Loading...
HomeMy WebLinkAboutSDP200500054 Action Letter 2005-09-26LrRGltsl�` COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 September 23, 2005 David Jensen WW Associates 1402 Greenbrier Place Charlottesville, VA 22901 RE: SDP - 2005 -0054 Westhall Phase 4 Townhouses Preliminary Site Plan Dear Sir: The Department of Community Development hereby grants administrative approval to the above referenced site plan. The approval of the preliminary site plan is valid for (1) one year in accordance with Section 32.4.3.1 of Chapter 18 of the Albemarle County Code. Therefore, the preliminary approval shall expire on September 23, 2006. If the preliminary site plan approval expires, a new application must be filed and processed. Please address all of the requirements and conditions listed below and submit eight (8) tentative plan copies to the Department of Community Development. This letter must be submitted with the tentative plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative plan will be denied. Erosion and Sediment Control, BMP Stormwater Management, and road plans with the associated applications and fees must also be submitted with the eight (8) tentative Plans. Once the tentative plan is submitted and reviewed you will receive comments from all departments /divisions /agencies that have made comment on the tentative plan. Any further responses must be made directly to each department /division/agency that has further comment. After all aforementioned departments /divisions /agencies have granted tentative approval, you must verify with the Planner that you may submit the final mylars (2 sets), paper copies (2 sets), the final site plan application, and final site plan fee to the Department of Community Development. Signing of the plans will occur within one week once it is determined that the final site plan mylars reflect all tentative approvals. The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in addition to the following conditions. The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained: Zoning & Current Development approval to include: ❑ [18- 32.6.3] Approval of a landscape plan in compliance with Section 32.7.9; ❑ [I 8-32.6.6.j and 18 -4.17] Submittal of a description and photograph or diagram and show the location of each type of outdoor luminaire that emits 3,000 or more initial lumens. Please be aware that installation of such luminaires in the future that are not shown on this plan shall require an amendment to this plan; ❑ [I 8-32.6.6.j and 18 -4.17] Submittal of a photometric plan on the site plan demonstrating that parking area luminaires are in compliance with 4.17.4.b ❑ [4.16] Approval and construction of the recreation area required for this multifamily development that will be physically installed in a portion of Phase 5 south of the proposed stormwater in Phase 5 and adjacent to Westhall Drive. Please contact Francis MacCall at 296 -5832 if you have questions or require additional information. Engineering approval to include: ❑ [I 8-32.5.6k] Concentrated flow will not be allowed to cross the internal streets of the site plan. It appears concentrated flows will cross the travel lanes at several locations; ❑ [18- 32.5.6k] The proposed SWM facilities in Phase I and H do not include the entire drainage area for Phase IV. Please provide conceptual SWM quantity and quality for the entire area for Phase IV. This includes showing the proposed drainage areas for Phase IV on a preliminary plan sheet; ❑ [ 18- 32.7.2.8,DM, Section 61OA] Please revise the sidewalks to a minimum width of five (5) feet. Note 8, on the cover sheet, will need to be revised as well. The most recent CG -12 detail from the VDOT Road and Bridge Standards, 2001 Edition (Page 203.06, insertable sheet A59, rev. date 03 -03) states a five (5) foot minimum width for sidewalks. "Sidewalks will be designed and constructed according to VDOT standards unless otherwise provided herein ", ❑ SWM computations for Facility B will be resubmitted in accordance with 19 August 2005 letter from David Jensen, PE and, ❑ All applicable items as specified in the Design Standards Manual, Section 902 B. Please contact Allan Schuck at 296 -5832 if you have questions or require additional information. Albemarle County Service Authority approval to include: ❑ Final water and sewer plans are required for review and approval prior to granting tentative approval. Please contact Gary Whelan at 977 -4511 if you have questions or require additional information. Fire & Rescue approval to include: ❑ [14-521] Verify Adequate fire flow is available. Required fire flow is 2000 GPM @ 20 PSI. Please contact James Barber at 296 -5833 if you have questions or require additional information. VDOT approval to include: ❑ Final approval is needed for all roads and entrances. Please contact Charles Proctor at 293 -0014 if you have questions or require additional information. Sincerely, Francis H MacCall Senior Planner Zoning & Current Development File: SDP - 2005 -054 Cc: Owner /Applicant: SHIFLETT FARM LLC/FRANK STONER 1412 SACHEM PLACE SUITE 301 CHARLOTTESVILLE VA 22901