HomeMy WebLinkAboutWPO201900039 Plan - E&S 2020-07-01ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS
1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION
CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE
WEEK PRIOR TO THE FINAL INSPECTION.
2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING
TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL
HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP
IN CLEARING.
4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE
AT ALL TIMES.
5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE
PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR
SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL
BY THE PLAN APPROVING AUTHORITY.
6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL
MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN
APPROVING AUTHORITY.
7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES
DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS
ACHIEVED.
8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE.
9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH
RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE
EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY.
10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA.
11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT
MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS.
12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING
ORDINANCE SECTION 5.1.28.
13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF
ALBEMARLE.
14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED
TO THE HOURS OF 7:OOAM TO 9:OOPM.
15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL
SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND
AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE O SLIDES, SINKING, OR COLLAPSE.
16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO
PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL
MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER
PORTION OF THE PROPERTY.
17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75
LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL
RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY
THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF.
ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR.
18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH.
AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP
4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10
NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95%
KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW
MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY
EROSION CONTROL INSPECTOR.
19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE
OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE
CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE
TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION
DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED
IMMEDIATELY.
20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF
FILL SLOPE
SOURCE: VA. DSWC
EMBANKMENT NOTES:
1
2
3.
In
TEMPO PAT�
DIVERSION
EARTHEN RIDGE
PT,ATE.101
FILL MATERIAL SHALL BE FREE OF ORGANIC MATERIALS, CONSTRUCTION
WASTE, STONES GREATER THAN 6-IN IN DIAMETER, AND OTHER
OBJECTIONABLE MATERIAL. CENTER OF THE EMBANKMENT SHALL CONFORM
TO UNIFIED SOIL CLASSIFICATION GC, SC, OR CL ("IMPERVIOUS CORE", AS
DEPICTED IN EMBANKMENT CROSS-SECTION, THIS SHEET).
FILL SHALL BE PLACED IN LIFTS NO GREATER THAN 8", WHICH SHOULD
EXTEND THE ENTIRE LENGTH OF THE EMBANKMENT. THE MOST PERMEABLE
BORROW MATERIAL SHALL BE PLACED IN THE DOWNSTREAM PORTIONS OF
THE EMBANKMENT.
FILL MATERIAL SHALL BE COMPACTED WITH APPROPRIATE EQUIPMENT WHILE
THERE IS A SUITABLE MOISTURE CONTENT IN MATERIAL TO ACHIEVE 95%
COMPACTION.
EMBANKMENT SEC. TION
RELATIVELY
IMPERVIOUS
CORE
(GC, SC, CL
IMPERVIOUS OR SODS ONLY) IMPERVIOUS OR
SEMI -PERVIOUS SEMI -PERVIOUS
SHOULDER SHOULDER
CLEARED GROUND LEVEL CUTOFF
4' min.
I I 4' min.
THE SURFACE LAYER OF COMPACTED FILL SHALL BE SCARIFIED PRIOR TO \
PLACEMENT OF TOP SOIL. TOP SOIL SHALL BE STABILIZED WITH SEED UPON ---- -
ACHIEVEMENT OF FINAL GRADE.
EMBANKMENT SHALL INCLUDE A CUTOFF TRENCH LOCATED ALONG
CENTERLINE, MEASURING A MINIMUM OF 4'-WIDE AND 4'-DEEP (SEE / PROPERTY LINE \ \ \
EMBANKMENT CROSS-SECTION, THIS SHEET).
--- - \
FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE -- - ---- - -
COUNTY EROSION CONTROL INSPECTOR.
-
\ X /I _10- X \ \
O _
X - - -SED. BASIN DRAINAGE AREA
�06� -�-0� TOP OF SLOPE
5.
SEDI ENT BASIN S k' MA TI C
ELE VA TIONS
ELEV. 1080.00
DESIGN HIGH
WATER
J
(25-YR. STORM
ELEV.)
MIN. 2.0'
ELEV.
1077.79
MIN. 3.0'
ELEV. 1076.70
MIN. 0.5'�
MIN. 1.0'
67 C.Y./ AC.
"DRY
STORAGE
N
(337 CY TOTAL)
-
ELEV. 1074.45
%� 36"-DIA. RISER
N
67 C.Y./ AC. DEWATERING
" WET " STORAGE DEVICE
(337 CY TOTAL) 3" ORIFICE, INV. 1074.45
SEDIMENT CLEANOUT POINT
ELEV. = 1073.00
BOTTOM ELEV @ BASE = 1070.50 60.0 LF 18"-DIA. HDPE N12 PIPE
NV. IN = 1070.40
ANTI -FLOTATION BASE INV. OUT 1069.80
DCESD N CELEMAT�ONS WTHOUT
EMERGENCY SPELLWAY
(RISER PASSES 25-YR. EVENT)
SOURCE: VA. DSWC PLATE. 3.14-2
I)/
ISER PIPE BASE C., ONDITIONS
CONCRETE BLOCK WIDTH = PIPE DIA. X 2
TYPICAL CONCRETE BASE
SOURCE: VA. DSWC
H J:
PR V. STABILIZED
EMBANKMENT
SB T\
2.00
92.W
o I SEDIMENT BASIN "ADD." \
00l 1 %76.00' J
-
/fijlllllll
36" CMP RISER W/ /
�0 \ ANTI -FLOTATION BASE AND / \
ANTI -VORTEX TRASH RACK
D
I I
18" FLARED END SECTION
// /// O / \\ 1 I I I / / i �� �� ��� % - AND OUTLET PROTECTION \
-7- LINED WITH FILTER CLOTH.
OP
KEY FILTER CLOTH 6"-9" FOR
ENTIRE PERIMETER OF STONE. 5�
D V.- OUT = 1069.80
��M L507 \
j
R / // / - / / Ile W = 4.33'
F I / i - / /�� / - SEDIMENT BASIN "ADD." DESIGN CRITERIA:
-
\0� / / / / / / DRAINAGE AREA = 5.03 AC. \
/ CURVE NUMBER = 84
\ \ \ \+\ \ �35 \ \ / / / �/ / i _ TIME OF CONCENTRATION (TR55) = 23.3 MIN
� / / \� / Q2 (RELEASE) = 3.09 CFS \ - -
DISCLAIMER:
\
\ \ THIS ADDENDUM IS BEING PROVIDED TO SPECIFY REASONABLY APPROPRIATE EROSION CONTROL MEASURES FOR THE DURATION OF THE PROJECT, UNTIL
DISTURBED AREAS CAN BE STABILIZED. TOPOGRAPHY AND BUILDING LOCATIONS SHOWN ARE PER SURVEY INFO FROM TOM SHUMATE, JR, LS, DATED MAY 25,
2020. REVISED PARKING LIMITS SHOWN ARE PER DEVELOPER DOCUMENTS PROVIDED TO THE ENGINEER ON MAY 26, 2020.
\ \ \ \ \ \ \ \ \ = '- - / / THIS ADDENDUM DOES NOT ALLEVIATE ANY RESPONSIBILITIES ASSOCIATED WITH THE IMPLEMENTATION OF APPROVED PLANS DATED APRIL 9, 2020. AREAS
\ \ \ \ \ SQL`" 5O On / / / / / LOCATED OUTSIDE OF THE SPECIFIED SEDIMENT TRAP'S DRAINAGE AREA MUST INCORPORATE EROSION AND SEDIMENT CONTROL MEASURES AS SPECIFIED IN
THE APPROVED PLANS UNTIL DEEMED FULLY STABILIZED BY THE APPROPRIATE COUNTY OFFICIALS. MAINTENANCE AND TEMPORARY/PERMANENT
\ \ \ \ \ -50 __25 0 \ O 100/ / / / / / / / STABILIZATION REQUIREMENTS OF THE APPROVED PLANS REMAIN VALID FOR ALL AREAS.
THIS ADDENDUM SHALL BE INCORPORATED AS A CHANGE IN THE SWPPP IMMEDIATELY UPON APPROVAL BY COUNTY OFFICIALS.
STEEL PLATE THICKNESS = 0.25" MIN
STEEL PLATE WIDTH = PIPE DIA. X 2
TYPOCAL STEEL BASE
PLATE. 3.14-3
APPROVED
by the Albemarle County
Community Development Department
Date 07/02/2020
File WP0201900039, Amendment 1 (ESCP only)
Approval pertains to ESC Plan only
PROPOSED EROSION AND
SEDIMENT CONTROL LEGEND
SAE SAFETY FENCE (3.01)
CE CONSTRUCTION ENTRANCE (3.02)
CRS CONSTRUCTION ROAD STABILIZATION (3.03)
SE SILT FENCE (3.05)�-X---]
IP STORM DRAIN INLET PROTECTION (3.07)
CIP
CULVERT INLET PROTECTION (3.08)
DD
TEMPORARY DIVERSION DIKE (3.09)�
ED
TEMPORARY FILL DIVERSION (3.10)�
ST
SEDIMENT TRAP (3.13)
ST
TO
TOP SOILING (3.30)
TO
TS
TEMPORARY SEEDING (3.31)
TS
PS PERMANENT SEEDING (3.32) PS
MU MULCHING (3.35) MU
DC DUST CONTROL (3.39) DC
SB SEDIMENT BASIN (3.14)
CD ROCK CHECK DAM (3.20)
LIMITS OF DISTURBANCE
SEDIMENT BASIN DRAINAGE AREA
H OF0
�
1
C SETH 1. ODERICK
Lic. No. 041454 W 2
O� W
July 1, zozo
��
No.
Description
Date
1
County
Review
Comments
8/02/19
2
County
Review
Comments
9/19/19
3
County
Review
Comments
1 1 /06/19
4
County
Review
Comments
11/21/19
5
County
Review
Comments
4/9/2020
6
Erosion
Control
Addendum
6/3/2020
7
Sediment
Basin
Addendum
6/15/2020
8
Sediment
Basin
Addendum
7/1/2020
PRELIMINARY ISSUE
NOT FOR CONSTRUCTION
ESC/PPP
ADDENDUM
Project number
Date
Drawn by
Checked by
19004C
June 21, 2019
ETS
SOR
C-3-01 -ADD,
13.24 AC DISTURBED AREA