HomeMy WebLinkAboutSUB200300262 Bond 2020-06-29Internal Use Only
by ALgR,"
Date Received:
Fee Paid:
Received by:
k
Intake: Forward to Management Analyst
�rRc tN�P
BOND INSPECTION REQUEST
APPROVED PLAN #: Rocks SP 2003-079, SUB 2003-262, WPO-2005-0013
PROJECT NAME (including Phase #): Newcomb Mountain Lane Final Private Road Plans
(As listed on the approved plan)
This form is used to request a reduction or release of a bond. A fee is required for each inspection. Please
check the appropriate box below for the requested inspection(s).
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
❑ VSMP/VESCP Erosion Control, Stormwater Management and/or Mitigation per
Water Protection Ordinance sections 17-207 & 17-208 $250
❑ Reduction ❑ Release
® Subdivision (roads, drainage, etc.) per Subdivision Ordinance sections 14-435 & 14-438 $269
❑ Reduction m Release
❑ Water & Sewer bond per Subdivision Ordinance section 14-435 $269
❑ Reduction ❑ Release
❑ Site Development Performance bond (Incomplete Site Work & Landscaping) $301
❑ Reduction (site work only) ❑ Release
TOTAL FEES $269
Submit requests to: Department of Community Development, 401 0 �"" e,
VA 22902, Attention: Management Analyst - Phone 434-296- 32: Fa-
stormwater facilities will require construction record draw' ,a wt FC—J-
certifications, and completion processes through VDOT or %,,Bonds will will not be reduced or released without record draw' 5 t E-, V r'
acceptance I tof all bonded improvlshed ementr For Site Develop ures. A mini r1 ''��' �� �,�.,r.t--a►"� D�.i��-��r"
part of the bonded site work, a request for reduction should
If all required documentation is not received within 30 days o
deemed incomplete and shall be rejected. If rejected, a new ap
be required. Applications may be withdrawn for a full refund
If this is a reduction request, the revised estimate will be preps
Please provide contact information.
EMAIL: mboggs@hcmgc.com
OR REGULAR MAIL ADDRESS: —
AI0A4-=Y, C"O f a rzl
Signature f Owner/D oper
Michael T. Boggs , jazd June 19, 2020
Print Name Date
Revised 7/15/2014, 7/20/2015, 1 1/3/2015, 8/14/2017, 1/28/2020