Loading...
HomeMy WebLinkAboutSUB201700074 Bond Reduction 2020-05-27John Anderson From: Sent: To: Subject: Attachments: John Anderson Wednesday, May 27, 2020 3:23 PM katurahsr@gmail.com Hollymead Towncenter Block VI (Transmittal); road plan bond inspection /bond reduction request -- Engineering review ( 3/18/20, 5/27/20 ) bond_inspection_checklist_(BIR)_SUB201700074_HTC block Vl_re_042020 Underhill Engr.pdf Katurah, thanks for your patience. Current bond amount =ordinal bond amount: $109,140. Thanks for 4/20/20 Underhill Engineering document. • Based on work complete, information received, and 4/20/20 Underhill Engineering report, Albemarle can reduce the bond, but there are several issues, primarily: • Need for additional items (listed, below). Ref. attached inspection checklist. Although I've not used check boxes to indicate if item received (Y/N), highlight items have not been received, unless overlooked, or additional information is needed. • Please review highlight items, discuss subgrade checks with Underhill, and furnish what is possible, as soon as possible. Otherwise, reduction will be less than maximum. • Please review As -built item; revision requested: provide or label design section stone /asphalt depths; revise base stone depth to 9"-11" (VDOT 21A). • If all items received, especially pipe video /additional subgrade data for each alley, then few repair items remain. (Limited concrete replacement /photos, below —SITE ITEMS) • I have not marked concrete curb sections for repair. Prior to marking, I hope to meet on -site and am available Fri, 29- May, to review what needs to be done. • 11/20/18 Schnabel Engineering concrete test report indicates adequate compressive strength. • Repair relates to damage during construction, and quality required for acceptance. • Limited sections require replacement. We value your perspective. • Storm pipe video is required. • Please let me know if this (or any other highlight item) has been submitted, and overlooked. ( Note: Field density summary reports list compaction >100%; without implying there is an issue, may reach out to Susan E. Ray, Geotechnical Engineer /Underhill Engineering to discuss these values.) Items needed: 1. Letter from P.E. certifying improvements to date are built to plan 2. Current certification form completed by owner /developer. Use link to form (please complete and return /email): hqp://www.albemarle.org/upload/images/forms center/departments/Community Development/forms/Engineering and _WPO_Forms/Road _ Inspections_& Acceptance- Certificate of Completion for Subdivision_03-16-09.pdf 3. Additional subgrade compaction information: areas under alleys. 4. Revise As -built, sheet AB-300 to show: a. Design alley section, or label design stone /asphalt depth b. 9"-11" VDOT 21 stone* * ref. p. 88, 4/20/20 Underhill Engineering report 5. Storm pipe video SITE ITEMS 6. Concrete repair 7. Site clean-up required 8. Storm inlet clean -out required 9. Check CG-12 ramp ( last photo) Thanks for your help and patience. We appreciate it very much. best, J. Anderson 434.296-5832 -0069 Photos /Albemarle County, 3/18/20 (Areas of damage): �, �� .�_� 3 2,w:_. F 4 Site /Alley Clean-up required: 4 ��' �'- - rt - - - .. _' �..__.. .. u� 5 Storm inlet Clean -out required (3/18/20 photos): �- sr'' .} '' . @. :�'��: a� • . �. �,., r''� ,�'' �,,, y:s � —J` `��f / 'r" -�� � �, _ �.,._ From: John Anderson Sent: Monday, May 18, 2020 2:59 PM To: I<aturahsr@gmail.com Subject: RE: Hollymead Towncenter Block VI Transmittal Katurah, thanks for the reminder. I will try to get to the HTC Area C, block VI information that Kate sent by Thursday. I am checking on block IV status (sent email in late March recommending SUB201400101 road plan bond release —will let you know as soon as I have an update). I am well, and hope that you are. Thanks again, take care, best, J. Anderson 434.296-5832 -0069 From: Katurah Roell <I<aturahsr@Bmail.com> Sent: Monday, May 18, 2020 1:50 PM To: John Anderson <4anderson2@albemarle.orB> Subject: Re: Hollymead Towncenter Block VI Transmittal Hello John, I wanted to follow up on this submittal from the engineering firm that observed the construction and filed these reports for HTC 6. Also, I requested the release of Block 4 final paving that has been completed for some time, as you remember, you were going to release this before but reminded you we still needed the final surface. Please give me an update on both of these requests. I will be submitting the bond release for Water & Sewer as that is now complete and Jeremy has sent a letter that it is done and I no further obligations. Thanks and I hope you are doing well, Katurah S. Roell Design Builders & Remodelers, LLC Charlottesville, VA 22901 Mobile: 434-906-2702 On Tue, Apr 21, 2020 at 2:30 PM <I<ate.tryon@underhillengineering.com> wrote: John, Attached is the transmittal summarizing the services Underhill provided for Hollymead Towncenter. Please let us know if you have any questions! Have a great week! Kate Kate Tryon Operations Coordinator underhill ENGINEERING geotechnical' geodesign 1 geoconstruction www.underhillengineering.com W, 1001 East Market St. STE 100 Charlottesville, VA 22902-5381 Office: 434.771.0234 Mobile: 540.840.8501 Email: kate.tryonCa)underhillenciineering.com 10