Loading...
HomeMy WebLinkAboutWPO202000004 Correspondence 2020-06-24 (2)® COLLINS ENGINEERING June 29, 2020 Emily Cox, PE Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Brookhill Blocks 9-11 VSMP Plan (WP020200004) `200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 j 434.293.3719 PH 434.293.2813 FX ( www.collins-engineering.com Thank you for your comments dated June 12, 2020 on the above referenced project. Below are our detailed responses to your comments. Should you have any questions during your review and approval of this project, feel free to contact Scott Collins at scott@collins-engineering.com or at (434) 293-3719. A. Stormwater Pollution Prevention Plan (SWPPP) 1. An updated coverage map has been provided which also lists the areas and associated WPO #s. There is some questions that we are working with staff on the overall coverage map to finalize this mapping and the registration statemetn 2. The updated registration statement has been provided which adds in this section of the development and is based on the updated registration statement including the modifications to the village center, which will need to be approved first, before the approval of this WPO plan. B. Pollution Prevention Plan (PPP) comment aaaresseL. C. Stormwater Management Plan (SWMP) 1. comment aaaresseu. 2. Comment addressed. 3. Comment addressed. 4. Comment addressed. 5. CnmmPnt ndrlracsa,' 6. Comment acknowledged. SWM agreement forthcoming. 7. The legend on Sheet 4 has been revised to specify "SWM Forest and Open Space Easement". 8. Comment addressee. 9. Comment addressed. 10. Comment addressed. 11. Comment addressed. 12. Comment addressed. 13. Comment addressed. 14. Comment addressed. 15. Comment addressed. 16. Comment addressed. 17. Comment addressed. 18. Comment acknowledged. Retaining wall plans for the SWM facility grading are forthcoming. 19. Comment addressed. 20. Comment addressed. 21. Comment addressed. 23. The legend on Sheet 4 has been revised to specify "SWM Forest and Open Space Easement". 24. Comment acknowledged. The nutrient credits will be purchased this week. 25. Comment acknowledged. This plan has been resubmitted for approval as well. D. Erosion and Sediment Control Plan (ESCP) 1. Comment addressed. 2. Comment addressed. 3. Comment addressed. 4. Comment addressed 5. DB and PG have been provided for the Block 4B easements on Sheet 2 - Existing Conditions. 6. Comment addressed 7. Comment addressed. 8. Comment addressed. 9. Comment addressed. 10. Comment addressed. 11. Comment addressed. 12. Comment addressed. 13. Comment addressed. 14. Comment addressed. 15. Comment addressed. 16. Comment addressed. 17. Comment addressed. 18. Comment addressed. 19. Comment addressed. 20. Comment addressed. 21. Comment addressed. 22. Comment addressed. 23. Comment addressed. 24. Comment addressed. 25. Comment addressed. 26. Comment addressed. 27. Comment addressed. 28. Comment addressed. 29. Comment addressed. 30. Comment addressed. 31. Comment addressed. 32. Comment addressed. 33. Comment addressed. 34. 'bmment addressed. 35. Notes near ST#6 have been revised on Sheet 11 to reference ST#6. Sincerely, Scott Collins