo die -off and must be transported by runoff from rainfall events into the stream. Direct - deposited sources enter the stream immediately without die -off and without the need for a rainfall event. The relative contributions given in Tables ES. 3 and 4 reflect the results of modeling (see next section) that takes into account these varied fate and transport processes and represents the fraction of in -stream bacteria attributable to each source. Table ES. 2. Annual fecal coliform loadings to the stream and the various land use cateaories for existina conditions in the Hardware and North Fork Hardware watersheds. Source Fecal col12cfu/yr) orm loading (x10 Hardware North Fork River Hardware River percent of total loading Hardware North Fork River Hardware River Direct loading to streams Cattle in stream 83 18 <1 % 1 % Wildlife in stream 28 3 <1 % <1 % Straight pipes 16 4 <1 % <1 % Point Sources <1 <1 <1 % <1 % Loading to land surfaces Cropland 18 4 <1 % <1 % Pasture 18,212 3,170 95% 93% Residential 656 182 3% 5% Forest 135 18 1 % 1 % Total 19,148 3,400 Table ES. 3. Relative contributions of different E. coli sources to the overall E. coli concentration for existing conditions in the North Fork Hardware River. Mean Daily E. coli Relative Source Concentration by Source, Contribution by cfu/100 mL Source All Sources 72 Nonpoint source loadings 59 82% from pervious land segments Direct nonpoint source loadings to the stream from 3 4% wildlife Direct nonpoint source loadings to the stream from 7 10% livestock Interflow and groundwater < 1 <1 % contribution Straight -pipe discharges to 3 4% stream Nonpoint source loadings < 1 <1 % from impervious land use Point sources <1 <1 % Table ES. 4. Relative contributions of different E. coli sources to the overall E. coli concentration for existing conditions in Hardware River. Mean Daily E. coli Relative Source Concentration by Source, Contribution by cfu/100 mL Source All Sources 310 Nonpoint source loadings 252 81 % from pervious land segments Direct nonpoint source loadings to the stream from 11 4% wildlife Direct nonpoint source loadings to the stream from 39 13% livestock Interflow and groundwater <1 <1% contribution Straight -pipe discharges to 8 2% stream Nonpoint source loadings < 1 <1% from impervious land use Point sources <1 <1% Modeling The Hydrological Simulation Program — FORTRAN (HSPF) (Bicknell et al., 2001) was used to simulate the fate and transport of fecal coliform bacteria in the Hardware River watershed. HSPF is a continuous model that can represent fate and transport of pollutants on both the land surface and in the stream. As recommended by VADEQ, water quality modeling was conducted with fecal coliform inputs, and a translator equation was used to convert the output to E. coli for the final TMDL. To identify localized sources of fecal coliform within the watershed, the Hardware River watershed was divided into 36 sub -watersheds (24 in the Hardware and 12 in the South Fork Hardware) based on homogeneity of land use, stream network connectivity, and monitoring station locations. The North Fork Hardware River watershed was likewise divided into 8 sub - watersheds. The hydrology component of HSPF was calibrated using flow data from September 1, 1989 to August 31, 1995; it was validated using data from September 1, 1997 to August 31, 2001. Initial estimates of hydrologic parameters were generated according to the guidance in BASINS Technical Note iv 6 (USEPA, 2000). These parameters were refined during calibration. The combination of the optimization program PEST and Expert System for the Calibration of HSPF (HSPEXP) was used to aid calibration, and after the successful calibration the default calibration criteria in HSPEXP were met for both the calibration and validation periods. The water quality component of the HSPF model was calibrated and validated for Hardware River at a monitoring station near the watershed outlet. The model was calibrated during the period from 2000 to 2005 and validated from 1995 to 1998. The North Fork Hardware River was calibrated with data from one monitoring station within the watershed, from 1995 to 2005. Inputs to the model included fecal coliform loadings on land and in the stream. A comparison of simulated and observed fecal coliform loadings in the stream indicated that the model adequately simulated the fate and transport of fecal coliform bacteria. Existing Conditions Contributions from various sources in the Hardware and the North Fork Hardware River watersheds were represented in HSPF to establish the existing conditions for a representative 3-year period that included both low and high -flow conditions. Monthly bacteria loadings to different land use categories were calculated for each sub -watershed. Direct seasonal bacteria loadings to streams by cattle were calculated for pastures adjacent to streams. Bacteria loadings to streams and land by wildlife were estimated for several species. Bacteria loadings to land from failing septic systems were estimated based on information on failing septic systems from the Virginia Department of Health; contributions of bacteria directly to the stream from straight pipes were also estimated based on information from the 2000 Census data, as well as information from other local sources. Bacteria contributions from pet waste were also considered. Meteorological data from 1989-2005 were paired with bacterial loading and land use data for existing conditions to establish this baseline scenario. Results from the calibrated HSPF model showed routine high signatures from livestock direct deposit, wildlife direct deposit, and pervious land surfaces. v Allocation Scenarios Different source reduction scenarios were evaluated to identify scenarios that meet both the calendar -month geometric mean E. coli criterion (126 cfu/100 mL) and the single sample maximum E. coli criterion (235 cfu/100 mL) with zero violations. These scenarios were conducted using meteorological data from 1996-1998 to represent a variety of high and low flow conditions. The reductions required for each impaired segment are presented in Table ES. 5 and Table ES. 6. Details on the loads to be reduced from each source are given in Table ES. 7 through Table ES. 10. Table ES. 5. Successful allocation scenario for the North Fork Hardware River. Required Fecal Coliform Loading Reductions to Meet the E. coli Standards,% Livestock DD* Loads from Loads from Wildlife DD* Straight Pipes Loads from Cropland Pasture Residential 100 10 99 20 100 71 DID = direct deposit Table ES. 6. Successful allocation scenario for the Hardware River. Required Fecal Coliform Loading Reductions to Meet the E. coli Standards,% Livestock DD* Loads from Loads from Wildlife DD* Straight Pipes Loads from Cropland Pasture Residential 100 10 99 0 100 83 DID = direct deposit Table ES.7. Annual nonpoint source fecal coliform loads under existing conditions and corresponding reductions for TMDL allocation for Hardware River. Existing Conditions Allocation Scenario Existing Percent of total TMDL nonpoint Land use Conditions land deposited source Percent category Load load from allocation load Reduction from (x1012 cfu/yr) nonpoint (x1012 cfu/yr) Existing Load sources Cropland 18 0.1 % 16 10% Pasture 18,212 95.8% 182 99% Residential% 656 3.4% 112 83% Forest 135 0.7% 135 0% Total 19,021 445 98% Includes loads applied to pervious areas of both High and Low Density Residential vl Table ES. 8. Annual direct nonpoint source fecal coliform loads under existing conditions and corresponding reductions for TMDL allocation for Hardware River. Existing Conditions Allocation Scenario Percent of total TMDL direct Existing direct nonpoint Percent Source Conditions deposited load source Reduction from Load from direct allocation load Existing Load (x1012 cfu/yr) nonpoint (x10 12 cfu/yr) source Livestock in 83 65% 0 100% Streams Straight 16 13% 0 100% Pipes Wildlife in 28 22% 28 0% Streams Point <0.01 <1 % 0.24* 0 Sources Total 127 28.24 78% 1 % of TMDL Table ES.9. Annual nonpoint source fecal coliform loads under existing conditions and corresponding reductions for TMDL allocation for North Fork Hardware River. Existing Conditions Allocation Scenario Land use Existing Percent of total land deposited TMDL nonpoint Percent category Conditions load from source Reduction from Load nonpoint allocation load Existing Load (x1012 cfu/yr) (x1012 cfu/yr) sources Cropland 4 0.1 % 3.6 10% Pasture 3,170 94.0% 31.7 99% Residentials 182 5.4% 52.8 71 % Forest 18 0.5% 18.0 0% Total 3,374 106.1 97% Includes loads applied to pervious areas of both High and Low Density Residential Table ES. 10. Annual direct nonpoint source fecal coliform loads under existing conditions and corresponding reductions for TMDL allocation for North Fork Hardware River. Existing Conditions Allocation Scenario Existing Percent of total TMDL direct Percent Source Conditions Load direct deposited nonpoint source Reduction from (x10 cfu/yr) load from direct allocation load Future Load nonpoint source (x1012 cfu/yr) Livestock in 18 72% 0 100% Streams Straight 4 16% 0 100% Pipes Wildlife in 3 12% 2 20% Streams Point 0.04 <1 % 0.06* 0% Sources Total 25.04 2.06 92% 1 % of TMDL VII For North Fork Hardware River, there are two permitted point sources discharging at or below their permit requirements. For Hardware River, there is one single family home permitted point source discharging into an unnamed tributary of the South Fork Hardware River. Therefore, the proposed scenario requires load reductions only for nonpoint sources of fecal coliform. The TMDL was determined as the average annual E. coli load at the watershed outlet for the chosen allocation scenarios. The WLAs for the North Fork Hardware River and Hardware River watersheds were obtained by taking the product of the permitted point sources' E. coli discharge concentrations and allowable annual discharges plus 1 % of the total TMDL load for future growth. The LA was then determined as the TMDL-WLA. Equation ES.1 was used to calculate the TMDL allocation shown in Table ES. 11. TMDL = 7-WLA + FLA + MOS [ES.1] where: WLA = wasteload allocation (point source contributions); LA = load allocation (nonpoint source contributions); and MOS = margin of safety. Table ES. 11. Annual E. coli loadinas (cfu/vrl for the TMDLs. Impaired Segment EWLA ELA MOS* TMDL 0.02x10 3 Hardware River VAG408412 0.002x1o12 2.38xl013 -- 2.40x1013 1 % Future Growth 0.024x1013 0.06x10 12 North Fork VAG408054 0.002x1012 2.25x1012 -- 2.31x1012 Hardware River VA0083291 0.035x1012 1 % Future Growth 0.023xl012 Implicit MOS Transitional Scenario The implementation of a transitional scenario, or staged implementation, will allow for an evaluation of the effectiveness of management practices and accuracy of model assumptions through data collection. Staged implementation was developed without reductions for wildlife; a target of a 10.5% violation rate of W the single sample maximum E. coli water quality criterion (235 cfu/100 mL) was used where the elimination of wildlife reductions did not prohibit it. A staged scenario for each impaired segment is presented in Tables ES. 12 and 13. Table ES. 12. Allocation scenario for Stage 1 implementation for Hardware River. Required Fecal Coliform Loading Reductions to Meet the Single Sample Maximum E. coli Criterion 89.5% of the Time Livestock DD* Loads from Loads from Wildlife DD* Straight Pipes Loads from Cropland Pasture Residential 40 10 65 0 100 83 DD = Direct Deposit Table ES. 13. Allocation scenario for Stage 1 implementation for North Fork Hardware River. Required Fecal Coliform Loading Reductions to Meet the Single Sample Maximum E. coli Criterion 89.5% of the Time Livestock DD* Loads from Loads from Wildlife DD* Straight Pipes Loads from Cropland Pasture Residential 95 10 80 0 100 71 DD = Direct Deposit Implementation The goal of the TMDL program is to establish a three -step path that will lead to attainment of water quality standards. The first step in the process is to develop TMDLs that will result in attainment of water quality standards. This report represents the culmination of that effort for the bacteria impairment on Hardware River and North Fork Hardware River. The second step is to develop a TMDL implementation plan. The final step is to implement the TMDL implementation plan and to monitor stream water quality to determine if water quality standards are being attained. Watershed stakeholders will have opportunities to provide input and to participate in the development of the implementation plan, which will also be supported by regional and local offices of VADEQ, VADCR, and other cooperating agencies. ix Section 8. Qualified personnel The following personnel are responsible for inspections; (Provide the name, telephone number, and qualifications of the qualified personnel conducting inspections.) Mr. Rick Truslow VIRTEXCO Corporation 944 Norfolk Square Norfolk, VA 23502 804.641.4378 Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 9. Signed Certification (Provide certification according to 9VAC25-870-370. For purposes of plan review and approvals, this certification should be the owner of the property, the same signature as appears on the bonds and applications. Another operator can be designated on the delegation of authority form to follow.) CERTIFICATION "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Owner/Operator Name Company: Title: Signature: Date: Mr. Joseph P. Letteri 401 McIntire Road Charlottesville, VA 22902 434.975.9340 Mr. Joseph Letteri Albemarle Countv School Board Director of Building Services Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 10. Delegation of authority. (Provide the persons or positions with authority to sign inspection reports or to modify the stormwater pollution prevention plan. A formal, signed delegation of authority is needed.) Delegation of Authority 1, Adam J. Yates (name), hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit, at the Red Hill School Gym Addition and Renovation construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit. Rick Truslow (name of person or position) VIRTEXCO Corporation (company) 944 Norfolk Square (address) Norfolk, VA 23502 (city, state, zip) 804-641-4378 (phone) By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in the Construction General Permit (CGP), and that the designee above meets the definition of a "duly authorized representative". Operator Name: Adam J. Yates Company: Title: Signature: Date: VIRTEXCO Corporation Vice President Ul W CQ 6/18/2020 Issued — l 0/20l 4 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 11. General permit copy (Provide a copy of the construction general permit, 9VAC25-880) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY General Permit No.: VAR10 Effective Date: July 1, 2019 Expiration Date: June 30, 2024 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT PROGRAM AND THE VIRGINIA STORMWATER MANAGEMENT ACT In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the Virginia Stormwater Management Act and regulations adopted pursuant thereto, operators of construction activities are authorized to discharge to surface waters within the boundaries of the Commonwealth of Virginia, except those specifically named in State Water Control Board regulations that prohibit such discharges. The authorized discharge shall be in accordance with the registration statement filed with the Department of Environmental Quality, this cover page, Part I - Discharge Authorization and Special Conditions, Part II - Stormwater Pollution Prevention Plan, and Part III - Conditions Applicable to All VPDES Permits as set forth in this general permit. Construction General Permit Effective July 1, 2019 Page 2 of 26 PART DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS A. Coverage under this general permit. 1. During the period beginning with the date of coverage under this general permit and lasting until the general permit's expiration date, the operator is authorized to discharge stormwater from construction activities. 2. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) located on -site or off -site provided that: a. The support activity is directly related to the construction activity that is required to have general permit coverage for discharges of stormwater from construction activities; b. The support activity is not a commercial operation, nor does it serve multiple unrelated construction activities by different operators; c. The support activity does not operate beyond the completion of the last construction activity it supports; d. The support activity is identified in the registration statement at the time of general permit coverage; e. Appropriate control measures are identified in a stormwater pollution prevention plan and implemented to address the discharges from the support activity areas; and f. All applicable state, federal, and local approvals are obtained for the support activity. B. Limitations on coverage. 1. Post -construction discharges. This general permit does not authorize stormwater discharges that originate from the site after construction activities have been completed and the site, including any support activity sites covered under the general permit registration, has undergone final stabilization. Post -construction industrial stormwater discharges may need to be covered by a separate VPDES permit. 2. Discharges mixed with nonstormwater. This general permit does not authorize discharges that are mixed with sources of nonstormwater, other than those discharges that are identified in Part I E (Authorized nonstormwater discharges) and are in compliance with this general permit. 3. Discharges covered by another state permit. This general permit does not authorize discharges of stormwater from construction activities that have been covered under an individual permit or required to obtain coverage under an alternative general permit. Page 3 of 26 4. Impaired waters and total maximum daily load (TMDL) limitation. a. Nutrient and sediment impaired waters. Discharges of stormwater from construction activities to surface waters identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit for (i) sediment or a sediment -related parameter (i.e., total suspended solids or turbidity) or (ii) nutrients (i.e., nitrogen or phosphorus) are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a stormwater pollution prevention plan (SWPPP) in accordance with Part II B 5 of this permit that minimizes the pollutants of concern and, when applicable, is consistent with the assumptions and requirements of the approved TMDL wasteload allocations and implements an inspection frequency consistent with Part II G 2 a. b. Polychlorinated biphenyl (PCB) impaired waters. Discharges of stormwater from construction activities that include the demolition of any structure with at least 10,000 square feet of floor space built or renovated before January 1, 1980, to surface waters identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit for PCB are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a SWPPP in accordance with Part II B 6 of this permit that minimizes the pollutants of concern and, when applicable, is consistent with the assumptions and requirements of the approved TMDL wasteload allocations, and implements an inspection frequency consistent with Part II G 2 a. 5. Exceptional waters limitation. Discharges of stormwater from construction activities not previously covered under the general permit effective on July 1, 2014, to exceptional waters identified in 9VAC25-260-30 A 3 c are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a SWPPP in accordance with Part II B 7 of this permit and implements an inspection frequency consistent with Part II G 2 a. 6. There shall be no discharge of floating solids or visible foam in other than trace amounts. C. Commingled discharges. Discharges authorized by this general permit may be commingled with other sources of stormwater that are not required to be covered under a state permit, so long as the commingled discharge is in compliance with this general permit. Discharges authorized by a separate state or VPDES permit may be commingled with discharges authorized by this general permit so long as all such discharges comply with all applicable state and VPDES permit requirements. D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, 1 C, and I E, all discharges covered by this general permit shall be composed entirely of stormwater associated with construction activities. All other discharges including the following are prohibited: 1. Wastewater from washout of concrete; 2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; Page 4 of 26 3. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; 4. Oils, toxic substances, or hazardous substances from spills or other releases; and 5. Soaps, solvents, or detergents used in equipment and vehicle washing. E. Authorized nonstormwater discharges. The following nonstormwater discharges from construction activities are authorized by this general permit when discharged in compliance with this general permit: 1. Discharges from firefighting activities; 2. Fire hydrant flushings; 3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge; 5. Potable water sources, including uncontaminated waterline flushings, managed in a manner to avoid an instream impact; 6. Routine external building wash down where soaps, solvents or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (or where all spilled or leaked material has been removed prior to washing); where soaps, solvents, or detergents have not been used; and where the wash water has been filtered, settled, or similarly treated prior to discharge; 8. Uncontaminated air conditioning or compressor condensate; 9. Uncontaminated ground water or spring water; 10. Foundation or footing drains where flows are not contaminated with process materials such as solvents; 11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have been filtered, settled, or similarly treated prior to discharge; and 12. Landscape irrigation. F. Termination of general permit coverage. 1. The operator of the construction activity shall submit a notice of termination in accordance with 9VAC25-880-60, unless a registration statement was not required to be submitted in accordance with 9VAC25-880-50 A 1 c or A 2 b for single-family detached residential structures, to the VSMP authority after one or more of the following conditions have been met: Page 5 of 26 a. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator has operational control. When applicable, long term responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records prior to the submission of a complete and accurate notice of termination and the construction record drawing prepared; b. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; c. Coverage under an alternative VPDES or state permit has been obtained; or d. For individual lots in residential construction only, final stabilization as defined in 9VAC25- 880-1 has been completed, including providing written notification to the homeowner and incorporating a copy of the notification and signed certification statement into the SWPPP, and the residence has been transferred to the homeowner. 2. The notice of termination shall be submitted no later than 30 days after one of the above conditions in subdivision 1 of this subsection is met. 3. Termination of authorization to discharge for the conditions set forth in subdivision 1 a of this subsection shall be effective upon notification from the department that the provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of a complete and accurate notice of termination in accordance with 9VAC25-880-60 C, whichever occurs first. 4. Authorization to discharge terminates at midnight on the date that the notice of termination is submitted for the conditions set forth in subdivisions 1 b through 1 d of this subsection unless otherwise notified by the VSMP authority or department. 5. The notice of termination shall be signed in accordance with Part III K of this general permit. G. Water quality protection. 1. The operator shall select, install, implement, and maintain control measures as identified in the SWPPP at the construction site that minimize pollutants in the discharge as necessary to ensure that the operator's discharge does not cause or contribute to an excursion above any applicable water quality standard. 2. If it is determined by the department that the operator's discharges are causing, have reasonable potential to cause, or are contributing to an excursion above any applicable water quality standard, the department, in consultation with the VSMP authority, may take appropriate enforcement action and require the operator to: a. Modify or implement additional control measures in accordance with Part II C to adequately address the identified water quality concerns; b. Submit valid and verifiable data and information that are representative of ambient conditions and indicate that the receiving water is attaining water quality standards; or Page 6 of 26 c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3. All written responses required under this chapter shall include a signed certification consistent with Part II I K. PART II STORMWATER POLLUTION PREVENTION PLAN A. Stormwater pollution prevent plan. A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission of a registration statement and implemented for the construction activity, including any support activity, covered by this general permit. SWPPPs shall be prepared in accordance with good engineering practices. Construction activities that are part of a larger common plan of development or sale and disturb less than one acre may utilize a SWPPP template provided by the department and need not provide a separate stormwater management plan if one has been prepared and implemented for the larger common plan of development or sale. 2. The SWPPP requirements of this general permit may be fulfilled by incorporating by reference other plans such as a spill prevention control and countermeasure (SPCC) plan developed for the site under § 311 of the federal Clean Water Act or best management practices (BMP) programs otherwise required for the facility provided that the incorporated plan meets or exceeds the SWPPP requirements of Part II B. All plans incorporated by reference into the SWPPP become enforceable under this general permit. If a plan incorporated by reference does not contain all of the required elements of the SWPPP, the operator shall develop the missing elements and include them in the SWPPP. 3. Any operator that was authorized to discharge under the general permit effective July 1, 2014, and that intends to continue coverage under this general permit, shall update its stormwater pollution prevention plan to comply with the requirements of this general permit no later than 60 days after the date of coverage under this general permit. B. Contents. The SWPPP shall include the following items: 1. General information. a. A signed copy of the registration statement, if required, for coverage under the general VPDES permit for discharges of stormwater from construction activities; b. Upon receipt, a copy of the notice of coverage under the general VPDES permit for discharges of stormwater from construction activities (i.e., notice of coverage letter); c. Upon receipt, a copy of the general VPDES permit for discharges of stormwater from construction activities; d. A narrative description of the nature of the construction activity, including the function of the project (e.g., low density residential, shopping mall, highway, etc.); e. A legible site plan identifying: Page 7 of 26 (1) Directions of stormwater flow and approximate slopes anticipated after major grading activities; (2) Limits of land disturbance including steep slopes and natural buffers around surface waters that will not be disturbed; (3) Locations of major structural and nonstructural control measures, including sediment basins and traps, perimeter dikes, sediment barriers, and other measures intended to filter, settle, or similarly treat sediment, that will be installed between disturbed areas and the undisturbed vegetated areas in order to increase sediment removal and maximize stormwater infiltration; (4) Locations of surface waters; (5) Locations where concentrated stormwater is discharged; (6) Locations of any support activities, including (i) areas where equipment and vehicle washing, wheel wash water, and other wash water is to occur; (ii) storage areas for chemicals such as acids, fuels, fertilizers, and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on the construction site; and (vi) construction waste storage; and (7) When applicable, the location of the on -site rain gauge or the methodology established in consultation with the VSMP authority used to identify measurable storm events for inspection as allowed by Part II G 2 a (1) (ii) or Part II G 2 b (2). 2. Erosion and sediment control plan. a. An erosion and sediment control plan designed and approved in accordance with the Virginia Erosion and Sediment Control Regulations (9VAC25-840), an "agreement in lieu of a plan" as defined in 9VAC25-840-10 from the VESCP authority, or an erosion and sediment control plan prepared in accordance with annual standards and specifications approved by the department. b. All erosion and sediment control plans shall include a statement describing the maintenance responsibilities required for the erosion and sediment controls used. c. An approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department -approved annual standards and specifications, implemented to: (1) Control the volume and velocity of stormwater runoff within the site to minimize soil erosion; (2) Control stormwater discharges, including peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion; Page 8 of 26 (3) Minimize the amount of soil exposed during the construction activity; (4) Minimize the disturbance of steep slopes; (5) Minimize sediment discharges from the site in a manner that addresses (i) the amount, frequency, intensity, and duration of precipitation; (ii) the nature of resulting stormwater runoff; and (iii) soil characteristics, including the range of soil particle sizes present on the site; (6) Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal, and maximize stormwater infiltration, unless infeasible; (7) Minimize soil compaction and, unless infeasible, preserve topsoil; (8) Ensure initiation of stabilization activities, as defined in 9VAC25-880-1, of disturbed areas immediately whenever any clearing, grading, excavating, or other land - disturbing activities have permanently ceased on any portion of the site, or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 days; and (9) Utilize outlet structures that withdraw stormwater from the surface (i.e., above the permanent pool or wet storage water surface elevation), unless infeasible, when discharging from sediment basins or sediment traps. 3. Stormwater management plan. a. Except for those projects identified in Part II B 3 b, a stormwater management plan approved by the VSMP authority as authorized under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-870), or an "agreement in lieu of a stormwater management plan" as defined in 9VAC25-870-10 from the VSMP authority, or a stormwater management plan prepared in accordance with annual standards and specifications approved by the department. b. For any operator meeting the conditions of 9VAC25-870-47 B of the VSMP regulation, an approved stormwater management plan is not required. In lieu of an approved stormwater management plan, the SWPPP shall include a description of, and all necessary calculations supporting, all post -construction stormwater management measures that will be installed prior to the completion of the construction process to control pollutants in stormwater discharges after construction operations have been completed. Structural measures should be placed on upland soils to the degree possible. Such measures must be designed and installed in accordance with applicable VESCP authority, VSMP authority, state, and federal requirements, and any necessary permits must be obtained. 4. Pollution prevention plan. A pollution prevention plan that addresses potential pollutant - generating activities that may reasonably be expected to affect the quality of stormwater discharges from the construction activity, including any support activity. The pollution prevention plan shall: a. Identify the potential pollutant -generating activities and the pollutant that is expected to be exposed to stormwater; Page 9 of 26 b. Describe the location where the potential pollutant -generating activities will occur, or if identified on the site plan, reference the site plan; c. Identify all nonstormwater discharges, as authorized in Part I E of this general permit, that are or will be commingled with stormwater discharges from the construction activity, including any applicable support activity; d. Identify the person responsible for implementing the pollution prevention practice or practices for each pollutant -generating activity (if other than the person listed as the qualified personnel); e. Describe the pollution prevention practices and procedures that will be implemented to: (1) Prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, and cleaning up spills, leaks, and other releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part III G; (2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicle fueling and maintenance activities (e.g., providing secondary containment such as spill berms, decks, spill containment pallets, providing cover where appropriate, and having spill kits readily available); (3) Prevent the discharge of soaps, solvents, detergents, and wash water from construction materials, including the clean-up of stucco, paint, form release oils, and curing compounds (e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs) to prevent contact with stormwater; (ii) collection and proper disposal in a manner to prevent contact with stormwater; and (iii) a similarly effective means designed to prevent discharge of these pollutants); (4) Minimize the discharge of pollutants from vehicle and equipment washing, wheel wash water, and other types of washing (e.g., locating activities away from surface waters and stormwater inlets or conveyance and directing wash waters to sediment basins or traps, using filtration devices such as filter bags or sand filters, or using similarly effective controls); (5) Direct concrete wash water into a leak -proof container or leak -proof settling basin. The container or basin shall be designed so that no overflows can occur due to inadequate sizing or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wastes. Liquid concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wash waters and shall not be discharged to surface waters; (6) Minimize the discharge of pollutants from storage, handling, and disposal of construction products, materials, and wastes including (i) building products such as asphalt sealants, copper flashing, roofing materials, adhesives, and concrete admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape Page 10 of 26 materials; and (iii) construction and domestic wastes such as packaging materials, scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics, Styrofoam, concrete, and other trash or building materials; (7) Prevent the discharge of fuels, oils, and other petroleum products, hazardous or toxic wastes, waste concrete, and sanitary wastes; (8) Address any other discharge from the potential pollutant -generating activities not addressed above; (9) Minimize the exposure of waste materials to precipitation by closing or covering waste containers during precipitation events and at the end of the business day, or implementing other similarly effective practices. Minimization of exposure is not required in cases where the exposure to precipitation will not result in a discharge of pollutants; and f. Describe procedures for providing pollution prevention awareness of all applicable wastes, including any wash water, disposal practices, and applicable disposal locations of such wastes, to personnel in order to comply with the conditions of this general permit. The operator shall implement the procedures described in the SWPPP. 5. SWPPP requirements for discharges to nutrient and sediment impaired waters. For discharges to surface waters (i) identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or (ii) with an applicable TMDL wasteload allocation established and approved prior to the term of this general permit for sediment for a sediment - related parameter (i.e., total suspended solids or turbidity) or nutrients (i.e., nitrogen or phosphorus), the operator shall: a. Identify the impaired waters, approved TMDLs, and pollutants of concern in the SWPPP; and b. Provide clear direction in the SWPPP that: (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and (3) A modified inspection schedule shall be implemented in accordance with Part II G 2 a. 6. SWPPP requirements for discharges to polychlorinated biphenyl (PCB) impaired waters. For discharges from construction activities that include the demolition of any structure with at least 10,000 square feet of floor space built or renovated before January 1, 1980, to surface waters (i) identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or (ii) with an applicable TMDL wasteload allocation established and approved prior to the term of this general permit for PCB, the operator shall: Page 11 of 26 a. Identify the impaired waters, approved TMDI-s, and pollutant of concern in the SWPPP; b. Implement the approved erosion and sediment control plan in accordance with Part II B 2; c. Dispose of waste materials in compliance with applicable state, federal, and local requirements; and d. Implement a modified inspection schedule in accordance with Part II G 2 a. 7. SWPPP requirements for discharges to exceptional waters. For discharges to surface waters identified in 9VAC25-260-30 A 3 c as an exceptional water, the operator shall: a. Identify the exceptional surface waters in the SWPPP; and b. Provide clear direction in the SWPPP that: (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and (3) A modified inspection schedule shall be implemented in accordance with Part II G 2 a. 8. Identification of qualified personnel. The name, phone number, and qualifications of the qualified personnel conducting inspections required by this general permit. 9. Delegation of authority. The individuals or positions with delegated authority, in accordance with Part III K, to sign inspection reports or modify the SWPPP. 10. SWPPP signature. The SWPPP shall be signed and dated in accordance with Part III K. C. SWPPP amendments, modification, and updates. 1. The operator shall amend the SWPPP whenever there is a change in the design, construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters and that has not been previously addressed in the SWPPP. 2. The SWPPP shall be amended if, during inspections or investigations by the operator's qualified personnel, or by local, state, or federal officials, it is determined that the existing control measures are ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the SWPPP shall include additional or modified control measures designed and implemented to correct problems identified. If approval by the VESCP authority, VSMP authority, or department is necessary for the control measure, revisions to the SWPPP shall be completed no later than seven calendar days following approval. Implementation of these additional or modified control measures shall be accomplished as described in Part II H. Page 12 of 26 3. The SWPPP shall clearly identify the contractors that will implement and maintain each control measure identified in the SWPPP. The SWPPP shall be amended to identify any new contractor that will implement and maintain a control measure. 4. The operator shall update the SWPPP as soon as possible but no later than seven days following any modification to its implementation. All modifications or updates to the SWPPP shall be noted and shall include the following items: a. A record of dates when: (1) Major grading activities occur; (2) Construction activities temporarily or permanently cease on a portion of the site; and (3) Stabilization measures are initiated; b. Documentation of replaced or modified controls where periodic inspections or other information have indicated that the controls have been used inappropriately or incorrectly and were modified; c. Areas that have reached final stabilization and where no further SWPPP or inspection requirements apply; d. All properties that are no longer under the legal control of the operator and the dates on which the operator no longer had legal control over each property; e. The date of any prohibited discharges, the discharge volume released, and what actions were taken to minimize the impact of the release; f. Measures taken to prevent the reoccurrence of any prohibited discharge; and g. Measures taken to address any evidence identified as a result of an inspection required under Part II G. 5. Amendments, modifications, or updates to the SWPPP shall be signed in accordance with Part III K. D. Public notification. Upon commencement of land disturbance, the operator shall post conspicuously a copy of the notice of coverage letter near the main entrance of the construction activity. For linear projects, the operator shall post the notice of coverage letter at a publicly accessible location near an active part of the construction project (e.g., where a pipeline crosses a public road). The operator shall maintain the posted information until termination of general permit coverage as specified in Part I F. E. SWPPP availability. 1. Operators with day-to-day operational control over SWPPP implementation shall have a copy of the SWPPP available at a central location on -site for use by those identified as having responsibilities under the SWPPP whenever they are on the construction site. Page 13 of 26 2. The operator shall make the SWPPP and all amendments, modifications, and updates available upon request to the department, the VSMP authority, the EPA, the VESCP authority, local government officials, or the operator of a municipal separate storm sewer system receiving discharges from the construction activity. If an on -site location is unavailable to store the SWPPP when no personnel are present, notice of the SWPPP's location shall be posted near the main entrance of the construction site. 3. The operator shall make the SWPPP available for public review in an electronic format or in hard copy. Information for public access to the SWPPP shall be posted and maintained in accordance with Part II D. If not provided electronically, public access to the SWPPP may be arranged upon request at a time and at a publicly accessible location convenient to the operator or his designee but shall be no less than once per month and shall be during normal business hours. Information not required to be contained within the SWPPP by this general permit is not required to be released. F. SWPPP implementation. The operator shall implement the SWPPP and subsequent amendments, modifications, and updates from commencement of land disturbance until termination of general permit coverage as specified in Part I F. All control measures shall be properly maintained in effective operating condition in accordance with good engineering practices and, where applicable, manufacturer specifications. If a site inspection required by Part II G identifies a control measure that is not operating effectively, corrective actions shall be completed as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority, to maintain the continued effectiveness of the control measures. 2. If site inspections required by Part II G identify an existing control measure that needs to be modified or if an additional or alternative control measure is necessary for any reason, implementation shall be completed prior to the next anticipated measurable storm event. If implementation prior to the next anticipated measurable storm event is impracticable, then additional or alternative control measures shall be implemented as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority. G. SWPPP Inspections. 1. Personnel responsible for on -site and off -site inspections. Inspections required by this general permit shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator is responsible for ensuring that the qualified personnel conduct the inspection. 2. Inspection schedule. a. For construction activities that discharge to a surface water identified in Part II B 5 and B 6 as impaired or having an approved TMDL or Part I B 7 as exceptional, the following inspection schedule requirements apply: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 24 hours following a measurable storm event. In the event that a measurable storm event occurs when Page 14 of 26 there are more than 24 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections as authorized in Part II G 2 d shall not be allowed. b. Except as specified in Part II G 2 a, inspections shall be conducted at a frequency of: (1) At least once every five business days; or (2) At least once every 10 business days and no later than 24 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 24 hours between business days, the inspection shall be conducted on the next business day. c. Where areas have been temporarily stabilized or land -disturbing activities will be suspended due to continuous frozen ground conditions and stormwater discharges are unlikely, the inspection frequency described in Part II G 2 a and 2 b may be reduced to once per month. If weather conditions (such as above freezing temperatures or rain or snow events) make discharges likely, the operator shall immediately resume the regular inspection frequency. d. Except as prohibited in Part II G 2 a (2), representative inspections may be utilized for utility line installation, pipeline construction, or other similar linear construction activities provided that: (1) Temporary or permanent soil stabilization has been installed and vehicle access may compromise the temporary or permanent soil stabilization and potentially cause additional land disturbance increasing the potential for erosion; (2) Inspections occur on the same frequency as other construction activities; (3) Control measures are inspected along the construction site 0.25 miles above and below each access point (i.e., where a roadway, undisturbed right-of-way, or other similar feature intersects the construction activity and access does not compromise temporary or permanent soil stabilization); and (4) Inspection locations are provided in the inspection report required by Part II G. e. If adverse weather causes the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. Any time inspections are delayed due to adverse weather conditions, evidence of the adverse weather conditions shall be included in the SWPPP with the dates of occurrence. 3. Inspection requirements. a. As part of the inspection, the qualified personnel shall: (1) Record the date and time of the inspection and, when applicable, the date and rainfall amount of the last measurable storm event; Page 15 of 26 (2) Record the information and a description of any discharges occurring at the time of the inspection or evidence of discharges occurring prior to the inspection; (3) Record any land -disturbing activities that have occurred outside of the approved erosion and sediment control plan; (4) Inspect the following for installation in accordance with the approved erosion and sediment control plan, identification of any maintenance needs, and evaluation of effectiveness in minimizing sediment discharge, including whether the control has been inappropriately or incorrectly used: (a) All perimeter erosion and sediment controls, such as silt fence; (b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping measures; (c) Completed earthen structures, such as dams, dikes, ditches, and diversions for stabilization and effective impoundment or flow control; (d) Cut and fill slopes; (e) Sediment basins and traps, sediment barriers, and other measures installed to control sediment discharge from stormwater; (f) Temporary or permanent channels, flumes, or other slope drain structures installed to convey concentrated runoff down cut and fill slopes; (g) Storm inlets that have been made operational to ensure that sediment laden stormwater does not enter without first being filtered or similarly treated; and (h) Construction vehicle access routes that intersect or access paved or public roads for minimizing sediment tracking; (5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days to ensure: (a) Initiation of stabilization activities have occurred immediately, as defined in 9VAC25-880-1; and (b) Stabilization activities have been completed within seven days of reaching grade or stopping work; (6) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department -approved annual standards and specifications has not been properly implemented. This includes: Page 16 of 26 (a) Concentrated flows of stormwater in conveyances such as rills, rivulets, or channels that have not been filtered, settled, or similarly treated prior to discharge, or evidence thereof; (b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; (c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediment controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; (d) Sediment deposition on any property (including public and private streets) outside of the construction activity covered by this general permit; (e) Required stabilization has not been initiated or completed or is not effective on portions of the site; (f) Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; (g) Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and (h) Land disturbance or sediment deposition outside of the approved area to be disturbed; (7) Inspect pollutant generating activities identified in the pollution prevention plan for the proper implementation, maintenance, and effectiveness of the procedures and practices; (8) Identify any pollutant generating activities not identified in the pollution prevention plan; and (9) Identify and document the presence of any evidence of the discharge of pollutants prohibited by this general permit. 4. Inspection report. Each inspection report shall include the following items: a. The date and time of the inspection and, when applicable, the date and rainfall amount of the last measurable storm event; b. Summarized findings of the inspection; c. The locations of prohibited discharges; d. The locations of control measures that require maintenance; Page 17 of 26 e. The locations of control measures that failed to operate as designed or proved inadequate or inappropriate for a particular location; f. The locations where any evidence identified under Part II G 3 a (6) exists; g. The locations where any additional control measure is needed; h. A list of corrective actions required (including any changes to the SWPPP that are necessary) as a result of the inspection or to maintain permit compliance; Documentation of any corrective actions required from a previous inspection that have not been implemented; and The date and signature of the qualified personnel and the operator or its duly authorized representative. 5. The inspection report shall be included into the SWPPP no later than four business days after the inspection is complete. 6. The inspection report and any actions taken in accordance with Part II shall be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection report does not identify any incidents of noncompliance, the report shall contain a certification that the construction activity is in compliance with the SWPPP and this general permit. The report shall be signed in accordance with Part III K of this general permit. H. Corrective actions. The operator shall implement the corrective actions identified as a result of an inspection as soon as practicable but no later than seven days after discovery or a longer period as approved by the VSMP authority. If approval of a corrective action by a regulatory authority (e.g., VSMP authority, VESCP authority, or the department) is necessary, additional control measures shall be implemented to minimize pollutants in stormwater discharges until such approvals can be obtained. 2. The operator may be required to remove accumulated sediment deposits located outside of the construction activity covered by this general permit as soon as practicable in order to minimize environmental impacts. The operator shall notify the VSMP authority and the department as well as obtain all applicable federal, state, and local authorizations, approvals, and permits prior to the removal of sediments accumulated in surface waters including wetlands. Page 18 of 26 PART III CONDITIONS APPLICABLE TO ALL VPDES PERMITS NOTE: Discharge monitoring is not required for this general permit. If the operator chooses to monitor stormwater discharges or control measures, the operator shall comply with the requirements of subsections A, B, and C, as appropriate. A. Monitoring. Samples and measurements taken for the purpose of monitoring shall be representative of the monitoring activity. 2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures have been specified in this general permit. Analyses performed according to test procedures approved under 40 CFR Part 136 shall be performed by an environmental laboratory certified under regulations adopted by the Department of General Services (1 VAC30-45 or 1 VAC30-46). 3. The operator shall periodically calibrate and perform maintenance procedures on all monitoring and analytical instrumentation at intervals that will ensure accuracy of measurements. B. Records. 1. Monitoring records and reports shall include: a. The date, exact place, and time of sampling or measurements; b. The individuals who performed the sampling or measurements; c. The dates and times analyses were performed; d. The individuals who performed the analyses; e. The analytical techniques or methods used; and f. The results of such analyses. 2. The operator shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by this general permit, and records of all data used to complete the registration statement for this general permit, for a period of at least three years from the date of the sample, measurement, report or request for coverage. This period of retention shall be extended automatically during the course of any unresolved litigation regarding the regulated activity or regarding control standards applicable to the operator, or as requested by the board. C. Reporting monitoring results. Page 19 of 26 1. The operator shall update the SWPPP to include the results of the monitoring as may be performed in accordance with this general permit, unless another reporting schedule is specified elsewhere in this general permit. 2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms provided, approved or specified by the department; or in any format provided that the date, location, parameter, method, and result of the monitoring activity are included. 3. If the operator monitors any pollutant specifically addressed by this general permit more frequently than required by this general permit using test procedures approved under 40 CFR Part 136 or using other test procedures approved by the U.S. Environmental Protection Agency or using procedures specified in this general permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted in the DMR or reporting form specified by the department. 4. Calculations for all limitations which require averaging of measurements shall utilize an arithmetic mean unless otherwise specified in this general permit. D. Duty to provide information. The operator shall furnish, within a reasonable time, any information which the board may request to determine whether cause exists for terminating this general permit coverage or to determine compliance with this general permit. The board, department, EPA, or VSMP authority may require the operator to furnish, upon request, such plans, specifications, and other pertinent information as may be necessary to determine the effect of the wastes from his discharge on the quality of surface waters, or such other information as may be necessary to accomplish the purposes of the CWA and the Virginia Stormwater Management Act. The operator shall also furnish to the board, department, EPA, or VSMP authority, upon request, copies of records required to be kept by this general permit. E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this general permit shall be submitted no later than 14 days following each schedule date. F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except in compliance with a state permit issued by the department, it shall be unlawful to cause a stormwater discharge from a construction activity. G. Reports of unauthorized discharges. Any operator who discharges or causes or allows a discharge of sewage, industrial waste, other wastes or any noxious or deleterious substance or a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, 40 CFR Part 302, or § 62.1-44.34:19 of the Code of Virginia that occurs during a 24-hour period into or upon surface waters or who discharges or causes or allows a discharge that may reasonably be expected to enter surface waters, shall notify the Department of Environmental Quality of the discharge immediately upon discovery of the discharge, but in no case later than within 24 hours after said discovery. A written report of the unauthorized discharge shall be submitted to the department and the VSMP authority within five days of discovery of the discharge. The written report shall contain: 1. A description of the nature and location of the discharge; 2. The cause of the discharge; Page 20 of 26 3. The date on which the discharge occurred; 4. The length of time that the discharge continued; 5. The volume of the discharge; 6. If the discharge is continuing, how long it is expected to continue; 7. If the discharge is continuing, what the expected total volume of the discharge will be; and 8. Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present discharge or any future discharges not authorized by this general permit. Discharges reportable to the department and the VSMP authority under the immediate reporting requirements of other regulations are exempted from this requirement. H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a "bypass" or "upset," as defined in this general permit, should occur from a facility and the discharge enters or could be expected to enter surface waters, the operator shall promptly notify, in no case later than within 24 hours, the department and the VSMP authority by telephone after the discovery of the discharge. This notification shall provide all available details of the incident, including any adverse effects on aquatic life and the known number of fish killed. The operator shall reduce the report to writing and shall submit it to the department and the VSMP authority within five days of discovery of the discharge in accordance with Part III 12. Unusual and extraordinary discharges include any discharge resulting from: 1. Unusual spillage of materials resulting directly or indirectly from processing operations; 2. Breakdown of processing or accessory equipment; 3. Failure or taking out of service of some or all of the facilities; and 4. Flooding or other acts of nature. I. Reports of noncompliance. The operator shall report any noncompliance which may adversely affect surface waters or may endanger public health. 1. An oral report to the department and the VSMP authority shall be provided within 24 hours from the time the operator becomes aware of the circumstances. The following shall be included as information that shall be reported within 24 hours under this subdivision: a. Any unanticipated bypass; and b. Any upset that causes a discharge to surface waters. 2. A written report shall be submitted within five days and shall contain: a. A description of the noncompliance and its cause; Page 21 of 26 b. The period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The department may waive the written report on a case -by -case basis for reports of noncompliance under Part III I if the oral report has been received within 24 hours and no adverse impact on surface waters has been reported. 3. The operator shall report all instances of noncompliance not reported under Part II I 1 1 or 2 in writing as part of the SWPPP. The reports shall contain the information listed in Part 111 12. NOTE: The reports required in Part III G, H and I shall be made to the department and the VSMP authority. Reports may be made by telephone, email, or by fax. For reports outside normal working hours, leaving a recorded message shall fulfill the immediate reporting requirement. For emergencies, the Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468-8892. 4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of incorrect information in any report, including a registration statement, to the department or the VSMP authority, the operator shall promptly submit such facts or correct information. J. Notice of planned changes. 1. The operator shall give notice to the department and the VSMP authority as soon as possible of any planned physical alterations or additions to the permitted facility or activity. Notice is required only when: a. The operator plans an alteration or addition to any building, structure, facility, or installation that may meet one of the criteria for determining whether a facility is a new source in 9VAC25-870-420; b. The operator plans an alteration or addition that would significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants that are not subject to effluent limitations in this general permit; or 2. The operator shall give advance notice to the department and VSMP authority of any planned changes in the permitted facility or activity, which may result in noncompliance with state permit requirements. K. Signatory requirements. 1. Registration statement. All registration statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the Page 22 of 26 manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. 2. Reports and other information. All reports required by this general permit, including SWPPPs, and other information requested by the board or the department shall be signed by a person described in Part III K 1 or by a duly authorized representative of that person. A person is a duly authorized representative only if: a. The authorization is made in writing by a person described in Part III K 1; b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the operator. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and c. The signed and dated written authorization is included in the SWPPP. A copy shall be provided to the department and VSMP authority, if requested. 3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because a different individual or position has responsibility for the overall operation of the construction activity, a new authorization satisfying the requirements of Part III K 2 shall be submitted to the VSMP authority as the administering entity for the board prior to or together with any reports or information to be signed by an authorized representative. 4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following certification: 5. "1 certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant Page 23 of 26 penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state permit noncompliance constitutes a violation of the Virginia Stormwater Management Act and the Clean Water Act, except that noncompliance with certain provisions of this general permit may constitute a violation of the Virginia Stormwater Management Act but not the Clean Water Act. Permit noncompliance is grounds for enforcement action; for state permit coverage, termination, revocation and reissuance, or modification; or denial of a state permit renewal application. The operator shall comply with effluent standards or prohibitions established under § 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions or standards for sewage sludge use or disposal, even if this general permit has not yet been modified to incorporate the requirement. M. Duty to reapply. If the operator wishes to continue an activity regulated by this general permit after the expiration date of this general permit, the operator shall submit a new registration statement at least 60 days before the expiration date of the existing general permit, unless permission for a later date has been granted by the board. The board shall not grant permission for registration statements to be submitted later than the expiration date of the existing general permit. N. Effect of a state permit. This general permit does not convey any property rights in either real or personal property or any exclusive privileges, nor does it authorize any injury to private property or invasion of personal rights, or any infringement of federal, state or local law or regulations. O. State law. Nothing in this general permit shall be construed to preclude the institution of any legal action under, or relieve the operator from any responsibilities, liabilities, or penalties established pursuant to any other state law or regulation or under authority preserved by § 510 of the Clean Water Act. Except as provided in general permit conditions on "bypassing" (Part III U) and "upset" (Part III V), nothing in this general permit shall be construed to relieve the operator from civil and criminal penalties for noncompliance. P. Oil and hazardous substance liability. Nothing in this general permit shall be construed to preclude the institution of any legal action or relieve the operator from any responsibilities, liabilities, or penalties to which the operator is or may be subject under §§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water Control Law or § 311 of the Clean Water Act. Q. Proper operation and maintenance. The operator shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances), which are installed or used by the operator to achieve compliance with the conditions of this general permit. Proper operation and maintenance also includes effective plant performance, adequate funding, adequate staffing, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems, which are installed by the operator only when the operation is necessary to achieve compliance with the conditions of this general permit. R. Disposal of solids or sludges. Solids, sludges or other pollutants removed in the course of treatment or management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such materials from entering surface waters and in compliance with all applicable state and federal laws and regulations. Page 24 of 26 S. Duty to mitigate. The operator shall take all steps to minimize or prevent any discharge in violation of this general permit that has a reasonable likelihood of adversely affecting human health or the environment. T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this general permit. U. Bypass. 1. "Bypass," as defined in 9VAC25-870-10, means the intentional diversion of waste streams from any portion of a treatment facility. The operator may allow any bypass to occur that does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to ensure efficient operation. These bypasses are not subject to the provisions of Part I I I U 2 and 3. 2. Notice. a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the operator shall submit prior notice to the department, if possible at least 10 days before the date of the bypass. b. Unanticipated bypass. The operator shall submit notice of an unanticipated bypass as required in Part III I. 3. Prohibition of bypass. a. Except as provided in Part III U 1, bypass is prohibited, and the board or department may take enforcement action against an operator for bypass unless: (1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage. Severe property damage means substantial physical damage to property, damage to the treatment facilities that causes them to become inoperable, or substantial and permanent loss of natural resources that can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production; (2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass that occurred during normal periods of equipment downtime or preventive maintenance; and (3) The operator submitted notices as required under Part III U 2. b. The department may approve an anticipated bypass, after considering its adverse effects, if the department determines that it will meet the three conditions listed in Part III U 3 a. Page 25 of 26 V. Upset 1. An "upset," as defined in 9VAC25-870-10, means an exceptional incident in which there is unintentional and temporary noncompliance with technology -based state permit effluent limitations because of factors beyond the reasonable control of the operator. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. 2. An upset constitutes an affirmative defense to an action brought for noncompliance with technology -based state permit effluent limitations if the requirements of Part III V 4 are met. A determination made during administrative review of claims that noncompliance was caused by upset, and before an action for noncompliance, is not a final administrative action subject to judicial review. 3. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventative maintenance, or careless or improper operation. 4. An operator who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs or other relevant evidence that: a. An upset occurred and that the operator can identify the cause of the upset; b. The permitted facility was at the time being properly operated; c. The operator submitted notice of the upset as required in Part III I; and d. The operator complied with any remedial measures required under Part III S. 5. In any enforcement proceeding, the operator seeking to establish the occurrence of an upset has the burden of proof. W. Inspection and entry. The operator shall allow the department as the board's designee, the VSMP authority, EPA, or an authorized representative of either entity (including an authorized contractor), upon presentation of credentials and other documents as may be required by law to: 1. Enter upon the operator's premises where a regulated facility or activity is located or conducted, or where records shall be kept under the conditions of this general permit; 2. Have access to and copy, at reasonable times, any records that shall be kept under the conditions of this general permit; 3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this general permit; and 4. Sample or monitor at reasonable times, for the purposes of ensuring state permit compliance or as otherwise authorized by the Clean Water Act or the Virginia Stormwater Management Act, any substances or parameters at any location. Page 26 of 26 For purposes of this section, the time for inspection shall be deemed reasonable during regular business hours, and whenever the facility is discharging. Nothing contained herein shall make an inspection unreasonable during an emergency. X. State permit actions. State permit coverage may be modified, revoked and reissued, or terminated for cause. The filing of a request by the operator for a state permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance does not stay any state permit condition. Y. Transfer of state permit coverage. 1. State permits are not transferable to any person except after notice to the department. Except as provided in Part III Y 2, a state permit may be transferred by the operator to a new operator only if the state permit has been modified or revoked and reissued, or a minor modification made, to identify the new operator and incorporate such other requirements as may be necessary under the Virginia Stormwater Management Act and the Clean Water Act. 2. As an alternative to transfers under Part III Y 1, this state permit may be automatically transferred to a new operator if: a. The current operator notifies the department at least 30 days in advance of the proposed transfer of the title to the facility or property; b. The notice includes a written agreement between the existing and new operators containing a specific date for transfer of state permit responsibility, coverage, and liability between them; and c. The department does not notify the existing operator and the proposed new operator of its intent to modify or revoke and reissue the state permit. If this notice is not received, the transfer is effective on the date specified in the agreement mentioned in Part III Y 2 b. 3. For ongoing construction activity involving a change of operator, the new operator shall accept and maintain the existing SWPPP, or prepare and implement a new SWPPP prior to taking over operations at the site. Z. Severability. The provisions of this general permit are severable, and if any provision of this general permit or the application of any provision of this state permit to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this general permit shall not be affected thereby. Section 12. Inspection logs INSPECTION FREQUENCY: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 24 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections as authorized in Part II G 2 d shall not be allowed. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County