Loading...
HomeMy WebLinkAboutSDP202000036 Correspondence 2020-06-23ALBEMAR,LE COUNTY I VIRGINIA Is this a new submission or a re -submission? r New Submission r Re -submission The Community Development Department (CDD) now accepts the digital submission of development applications through a new web -based form.This feature is being implemented in an effort to provide a user-friendly method to submit and resubmit multiple development applications. Please click the New Submission button above to see the list of available applications. To guide you through the digital submission process, we have provided Submittal Instructions on how to use this Submission Form and some General Submission Guidelines. Please review both of these documents before making your submission. Submittal Instructions General Submission Guidelines If you have questions about the correct submission method for your project, please email us at cddsubmittal@albemarle.org or call us at (434) 296-5832. You have selected re -submission. If necessary, you will need to complete the appropriate PDF application form(s). • For Road Plan re -submissions, an application and fee are required and can be found here. • For Water Protection Ordinance re -submissions, an application and fee are required and can be found here. • For Special Use Permit re -submissions, an application can be found here. A Fee will apply for all submittals after the first free re -submittal. • For Zoning Map Amendment re -submissions, an application can be found here. A Fee will apply for all submittals after the first free re -submittal. • For all other applications (SDP, SUB, CLE, etc.) there is no application or fee required to submit. Once you have finished filling out any required application, save it to a location on your computer. Please enter your project's application number in the field provided below, once completed, tab to the next field. The application number you entered will reference the project's application number in Albemarle County Community Development Department's development tracking system. Once referenced, the Project Name and Project Type fields will be auto -populated. Please confirm the information referenced in these fields is correct. After confirmation, please enter your name and email address for contact purposes and attach any associated files for resubmittal through the File Upload button. Submission Fees are determined by application type and are listed within each application. Full Name* Ex: John Doe Riki van-Niekerk Email* Ex: johndoe@grrail.com riki@roudabush.com Phone Number* Ex:434-973-9999 806-283-1802 Application Number* Ex:SDF-201800005 SDP202000036 (Ref ix +4 digit year + 5 digit nurrber Is this an LOR?* r Yes rJ No Project Name (I\b entry needed) Belvedere Phase 5A - Final - Digital Project Type (W entry needed) SDP File Upload Only FDF and TIFF filetypes accepted Application —SDP —Belvedere Ph 5 Final Site Plan.pdf 79.62KB Belvedere Phase 5A comment response letter.pdf 157.99KB Belvedere Phase5A SDP202000036 Final Site Plan SHEETS 1-23 37.48M6 set. pdf Checklist —Final —Site —Plan —Belvedere Ph 5.pdf 93.18KB Water and sewer datasheets_rev3.pdf 69.4KB Maxirrumsize per file: 70rvB